CN100594158C - Method for mounting large-scale gangplank of ro-ro vessel - Google Patents

Method for mounting large-scale gangplank of ro-ro vessel Download PDF

Info

Publication number
CN100594158C
CN100594158C CN200710053182A CN200710053182A CN100594158C CN 100594158 C CN100594158 C CN 100594158C CN 200710053182 A CN200710053182 A CN 200710053182A CN 200710053182 A CN200710053182 A CN 200710053182A CN 100594158 C CN100594158 C CN 100594158C
Authority
CN
China
Prior art keywords
welding
springboard
rocker bar
bar bearing
hinge
Prior art date
Application number
CN200710053182A
Other languages
Chinese (zh)
Other versions
CN101269696A (en
Inventor
李丽丽
南平
罗国胜
李金波
汪勇军
廖全勇
向安玉
陶桓林
陈爱国
Original Assignee
中国葛洲坝集团机械船舶有限公司
李丽丽
南平
罗国胜
李金波
汪勇军
廖全勇
向安玉
陶桓林
陈爱国
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国葛洲坝集团机械船舶有限公司, 李丽丽, 南平, 罗国胜, 李金波, 汪勇军, 廖全勇, 向安玉, 陶桓林, 陈爱国 filed Critical 中国葛洲坝集团机械船舶有限公司
Priority to CN200710053182A priority Critical patent/CN100594158C/en
Publication of CN101269696A publication Critical patent/CN101269696A/en
Application granted granted Critical
Publication of CN100594158C publication Critical patent/CN100594158C/en

Links

Abstract

The invention relates to a method used for mounting a large-scale springboard of a Ro-Ro ship. The major technics of the invention is that gemel supporting seat holes are bored first, then the assembly is carried out, and positioning dummy spindles are adopted to carry out the positioning and the installation of a plurality of gemel supporting seats. Reasonable technics of controlling the weldingdeformation is made and carried out to guarantee the assembly accuracy as well as to regulate the welding deformation, so that the installation accuracies of the coaxiality among gemels, the openingsof gemels, the axes verticality, etc. and the construction quality are met the design requirements.

Description

A kind of method that is used for the large-scale gangplank of ro-ro vessel installation

Technical field

The present invention relates to the method that large-scale gangplank of ro-ro vessel is installed.

Background technology

Great the equipment transportation in roll-on-roll-off ship such as Three Gorges roll-on-roll-off ship springboard carrying rolling cargo single-piece weighs 734 tons, long 14 meters of its structure, wide 12 meters, thick 0.7 meter, conduct oneself with dignity 100 tons, design has 7 pairs of forged steel hinges between springboard and hull stem, and every pair of hinge weighs 4.2 tons, and hinge and hull stem, springboard rear end are adopted and be welded to connect.Large-scale roll-on-roll-off ship springboard deadweight such as 60 parking stalls, Chuanjiang River is many, and every pair of hinge weight mostly is welded-steel plate construction about 1 ton about 50 tons, and the right alignment between each hinge, opening and axis verticality are less demanding, adopt single hinge to install respectively.And big for hinge arrangement, the demanding roll-on transport ship of setting accuracy, single installation welding process can not meet the demands.

Summary of the invention

The objective of the invention is to provide a kind of right alignment that can guarantee better that the springboard hinge is installed,, satisfy the method that large-scale gangplank of ro-ro vessel is installed that is used for of engineering design needs in the hope of improving the service life of springboard and hinge.

The object of the present invention is achieved like this: a kind of method that is used for the large-scale gangplank of ro-ro vessel installation,

The location of hinge:

1) adopt thick-walled seamless steel pipes to make the location dummy shaft, the location dummy shaft is with drawing sign indicating number to be linked to be integral body,

2) make the positioning sleeve of locating between dummy shaft cylindrical and bearing endoporus, circle is transition fit with location dummy shaft cylindrical, cylindrical and bearing endoporus in the positioning sleeve,

3) make the location drift that adapts with opened gap, make first rocker bar bearing and the second rocker bar bearing opened gap towards on one side,

