CN101916531B - Concrete pole signboard fixing device - Google Patents

Concrete pole signboard fixing device Download PDF

Info

Publication number
CN101916531B
CN101916531B CN 201010231208 CN201010231208A CN101916531B CN 101916531 B CN101916531 B CN 101916531B CN 201010231208 CN201010231208 CN 201010231208 CN 201010231208 A CN201010231208 A CN 201010231208A CN 101916531 B CN101916531 B CN 101916531B
Authority
CN
China
Prior art keywords
fixing device
angle bar
concrete pole
hole
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010231208
Other languages
Chinese (zh)
Other versions
CN101916531A (en
Inventor
赵磊
秦朝卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Xuzhou Power Supply Co of Jiangsu Electric Power Co Ltd
Original Assignee
Xuzhou Power Supply Co of Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Power Supply Co of Jiangsu Electric Power Co Ltd filed Critical Xuzhou Power Supply Co of Jiangsu Electric Power Co Ltd
Priority to CN 201010231208 priority Critical patent/CN101916531B/en
Publication of CN101916531A publication Critical patent/CN101916531A/en
Application granted granted Critical
Publication of CN101916531B publication Critical patent/CN101916531B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses a concrete pole signboard fixing device, which relates to the field of signboard installation technology. The concrete pole signboard fixing device consists of a fixing device I consisting of a connection plate and a bolt and a fixing device II consisting of a U-shaped hoop and angle iron; a hole fitting a U-shaped hoop is formed on one side of the angle iron; the open end of the U-shaped hoop passes through the hole on the angle iron and is fastened by a nut; one end of the connection plate is bent to a hook shape which can be clamped on the angle iron, and the other end is provided with flat iron with a slot hole; one end of the bolt is bent to a hook shape which can be clamped on the angle iron, and the screw thread end passes through the slot hole on the connection plate and is fastened by a nut. The concrete pole signboard fixing device has the advantages that the manufacturing is simple, the components are not easily lost, phenomena such as artificial damage and the like do not happen frequently, and the work safety during line overhauling or construction and alteration is improved as the signboards are orderly installed on the concrete pole.

