CN108091252A - A kind of shaft tower Sign Board reinforces gold utensil - Google Patents
A kind of shaft tower Sign Board reinforces gold utensil Download PDFInfo
- Publication number
- CN108091252A CN108091252A CN201711469238.9A CN201711469238A CN108091252A CN 108091252 A CN108091252 A CN 108091252A CN 201711469238 A CN201711469238 A CN 201711469238A CN 108091252 A CN108091252 A CN 108091252A
- Authority
- CN
- China
- Prior art keywords
- fixing piece
- screw rod
- shaft tower
- sign board
- gold utensil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F7/00—Signs, name or number plates, letters, numerals, or symbols; Panels or boards
- G09F7/18—Means for attaching signs, plates, panels, or boards to a supporting structure
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F7/00—Signs, name or number plates, letters, numerals, or symbols; Panels or boards
- G09F7/18—Means for attaching signs, plates, panels, or boards to a supporting structure
- G09F2007/1839—Means for attaching signs, plates, panels, or boards to a supporting structure for fastening to cables
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
The invention discloses a kind of shaft tower Sign Boards to reinforce gold utensil, is related to electric armour clamp technical field;It includes fixing piece, the second fixing piece and nut that the fixing piece includes screw rod, is arranged on first fixing piece of screw rod one end, is arranged on the screw rod other end, second fixing piece includes fixing pipe, the connection sheet being fixedly connected with fixing pipe front inner wall, the screw hole for being arranged in connection sheet and being adapted with screw rod, the stuck point being arranged on the inner wall of fixing pipe rear end and the card for being arranged on fixing pipe front end, the nut and is mutually adapted respectively with screw rod, fixing pipe and stuck point;It passes through screw rod, the first fixing piece and the second fixing piece, realize the Fast Installation constant mark board on the cross bar of shaft tower, it is time saving and energy saving, construction efficiency is high, securely and reliably, so as to prevent Sign Board deformation, damage and the generation of stolen phenomenon, security risk is eliminated, has ensured power network safety operation.
Description
Technical field
The present invention relates to electric armour clamp technical fields more particularly to a kind of shaft tower Sign Board to reinforce gold utensil.
Background technology
At present, shaft tower Sign Board largely uses on transmission line of electricity, and shaft tower Sign Board is reflection transmission line of electricity each side
The important symbol of face situation plays an important role of mark, warning.It is limited by environment and installation site requirement, Sign Board is located for a long time
In wild environment, inherently it is easily deformed, damages;Along with the position of its installation is relatively low, it is easier to cause artificial damage
Nut simultaneously steals Sign Board, therefore transmission line of electricity is run the phenomenon and service work forms very big security risk.
In prior art, Sign Board is mounted on the cross bar of shaft tower by the way of wirerope-winding, installation fee
When it is laborious, it is more time-consuming and laborious that when replacement, unlocks steel wire rope, low construction efficiency.Or it uses and is consolidated on cross bar after perforating with screw
Determine Sign Board, not only install time-consuming and laborious, also destroy the structure of cross bar, cause security risk.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of shaft tower Sign Board and reinforce gold utensil, pass through screw rod, first
Fixing piece and the second fixing piece realize the Fast Installation constant mark board on the cross bar of shaft tower, time saving and energy saving, and construction efficiency is high,
Securely and reliably, so as to prevent Sign Board deformation, damage and the generation of stolen phenomenon, security risk is eliminated, has ensured electricity
Net safe and stable operation.In this year, promoted the use of in 1095 base shaft tower of our unit, it is hundreds thousand of remaining to save operating cost
Member achieves good effect.
In order to solve the above technical problems, the technical solution used in the present invention is:It includes fixing piece, the fixing piece bag
Include screw rod, the second fixing piece and nut that are arranged on first fixing piece of screw rod one end, are arranged on the screw rod other end, described second
Fixing piece include fixing pipe, be fixedly connected with fixing pipe front inner wall connection sheet, be arranged in connection sheet and mutually fitted with screw rod
The screw hole matched somebody with somebody, the stuck point being arranged on the inner wall of fixing pipe rear end and the card for being arranged on fixing pipe front end, the nut difference
It is mutually adapted with screw rod, fixing pipe and stuck point.
Further technical solution is:First fixing piece is welded and fixed for circular plates and with screw rod.
Further technical solution is:The card is ligule, the stress surface of one side and the horizontal stroke of connection to be fixed
Bar is adapted.