4) make the dummy shaft positioning support, be used to locate the fixing of dummy shaft,

Assembling, welding:

1) set up hinge erection work platform in the bow bottom, deliver for a check center and stringcourse, on first shrouding, draw first rocker bar bearing (1) horizontal center line, spacing dimension line and locating support line of position are installed by hull,

2) press process and on the springboard shrouding, draw second rocker bar bearing installation horizontal center line, spacing dimension line,

3) on first shrouding of hull and springboard shrouding, hold mounting hole with carbon arc air gouging successfully according to process, bevel for welding carried out reconditioning,

4) the whole pairing of first rocker bar bearing and second rocker bar bearing, bearing pin is not adorned, urgent location drift, check meets the requirements the back with interim sign indicating number plate firm welding, draws good install check line and center-punching,

5) integral hoisting first rocker bar bearing and second rocker bar bearing be in the hull mounting hole, and establish below every cover rocker bar bearing and regulate jack in the erecting stage upper support,

6) change the circle place on the bow both sides and establish support, draw hinge that theoretical centerline is installed with steel wire, adjusting dummy shaft locating support and hinge mounting center overlaps with theoretical center, do mark after meeting the requirements, with every pair of hinge location dimension of transit survey and record, to locate dummy shaft two end support tack weldings then connects

7) pass location dummy shaft and positioning sleeve, will locate dummy shaft, positioning sleeve is pressed in second rocker bar bearing, adjust two rocker bar bearing spacings, regulate jack and be supported in all the time on the erecting stage with clamp with drawing the sign indicating number seat to be linked to be integral body,

8) compare with every pair of hinge location dimension of theodolite repetition measurement and with former record,

9) set up the springboard erecting stage with berth bogie, hang the springboard upper mounting plate, measure, adjust springboard height and side-to-side dimensions, make it to align with the oriented hinge of hull,

10) mobile berth bogie platform and springboard all insert springboard, meet installation requirement until first rocker bar bearing,

11) in bow side and springboard side first rocker bar bearing, second rocker bar bearing are positioned weldering, weld by technological requirement then, postwelding eliminates stress with hammering, monitors each spot size situation with theodolite when welding,

Springboard assembling and installation:

Adopt berth bogie to set up the springboard erecting stage and carry out springboard assembling and installation, with convenient position adjustments springboard.

The method that is used for the large-scale gangplank of ro-ro vessel installation provided by the invention, adopt first bore hole to assemble welding again, utilize the method for dummy shaft auxiliary positioning, guaranteed the right alignment that the springboard hinge is installed, improved the service life of springboard and hinge, for the installation of boats and ships large-scale gangplank from now on provides the reliable technique technology ensuring.

Description of drawings

The invention will be further described below in conjunction with drawings and Examples.

Fig. 1 is the structural representation of springboard hinge axis of the present invention.

Fig. 2, Fig. 3 are the structural representations of springboard rocker bar bearing of the present invention.

Fig. 4 is a springboard hinge scheme of installation of the present invention.

Top, lower position two weld seam sequence of welding scheme drawings when Fig. 5 is vertically vertical compound plate of the present invention and hinge welding.

Fig. 6 is horizontal brace panel of the present invention and hinge overhead welding sequence of welding scheme drawing.

The specific embodiment

1. hinge processing, installation specification

Springboard first rocker bar bearing 1, springboard second rocker bar bearing 2 and 3 technical requirementss of springboard hinge axis are as follows:

1) first rocker bar bearing, 1 A/F 272mm, second rocker bar bearing, 2 insertion end width 270mm consider free tolerance, first rocker bar bearing, 1 A/F is by 272 + 3Mm, second rocker bar bearing, 2 insertion end width are by 270 -0.5Mm processing.

2) first rocker bar bearing 1, second rocker bar bearing, 2 pan sizes are pressed φ 260 + 0.2Mm, the hinge axis size is pressed φ 258 -0.2Mm processing.

3) squareness of first rocker bar bearing, 1 pan axis and opening finished surface, second rocker bar bearing, 2 pan axis and insertion end finished surface all is not more than 0.2mm.

