CN101922586A - Method for installing outdoor process pipelines - Google Patents

Method for installing outdoor process pipelines Download PDF

Info

Publication number
CN101922586A
CN101922586A CN 201010247015 CN201010247015A CN101922586A CN 101922586 A CN101922586 A CN 101922586A CN 201010247015 CN201010247015 CN 201010247015 CN 201010247015 A CN201010247015 A CN 201010247015A CN 101922586 A CN101922586 A CN 101922586A
Authority
CN
China
Prior art keywords
pipelines
ditch
pipeline
process pipelines
macadam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010247015
Other languages
Chinese (zh)
Inventor
王明辉
杨昌红
杨明仁
杨云
刘旭东
夏逢
蒋勇
徐师禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Baiyao Group Co Ltd
Original Assignee
Yunnan Baiyao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Baiyao Group Co Ltd filed Critical Yunnan Baiyao Group Co Ltd
Priority to CN 201010247015 priority Critical patent/CN101922586A/en
Publication of CN101922586A publication Critical patent/CN101922586A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for installing outdoor process pipelines, relates to a method for installing pipelines, in particular to a method for industrial and mining enterprises to install various process pipelines outdoors. In the method, a ditch is excavated and the pipeline is embedded outdoors. The method comprises the following steps of: a, excavating the ditch, wherein the distance from the edge of the ditch to the edge of an outdoor road is 1 to 1.5m; and the width of the ditch is 1.5 to 2m; b, tamping the bottom of the ditch, and then paving a gravel layer with gravel, wherein the thickness of the gravel layer is 20 to 40cm; c, placing the pipeline on the gravel layer, and covering grain-size fine stone or coarse sand with the thickness of 45 to 55cm on the pipeline; d, covering river sand with the covering thickness of 4 to 20cm on the top of the fine stone or coarse sand, and planting plants on the river sand; and e, arranging a drain pipe at a position, which is closest to a rainwater collecting pit of the road, on the gravel layer at the bottom. Due to the adoption of the method, various pipelines can be flexibly arranged according to the distances of different pipelines; and the fine sand is covered on the surface and the plants are planted, so that the embedding depth of the pipelines can be reduced, the excavating detection of the pipelines is facilitated, and the pipelines can be overhauled and replaced by excavating the coarse sand during the overhauling. By arranging the drain pipe, the rainwater can be effectively removed from the coarse sand, and the pipelines can be effectively protected.