Further technical solution is:It further includes screwing wrench, and the screwing wrench includes wrenching bar, is arranged on and pulls
The handle of hand lever one end and wrenching bar other end telescopic mast connected vertically and the buckle casing being arranged on telescopic mast, it is described
Buckle casing is mutually adapted respectively with screw rod, the second fixing piece and nut.
Further technical solution is:The stuck point for cylindrical shape and the inner wall vertical connection with fixing pipe.
Further technical solution is:The length of stuck point subtracts the outer diameter of buckle casing for the internal diameter of fixing pipe.
Further technical solution is:The handle is spheroid shape.
Further technical solution is:Anti-skid chequer is provided on the handle.
Further technical solution is:The nut is M16's.
Further technical solution is:Second fixing piece is made of stainless steel.
It is using advantageous effect caused by above-mentioned technical proposal:
First, screw rod passes through the mounting hole of Sign Board, and the first fixing piece is located at before Sign Board, and stress surface is tight with rail surface
Contiguity is touched, and the first fixing piece, the second fixing piece clamp the cross bar of shaft tower so that Sign Board is fixedly attached on cross bar, time saving province
Power, construction efficiency are high, without the perforating on cross bar, securely and reliably;The hair of Sign Board deformation, damage and stolen phenomenon is prevented
It is raw, security risk is eliminated, has ensured power network safety operation.
The second, the first fixing piece is circular plates and is welded and fixed with screw rod, the surfacing of circular plates,
It is good that it contacts effect with Sign Board, is not easy that Sign Board is triggered to deform, clamping effect securely, it is reliable;Welding manner is fixedly connected, peace
Entirely, it is secured, antitheft.
3rd, for ligule, stress surface and the rail surface of one side be in close contact card, installation effect more securely,
Reliably, safety.
4th, using screwing wrench clamp nut, operation is quickly, conveniently;Wrenching bar and telescopic mast vertical connection so that
It is convenient to exert oneself with strength during using screwing wrench.
5th, stuck point for cylindrical shape and the inner wall vertical connection with fixing pipe, the length of stuck point it is interior for fixing pipe
Footpath subtracts the outer diameter of buckle casing, improves screwing wrench work efficiency, effectively prevents buckle casing from skidding with nut.
6th, handle is spheroid shape, and anti-skid chequer is provided on handle, using screwing wrench good hand touch, facilitates holding
Firmly with strength, it is non-slip.
7th, nut is M16, meets fastness requirement, and using effect is optimal, occupies small volume;Standardization is unified
Management simplifies production, reduces production cost, simplifies and safeguards, reduces maintenance cost.
8th, the second fixing piece is made of stainless steel, light weight and intensity height.
Description of the drawings
Fig. 1 is the structure chart of fixing piece in the present invention;
Fig. 2 is the schematic view of the mounting position of nut in the present invention;
Fig. 3 is the structure chart of the second fixing piece in the present invention;
Fig. 4 is the structure chart of screwing wrench in the present invention;
Fig. 5 is the schematic view of the mounting position of the present invention.
Wherein:1 screw rod, 2 first fixing pieces, 3 second fixing pieces, 31 fixing pipes, 32 connection sheets, 33 stuck points, 34 cards, 35
Stress surface, 4 nuts, 5 wrenching bars, 6 handles, 7 telescopic masts, 8 buckle casings, 9 cross bars, 10 Sign Boards.
Specific embodiment
With reference to the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Ground describes, it is clear that described embodiment is only the part of the embodiment of the present invention, instead of all the embodiments.Based on this
Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained without making creative work
Example is applied, belongs to the scope of protection of the invention.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with
Implemented using other different from other manner described here, those skilled in the art can be without prejudice to intension of the present invention
In the case of do similar popularization, therefore the present invention is from the limitation of following public specific embodiment.
As Figure 1-Figure 5, the invention discloses a kind of shaft tower Sign Boards to reinforce gold utensil, includes fixing piece and pulls with screwing
Hand, the fixing piece include screw rod 1, are arranged on first fixing piece 2 of 1 one end of screw rod, are arranged on the second solid of 1 other end of screw rod
Determine part 3 and nut 4, first fixing piece 2 is welded and fixed for circular plates and with screw rod 1;Second fixing piece 3 wraps
Fixing pipe 31, the connection sheet 32 being fixedly connected with 31 front inner wall of fixing pipe are included, is arranged in connection sheet 32 and is fitted with 1 phase of screw rod
The screw hole matched somebody with somebody, the stuck point 33 being arranged on 31 rear end inner wall of fixing pipe and the card 34 for being arranged on 31 front end of fixing pipe, second
For fixing piece 3 made of stainless steel, the card 34 is ligule, the stress surface 35 of one side and the cross bar 9 of connection to be fixed
Be adapted, the stuck point 33 for cylindrical shape and the inner wall vertical connection with fixing pipe 31;The nut 4 is M16's, and point
It is not mutually adapted with screw rod 1, fixing pipe 31 and stuck point 33.