4) 7 pairs of hinges are installed right alignment and are not more than φ 2.4mm.

5) 7 pairs of hinge installing space errors are less than 1mm.

2. locate the dummy shaft mount scheme

Center-to-center distance is 1.8 meters between per two hinges, and width between centers is 10.8 meters between two limit hinges of port and starboard, totally 7 pairs of hinges.In order to reach the setting accuracy requirement, adopt solid drawn pipe to make the location dummy shaft 4 that can connect 7 pairs of hinges, on technology, connect into 12 meters axis by drawing the sign indicating number seat by three axles, hinge position edge positioning sleeve, the making precision of package unit satisfies the requirement of hinge setting accuracy, by closely cooperating of positioning sleeve 5 and each pair hinge endoporus on the dummy shaft 4 of location, make each pair hinge endoporus be positioned at same axis, opening and insertion end finished surface and guarantee assembly precision perpendicular to axis; Control welding deformation by taking the welding process measure.When welding, the location dummy shaft has certain corrective action to welding deformation, and postwelding is hammering weld seam residual stress relieving successively.Special frock of making is:

1) make φ 215 * 3700, φ 215 * 4600, φ 215 * 3690 location 4 three of dummy shafts (employing thick-walled seamless steel pipes), three dummy shafts are with drawing the sign indicating number seat to be linked to be integral body.

2) positioning sleeve between making location dummy shaft 4 cylindricals and bearing endoporus is 50 four, and circle is transition fit with dummy shaft cylindrical, cylindrical and bearing endoporus in the positioning sleeve 5.

3) make 7 seven of the location drifts that adapt with opened gap, make first rocker bar bearing 1 and second rocker bar bearing, 2 opened gaps towards one side.

4) make 6 two of dummy shaft positioning supports, be used to locate the fixing of dummy shaft 6.

3 assemblings, welding

1) sets up hinge erection work platform in the bow bottom, deliver for a check center and stringcourse, on first shrouding, draw hinge first rocker bar bearing 1 horizontal center line, spacing dimension line and locating support line of position are installed by hull.

2) press process and on the springboard shrouding, draw second rocker bar bearing, 2 installation horizontal center lines, spacing dimension line.

3) on first shrouding of hull and springboard shrouding, hold mounting hole (shrouding is an interlayer) with carbon arc air gouging successfully according to process, with oxyacetylene metal-cutting flame, the good bevel for welding of polishing lathe reconditioning.

4) first rocker bar bearing 1 and the 2 whole pairings of second rocker bar bearing, bearing pin is not adorned, urgent location drift 7, check meets the requirements the back with interim sign indicating number plate firm welding, draws good install check line and center-punching.

5) integral hoisting hinge first rocker bar bearing 1 and second rocker bar bearing 2 be in the hull mounting hole, establishes 4 below every cover rocker bar bearing to regulate jacks in the erecting stage upper support.

6) change the circle place on the bow both sides and establish support, draw hinge that theoretical centerline is installed, adjust dummy shaft locating support and 7 pairs of hinge mounting center and overlap with theoretical center with steel wire.Do mark after meeting the requirements, with every pair of hinge location dimension of transit survey and record.To locate the 6 location welding of 4 liang of end supports of dummy shaft then.

7) wear three location dummy shafts 4 and positioning sleeve 5, draw sign indicating number seat 7 to be linked to be integral body dummy shaft 4 usefulness, positioning sleeve is pressed in the rocker bar bearing with clamp.Adjust the rocker bar bearing spacing with turnbuckle, guarantee that its center-to-center distance is 1800mm, deviation is not more than 1mm.Regulating jack for 4 is supported on the erecting stage all the time.

8) compare with every pair of hinge location dimension of theodolite repetition measurement and with former record.

9) set up the springboard erecting stage with berth bogie, hang the springboard upper mounting plate, measure, adjust springboard height and side-to-side dimensions, make it to align with the oriented hinge of hull.

10) mobile berth bogie platform and springboard all insert springboard, meet installation requirement until first rocker bar bearing 1.