Description

A kind of method for installing outdoor process pipelines
Technical field
The present invention relates to a kind of installation method of outdoor pipeline, particularly industrial and mining enterprise are in the method for all kinds of process pipelines of outdoor mounted.
Technical background
Dual mode is generally adopted in the installation of the outdoor all kinds of process pipelines of industrial and mining enterprise at present, and a kind of is direct-burried, and another is an integrated pipe canal, but dual mode all respectively has pluses and minuses.Integrated pipe canal is divided into and can passes through and two kinds of forms of no thoroughfare.Though the passable conduit maintainer can pass through, easy access, replacing pipeline, the scale of construction of this kind pipe trench is big, be generally about 1.8 * 2 meters, and need facilities such as supporting illumination, ventilation, waterproof, draining, also will consider problems such as sedimentation, anti-draining simultaneously, so cost is higher from structure; Unpassable duct is not because of need the consideration personnel passing through, do not need supporting illumination, ventilation equipment, the scale of construction is less relatively, but need facilities such as supporting waterproof, draining, pressing needs above the code requirement need excavate during the maintenance pipeline more than the earthing 30cm, also need consider to lift the work of trench cover, also to consider problems such as sedimentation, anti-draining from structure simultaneously, more loaded down with trivial details, and cost is also higher.Though standard allows ditch, the generation " thermo-pollution " easily altogether with it of water supply and sewerage pipelines such as tap water, Zhong Shui, fire hydrant pipeline.And the employing pipe trench, than higher, rainwater and underground water is accessible pipe duct very easily as outdoor level of ground water, and just loses insulation effect after the immersion of the thermal insulation layer of heating pipeline, needs excavation replacing completely, and the difficult processing of the waterproof of pipe trench.Adopt the direct-burried form changing, need excavate when overhauling, it is higher manually to reach operating cost, and pipeline need carry out waterproof, preservative treatment.
Summary of the invention:
Purpose of the present invention is intended to overcome the defective of prior art, provide a kind of and have direct-burried form and pipe trench form advantage simultaneously, and again can method for installing outdoor process pipelines.
Method for installing outdoor process pipelines of the present invention is at outdoor excavation irrigation canals and ditches, buries pipeline underground, the steps include:
A, ditching, the distance in roadside, the outdoor road of ditch back gauge is a 1-1.5 rice, furrow width 1.5-2 rice;
Rubble place mat macadam is used in the bottom compacting of b, ditch then, and the thickness of macadam is 20-40 centimetre;
C, pipeline is placed on the macadam, microlith or coarse sand with particle diameter on the pipeline cover the 45-55 cm thick;
The top of d, microlith or coarse sand covers with river sand again, and cladding thickness is 4-20 centimetre, plants plant on river sand;
E, waste pipe is set in the nearest position of bottom macadam and road rain water sump.
Tamp with clay around the described ditch of step a.
The particle diameter of the described rubble of step b is 2-5 centimetre.
The microlith of step c or the particle diameter of coarse sand are 0.4-0.6 centimetre.
The described waste pipe of step e is the D100 waste pipe.
There is filtrating equipment described waste pipe of step e and bottom of trench macadam joint.Described filtrating equipment is a kind of in nylon wire and the Stainless Steel Cloth.
Method for installing outdoor process pipelines of the present invention, during trench, limes marginis is if original soil, the words that the disturbance that is subjected to during excavation is less, then needn't tamp, if limes marginis is a backfill,, then should carry out compacting for preventing the sedimentation inequality, compacting is to tamp with clay around the ditch, the distance in roadside, the outdoor road of ditch back gauge is a 1-1.5 rice, then is to roll a set safe distance in order to prevent that vehicle may cause pipeline on the road, can not have influence on the construction of roadbed simultaneously when construction.Furrow width 1.5-2 rice then is in order to satisfy the code requirement of various pipes direct-burried.After the bottom of trench compacting, carry out place mat with the rubble of 2-5 centimetre of particle diameter, thickness is 20-40 centimetre, the one, and in order to allow pipeline and bottom surface of contact that certain flexibility is arranged, the 2nd, can play the effect of drainage, water can be discharged by waste pipe as early as possible.Cover the microlith or the coarse sand of 0.4-0.6 centimetre of particle diameter on the pipeline, cladding thickness is 45-55 centimetre, can play the effect of protection on the one hand to pipeline, be the zone that can in time be packed into sinking when soil layer generation uneven settlement on the other hand, and assurance pipeline surface of contact enriches and do not deform; Can favourablely overhaul in addition, change, the excavation when increasing pipeline.Cover 4-20 centimetre river sand at the top, and on river sand, plant plant, when playing the greening effect, can also prevent effectively that foreign matter from infiltrating in the coarse sands layer to river sand, plant plant on river sand, easily monoblock takes away or restores, and so also is to help very much maintenance.The position nearest at bottom macadam and road rain water sump is provided with waste pipe, and the nylon net filter device is arranged at waste pipe and bottom of trench macadam joint, waste pipe can be in time drains into the water on upper strata in the road rain water sump, and filtrating equipment can prevent that then coarse sand from flowing into Storm Sewer Network and resulting in blockage.Method for installing outdoor process pipelines of the present invention is filled out coarse sand in the pipe trench, the pipe end adds the rubble compacting, has avoided the settlement issues of pipe trench in the backfill soil, can flexibly, arrange all kinds of pipelines according to the spacing of different pipelines simultaneously.Fill out coarse sand in the pipe trench, surface coverage fine sand kind grass can reduce the buried depth of pipeline, and the excavation of favourable pipeline detects, and only needs when needing excavation the lawn, top layer is removed, and the excavation coarse sand can overhaul, change pipeline.In the place of collecting well near rainwater waste pipe is set, can effectively gets rid of the rainwater in the coarse sand, effectively protect pipeline.
Description of drawings
Fig. 1 is an outdoor process pipelines mounting structure schematic representation of the present invention.
Among the figure, 1-argillic horizon, 2 outdoor roads, 3-river sand layer, 4-pipeline, 5-macadam, 6-filtrating equipment, 7-waste pipe, 8-rainwater sump.
Embodiment
The present invention is described further below in conjunction with accompanying drawing, but be not limited to embodiment.
Embodiment 1
Method for installing outdoor process pipelines of the present invention is at outdoor excavation irrigation canals and ditches, buries pipeline underground, the steps include:
A, ditching, the distance on the outdoor road of ditch back gauge 2 limits is 1 meter, and 1.5 meters of furrow widths, limes marginis are backfill, and tamping with clay around the ditch is argillic horizon 1;
The bottom of b, ditch is with after being stained with layer 1 compacting, and with the rubble place mat macadam 5 of 2 centimetres of particle diameters, the thickness of macadam 5 is 20 centimetres;
C, pipeline 4 is placed on the macadam 5, microlith or coarse sand with 0.4 centimetre of particle diameter on the pipeline 4 cover 45 cm thicks;
The top of d, microlith or coarse sand covers with river sand again, covers into thickness and be 4 centimetres river sand layer 3, plants grass on river sand layer 3;
E, D100 waste pipe 7 is set, filtrating equipment 6 is arranged in waste pipe 7 and bottom of trench macadam 5 joints in bottom macadam 5 and road rain water sump 8 nearest positions.
Embodiment 2
Method for installing outdoor process pipelines of the present invention is at outdoor excavation irrigation canals and ditches, buries pipeline underground, the steps include:
A, ditching, the distance on the outdoor road of ditch back gauge 2 limits is 1.5 meters, 2 meters of furrow widths, limes marginis are original soil, and the disturbance that excavation is subjected to the time is less, then needn't tamp;
After b, ditch dug, with the rubble place mat macadam 5 of 5 centimetres of particle diameters, the thickness of macadam 5 was 40 centimetres;
C, pipeline 4 is placed on the macadam, microlith or coarse sand with 0.6 centimetre of particle diameter on the pipeline 4 cover 55 cm thicks;
The top of d, microlith or coarse sand covers with river sand again, covers into thickness and be 20 centimetres river sand layer 3, plants flower on river sand layer 3;
E, D100 waste pipe 7 is set, nylon wire is arranged in waste pipe 7 and bottom of trench macadam 5 joints in bottom macadam 5 and road rain water sump 8 nearest positions.
Embodiment 3
Method for installing outdoor process pipelines of the present invention is at outdoor excavation irrigation canals and ditches, buries pipeline underground, the steps include:
A, ditching, the distance on the outdoor road of ditch back gauge 2 limits is 1.25 meters, 1.75 meters of furrow widths, tamping with clay around the ditch is argillic horizon 1;
Tamp with argillic horizon 1 bottom of b, ditch, uses the rubble place mat macadam 5 of 3.5 centimetres of particle diameters then, and the thickness of macadam 5 is 25 centimetres;
C, pipeline 4 is placed on the macadam, microlith or coarse sand with 0.5 centimetre of particle diameter on the pipeline 4 cover 50 cm thicks;
The top of d, microlith or coarse sand covers with river sand again, covers into thickness and be 5 centimetres river sand layer 3, plants grass on river sand layer 3;
E, in bottom macadam 5 and road rain water sump 8 nearest positions D100 waste pipe 7 is set, waste pipe 7 has Stainless Steel Cloth with bottom of trench macadam 5 joints.

Claims (8)

1. a method for installing outdoor process pipelines is at outdoor excavation irrigation canals and ditches, buries pipeline underground, it is characterized in that, the steps include:
A, ditching, the distance in roadside, the outdoor road of ditch back gauge is a 1-1.5 rice, furrow width 1.5-2 rice;
Rubble place mat macadam is used in the bottom compacting of b, ditch then, and the thickness of macadam is 20-40 centimetre;
C, pipeline is placed on the macadam, microlith or coarse sand with particle diameter on the pipeline cover the 45-55 cm thick;
The top of d, microlith or coarse sand covers with river sand again, and cladding thickness is 4-20 centimetre, plants plant on river sand;
E, waste pipe is set in the nearest position of bottom macadam and road rain water sump.
2. method for installing outdoor process pipelines according to claim 1 is characterized in that, tamps with clay around the described ditch of step a.
3. method for installing outdoor process pipelines according to claim 1 is characterized in that, the particle diameter of the described rubble of step b is 2-5 centimetre.
4. method for installing outdoor process pipelines according to claim 1 is characterized in that, the microlith of step c or the particle diameter of coarse sand are 0.4-0.6 centimetre.
5. method for installing outdoor process pipelines according to claim 1 is characterized in that, the described waste pipe of step e is the D100 waste pipe.
6. method for installing outdoor process pipelines according to claim 1 or 5 is characterized in that there is filtrating equipment described waste pipe of step e and bottom of trench macadam joint.
7. method for installing outdoor process pipelines according to claim 6 is characterized in that, described filtrating equipment is a nylon wire.
8. method for installing outdoor process pipelines according to claim 6 is characterized in that, described filtrating equipment is a Stainless Steel Cloth.
CN 201010247015 2010-08-06 2010-08-06 Method for installing outdoor process pipelines Pending CN101922586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010247015 CN101922586A (en) 2010-08-06 2010-08-06 Method for installing outdoor process pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010247015 CN101922586A (en) 2010-08-06 2010-08-06 Method for installing outdoor process pipelines

Publications (1)

Publication Number Publication Date
CN101922586A true CN101922586A (en) 2010-12-22

Family

ID=43337689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010247015 Pending CN101922586A (en) 2010-08-06 2010-08-06 Method for installing outdoor process pipelines

Country Status (1)

Country Link
CN (1) CN101922586A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895178A (en) * 2020-07-08 2020-11-06 中石化重庆天然气管道有限责任公司 Ecological protection system suitable for stone channel district pipeline
CN113236855A (en) * 2021-04-20 2021-08-10 武汉一冶建筑安装工程有限责任公司 Method for taking out pipe jacking machine head when jacking cannot be carried out
CN113300311A (en) * 2021-05-31 2021-08-24 中电保力(北京)科技有限公司 Waterproof method for cable well or cable channel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1346950A (en) * 2000-09-25 2002-05-01 株式会社韩美 Method for filling protective layer of embedded tube
JP2007170678A (en) * 2007-03-14 2007-07-05 National Agriculture & Food Research Organization Shallow burying construction method of underground structure by geotextile
JP4070217B1 (en) * 2006-10-24 2008-04-02 一紀 ▲杖▼村 Underground construction method
CN101457854A (en) * 2007-12-11 2009-06-17 北京市煤气热力工程设计院有限公司 Large-diameter hot water pipe non-compensation direct-burried laying method
CN101482195A (en) * 2009-02-18 2009-07-15 中冶东方工程技术有限公司 Non-compensation cold mounting method for large diameter heat supply pipeline
CN101565964A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for mounting outdoor embedded high-density polyethylene double-wall corrugated drain pipe
CN101775826A (en) * 2010-01-26 2010-07-14 济南金鼎信息技术有限公司 Construction method for laying water pipes

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1346950A (en) * 2000-09-25 2002-05-01 株式会社韩美 Method for filling protective layer of embedded tube
JP4070217B1 (en) * 2006-10-24 2008-04-02 一紀 ▲杖▼村 Underground construction method
JP2007170678A (en) * 2007-03-14 2007-07-05 National Agriculture & Food Research Organization Shallow burying construction method of underground structure by geotextile
CN101457854A (en) * 2007-12-11 2009-06-17 北京市煤气热力工程设计院有限公司 Large-diameter hot water pipe non-compensation direct-burried laying method
CN101482195A (en) * 2009-02-18 2009-07-15 中冶东方工程技术有限公司 Non-compensation cold mounting method for large diameter heat supply pipeline
CN101565964A (en) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 Construction method for mounting outdoor embedded high-density polyethylene double-wall corrugated drain pipe
CN101775826A (en) * 2010-01-26 2010-07-14 济南金鼎信息技术有限公司 Construction method for laying water pipes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895178A (en) * 2020-07-08 2020-11-06 中石化重庆天然气管道有限责任公司 Ecological protection system suitable for stone channel district pipeline
CN113236855A (en) * 2021-04-20 2021-08-10 武汉一冶建筑安装工程有限责任公司 Method for taking out pipe jacking machine head when jacking cannot be carried out
CN113300311A (en) * 2021-05-31 2021-08-24 中电保力(北京)科技有限公司 Waterproof method for cable well or cable channel

Similar Documents

Publication Publication Date Title
CN106192665B (en) A kind of sponge urban road rain infiltration system and its construction method
CN107587557A (en) Outdoor water engineering construction method
CN113818534B (en) Biological detention facility for sponge urban road
CN101922586A (en) Method for installing outdoor process pipelines
Uda et al. Evaluation of life cycle costs for low impact development stormwater management practices
CN108457289A (en) A kind of open caisson construction method of complex condition
CN201770986U (en) Structure for embedding outdoor process pipeline
CN105155386A (en) Water blocking type kerb and construction method thereof
NRCS Conservation Practice Standard
CN113250220A (en) Novel dewatering method for deep foundation pit close to existing building
CN204919265U (en) Waterproofing type curb
CN113882415B (en) Drainage method
CN217601117U (en) Seepage-proofing blind ditch for reconstruction of broken regenerative pavement
CN219118065U (en) Ecological slope protection structure of river course
CN214116144U (en) Ecological side ditch structure
CN219653757U (en) Multifunctional integrated comprehensive pipe ditch
CN214194490U (en) Water conservancy system suitable for soil improvement
Budleigh Trench excavation and support
CN114319556A (en) Concealed water purification drainage ditch and construction method thereof
GARDINER et al. NORTHSHORE UTILITY DISTRICT
CN113062173A (en) Construction method for joint of garden path underpass flat plate bridge and conical slope foundation
Lot et al. BID DOCUMENTS
RU2618693C1 (en) Method for draining lands with close groundwater bedding while building aerodrome runways
Arcot et al. UBC Stormwater Detention: Multiple Use Stormwater Detention Adjacent to UBC Centre for Comparative Medicine
Guide Massachusetts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20101222