The screwing wrench includes wrenching bar 5, the handle 6, vertical with 5 other end of wrenching bar for being arranged on 5 one end of wrenching bar
The telescopic mast 7 of connection and the buckle casing 8 being arranged on telescopic mast 7, the buckle casing 8 respectively with screw rod 1, the second fixing piece
3 and nut 4 be mutually adapted;The handle 6 is spheroid shape, and anti-skid chequer is provided on handle 6.
The length of stuck point 33 subtracts the outer diameter of buckle casing 8 for the internal diameter of fixing pipe 31.
Operating instruction:
Screw rod 1 passes through the mounting hole of Sign Board 10, and the first fixing piece 2 is located at before Sign Board 10;Screw rod 1 is fixed through second
After the screw hole of part 3, nut 4 is put into fixing pipe 31 and is socketed with screw rod 1;First fixing piece 2, the second fixing piece 3 are clamped
The cross bar 9 of shaft tower, cross bar 9 are angle iron, and stress surface 35 is clamped and is in close contact with 9 surface of cross bar;Using screwing wrench, by card
Retaining ring pipe 8 is inserted into fixing pipe 31 and nested firmly nut 4,6 tightening nut 4 of swing handle so that the first fixing piece 2, second is solid
Determine part 3 to clamp the cross bar 9 of shaft tower and securely connect.
Screw rod 1 passes through the mounting hole of Sign Board 10, and the first fixing piece 2 is located at before Sign Board 10, stress surface 35 and horizontal stroke
9 intimate surface contact of bar, the first fixing piece 2, the second fixing piece 3 clamp the cross bar 9 of shaft tower so that Sign Board 10 is fixedly attached to
Time saving and energy saving on cross bar 9, construction efficiency is high, without the perforating on cross bar 9, securely and reliably;Prevent Sign Board 10 to deform, damage
The generation of bad and stolen phenomenon, eliminates security risk, has ensured power network safety operation.
First fixing piece 2 is circular plates and is welded and fixed with screw rod 1, the surfacing of circular plates,
It is good that effect is contacted with Sign Board 10, is not easy that Sign Board 10 is triggered to deform, clamping effect is securely, reliably;Welding manner is fixedly connected,
Safely, securely, it is antitheft.
Card 34 is ligule, stress surface 35 and 9 intimate surface contact of cross bar of one side, installation effect more securely,
Reliably, safety.
Using screwing wrench clamp nut 4, operation is quickly, conveniently;Wrenching bar 5 and 7 vertical connection of telescopic mast so that make
It is convenient to exert oneself with strength during with screwing wrench.
Stuck point 33 for cylindrical shape and the inner wall vertical connection with fixing pipe 31, the length of stuck point 33 be fixing pipe 31
Internal diameter subtracts the outer diameter of buckle casing 8, improves screwing wrench work efficiency, effectively prevents buckle casing 8 from skidding with nut 4.
Handle 6 is spheroid shape, is provided with anti-skid chequer on handle 6, using screwing wrench good hand touch, holding is facilitated to exert oneself
With strength, it is non-slip.
Nut 4 is M16's, meets fastness requirement, and using effect is optimal, occupies small volume;Standardization unified management,
Simplify production, reduce production cost, simplify and safeguard, reduce maintenance cost.
Second fixing piece 3 is made of stainless steel, light weight and intensity height.
Claims (10)
1. a kind of shaft tower Sign Board reinforces gold utensil, it is characterised in that:It includes fixing piece, and the fixing piece includes screw rod(1), set
It puts in screw rod(1)First fixing piece of one end(2), be arranged on screw rod(1)Second fixing piece of the other end(3)And nut(4), institute
State the second fixing piece(3)Including fixing pipe(31)With fixing pipe(31)The connection sheet that front inner wall is fixedly connected(32), be arranged on
Connection sheet(32)Upper and and screw rod(1)The screw hole that is adapted is arranged on fixing pipe(31)Stuck point on the inner wall of rear end(33)With
It is arranged on fixing pipe(31)The card of front end(34), the nut(4)Respectively with screw rod(1), fixing pipe(31)And stuck point(33)
It is mutually adapted.
