CN101929160A - 排岩修筑高散堆不透水尾矿坝的方法 - Google Patents

排岩修筑高散堆不透水尾矿坝的方法 Download PDF

Info

Publication number
CN101929160A
CN101929160A CN2009100121984A CN200910012198A CN101929160A CN 101929160 A CN101929160 A CN 101929160A CN 2009100121984 A CN2009100121984 A CN 2009100121984A CN 200910012198 A CN200910012198 A CN 200910012198A CN 101929160 A CN101929160 A CN 101929160A
Authority
CN
China
Prior art keywords
tailings
rock
rocks
dam
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009100121984A
Other languages
English (en)
Other versions
CN101929160B (zh
Inventor
李荣海
迟淑萍
李海臣
姜科
沈占功
范跃铁
陈进
王瑞
贾学智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Iron And Steel Group Mining Design And Research Institute Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN2009100121984A priority Critical patent/CN101929160B/zh
Publication of CN101929160A publication Critical patent/CN101929160A/zh
Application granted granted Critical
Publication of CN101929160B publication Critical patent/CN101929160B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明涉及一种排岩修筑高散堆不透水尾矿坝的方法,分析尾矿砂承载能力,设计双层钢筋混凝土防渗墙,防渗墙为双层钢筋混凝土框架结构,每层厚1.4-1.6米,双层防渗墙之间设有横墙,制作双层钢筋混凝土防渗墙基础,在尾矿砂至基岩段大孔径钻,使孔深入到基岩中,然后采用灌注柱的方式施工,防渗墙墙身采用现场浇注方式施工,在双层钢筋混凝土防渗墙的两侧及双层墙之间排岩,修筑不透水尾矿坝,初期坝散体岩石采用胶带运输和排放,推土机来回碾压,碾压后再在其上排岩,再碾压形成路堤,在排岩过程中以6%的坡度向上爬升至200-210m标高,后期坝散体岩石采用汽车运输和排放。本发明可增加尾矿库的容积,延长尾矿库的服务年限。

