CN105525595A - 格宾-桩板式泥石流拦挡结构及其实施方法 - Google Patents

格宾-桩板式泥石流拦挡结构及其实施方法 Download PDF

Info

Publication number
CN105525595A
CN105525595A CN201610044312.1A CN201610044312A CN105525595A CN 105525595 A CN105525595 A CN 105525595A CN 201610044312 A CN201610044312 A CN 201610044312A CN 105525595 A CN105525595 A CN 105525595A
Authority
CN
China
Prior art keywords
gabion
reinforced concrete
steel bar
bar concrete
debris flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610044312.1A
Other languages
English (en)
Inventor
吴红刚
张乾翼
杨昊天
陈小云
冯文强
任庆钊
庞伟军
常刚
李元彪
苟海瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Original Assignee
Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec filed Critical Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Priority to CN201610044312.1A priority Critical patent/CN105525595A/zh
Publication of CN105525595A publication Critical patent/CN105525595A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys

Abstract

格宾-桩板式泥石流拦挡结构。它是由钢筋砼连系梁、钢筋砼挡土板、钢筋砼抗滑桩和格宾缓冲层组成的泥石流拦挡结构,其特征是:钢筋砼连系梁将钢筋砼抗滑桩连接成一个整体,钢筋砼抗滑桩又与钢筋砼挡土板连接成整体,格宾缓冲层紧贴在钢筋砼挡土板后部布置。具有以下优点:(1)坝高、库容大。(2)承载能力大、结构强度高。(3)较高的排导能力。

Description

格宾-桩板式泥石流拦挡结构及其实施方法
所属技术领域
[0001]本发明涉及一种泥石流拦挡结构,尤其是能提高坝高和库容,增强结构安全储备、节约工程材料的拦挡结构。
背景技术
[0002]目前,公知的泥石流治理工程中常采用的方法是通过上游的稳坡截水和中游拦挡护坡等,减少泥石流固体物质,控制泥石流规模,改变泥石流体的性质,有利于下游的排导效果,从而控制泥石流的危害。拦挡结构常采用的结构形式有拦挡坝、粧板墙和格宾等。
[0003]拦挡坝的优点有:(I)施工简单;(2)在有地材的情况下,造价合宜;(3)用处广泛,排导能力强。缺点有:(I)每工量大;(2)现尚不宜过尚。
[0004]粧板墙的优点是(I)拦挡能力大,安全性高;(2)当坝肩有坍塌等病害时,可使用抗滑粧、连系梁、锚杆(索)等结构加固坝肩;(3)对于地材较缺乏的地区,使用粧板墙拦挡结构时,圬工量相对节省,便于建设。其缺点是粧间板抗冲击能力较弱,同时,板上设置的排水孔使得板的结构强度削减较大,容易造成安全隐患。
[0005]格宾具有可变形、消耗冲击能量大、透水性高和安装方便等优点,但是承载能力有限。
发明内容
[0006]为了克服现有的谷坊坝圬工量大、坝高不宜过高,粧板墙粧间板抗冲击能力较弱,格宾承载能力有限的缺点,本发明提供了一种格宾-粧板式泥石流拦挡结构,该拦挡结构具有以下优点:(I)可适用于建高坝泥石流沟,其库容大;(2)承载能力大、结构强度高;(3)较高的排导能力。
[0007]本发明解决其技术问题所采用的技术方案是:格宾-粧板式泥石流拦挡结构,由抗滑粧、挡土板、连系梁和格宾组成,其特征是:钢筋砼连系梁将钢筋砼抗滑粧连接成一个整体,钢筋砼抗滑粧又与钢筋砼挡土板连接成整体,格宾缓冲层紧贴在钢筋砼挡土板后部布置。将格宾呈阶梯式紧贴布置在挡土板后部,格宾宽度从下向上依次减小。当上游泥石流冲下来之后,首先冲击的是格宾,由于格宾是一种柔性拦挡结构,其变形能力大,可以吸收瞬间冲击能量,同时液态物质可以通过格宾的大孔隙,然后通过粧板墙上的排水孔排出,虽然格宾的承载能力较小,但是由于其紧贴粧板墙,固态物质的侧向压力可以通过格宾传递给粧板墙,这样组合结构结合了粧板墙和格宾两种拦挡结构的优点,既保证了液态物质的及时排出,又保证了粧板墙不被泥石流的瞬间冲击能量击垮,达到了提高安全储备的目的。
[0008]本发明的有益效果是,既有坝高、库容大,承载能力大、结构强度高和较高的排导能力的优点,又便于实施,造价合理,单项技术成熟。
附图说明
[0009]下面结合附图和实施例对本发明进一步说明。
[0010]图1是本发明的防治结构平面布置示意图。
[0011 ]图2是本发明的防治结构立面布置示意图。
[0012]图3是本发明的防治结构断面布置示意图。
[0013] 图4是图1的A—A剖视图。
[0014] 图5是图2的B—B剖视图。
[0015]图中1.钢筋砼连系梁,2.钢筋砼挡土板,3.格宾缓冲层,4.钢筋砼抗滑粧,5.地面线。
具体实施方式
[0016]在图1中,钢筋砼连系梁(I)布置在钢筋砼抗滑粧(4)顶部,将钢筋砼抗滑粧(4)连接成为一个整体,钢筋砼挡土板(2)布置在钢筋砼抗滑粧(4)后部,并与钢筋砼抗滑粧(4)连接成为整体,格宾缓冲层(3)紧贴地布置在钢筋砼挡土板(2)后部,泥石流固体物质的侧向土压力可以通过格宾缓冲层(3)传递给钢筋砼挡土板(2)。