2. a kind of shaft tower Sign Board according to claim 1 reinforces gold utensil, it is characterised in that:First fixing piece(2)
For circular plates and and screw rod(1)It is welded and fixed.
3. a kind of shaft tower Sign Board according to claim 2 reinforces gold utensil, it is characterised in that:The card(34)For ligule
, the stress surface of one side(35)With the cross bar of connection to be fixed(9)It is adapted.
4. a kind of shaft tower Sign Board according to claim 3 reinforces gold utensil, it is characterised in that:It further includes screwing wrench,
The screwing wrench includes wrenching bar(5), be arranged on wrenching bar(5)The handle of one end(6)With wrenching bar(5)The other end is vertical
The telescopic mast of connection(7)Be arranged on telescopic mast(7)On buckle casing(8), the buckle casing(8)Respectively with screw rod(1)、
Second fixing piece(3)And nut(4)It is mutually adapted.
5. a kind of shaft tower Sign Board according to claim 4 reinforces gold utensil, it is characterised in that:The stuck point(33)For cylinder
Body shape and and fixing pipe(31)Inner wall vertical connection.
6. a kind of shaft tower Sign Board according to claim 5 reinforces gold utensil, it is characterised in that:Stuck point(33)Length be solid
Fixed tube(31)Internal diameter subtract buckle casing(8)Outer diameter.
7. a kind of shaft tower Sign Board according to claim 4 reinforces gold utensil, it is characterised in that:The handle(6)For ellipsoid
Body shape.
8. a kind of shaft tower Sign Board according to claim 7 reinforces gold utensil, it is characterised in that:The handle(6)Upper setting
There is anti-skid chequer.
9. a kind of shaft tower Sign Board according to claim 1 reinforces gold utensil, it is characterised in that:The nut(4)For M16
's.
10. a kind of shaft tower Sign Board according to any one in claim 1-9 reinforces gold utensil, it is characterised in that:It is described
Second fixing piece(3)For made of stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711469238.9A CN108091252A (en) | 2017-12-29 | 2017-12-29 | A kind of shaft tower Sign Board reinforces gold utensil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711469238.9A CN108091252A (en) | 2017-12-29 | 2017-12-29 | A kind of shaft tower Sign Board reinforces gold utensil |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108091252A true CN108091252A (en) | 2018-05-29 |
Family
ID=62179869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711469238.9A Pending CN108091252A (en) | 2017-12-29 | 2017-12-29 | A kind of shaft tower Sign Board reinforces gold utensil |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108091252A (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0335855A2 (en) * | 1988-03-31 | 1989-10-04 | JOSEF WICK & SÖHNE WICK GESELLSCHAFT M.B.H. | Holder for fixing a covering profile or the same to a support |
JP2001220719A (en) * | 2000-02-09 | 2001-08-17 | Akira Miyagi | Triangular traffic sign |
CN101881291A (en) * | 2010-07-08 | 2010-11-10 | 江苏省电力公司徐州供电公司 | Fixing part for signboard of iron tower |
CN101916531A (en) * | 2010-07-14 | 2010-12-15 | 江苏省电力公司徐州供电公司 | Concrete pole signboard fixing device |
CN201918113U (en) * | 2010-11-01 | 2011-08-03 | 甘肃省电力公司白银供电公司 | Simple connector for tower materials |
CN203185476U (en) * | 2013-01-28 | 2013-09-11 | 许金锔 | Buckle structure device for quick-mounted concrete formwork |
CN103659681A (en) * | 2012-09-17 | 2014-03-26 | 昆山尚达智机械有限公司 | Novel spanner |
CN203799586U (en) * | 2014-04-29 | 2014-08-27 | 国家电网公司 | Signboard mounting support for power transmission line steel tube tower |
CN204401736U (en) * | 2014-12-15 | 2015-06-17 | 厦门瑞尔特卫浴科技股份有限公司 | A kind ofly prevent the structure of screw rod positioning and adopt the pushbutton unit of this structure |
CN204650926U (en) * | 2015-05-26 | 2015-09-16 | 国网冀北电力有限公司张家口供电公司 | A kind of pole tag being convenient to install |
