CN101915112B - 强帮强角煤巷锚杆支护方法 - Google Patents
强帮强角煤巷锚杆支护方法 Download PDFInfo
- Publication number
- CN101915112B CN101915112B CN2010102430947A CN201010243094A CN101915112B CN 101915112 B CN101915112 B CN 101915112B CN 2010102430947 A CN2010102430947 A CN 2010102430947A CN 201010243094 A CN201010243094 A CN 201010243094A CN 101915112 B CN101915112 B CN 101915112B
- Authority
- CN
- China
- Prior art keywords
- anchor
- group
- strong
- roadway
- coal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title claims abstract description 13
- 240000007594 Oryza sativa Species 0.000 claims description 2
- 235000007164 Oryza sativa Nutrition 0.000 claims description 2
- 235000009566 rice Nutrition 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 239000011435 rock Substances 0.000 description 5
- 230000008093 supporting effect Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 238000004088 simulation Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种强帮强角煤巷锚杆支护方法,包括设于巷道顶板的多根顶锚杆及顶锚索和设于巷道侧壁的多根帮锚杆及帮锚索,多根顶锚杆及顶锚索中,靠近巷道两侧的顶锚杆及顶锚索分别向巷道的外侧倾斜15°-30°;多根帮锚杆及帮锚索中,最上层帮锚杆及帮锚索向上倾斜15°-30°,最下层帮锚杆及帮锚索向下倾斜15°-30°。使煤巷的支护效果得到了很大的提高与改善,提高了巷道整体稳定性,减少了巷道变形量与塑性破坏区,保证了巷道安全性,降低了巷道支护成本与维护难度,提高了巷道的掘进速度。
Description
技术领域
本发明涉及一种煤巷支护技术,尤其涉及一种强帮强角煤巷锚杆支护方法。
背景技术
如图1所示,巷道穿过的岩层大多或全部是煤的巷道称为煤巷,采区周围的巷道一般是煤巷。通常情况下,煤巷岩层复杂多变,经常受采动影响,且服务周期较短,安全系数不能过高,故煤巷支护具有难度高,稳定性差,安全性低的特点。煤巷支护费用一般占巷道掘进总费用的50%以上,煤巷支护速度是煤巷掘进速度最为重要的影响因素。
如图2所示,现有煤巷支护,包括设于巷道顶板的多根顶锚杆及顶锚索1和设于巷道侧壁的多根帮锚杆及帮锚索2,顶锚杆及顶锚索1一般垂直于巷道顶板设置;帮锚杆及帮锚索2一般垂直于巷道侧壁设置。现有煤巷支护设计基本都以顶板为重点,存在片面加长、加密、加强顶锚杆及顶锚索,巷道整体性差、变形量大,事故时有发生。
发明内容
本发明的目的是提供一种能使得巷道围岩受力合理、提高巷道整体稳定性、减小变形量、加快掘进速度的强帮强角煤巷锚杆支护方法。
本发明的目的是通过以下技术方案实现的:
本发明的强帮强角煤巷锚杆支护方法,包括设于巷道顶板的多根顶锚杆及顶锚索和设于巷道侧壁的多根帮锚杆及帮锚索,多根顶锚杆及顶锚索中,靠近巷道两侧的顶锚杆及顶锚索分别向巷道的外侧倾斜15°-30°;多根帮锚杆及帮锚索中,最上层帮锚杆及帮锚索向上倾斜15°-30°,最下层帮锚杆及帮锚索向下倾斜15°-30°。
由上述本发明提供的技术方案可以看出,本发明所述的强帮强角煤巷锚杆支护方法,加强了煤巷帮部及角部支护,能使得巷道围岩受力合理、提高巷道整体稳定性、减小变形量,可以加快煤巷掘进速度。
附图说明
图1为煤巷开挖后,未支护时巷道变形示意图;
图2为现有技术中支护形式及其巷道变形示意图;
图3为本发明的强帮强角煤巷锚杆支护方法及其巷道变形示意图。
具体实施方式
本发明的强帮强角煤巷锚杆支护方法,其较佳的具体实施方式如图3所示,包括设于巷道顶板的多根顶锚杆及顶锚索和设于巷道侧壁的多根帮锚杆及帮锚索,所述的多根顶锚杆及顶锚索中,靠近巷道两侧的顶锚杆及顶锚索3分别向巷道的外侧倾斜15°-30°。