Claims (2)

1.格宾-粧板式泥石流拦挡结构,由抗滑粧、挡土板、连系梁和格宾组成,其特征是:钢筋砼连系梁将钢筋砼抗滑粧连接成一个整体,钢筋砼抗滑粧又与钢筋砼挡土板连接成整体,格宾缓冲层紧贴在钢筋砼挡土板后部布置。
2.根据权利要求1所述的格宾-粧板式泥石流拦挡结构,其特征是:将格宾呈阶梯式紧贴布置在挡土板后部,格宾宽度从下向上依次减小。
CN201610044312.1A 2016-01-25 2016-01-25 格宾-桩板式泥石流拦挡结构及其实施方法 Pending CN105525595A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610044312.1A CN105525595A (zh) 2016-01-25 2016-01-25 格宾-桩板式泥石流拦挡结构及其实施方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610044312.1A CN105525595A (zh) 2016-01-25 2016-01-25 格宾-桩板式泥石流拦挡结构及其实施方法

Publications (1)

Publication Number Publication Date
CN105525595A true CN105525595A (zh) 2016-04-27

Family

ID=55768090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610044312.1A Pending CN105525595A (zh) 2016-01-25 2016-01-25 格宾-桩板式泥石流拦挡结构及其实施方法

Country Status (1)

Country Link
CN (1) CN105525595A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926545A (zh) * 2016-06-08 2016-09-07 中铁西北科学研究院有限公司勘察设计分公司 一种透过性梳齿坝及实施方法
CN111305159A (zh) * 2020-03-05 2020-06-19 中钢集团马鞍山矿山研究总院股份有限公司 一种柔性透水的泥石流拦挡坝