11) in bow side and springboard side first rocker bar bearing 1, second rocker bar bearing 2 are positioned weldering, weld by technological requirement then, postwelding eliminates stress with hammering.When welding, monitor each spot size situation with theodolite.

4. the welding process of springboard rocker bar bearing

Because the welding that is welded as full position continuous weld of springboard first rocker bar bearing 1 and second rocker bar bearing 2, and weld seam is concentrated relatively, on-the-spot welding condition difficulty, the welding narrow space, under the prerequisite that guarantees welding quality, can not produce excessive welding deformation, and eliminate welding residual stress, in order to avoid influence the assembling running of integral hinge bearing, so will on welding process, take measures necessary, Given this on-site actual situations of workpiece welding is the welding quality of assurance weld seam, and technology is instructed in the following welding of special establishment.

4.1 the weld seam requirement between rocker bar bearing and springboard, hull, reinforced rib

With the attachment weld of hinge be the one-level melt-through weld, between other gusset and the attachment weld between gusset and hull structure, the springboard structure be the one-level continuous weld.All one-level penetration weld weld seams need be made UT and check, adopt super sonic as far as possible, adopt magnetic particle inspection can not adopting under the hypracoustic situation; All one-level continuous welds can adopt the form of continuous single fillet welding or plug welding, only make the exterior check of weld seam.Concrete each position welding requirements is:

4.1.1 carrying out electric welding by the design paper requirement, rocker bar bearing and bow transom plate and compound plate, springboard end floor beam and compound plate girth joint fill up;

4.1.2 vertically vertical compound plate and hinge carry out electric welding by the design paper requirement and fill up; Vertically vertical compound plate and hull or springboard structure overlapping weld are by the welding of one-level continuous weld;

4.1.3 laterally vertical brace panel and hull structure weld seam adopt by the one-level continuous weld The type groove type, the vertical position welding welding;

4.1.4 laterally vertical brace panel and hinge adopt by the welding of one-level melt-through weld The type groove type, welding all around;

4.1.5 vertically vertical reinforced rib in springboard hinge both sides and the welding of springboard structure are by the welding of one-level continuous weld;

4.1.6 horizontal brace panel adopts with laterally vertical brace panel welding with springboard structure, horizontal brace panel with hull structure, horizontal brace panel The type groove type, the overhead welding welding, weld seam is a continuous weld;

4.1.7 horizontal brace panel and hinge adopt The type groove type, the overhead position welding, weld seam is the one-level melt-through weld.

4.2 the assembling of parts, sequence of welding and survey requirement

The assembling of hinge and hull and springboard structure and each parts of gusset and sequence of welding and survey requirement are:

The first step: bow and springboard hinge location;

Second step: bow and the vertical vertical compound plate in springboard hinge center are installed;

The 3rd step: vertically vertical compound plate and hull or the welding of springboard structure; Vertically vertical compound plate and hinge carry out electric welding by the design paper requirement and fill up; Rocker bar bearing and bow transom plate and compound plate, rocker bar bearing and springboard end floor beam and compound plate girth joint carry out electric welding by the design paper requirement and fill up; Weld inspection;

The 4th step: the laterally vertical compound plate of bow is installed, laterally vertical compound plate and hull structure welding; Laterally vertical compound plate and hinge welding; Weld inspection;

The 5th step: the vertically vertical reinforced rib in springboard hinge both sides is installed, vertically vertical reinforced rib and the welding of springboard structure; Weld inspection;

The 6th step: bow or the horizontal brace panel in springboard hinge place are installed, horizontal brace panel and hull structure, horizontal brace panel and springboard structure, horizontal brace panel and the overhead welding of hinge single face, weld inspection;

The 7th step: the plug welding of springboard base plate shrouding, check.

4.3 welding process requirement

4.3.1, welding method: covered arc welding, welding rod: J426, specification: φ 3.2mm, φ 4.0mm

4.3.2, welding conditions: welding current (I): 140A-180A (downhand welding); 110A-150A (face upward, vertical position welding)

Arc voltage (V): 22-28; Welding speed (cm/ root): 7-9

Adopt direct supply, welding rod connects positive pole.