多根帮锚杆及帮锚索中,最上层帮锚杆及帮锚索4也可以向上倾斜15°-30°。
多根帮锚杆及帮锚索中,最下层帮锚杆及帮锚索5也可以向下倾斜15°-30°。
本发明中,最上层和最下层的帮锚杆(帮锚索)分别向上和向下倾15°-30°,两侧顶锚杆(顶锚索)向巷道外侧倾15°-30°。其角度的具体大小应依据实际煤层与岩层的参数及条件通过适当的岩石强度理论计算和数值模拟确定。通过上述措施,提高角部的强度与刚度,以达到强角的目的。
可以依据具体的岩层参数,设计合理的支护形式,通过加长帮锚杆(帮锚索)的长度,或加大其直径,或增加其密度等措施,提高煤巷帮部的强度与刚度,以达到强帮的目的。帮锚杆(锚索)的具体参数可以依据实际煤层参数及条件通过适当的理论计算和数值模拟确定。
通过上述措施,加强煤巷帮、角支护,确保煤巷整体稳定性的前提下,根据实际情况,通过适当减少顶锚杆(顶锚索)的长度或直径或密度,合理降低顶板支护的强度,即提高帮部结构体与顶板结构体的强度比值和刚度的比值,以增强巷道抵抗回采动载影响的能力,保持巷道在动载作用下的稳定性。
本发明可以与FLAC3D软件相结合,优化煤巷支护参数,提出科学合理的煤巷支护方案,提高煤巷稳定性,同时降低支护成本,提高经济效益。
本发明的强帮强角煤巷支护技术,使煤巷的支护效果得到了很大的提高与改善,提高了巷道整体稳定性,减少了巷道变形量与塑性破坏区,保证了巷道安全性,降低了巷道支护成本与维护难度,提高了巷道的掘进速度。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102430947A CN101915112B (zh) | 2010-08-02 | 2010-08-02 | 强帮强角煤巷锚杆支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102430947A CN101915112B (zh) | 2010-08-02 | 2010-08-02 | 强帮强角煤巷锚杆支护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101915112A CN101915112A (zh) | 2010-12-15 |
CN101915112B true CN101915112B (zh) | 2012-05-23 |
Family
ID=43322725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102430947A Expired - Fee Related CN101915112B (zh) | 2010-08-02 | 2010-08-02 | 强帮强角煤巷锚杆支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101915112B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425437A (zh) * | 2011-11-21 | 2012-04-25 | 大同煤矿集团有限责任公司 | 石炭系煤层开采顺槽巷道支护方法 |
CN102661144B (zh) * | 2012-04-28 | 2014-12-10 | 山东科技大学 | 深部沿空顺槽实体煤侧巷帮锚索锚固深度确定方法 |
CN102979541A (zh) * | 2012-12-11 | 2013-03-20 | 安徽恒源煤电股份有限公司 | 一种新型锚杆锚索安装方法 |
CN102979542B (zh) * | 2012-12-11 | 2015-09-30 | 安徽恒源煤电股份有限公司 | 一种锚网梁索支护工艺 |
CN103742177B (zh) * | 2013-12-30 | 2016-03-02 | 北京科技大学 | 一种强矿压巷道支护设计方法 |
CN104537566B (zh) * | 2014-12-22 | 2018-08-31 | 山西煤炭职业技术学院 | 一种六边形煤巷表面位移量的预测方法 |
CN108035751A (zh) * | 2017-11-22 | 2018-05-15 | 中国矿业大学 | 一种半煤岩巷道的巷帮支护方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4946315A (en) * | 1988-12-13 | 1990-08-07 | Chugh Yoginder P | Mine roof system |