Description

排岩修筑高散堆不透水尾矿坝的方法
技术领域
本发明属于冶金矿山尾矿坝技术领域,特别是涉及一种排岩修筑高散堆不透水尾矿坝的方法。
背景技术
目前冶金矿山的尾矿库许多处于服务年限的末期,即处于将闭库或新选库址的关键阶段。尾矿库主要承担一个或者多个选矿厂的尾矿排放,它的服务年限和生产情况对矿山生产具有重大影响。随着铁矿山开采的不断进行,其界内的岩石量也越来越大,矿山现有的排土场将不能满足排岩要求,需增加排土场容积,为此需重新选择排土场,会涉及到大量动迁和征地的难题,投资巨大,采矿占地与农业争地的矛盾日益突出。同时对矿山周边地区的生态环境影响较大。
冶金矿山的尾矿坝都是采用上游式池填法尾矿砂筑坝,先筑初期坝,然后用尾矿砂修筑子坝,用此种方法修筑的尾矿坝存在的问题是:尾矿坝较高时,其抗震性和稳定性满足不了要求;且有效库容大量减少。
发明内容
本发明的目的是提供一种利用废弃排岩修筑高散堆不透水尾矿坝的方法,达到加高尾矿坝顶标高,解决矿山现有排土场容积不足的问题,延长其服务年限的目的。
本发明的排岩修筑高散堆不透水尾矿坝的方法,其特征在于包括下述步骤:
1)分析尾矿砂承载能力
根据胶带排岩的物理力学性质,尾矿砂试验所得的物理力学指标,通过勃兰特(L.Prandtl)公式进行尾矿砂承载力计算。
2)设计双层钢筋混凝土防渗墙
所述的防渗墙为双层钢筋混凝土框架结构,双层防渗墙之间设有横墙。
3)制作双层钢筋混凝土防渗墙基础
在尾矿砂至基岩段大孔径钻孔,使孔深入到基岩中,然后采用灌注桩的方式施工。
4)制作双层钢筋混凝土防渗墙墙身,采用现场浇注方式施工,
5)采用胶带机和大型移动式排土机在双层钢筋混凝土防渗墙的两侧及双层墙之间排岩,修筑不透水尾矿坝,
初期坝散体岩石采用胶带运输和排放,采用推土机来回碾压,压平,压实,在碾压的过程中,视岩石的湿度适当地洒水,碾压后再在其上排岩,再碾压形成路堤,在排岩过程中以6%的坡度向上爬升至200-210m标高(设计标高200米,但为了沉降,需要预先排到210米标高),后期坝散体岩石采用汽车运输和排放,
6)采用推土机对设置的马道适当进行整平。
所述防渗墙的厚度为1.4m-1.6m。
所述的初期坝顶宽90m,终期可达200m,边坡坡度为1∶1.5,角度为33.69°,每10m高设5m宽的马道。
所述的尾矿砂承载力计算的结果是尾矿层可以承载散料排岩体的最大高度为200m。
本发明采用双层钢筋混凝土防渗墙的结构修筑高散堆不透水尾矿坝,主要是为了满足高坝体水平推力、胶带机-大型移动式排土机作业和防渗的需要。
本发明的核心是排岩筑坝,即利用矿山排弃的碎石土为尾矿库筑坝,将矿山排土场和选矿厂尾矿库有效结合起来,可提高矿山现有土地的利用率,进而可增加矿山排土容积,解决铁矿山长期开采排土场容积不足的问题,减少排土场新征土地面积,同时也可增加尾矿库的容积,延长尾矿库的服务年限。其经济效益:以某铁矿山的选矿厂尾矿坝为例进行测算,项目在整个计算期内的经济效益现值为494156万元,年平均经济效益现值为19006万元。其社会间接效益:建设本项目可以减少土地占用1688.50万平方米,减少征地费用近57亿元;可以避免因征用土地、动迁建构筑物对当地居民和现有环境的影响和破坏,对建设和谐社会具有重要意义。项目运营后,直接和间接增加就业200多人,居民的收入水平和质量将得到很大提高,对区域经济具有重大意义。
附图说明
图1为本发明的结构示意图。
具体实施方式
下面结合实施例详细说明本发明的具体实施方式。
如图1所示,本发明的排岩修筑高散堆不透水尾矿坝的方法,其特征在于包括下述步骤:
1)分析尾矿砂承载能力
根据胶带排岩的物理力学性质,尾矿砂试验所得的物理力学指标,通过勃兰特(L.Prandtl)公式进行尾矿砂承载力计算,
2)设计双层钢筋混凝土防渗墙4
所述的防渗墙4为双层钢筋混凝土框架结构,双层防渗墙之间设有横墙,
3)制作双层钢筋混凝土防渗墙基础,
在尾矿砂1至基岩6段大孔径钻孔,使孔深入到基岩6中,然后采用灌注桩的方式施工,
4)制作双层钢筋混凝土防渗墙4墙身,采用现场浇注方式施工,
5)采用胶带机和大型移动式排土机在双层钢筋混凝土防渗墙4的两侧及双层墙之间排岩,修筑高散堆不透水尾矿坝,
初期坝2散体岩石采用胶带运输和排放,采用推土机来回碾压,压平,压实,在碾压的过程中,视岩石的湿度适当地洒水,碾压后再在其上排岩,再碾压形成路堤,在排岩过程中以6%的坡度向上爬升至200-210m标高(设计标高200m,但为了沉降,需要预先排到210m标高),后期坝5散体岩石采用汽车运输和排放,
6)采用推土机对设置的马道3适当进行整平。
所述防渗墙4的厚度为1.4m-1.6m。
所述的初期坝2顶宽90m,终期可达200m,边坡坡度为1∶1.5,角度为33.69°,每10m高设5m宽的马道3。
所述的尾矿砂1承载力计算的结果是尾矿层可以承载散料排岩体的最大高度为200m。
本发明的核心是排岩筑坝,即利用矿山排弃的碎石土为尾矿库筑坝,将矿山排土场和选矿厂尾矿库有效结合起来,可提高矿山现有土地的利用率,进而可增加矿山排土容积,解决铁矿山长期开采排土场容积不足的问题,减少排土场新征土地面积,同时也可增加尾矿库的容积,延长尾矿库的服务年限。其经济效益:以某铁矿山的选矿厂尾矿坝为例进行测算,项目在整个计算期内的经济效益现值为494156万元,年平均经济效益现值为19006万元。其社会间接效益:建设本项目可以减少土地占用1688.50万平方米,减少征地费用近57亿元;可以避免因征用土地、动迁建构筑物对当地居民和现有环境的影响和破坏,对建设和谐社会具有重要意义。项目运营后,直接和间接增加就业200多人,居民的收入水平和质量将得到很大提高,对区域经济具有重大意义。

Claims (4)