4.3.3 welding measure

1. welding surroundings

During the wind speed 〉=2m/sec in welding place, should take the measure of keeping out the wind; Relative humidity>90% o'clock in welding place must not weld; Use the scope of oxyacetylene torch oven dry groove and peripheral 50mm thereof before the welding; During room temperature<0 ℃ in welding place, welding in the open.

2. the cleaning of welding rod, groove and periphery thereof

Welding rod cures 60min under 300~350 ℃, and uses the heat-preservation cylinder device, once adorns 15-20 root bead bar, ready access upon use; Slag, greasy dirt, water mark etc. are removed clean.Groove and peripheral 50mm scope planted agent thereof be strict to remove oil, rust, water, dirt, stopping the source of the diffusible hydrogen in the weld metal as far as possible, thereby pore and hydrogen induced cracking do not occur in the assurance weld seam.

3. preheating

Be the rate of cooling that slows down, reduce the degree of hardening of welded joint, prevent the generation of crackle; Dwindle the temperature difference of heat affected zone, in the scope of broad, obtain the comparison even temperature and distribute, reduce the Yin Wendu difference and the welding residual stress that causes and the crackle that causes produces.

4. temperature control between weld layer (road)

Temperature should be controlled between 140-200 ℃ between weld layer (road).Thick for preventing to cause the crystal grain of weld metal and heat affected zone, make their toughness and plasticity descend.

4.3.4 welding principle:

1. weld fundamental principle: adopt segmentation, subregion symmetrical welding, first backing welding, multi-pass welding is divided in the plug welding position, adopts little standard electric current welding, and every weldering finishes one deck, knocks with hand hammer, to eliminate welding stress.

Symmetry: first rocker bar bearing 1 and second hinged-support, 2 two ends are respectively by 2 qualification welder's symmetrical weldings; Seven pairs of hinges weld simultaneously, will guarantee that at least three pairs of hinges of 1,3,5 positions weld simultaneously under the not enough situation of welder's quantity, and two pairs of hinges that carry out 2,4 positions then weld simultaneously.

Segmentation: circumferential weld segmentation and symmetrical welding;

Subregion: many weld seams of the same side are wanted the skip welding of subregion symmetry.

2. spot welding principle: spot welding is firm, and the location is correct, and the weldering height is no more than 5mm, and spot welding length is in the 30mm-50mm scope.

4.3.5 the welding manner at concrete position

The rocker bar bearing assembling is firmly located under the correct situation and is welded, and first rocker bar bearing 1 and second rocker bar bearing 2 respectively arrange a welder to weld simultaneously, and whole ship welds in the frock position.

The first step: vertically vertical compound plate and hinge electric welding by drawing fill up, and the sequence of welding of top, lower position two weld seams is: 1. → 2. → 3. → 4. → 5. → 6.

Second step: the welding of rocker bar bearing and ship shrouding and compound plate.

I, weld preheating: with grilled gun preheating in the scope of the 120mm of weld seam both sides;

II, the bottoming of first road, it is the welding rod of φ 3.2mm that backing welding is selected diameter for use, adopts little standard electric current welding.Sequence of welding: 1. → 2. → 3. → 4.;

III, by same mode sealing weld 3~4 roads again; Capping 2 road mode such as Fig. 5, selecting diameter for use is the welding rod of φ 4mm,

The welding in IV, plug welding hole adopts interval, subregion to be symmetrically welded;

The 3rd step: the welding of rocker bar bearing and springboard end floor beam and compound plate, the bottoming of first road, it is the welding rod of φ 3.2mm that backing welding is selected diameter for use, adopts little standard electric current welding.Sequence of welding: 1. → 2. → 3. → 4.; Press same mode sealing weld 1 road again; Capping 1 road, selecting diameter for use is the welding rod of φ 4mm,

The 4th step: the welding of laterally vertical compound plate and hull or springboard, selecting diameter for use is the welding rod of φ 4mm, continuous single fillet welding connects, the welding of first vertical position of welding, the welding of overhead position is carried out in from bottom to top symmetrical skip welding again, and welding finishes together.See Fig. 2.