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2008201576A1 (en) * 2008-04-07 2009-10-22 John S Higgs A Retaining Wall for Erosion Protection
CN103334385A (zh) * 2013-07-09 2013-10-02 中国人民解放军后勤工程学院 一种防落石的柔性拦石墙
CN203361033U (zh) * 2013-05-27 2013-12-25 中铁工程设计咨询集团有限公司 一种路堑拦落石防护装置
CN103556602A (zh) * 2013-11-21 2014-02-05 中国科学院、水利部成都山地灾害与环境研究所 一种防治沟道泥石流起动的结构体及其设计方法
CN203613507U (zh) * 2013-10-16 2014-05-28 中国科学院、水利部成都山地灾害与环境研究所 一种泥石流石笼防治结构体
CN204530521U (zh) * 2015-02-15 2015-08-05 中国铁路总公司 一种柔性复合拦石挡墙结构
CN205382465U (zh) * 2016-01-25 2016-07-13 中铁西北科学研究院有限公司勘察设计分公司 格宾-桩板式泥石流拦挡结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2008201576A1 (en) * 2008-04-07 2009-10-22 John S Higgs A Retaining Wall for Erosion Protection
CN203361033U (zh) * 2013-05-27 2013-12-25 中铁工程设计咨询集团有限公司 一种路堑拦落石防护装置
CN103334385A (zh) * 2013-07-09 2013-10-02 中国人民解放军后勤工程学院 一种防落石的柔性拦石墙
CN203613507U (zh) * 2013-10-16 2014-05-28 中国科学院、水利部成都山地灾害与环境研究所 一种泥石流石笼防治结构体
CN103556602A (zh) * 2013-11-21 2014-02-05 中国科学院、水利部成都山地灾害与环境研究所 一种防治沟道泥石流起动的结构体及其设计方法
CN204530521U (zh) * 2015-02-15 2015-08-05 中国铁路总公司 一种柔性复合拦石挡墙结构
CN205382465U (zh) * 2016-01-25 2016-07-13 中铁西北科学研究院有限公司勘察设计分公司 格宾-桩板式泥石流拦挡结构

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926545A (zh) * 2016-06-08 2016-09-07 中铁西北科学研究院有限公司勘察设计分公司 一种透过性梳齿坝及实施方法
CN111305159A (zh) * 2020-03-05 2020-06-19 中钢集团马鞍山矿山研究总院股份有限公司 一种柔性透水的泥石流拦挡坝
CN111305159B (zh) * 2020-03-05 2022-03-15 中钢集团马鞍山矿山研究总院股份有限公司 一种柔性透水的泥石流拦挡坝

Similar Documents

Publication Publication Date Title
CN101591904B (zh) 先预压排水后向排水体注浆形成复合桩基的加固方法
CN103615042B (zh) 一种横纵竖三向网络式排渗装置
CN201485847U (zh) 一种新型尾矿坝同步排渗加固装置
CN203145038U (zh) 格构柱式塔吊基础
CN202989867U (zh) 一种废旧轮胎护面组合式钢结构谷坊
CN101886374A (zh) 一种槽底加固的全衬砌泥石流排导槽及其施工方法
CN108951441A (zh) 一种用于防护高陡边坡下公路的生态棚洞结构
CN202298556U (zh) 滑坡转化型泥石流的新型防治结构
CN207633352U (zh) 一种用于快速抢险施工的边坡加固结构
CN105525595A (zh) 格宾-桩板式泥石流拦挡结构及其实施方法
CN109183809B (zh) 一种淤泥质黏土深基坑工程复合支护换撑的施工方法
CN203284795U (zh) 一种带锚定板的扶壁式挡土墙
CN205382465U (zh) 格宾-桩板式泥石流拦挡结构
CN207469269U (zh) 一种水利工程高强土工格室结构类生态护坡
CN203530921U (zh) 一种透水桩基丁坝
CN204551386U (zh) 用于沟水处理的挡排结构
CN204282395U (zh) 一种桩托扶壁式挡土墙
CN203320538U (zh) 滑坡深层排水及滑坡内地下水资源回收装置
CN105089058A (zh) 一种在高陡边坡快速形成集渣平台的方法及装置
CN205329632U (zh) 利用土工充灌袋及钢架支撑体系建造的临时性挡水堤坝
CN205776258U (zh) 一种深基坑桩锚支护体系
CN205917649U (zh) 一种河岸护坡结构
CN205444232U (zh) 一种锚杆-重力式渗水挡土墙
CN204690779U (zh) 一种挡土墙
CN102943480A (zh) 一种黄土基坑支护方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160427

WD01 Invention patent application deemed withdrawn after publication