CN205298163U (en) * | 2015-11-27 | 2016-06-08 | 武汉市汉阳市政建设集团公司 | U type card of connecting glass fiber steel and screw -thread steel |
CN205384828U (en) * | 2016-03-04 | 2016-07-13 | 国网山西省电力公司晋城供电公司 | Transmission line signboard linkage |
CN207718713U (en) * | 2017-12-29 | 2018-08-10 | 国网河北省电力有限公司衡水供电分公司 | A kind of shaft tower Sign Board reinforcing gold utensil |
-
2017
- 2017-12-29 CN CN201711469238.9A patent/CN108091252A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0335855A2 (en) * | 1988-03-31 | 1989-10-04 | JOSEF WICK & SÖHNE WICK GESELLSCHAFT M.B.H. | Holder for fixing a covering profile or the same to a support |
JP2001220719A (en) * | 2000-02-09 | 2001-08-17 | Akira Miyagi | Triangular traffic sign |
CN101881291A (en) * | 2010-07-08 | 2010-11-10 | 江苏省电力公司徐州供电公司 | Fixing part for signboard of iron tower |
CN101916531A (en) * | 2010-07-14 | 2010-12-15 | 江苏省电力公司徐州供电公司 | Concrete pole signboard fixing device |
CN201918113U (en) * | 2010-11-01 | 2011-08-03 | 甘肃省电力公司白银供电公司 | Simple connector for tower materials |
CN103659681A (en) * | 2012-09-17 | 2014-03-26 | 昆山尚达智机械有限公司 | Novel spanner |
CN203185476U (en) * | 2013-01-28 | 2013-09-11 | 许金锔 | Buckle structure device for quick-mounted concrete formwork |
CN203799586U (en) * | 2014-04-29 | 2014-08-27 | 国家电网公司 | Signboard mounting support for power transmission line steel tube tower |
CN204401736U (en) * | 2014-12-15 | 2015-06-17 | 厦门瑞尔特卫浴科技股份有限公司 | A kind ofly prevent the structure of screw rod positioning and adopt the pushbutton unit of this structure |
CN204650926U (en) * | 2015-05-26 | 2015-09-16 | 国网冀北电力有限公司张家口供电公司 | A kind of pole tag being convenient to install |
CN205298163U (en) * | 2015-11-27 | 2016-06-08 | 武汉市汉阳市政建设集团公司 | U type card of connecting glass fiber steel and screw -thread steel |
CN205384828U (en) * | 2016-03-04 | 2016-07-13 | 国网山西省电力公司晋城供电公司 | Transmission line signboard linkage |
CN207718713U (en) * | 2017-12-29 | 2018-08-10 | 国网河北省电力有限公司衡水供电分公司 | A kind of shaft tower Sign Board reinforcing gold utensil |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201284616Y (en) | Assisted climbing ladder of steel pipe column | |
CN207718713U (en) | A kind of shaft tower Sign Board reinforcing gold utensil | |
CN206751121U (en) | A kind of tilting prevention device suitable for the winding of deep well submersible pump cable | |
CN104153706B (en) | A kind of cat ladder detachable for communication tower | |
CN201228461Y (en) | Flange assembling apparatus | |
CN108091252A (en) | A kind of shaft tower Sign Board reinforces gold utensil | |
CN202164813U (en) | Anti-inclination device for scaffold lifting in construction | |
CN201312077Y (en) | Earth wire raiser for electric pole tower | |
CN205104835U (en) | A auxiliary device for power line erects | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN202888418U (en) | Portable self-tapping grounding pin | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN206016297U (en) | A kind of construction hole guard rail | |
CN203755795U (en) | Multifunctional safeguard rail | |
CN201868786U (en) | Special repairing lifter for 220KV lightning wire of power transmission line | |
CN203755796U (en) | Power construction safeguard rail | |
CN208749131U (en) | Shovel floor tile electric hammer trolley | |
CN203161459U (en) | Fixing device used for fixing wind power generator tower barrel with platform | |
CN214123334U (en) | Security protection device for construction | |
CN202861752U (en) | Hydraulic quick dismounting device for oil press pressing bolt | |
CN201883923U (en) | Multi-purpose ladder for aloft work | |
CN108756276A (en) | Shovel floor tile electric hammer trolley | |
CN205424111U (en) | Hose mechanical support device during barrel filling | |
CN205674087U (en) | A kind of multi-functional rapidly and efficiently spanner | |
CN205829046U (en) | Double suspension centre power transmission line overhead ground wire hoisting tools |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |