CN101888088A - 超深海大型半潜式钻井平台配电系统的优化配置方法 - Google Patents

超深海大型半潜式钻井平台配电系统的优化配置方法 Download PDF

Info

Publication number
CN101888088A
CN101888088A CN2010101879130A CN201010187913A CN101888088A CN 101888088 A CN101888088 A CN 101888088A CN 2010101879130 A CN2010101879130 A CN 2010101879130A CN 201010187913 A CN201010187913 A CN 201010187913A CN 101888088 A CN101888088 A CN 101888088A
Authority
CN
China
Prior art keywords
distribution
distribution system
power consumption
consumption equipment
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101879130A
Other languages
English (en)
Other versions
CN101888088B (zh
Inventor
庄建军
许桢英
许冉冉
宗建刚
屠艳
王飞
陈永明
张永康
徐昊
王匀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong COSCO Shipping Engineering Co., Ltd.
Jiangsu University
Original Assignee
Jiangsu University
Cosco Shipyard Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University, Cosco Shipyard Group Co Ltd filed Critical Jiangsu University
Priority to CN2010101879130A priority Critical patent/CN101888088B/zh
Publication of CN101888088A publication Critical patent/CN101888088A/zh
Application granted granted Critical
Publication of CN101888088B publication Critical patent/CN101888088B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种超深海大型半潜式钻井平台配电系统的优化配置方法,由于配电系统的设计与布局直接影响钻进平台的正常工作,本发明通过优化全船电力系统主单线图,强化区域供电原则,根据系统与区域原则,调整配电系统方案,优化DP3主电缆路径;通过优化钻井配电系统的布置并对重新优化的方案进行电力系统的负荷及平衡计算,使整个配电系统更趋于合理,减小施工难度,节省电缆与人工的成本。本发明具有可操作性强,应用范围广,解决了船体配电系统设计和布局的难题的优点。

Description

超深海大型半潜式钻井平台配电系统的优化配置方法
技术领域:
本发明涉及海洋工程装备的安装技术领域,特指一种超深海大型半潜式钻井平台配电系统的优化配置方法。
背景技术:
半潜式钻井平台配电系统设计和布局一直是半潜式钻井平台设计和制造的关键,集中供电以一个主配电板为核心,直接与用电设备连接,集中供电模式操作简单,易于控制实现,区域供电是指将发电系统以小规模、分散式的方式布置在用户附近,相对于集中供电模式,区域供电具有以下优势:没有或很低输配电损耗;可避免或延缓增加的输配电成本;适合多种热电比的变化,可使系统根据热或电的需求进行调节从而增加年设备利用小时;土建和安装成本低;各电站相互独立,用户可自行控制,不会发生大规模供电事故,供电的可靠性高;可进行遥控和监测区域电力质量和性能;大量减少了环保压力,但目前半潜式钻井平台配电系统采用的集中配电模式,容易造成电缆敷设距离太长,导致电缆资源浪费;局部电缆过于集中,与管系通风冲突严重,专业间协调极其困难,现场施工难度大。如何优化区域供电模式下半潜式钻井平台配电系统的配置仍然是制约半潜式钻井平台发展的关键因素之一。
发明内容:
本发明的目的是为了克服以上的不足,提供一种采用区域供电模式,可操作性强和应用范围广的超深海大型半潜式钻井平台配电系统的优化配置方法。
本发明的目的通过以下技术方案来实现:一种超深海大型半潜式钻井平台配电系统的优化配置方法,包括优化船体电力系统主单线图、调整配电系统方案和调整钻井配电系统的布局三个步骤:
A、优化船体电力系统主单线图:根据区域配电原则,将集中供电模式转换为区域供电模式,增加多个子配电板,使用电设备靠近配电板,保证用电设备与配电板连接的每根电缆长度应小于30米,主配电板与各分配电板之间通过一根电源线连接,并设置分配电板所有电源开关正常状态下处于常开状态;ICS,F/G系统分别通过PROFIBUS信号线和F/G多芯信号线集中控制半潜式钻井平台的起停运转和应急切断;
B、调整配电系统方案:根据船体实际用电设备布局,将配电板靠近用电设备,优化DP3主电缆路径,且大负载用电设备使用最近的配电板供电,将大电力电缆长度缩短至1~3m,根据用电设备布局,合理分配用于日常用电设备和钻井用电设备的配电板;
C、调整钻井配电系统的布局:配电系统方案调整完成后,对电力负荷与负载平衡进行重新计算,在靠近用电设备密集区开辟一块地方,建造配电板舱室,将钻井配电板移到配电板舱室,使配电板更加靠近钻井设备,缩短电缆敷设长度。
本发明与现有技术相比具有以下优点:大大减少了总电缆长度和用电负载电缆长度,缓解了主干路径电缆通道的拥挤问题,极大程度上节省了敷设电缆的舾装件和人工成本,减小了施工难度,缩短了施工周期。
附图说明:
图1是优化后的全船电力系统主单线图;
具体实施方式:
为了加深对本发明的理解,下面将结合实施例和附图对本发明作进一步详述,该实施例和附图仅用于解释本发明,并不构成对本发明保护范围的限定。
如图1和图2示出了本发明超深海大型半潜式钻井平台配电系统的优化配置方法的一种具体实施方式,包括以下步骤:
A、优化船体电力系统主单线图,根据区域配电原则,将集中供电模式转换为区域供电模式;增加6个子配电板,使用电设备尽可能靠近配电板,保证用电设备与配电板连接的每根电缆长度应小于30米,如图1所示,主配电板与各分配电板之间通过一根电源线连接,并设置分配电板所有电源开关正常状态下处于常开状态,ICS系统即Instrument Control system仪器控制系统、F/G系统即Fire/Gas火/气系统分别通过PROFIBUS信号线,即Process Field Bus现场总线技术和F/G多芯信号线集中控制半潜式钻井平台各子系统的起停运转和应急切断,通过对船体电力系统主单线图的优化,节约电缆总长度5万米,缓解了主干路径上电缆通道的拥挤问题,很大程度上节省了敷设电缆的舾装件和人工成本,减小了施工难度,缩短了施工周期。
B、调整配电系统方案,根据船体实际用电设备布局,将配电板尽量靠近用电设备,优化DP3主电缆路径,尽量将大负载用电设备用它最近的配电板供电,将大电力电缆长度缩短至1m~3m,根据用电设备布局,合理分配用于日常用电设备和钻井用电设备的配电板。
C、调整钻井配电系统的布局,配电系统方案调整完成后,对电力负荷与负载平衡进行重新计算;在靠近用电设备密集区开辟一块地方,建造两个配电板舱室1,如图2所示,将钻井配电板移到配电板舱室1;使配电板更加靠近钻井设备,缩短电缆敷设长度。
通过采用配电系统的优化配置方法大大减少了总电缆长度和用电负载电缆长度,缓解了主干路径电缆通道的拥挤问题,极大程度上节省了敷设电缆的舾装件和人工成本,减小了施工难度,缩短了施工周期。

Claims (1)

1.一种超深海大型半潜式钻井平台配电系统的优化配置方法,其特征在于,所述优化配置方法包括优化船体电力系统主单线图、调整配电系统方案和调整钻井配电系统的布局三个步骤:
A、优化船体电力系统主单线图:根据区域配电原则,将集中供电模式转换为区域供电模式,增加多个子配电板,使用电设备靠近配电板,保证用电设备与配电板连接的每根电缆长度应小于30米,主配电板与各分配电板之间通过一根电源线连接,并设置分配电板所有电源开关正常状态下处于常开状态;ICS,F/G系统分别通过信号线和F/G多芯信号线集中控制半潜式钻井平台各子系统的起停运转和应急切断;
B、调整配电系统方案:根据船体实际用电设备布局,将配电板靠近用电设备,优化DP3主电缆路径,且大负载用电设备使用最近的配电板供电,将大电力电缆长度缩短至1~3m,根据用电设备布局,合理分配用于日常用电设备和钻井用电设备的配电板;
C、调整钻井配电系统的布局:配电系统方案调整完成后,对电力负荷与负载平衡进行重新计算,在靠近用电设备密集区开辟一块地方,建造配电板舱室,将钻井配电板移到配电板舱室,使配电板更加靠近钻井设备,缩短电缆敷设长度。
CN2010101879130A 2010-05-31 2010-05-31 超深海大型半潜式钻井平台配电系统的优化配置方法 Active CN101888088B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101879130A CN101888088B (zh) 2010-05-31 2010-05-31 超深海大型半潜式钻井平台配电系统的优化配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101879130A CN101888088B (zh) 2010-05-31 2010-05-31 超深海大型半潜式钻井平台配电系统的优化配置方法

Publications (2)

Publication Number Publication Date
CN101888088A true CN101888088A (zh) 2010-11-17
CN101888088B CN101888088B (zh) 2011-08-17

Family

ID=43073862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101879130A Active CN101888088B (zh) 2010-05-31 2010-05-31 超深海大型半潜式钻井平台配电系统的优化配置方法

Country Status (1)

Country Link
CN (1) CN101888088B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094982A (zh) * 2011-10-27 2013-05-08 中集船舶海洋工程设计研究院有限公司 船舶冷藏集装箱的供电系统
CN103625607A (zh) * 2012-08-20 2014-03-12 中集船舶海洋工程设计研究院有限公司 集装箱船
CN104914721A (zh) * 2015-04-16 2015-09-16 南通中远船务自动化有限公司 船舶电气调试流程的优化配置方法
CN105000160A (zh) * 2015-08-12 2015-10-28 上海船舶研究设计院 一种船舶艏部设备供电系统
CN105027149A (zh) * 2013-03-04 2015-11-04 西门子公司 敷设电缆方法
CN106410710A (zh) * 2016-08-24 2017-02-15 广州文冲船厂有限责任公司 一种冰区船舶电伴热系统
CN106451416A (zh) * 2016-09-08 2017-02-22 上海中远船务工程有限公司 Dp3深水钻井船闭环高压配电系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101165988A (zh) * 2006-10-16 2008-04-23 康弗蒂姆有限公司 电力分配系统
CN101519116A (zh) * 2008-01-07 2009-09-02 康弗蒂姆技术有限公司 船舶配电和推进系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101165988A (zh) * 2006-10-16 2008-04-23 康弗蒂姆有限公司 电力分配系统
CN101519116A (zh) * 2008-01-07 2009-09-02 康弗蒂姆技术有限公司 船舶配电和推进系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《电工技术》 20100430 张辉 深水半潜式钻井平台电力系统的设计研究 43-44,62 1 , 第4期 2 *
《船电技术》 20090131 尚成枝等 舰船环形区域配电结构及可靠性分析 第29卷, 第01期 2 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094982A (zh) * 2011-10-27 2013-05-08 中集船舶海洋工程设计研究院有限公司 船舶冷藏集装箱的供电系统
CN103094982B (zh) * 2011-10-27 2017-08-01 中集船舶海洋工程设计研究院有限公司 船舶冷藏集装箱的供电系统
CN103625607A (zh) * 2012-08-20 2014-03-12 中集船舶海洋工程设计研究院有限公司 集装箱船
CN103625607B (zh) * 2012-08-20 2017-11-03 中集船舶海洋工程设计研究院有限公司 集装箱船
CN105027149A (zh) * 2013-03-04 2015-11-04 西门子公司 敷设电缆方法
CN104914721A (zh) * 2015-04-16 2015-09-16 南通中远船务自动化有限公司 船舶电气调试流程的优化配置方法
CN105000160A (zh) * 2015-08-12 2015-10-28 上海船舶研究设计院 一种船舶艏部设备供电系统
CN105000160B (zh) * 2015-08-12 2017-04-26 上海船舶研究设计院 一种船舶艏部设备供电系统
CN106410710A (zh) * 2016-08-24 2017-02-15 广州文冲船厂有限责任公司 一种冰区船舶电伴热系统
CN106451416A (zh) * 2016-09-08 2017-02-22 上海中远船务工程有限公司 Dp3深水钻井船闭环高压配电系统

Also Published As

Publication number Publication date
CN101888088B (zh) 2011-08-17

Similar Documents

Publication Publication Date Title
CN101888088B (zh) 超深海大型半潜式钻井平台配电系统的优化配置方法
CN102394501B (zh) 基于电网负荷动态平衡的节能装置
EP2981712B1 (en) Multi-farm wind power generation system
US9450413B2 (en) Power regulating system for solar power station
CN103872775B (zh) 一种智能微网监控系统及监控方法
CN103595044B (zh) 一种应用于孤立海岛微电网的柴油发电系统
CN105552916A (zh) 一种具有线路功率越限控制功能的upfc系统级控制方法
JP2009118670A (ja) 電力供給装置
CN201897726U (zh) 水电站自动化监控系统
CN201955673U (zh) 一种智能型电机控制中心
CN106786607B (zh) 一种确定upfc工程安装位置和安装容量的方法
CN205081559U (zh) 一种高压变频器控制系统热备用拓扑结构
He et al. Research on AC & DC hybrid power supply system with high‐proportion renewable energy of data centre
CN201985614U (zh) 多路电源备用自投装置
Fairley A grid as big as China
CN107294088B (zh) 用于电改的增量配电网构建应用方法与多电源直供电系统
CN107306029B (zh) 一种混合输电控制保护装置的模拟量传输系统及方法
Terada et al. Proposal of environmental adaptation for the next-generation distribution SCADA system
CN202737578U (zh) 一种大型公共建筑节电监控系统
CN107317341B (zh) 一种实现分布式电源接入配电网即插即用的方法
CN104795813A (zh) 构建适应分布式电源接入的中压配电网示例系统的方法
CN203166550U (zh) 一种配电网的电缆环网结构
CN204633455U (zh) 一种脱硫系统厂用电接线结构
Wang et al. Research on Reliability Evaluation and Scheme Optimization of Main Connection Mode of Substation
CN203933043U (zh) 一种城市轨道交通高架车站混合供电系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226000 No. 1, COSCO Road, Jiangsu, Nantong

Co-patentee after: jiangsu university

Patentee after: Nantong COSCO Shipping Engineering Co., Ltd.

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District COSCO Road No. 1

Co-patentee before: jiangsu university

Patentee before: COSCO Shipyard Group Co., Ltd.

CP03 Change of name, title or address