The 5th step: the welding of laterally vertical compound plate and rocker bar bearing.The bottoming of first road, it is the welding rod of φ 3.2mm that backing welding is selected diameter for use, adopts little standard electric current welding.Sequence of welding: 1. → 2. → 3. → 4.; By same mode capping 1 road, selecting diameter for use is the welding rod of φ 4mm,

The 6th step: the vertically vertical reinforced rib of hinge both sides and the welding of springboard structure, selecting diameter for use is the welding rod of φ 4mm, continuous single fillet welding connects, the welding of first vertical position of welding, the welding of overhead position is carried out in from bottom to top symmetrical skip welding again, and welding finishes together.

The 7th step: the welding of horizontal brace panel and springboard or hull structure, adopt single face to weld in the overhead position continuously, selecting diameter for use is the welding rod of φ 4mm, welding finishes together.

The 8th step: the overhead welding of horizontal brace panel and hinge, selecting diameter for use is the welding rod of φ 3.2mm 1 road that feels secure, selecting diameter for use is that welding rod capping 1 road of φ 4mm welds and finishes.Sequence of welding is as shown in Figure 6:

The 9th step: carry out the shrouding plug welding of springboard base plate.

4.3.6 weld inspection

After each welding finishes, butt welded seam carries out exterior check, the presentation quality of weld seam should meet the regulation of related specifications, after presentation quality is qualified, need carry out that UT checks, carry out flaw detection with super sonic or magnetic butt welded seam on request, it is qualified reaching one-level with hinged penetration weld weldquality grade; It is qualified that its presentation quality of sequential welding reaches one-level

5 checking situations

1) adopt said method to construct through timeliness after 15 days, positioning sleeve can easily take out with the M16 bolt, and hinge pin can freely be installed, and need not external force roof pressures such as jack.

2) after 7 pairs of hinges are installed,, quality inspection meets the requirements through being installed, springboard landing test, and hinge through is flexible.

3) at right bank Yang Jia gulf, Three Gorges harbour through real ship heavy-duty test, springboard and hinge operation conditions are good.The preliminary examination of engineering is once qualified.

Claims (1)

1, a kind of method that is used for the large-scale gangplank of ro-ro vessel installation is characterized in that:
The location of hinge:
1) adopt thick-walled seamless steel pipes to make location dummy shaft (4), location dummy shaft (4) is with drawing sign indicating number to be linked to be integral body,
2) make the positioning sleeve (5) of locating between dummy shaft (4) cylindrical and bearing endoporus, circle is transition fit with location dummy shaft (4) cylindrical, cylindrical and bearing endoporus in the positioning sleeve (5),
3) make the location drift (7) that adapts with opened gap, make first rocker bar bearing (1) and second rocker bar bearing (2) opened gap towards on one side,
4) make dummy shaft positioning support (6), be used to locate the fixing of dummy shaft (4),
Assembling, welding:
1) set up hinge erection work platform in the bow bottom, press hull verification center and stringcourse, on first shrouding, draw first rocker bar bearing (1) horizontal center line, spacing dimension line and locating support line of position are installed,
2) press process and on the springboard shrouding, draw second rocker bar bearing (2) installation horizontal center line, spacing dimension line,
3) on first shrouding of hull and springboard shrouding, hold mounting hole with carbon arc air gouging successfully according to process, bevel for welding carried out reconditioning,
4) first rocker bar bearing (1) and the whole pairing of second rocker bar bearing (2), bearing pin is not adorned, urgent location drift (7), check meets the requirements the back with interim sign indicating number plate firm welding, draws good install check line and center-punching,
5) integral hoisting first rocker bar bearing (1) and second rocker bar bearing (2) be in the hull mounting hole, and establish below every cover rocker bar bearing and regulate jack in the erecting stage upper support,
6) change the circle place on the bow both sides and establish support, draw hinge that theoretical centerline is installed with steel wire, adjusting dummy shaft locating support (6) and hinge mounting center overlaps with theoretical center, do mark after meeting the requirements, with every pair of hinge location dimension of transit survey and record, to locate the welding of dummy shaft (4) two end supports (6) location then
7) pass location dummy shaft (4) and positioning sleeve (5), to locate dummy shaft (4) with drawing sign indicating number seat (7) to be linked to be integral body, positioning sleeve (5) will be pressed in second rocker bar bearing (2), adjust two rocker bar bearing spacings with clamp, regulating jack is supported on the erecting stage all the time
8) compare with every pair of hinge location dimension of theodolite repetition measurement and with former record,
9) set up the springboard erecting stage with berth bogie, hang the springboard upper mounting plate, measure, adjust springboard height and side-to-side dimensions, make it to align with the oriented hinge of hull,
10) mobile berth bogie platform and springboard all insert springboard, meet installation requirement until first rocker bar bearing (1),
11) in bow side and springboard side first rocker bar bearing (1), second rocker bar bearing (2) are positioned weldering, weld by technological requirement then, postwelding eliminates stress with hammering, monitors each spot size situation with theodolite when welding,
Springboard assembling and installation:
Adopt berth bogie to set up the springboard erecting stage and carry out springboard assembling and installation, with convenient position adjustments springboard.
CN200710053182A 2007-09-07 2007-09-07 Method for mounting large-scale gangplank of ro-ro vessel CN100594158C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710053182A CN100594158C (en) 2007-09-07 2007-09-07 Method for mounting large-scale gangplank of ro-ro vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710053182A CN100594158C (en) 2007-09-07 2007-09-07 Method for mounting large-scale gangplank of ro-ro vessel

Publications (2)

Publication Number Publication Date
CN101269696A CN101269696A (en) 2008-09-24
CN100594158C true CN100594158C (en) 2010-03-17

Family

ID=40003986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710053182A CN100594158C (en) 2007-09-07 2007-09-07 Method for mounting large-scale gangplank of ro-ro vessel

Country Status (1)

Country Link
CN (1) CN100594158C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102990238B (en) * 2012-11-22 2015-04-08 宝鸡石油机械有限责任公司 Manufacture method of large span group-hole member
CN104339067A (en) * 2013-08-07 2015-02-11 上海市沪东锻造厂有限公司 Special steel welding process
CN103862235B (en) * 2014-02-26 2016-03-30 招商局重工(江苏)有限公司 A kind of preparation method of self-elevating drilling platform cantilever beam track
CN105438400A (en) * 2015-10-27 2016-03-30 沪东中华造船(集团)有限公司 Mounting method for large movable ramp
CN105438403B (en) * 2015-10-27 2018-04-24 沪东中华造船(集团)有限公司 The installation method on rolling dress activity car deck
CN105438404B (en) * 2015-10-27 2018-07-10 沪东中华造船(集团)有限公司 A kind of installation method of large size stern springboard
CN106494565A (en) * 2016-11-25 2017-03-15 沪东中华造船(集团)有限公司 The installation method in watertight ramp in a kind of shipbuilding
CN106628009B (en) * 2017-01-04 2018-12-04 江南造船(集团)有限责任公司 A kind of mounting tool and installation method of ship opening and closing hinge
CN110605422A (en) * 2019-09-24 2019-12-24 上海华润大东船务工程有限公司 Precision control process for on-site high-precision boring of hinge

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
江海直达滚装船尾跳板门的设计探讨. 方宁.船海工程,第1992年第2期. 1992
江海直达滚装船尾跳板门的设计探讨. 方宁.船海工程,第1992年第2期. 1992 *
滚装船固定行驶跳板优化设计. 黄金星等.广船科技,第1999年第3期. 1999
滚装船固定行驶跳板优化设计. 黄金星等.广船科技,第1999年第3期. 1999 *

Also Published As

Publication number Publication date
CN101269696A (en) 2008-09-24

Similar Documents

Publication Publication Date Title
CN101967886B (en) Assembly and installation methods of steel containment vessel of nuclear power station
CN205371829U (en) A multilayer pipeline gallows convenient to equipment
CN102184747B (en) Modular steel containment vessel annular hanging beam and assembling method thereof
CN101956457B (en) Method for constructing rectangular steel pipe concrete column
CN104858555A (en) Pressure pipeline welding process
CN101811553A (en) Preparation and on-board installation process of crane span of cutter suction dredger
CN101688638B (en) A tank structure
CN102296728A (en) Double-steel plate structure shear wall and construction method thereof
CN102167137B (en) Method for positioning independent cargo space and carrier body of asphalt carrier
CN201217140Y (en) Pipeline welding interfacing apparatus
CN101368220B (en) Novel structured metallurgy cinder ladle and method of producing the same
CN101544268B (en) Method for half-breadth double-span total assembling and building in shipbuilding
CN106624639B (en) A kind of large size valve and pre-splicing shorts circuit of large-diameter pipeline makes and hanging method
CN101537564B (en) Pairing method of H-section steel for super-large crane beams
CN101376431B (en) Method for mounting main unit with resilient support
Roland et al. Advanced joining techniques in European shipbuilding
CN105952032B (en) A kind of Multicarity steel plate shear force wall and its operating method
CN102513664B (en) Actual ship assembly welding process for ultra-large high-precision base
CN102029473B (en) Aerological welding method of steel sleeve
CN102431626A (en) Installation method of overlong twin-skeg structure segment and shaft bracket dock
CN101898292B (en) Cold welding and repairing technology of crankshaft cracks of large reciprocating compressor by manual argon arc welding
CN102923252A (en) Full rotation steering oar device installation method
CN101890583A (en) Hydraulic jacking automatic welding inverted construction method of large-sized storage tank
CN105157980B (en) Bullet train drive-train gearbox reliability test bench
CN101748800A (en) Hydraulic lifting reverse method of chimney steel inner cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: GEZHOUBA MACHINERY INDUSTRY CO., LTD.

Free format text: FORMER OWNER: GEZHOUBA GROUP MACHINERY + SHIP CO., LTD. OF CHINA

Effective date: 20150701

Free format text: FORMER OWNER: LI LILI NAN PING LUO GUOSHENG LI JINBO WANG YONGJUN LIAO QUANYONG XIANG ANYU TAO HUANLIN CHEN AIGUO

Effective date: 20150701

TR01 Transfer of patent right

Effective date of registration: 20150701

Address after: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road

Patentee after: Ge Zhou Ba mechanical industry Co., Ltd

Address before: Two road 443000 Hubei city of Yichang province Qiao Lake No. 70

Patentee before: Machinery & Ship Co., Ltd., China Gezhouba Group

Patentee before: Chen Aiguo

Patentee before: Li Lili

Patentee before: Nan Ping

Patentee before: Luo Guosheng

Patentee before: Li Jinbo

Patentee before: Wang Yongjun

Patentee before: Liao Quanyong

Patentee before: Xiang Anyu

Patentee before: Tao Huanlin

Effective date of registration: 20150701

Address after: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road

Patentee after: Ge Zhou Ba mechanical industry Co., Ltd

Address before: Two road 443000 Hubei city of Yichang province Qiao Lake No. 70

Patentee before: Machinery & Ship Co., Ltd., China Gezhouba Group

Patentee before: Chen Aiguo

Patentee before: Li Lili

Patentee before: Nan Ping

Patentee before: Luo Guosheng

Patentee before: Li Jinbo

Patentee before: Wang Yongjun

Patentee before: Liao Quanyong

Patentee before: Xiang Anyu

Patentee before: Tao Huanlin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171228

Address after: 18 No. 443007 Hubei city in Yichang province Xiao Ting Road

Patentee after: Machinery & Ship Co., Ltd., China Gezhouba Group

Address before: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road

Patentee before: Ge Zhou Ba mechanical industry Co., Ltd

Effective date of registration: 20171228

Address after: 18 No. 443007 Hubei city in Yichang province Xiao Ting Road

Patentee after: Machinery & Ship Co., Ltd., China Gezhouba Group

Address before: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road

Patentee before: Ge Zhou Ba mechanical industry Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100317

Termination date: 20190907

CF01 Termination of patent right due to non-payment of annual fee