US5466095A (en) * | 1993-06-10 | 1995-11-14 | Scott Investment Partners | Underground support system and method of support |
CN1191929A (zh) * | 1997-02-27 | 1998-09-02 | 陈居礼 | 井巷支护装置和方法 |
CN201218105Y (zh) * | 2008-05-28 | 2009-04-08 | 山西焦煤集团有限责任公司 | 矿井巷道掘进支护构件 |
CN101493011A (zh) * | 2008-12-30 | 2009-07-29 | 中国科学院武汉岩土力学研究所 | 一种软弱膨胀型围岩巷道支护方法 |
-
2010
- 2010-08-02 CN CN2010102430947A patent/CN101915112B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4946315A (en) * | 1988-12-13 | 1990-08-07 | Chugh Yoginder P | Mine roof system |
US5466095A (en) * | 1993-06-10 | 1995-11-14 | Scott Investment Partners | Underground support system and method of support |
CN1191929A (zh) * | 1997-02-27 | 1998-09-02 | 陈居礼 | 井巷支护装置和方法 |
CN201218105Y (zh) * | 2008-05-28 | 2009-04-08 | 山西焦煤集团有限责任公司 | 矿井巷道掘进支护构件 |
CN101493011A (zh) * | 2008-12-30 | 2009-07-29 | 中国科学院武汉岩土力学研究所 | 一种软弱膨胀型围岩巷道支护方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101915112A (zh) | 2010-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101915112B (zh) | 强帮强角煤巷锚杆支护方法 | |
CN106894833B (zh) | 深部不稳定覆岩下沿空掘巷非均称支护结构及施工方法 | |
CN105909289B (zh) | 一种深部三软煤层非对称巷道支护结构 | |
CN101215819B (zh) | 分离式双层桥面斜拉桥 | |
CN205647362U (zh) | 大跨度预应力拉索光伏支架 | |
CN204282187U (zh) | 一种新型蝴蝶拱桥 | |
CN202064983U (zh) | 一种架棚支护巷道底板控制装置 | |
CN102296976A (zh) | 大倾角煤层异形回采巷道非对称锚网索组合支护方法 | |
CN203145954U (zh) | 一种锚杆支护系统 | |
CN105370299A (zh) | 千米深埋厚煤层窄煤柱沿空护巷工艺 | |
CN203080400U (zh) | 一种单叶双曲面空间索网主缆的特大跨径悬索桥 | |
CN202578055U (zh) | 一种高、宽可调的焦炉筑炉施工用大棚 | |
CN209585718U (zh) | 一种多功能基坑防护棚 | |
CN201262097Y (zh) | 煤矿井下防堵型采区煤仓 | |
CN207131418U (zh) | 一种煤矿井下巷道支护装置 | |
CN204385629U (zh) | 一种用于悬索桥主塔上横梁施工的支架 | |
CN210948737U (zh) | 薄煤层倾斜小断面半煤岩巷的高效快速掘进巷道支护设施 | |
CN201187308Y (zh) | 大倾角厚煤层留小煤柱沿空掘巷支架 | |
CN102926388A (zh) | 一种用于深基坑开挖的运土装置及方法 | |
CN105756077B (zh) | 基础环岩石锚杆基础 | |
CN102535496A (zh) | 扩展墩结构和形成扩展墩结构的方法 | |
CN207177310U (zh) | 一种地下厂房岩壁吊车梁钢筋自稳结构 | |
CN105156111A (zh) | 大采高巷式充填条带开采的支护方法 | |
CN203701104U (zh) | 预制开口柱与基坑的连接结构 | |
CN106438216A (zh) | 分段直塔筒预应力混凝土风机塔架及其安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120523 Termination date: 20210802 |