Description

Concrete pole signboard fixing device
Technical field
The present invention relates to Sign Board field engineering field, specifically is a kind of concrete pole signboard fixing device, is applicable to that mainly the Sign Board on the power circuit concrete bar is installed.
Background technology
For maintenance and security needs, on power circuit concrete bar, generally all Sign Board to be installed, at present the most methods that adopt the iron wire colligation of the Sign Board on the concrete bar.Because power circuit concrete bar is in the outdoor or open-air environment, the time has been grown iron wire, and rust is disconnected easily, causes Sign Board to come off automatically; Bring potential safety hazard to the maintainer; Reporting for line inspection and defective impacts; Often to before maintenance, check circuit in the scene, increase workload.Sign Board on the concrete bar is lost easily at present, and does not have unified installation site and mode, and it is mixed and disorderly especially to make Sign Board install.
Summary of the invention
To the shortcoming of above-mentioned prior art, the present invention provides a kind of concrete pole signboard fixing device, utilizes this fixture constant mark board installation method easy, and makes the Sign Board on the concrete bar install neat.
The present invention realizes with following technical scheme: a kind of concrete pole signboard fixing device comprises fixing device I of being made up of web joint, bolt and the fixing device I I that is made up of U type anchor ear and angle bar; of angle bar help have match with U type anchor ear and the hole, the hole that the openend of U type anchor ear passes on the angle bar is fastening with nut; Web joint is that an end is bent with the hook solid that can be stuck on the angle bar, and the other end has the band iron of slotted hole; One end of bolt is bent with the hook solid that can be stuck on the angle bar, and the slotted hole that the screw thread end passes on the web joint is fastening with nut.
The invention has the beneficial effects as follows: make simply, be difficult for disappearance, be not prone to phenomenons such as artificial destruction; What Sign Board was neat is installed on the concrete bar, has improved the job security in line maintenance or the construction transformation.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
Fig. 1 is the fixing device I structural drawing;
Fig. 2 is a fixing device I I structural drawing.
Among the figure: 1, web joint; 11, slotted hole; 2, bolt; 3, U type anchor ear; 4, angle bar; 41, hole.
Embodiment
As depicted in figs. 1 and 2, concrete pole signboard fixing device, fixing device I of being made up of web joint 1, bolt 2 and the fixing device I I that is made up of U type anchor ear 3 and angle bar 4 form.Help of angle bar 4 and to have the hole 41 of matching with U type anchor ear 3, the hole 41 usefulness nuts that the openend of U type anchor ear 3 passes on the angle bar 4 are fastening.Web joint 1 is a band iron, and the one of which end is bent with the hook solid that can be stuck on the angle bar 4, and the other end has slotted hole 11.One end of bolt 2 is bent with the hook solid that can be stuck on the angle bar 4, and the slotted hole 11 usefulness nuts that the screw thread end passes on the web joint 1 are fastening.In the present embodiment, web joint 1 is the band iron of long 100mm, wide 50mm, thick 5mm; Crotch on web joint 1 one ends is a 45, helps for one that is used for firmly colluding at angle bar 4.Slotted hole 11 is apart from the width of the group of the distance h≤angle bar 4 of web joint 1 crooked position; Slotted hole 11 long 50mm, wide 8mm had not only satisfied multiple angle bar size but also had satisfied 6mm diameter bolt penetrating.Because the Sign Board mounting hole is generally normal diameter 8mm, therefore adopting bolt 2 diameters is 6mm, the bolt of long 100mm; Bolt 2 one end crotches are 45, are used for firmly colluding at another of angle bar 4 helping.Can change the size of web joint 1 and bolt 2 in addition according to the size of angle bar 4, with the fastness that guarantees that Sign Board is installed.
Installation process is: first mounting fixing parts II: U type anchor ear 3 is stuck on the concrete bar, and the hole 41 usefulness nuts that its openend passes on the angle bar 4 are fastening, and fixing device I I just is fixed on the concrete bar.Mounting fixing parts I again: the crotch end hook of web joint 1 is lived a group of angle bar 4, and the crotch end hook of bolt 2 is lived another group of angle bar 4; Bolt 2 screw thread ends pass the slotted hole 11 on the web joint 1, Sign Board are through on the bolt 2 again, get final product with nut is fastening.

Claims (1)

1. a concrete pole signboard fixing device is characterized in that: comprise fixing device I of being made up of web joint (1), bolt (2) and the fixing device I I that is made up of U type anchor ear (3) and angle bar (4); Help of angle bar (4) and to have the hole (41) of matching with U type anchor ear (3), the hole (41) that the openend of U type anchor ear (3) passes on the angle bar (4) is fastening with nut; Web joint (1) is that an end is bent with the hook solid that can be stuck on the angle bar (4), and the other end has the band iron of slotted hole (11); One end of bolt (2) is bent with the hook solid that can be stuck on the angle bar (4), and the slotted hole (11) that the screw thread end passes on the web joint (1) is fastening with nut; Crotch on described web joint (1) one end is a 45; Described slotted hole (11) is apart from the width of the group of the distance h≤angle bar (4) of web joint (1) crooked position.
CN 201010231208 2010-07-14 2010-07-14 Concrete pole signboard fixing device Active CN101916531B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010231208 CN101916531B (en) 2010-07-14 2010-07-14 Concrete pole signboard fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010231208 CN101916531B (en) 2010-07-14 2010-07-14 Concrete pole signboard fixing device

Publications (2)

Publication Number Publication Date
CN101916531A CN101916531A (en) 2010-12-15
CN101916531B true CN101916531B (en) 2012-06-27

Family

ID=43324028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010231208 Active CN101916531B (en) 2010-07-14 2010-07-14 Concrete pole signboard fixing device

Country Status (1)

Country Link
CN (1) CN101916531B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104050878B (en) * 2014-06-10 2016-08-24 国家电网公司 A kind of electric power overhaul safety device
CN104064113A (en) * 2014-07-01 2014-09-24 国家电网公司 Signboard bracket fixed on electric power steel tower
CN108091252A (en) * 2017-12-29 2018-05-29 国网河北省电力有限公司衡水供电分公司 A kind of shaft tower Sign Board reinforces gold utensil

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1313317A (en) * 1969-09-22 1973-04-11 Turner A R Building frame brackets
WO1986005228A1 (en) * 1985-02-28 1986-09-12 Pugh, Emmett, C. Grating clamp system
CN101440834A (en) * 2008-12-22 2009-05-27 河南电力试验研究院 U type bolt component for mounting electric power line on-line apparatus
CN201344173Y (en) * 2008-11-21 2009-11-11 安徽省电力公司芜湖供电公司 Fixture for fixing angle iron
CN201716933U (en) * 2010-07-14 2011-01-19 江苏省电力公司徐州供电公司 Power line concrete pole signboard fixing connecting piece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1313317A (en) * 1969-09-22 1973-04-11 Turner A R Building frame brackets
WO1986005228A1 (en) * 1985-02-28 1986-09-12 Pugh, Emmett, C. Grating clamp system
CN201344173Y (en) * 2008-11-21 2009-11-11 安徽省电力公司芜湖供电公司 Fixture for fixing angle iron
CN101440834A (en) * 2008-12-22 2009-05-27 河南电力试验研究院 U type bolt component for mounting electric power line on-line apparatus
CN201716933U (en) * 2010-07-14 2011-01-19 江苏省电力公司徐州供电公司 Power line concrete pole signboard fixing connecting piece

Also Published As

Publication number Publication date
CN101916531A (en) 2010-12-15

Similar Documents

Publication Publication Date Title
CN101916531B (en) Concrete pole signboard fixing device
CN201716933U (en) Power line concrete pole signboard fixing connecting piece
CN202360895U (en) Hinge type pipe clamp
CN204662659U (en) A kind of suspension cable net for inflation film building
CN201853426U (en) Identifying mark mounting structure for transmission line poles
JP5756243B1 (en) Piping support hardware with drop prevention mechanism
CN201757122U (en) Bolt fastening mechanism with one shot
US20160356401A1 (en) Devices, systems, and methods to secure wires and prevent wire theft
CN201696402U (en) Fixing part for signboards of iron tower
CN101881291A (en) Fixing part for signboard of iron tower
CN202756391U (en) Lock bolt
CN201311745Y (en) Fixing clip for iron tower nameplate
CN209837240U (en) Municipal administration water supply and drainage pipe convenient to installation
CN203839874U (en) Plateau type isolating switch cross arm
CN204957120U (en) Oil field pipe utensil RFID label fastener
CN203809903U (en) Lightningproof and antistatic flange bridging device
CN204345208U (en) A kind of spherical camera mounting bracket
CN202390850U (en) Quick mounting structure for foundation of machine tool
CN203228774U (en) Cantilever fixing device used for subway interval protective and airtight separation door
CN104064113A (en) Signboard bracket fixed on electric power steel tower
CN203248197U (en) Combined pipeline hanging clamp
CN103231711A (en) Cantilever fixing device used for protective and sealed partition door in subway section
CN201779123U (en) Rainproof cap for bolt
CN202042588U (en) Fixing device for antenna bracket
CN202551570U (en) Backboard fastening device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER CO. STATE ELECTRIC NET CROP

Effective date: 20121029

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121029

Address after: 221006 Jiefang North Road, Jiangsu, Xuzhou, No. 20

Patentee after: Xuzhou Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 221006 Jiefang North Road, Jiangsu, Xuzhou, No. 20

Patentee before: Xuzhou Power Supply Company of Jiangsu Electric Power Company