1.一种排岩修筑高散堆不透水尾矿坝的方法,其特征在于包括下述步骤:
1)分析尾矿砂承载能力
根据胶带排岩的物理力学性质,尾矿砂试验所得的物理力学指标,通过勃兰特(L.Prandtl)公式进行尾矿砂承载力计算,
2)设计双层钢筋混凝土防渗墙
所述的防渗墙为双层钢筋混凝土框架结构,双层防渗墙之间设有横墙,
3)制作双层钢筋混凝土防渗墙基础,
在尾矿砂至基岩段大孔径钻孔,使孔深入到基岩中,然后采用灌注柱的方式施工,
4)制作双层钢筋混凝土防渗墙墙身,采用现场浇注方式施工,
5)采用大型移动式胶带机和排土机在双层钢筋混凝土防渗墙的两侧及双层墙之间排岩,修筑不透水尾矿坝,
初期坝散体岩石采用胶带运输和排放,采用推土机来回碾压,压平,压实,在碾压的过程中,视岩石的湿度适当地洒水,碾压后再在其上排岩,再碾压形成路堤,在排岩过程中以6%的坡度向上爬升至200-210m标高,后期坝散体岩石采用汽车运输和排放,
6)采用推土机对设置的马道适当进行整平。
2.根据权利要求1所述的排岩修筑高散堆不透水尾矿坝的方法,其特征在于所述防渗墙的厚度为1.4m-1.6m。
3.根据权利要求1所述的排岩修筑高散堆不透水尾矿坝的方法,其特征在于所述的初期坝顶宽90米,终期可达200米,边坡坡度为1∶1.5,角度为33.69°,每10米高设5米宽马道。
4.根据权利要求1所述的排岩修筑高散堆不透水尾矿坝的方法,其特征在于所述的尾矿砂承载力计算的结果是主地基承载散料排岩体高度大于实际散料排岩体最大高度。
CN2009100121984A 2009-06-24 2009-06-24 排岩修筑高散堆不透水尾矿坝的方法 Expired - Fee Related CN101929160B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100121984A CN101929160B (zh) 2009-06-24 2009-06-24 排岩修筑高散堆不透水尾矿坝的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100121984A CN101929160B (zh) 2009-06-24 2009-06-24 排岩修筑高散堆不透水尾矿坝的方法

Publications (2)

Publication Number Publication Date
CN101929160A true CN101929160A (zh) 2010-12-29
CN101929160B CN101929160B (zh) 2012-05-23

Family

ID=43368561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100121984A Expired - Fee Related CN101929160B (zh) 2009-06-24 2009-06-24 排岩修筑高散堆不透水尾矿坝的方法

Country Status (1)

Country Link
CN (1) CN101929160B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140788A (zh) * 2011-04-29 2011-08-03 华北水利水电学院 尾矿坝施工方法及其专用挡水装置
CN103306240A (zh) * 2013-06-14 2013-09-18 鞍钢集团矿业公司 干式排放尾矿砂基础不透水坝的构造及砌筑方法
CN105178336A (zh) * 2015-08-18 2015-12-23 辽宁工程技术大学 一种软弱基底排土场极限承载力的确定方法
CN105544459A (zh) * 2015-12-16 2016-05-04 大连久鼎祥瑞特种工程技术研究院有限公司 尾矿坝结构及施工方法
CN106088107A (zh) * 2016-06-20 2016-11-09 中钢集团马鞍山矿山研究院有限公司 一种尾矿堆存于崩落法生产矿山地表塌陷坑的方法
CN115492055A (zh) * 2022-09-27 2022-12-20 太钢集团岚县矿业有限公司 一种排土机上排废石筑坝的方法
CN115492131A (zh) * 2022-08-23 2022-12-20 攀钢集团矿业有限公司 一种尾矿库闭库尾部软弱滩面路堤式覆土方法及装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1304093B1 (it) * 1998-12-10 2001-03-07 Sibelon Srl Diga in materiale sciolto e procedimento di impermeabilizzazione
CN1358907A (zh) * 2001-11-22 2002-07-17 水利部交通部电力工业部南京水利科学研究院 水力吹填地基的水平排水板振动碾压处理法
CN100534935C (zh) * 2006-05-18 2009-09-02 贵阳铝镁设计研究院 一种拜耳法赤泥干法堆场的子坝构筑方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140788A (zh) * 2011-04-29 2011-08-03 华北水利水电学院 尾矿坝施工方法及其专用挡水装置
CN102140788B (zh) * 2011-04-29 2012-05-30 华北水利水电学院 尾矿坝施工方法及其专用挡水装置
CN103306240A (zh) * 2013-06-14 2013-09-18 鞍钢集团矿业公司 干式排放尾矿砂基础不透水坝的构造及砌筑方法
CN105178336A (zh) * 2015-08-18 2015-12-23 辽宁工程技术大学 一种软弱基底排土场极限承载力的确定方法
CN105178336B (zh) * 2015-08-18 2017-02-01 辽宁工程技术大学 一种软弱基底排土场极限承载力的确定方法
CN105544459A (zh) * 2015-12-16 2016-05-04 大连久鼎祥瑞特种工程技术研究院有限公司 尾矿坝结构及施工方法
CN105544459B (zh) * 2015-12-16 2018-04-13 大连久鼎祥瑞特种工程技术研究院有限公司 尾矿坝结构及施工方法
CN106088107A (zh) * 2016-06-20 2016-11-09 中钢集团马鞍山矿山研究院有限公司 一种尾矿堆存于崩落法生产矿山地表塌陷坑的方法
CN115492131A (zh) * 2022-08-23 2022-12-20 攀钢集团矿业有限公司 一种尾矿库闭库尾部软弱滩面路堤式覆土方法及装置
CN115492055A (zh) * 2022-09-27 2022-12-20 太钢集团岚县矿业有限公司 一种排土机上排废石筑坝的方法

Also Published As

Publication number Publication date
CN101929160B (zh) 2012-05-23

Similar Documents

Publication Publication Date Title
CN101929160B (zh) 排岩修筑高散堆不透水尾矿坝的方法
CN101632993B (zh) 采用矿山排土堆筑尾矿坝的方法
Guo et al. Subsidence control and farmland conservation by solid backfilling mining technology
CN111305210B (zh) 采用中线法一次性建坝的超细粒尾矿库加高扩容堆排结构
CN111305211B (zh) 一种一次性建坝的超细粒尾矿库采用中线法加高扩容的方法
CN109899109A (zh) 非规则采空区的注浆充填方法
CN109577277A (zh) 一种壁挂式排水锚杆挡墙结构及其施工方法
CN206205903U (zh) 一种控制深部巷道底臌的底板卸压加固结构
CN106401609A (zh) 一种控制深部巷道底臌的底板卸压加固结构及其施工方法
CN103967496A (zh) 一种适于对山谷型尾矿堆积坝坝坡尾矿进行回采的新方法
CN203834422U (zh) 一种新型高桩码头
CN101929161B (zh) 排岩修筑高碾压透水尾矿坝的方法
CN109371919A (zh) 心墙防渗的土石挡水结构
CN204940298U (zh) 一种基坑工程的复合围护结构
CN110307034A (zh) 采空区的条带式注浆充填方法
CN102031971B (zh) 露天转地下覆盖层结构与厚度的确定方法
CN103321181A (zh) 全尾渣吹填裂膜丝机织土工模袋筑坝方法
CN209429056U (zh) 心墙防渗的土石挡水结构
CN102966109A (zh) 软土地基带状深基坑封底施工方法
CN109487747A (zh) 一种带双排钢板桩的海堤结构
CN111395082B (zh) 运营隧道上方的轻质路基结构、设计及施工方法
CN105525595A (zh) 格宾-桩板式泥石流拦挡结构及其实施方法
CN107859040A (zh) 一种基坑大面积松软土层的开挖方法
CN209891218U (zh) 大能力阻滑体系
CN103195077A (zh) 一种坝基加固框架结构和坝基加固方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: MINING DESIGN AND RESEARCH INSTITUTE, ANSHAN IRON

Free format text: FORMER OWNER: ANGANG GROUP MINE COMPANY

Effective date: 20130604

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130604

Address after: 114001 Liaoning Province, the eastern part of the Anshan iron green street, No. 27

Patentee after: Mining Design and Research Institute of Anshan Iron and Steel Group

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Angang Group Mine Company

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 114001 Liaoning Province, the eastern part of the Anshan iron green street, No. 27

Patentee after: Anshan Iron and Steel Group Mining Design and Research Institute Co., Ltd.

Address before: 114001 Liaoning Province, the eastern part of the Anshan iron green street, No. 27

Patentee before: Mining Design and Research Institute of Anshan Iron and Steel Group

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20210624

CF01 Termination of patent right due to non-payment of annual fee