CN106786607B - 一种确定upfc工程安装位置和安装容量的方法 - Google Patents
一种确定upfc工程安装位置和安装容量的方法 Download PDFInfo
- Publication number
- CN106786607B CN106786607B CN201710160873.2A CN201710160873A CN106786607B CN 106786607 B CN106786607 B CN 106786607B CN 201710160873 A CN201710160873 A CN 201710160873A CN 106786607 B CN106786607 B CN 106786607B
- Authority
- CN
- China
- Prior art keywords
- upfc
- installed capacity
- electricity
- transmission line
- route
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 25
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000005540 biological transmission Effects 0.000 claims abstract description 74
- 238000009826 distribution Methods 0.000 claims abstract description 11
- 230000005611 electricity Effects 0.000 claims description 43
- 239000011159 matrix material Substances 0.000 claims description 27
- 238000005520 cutting process Methods 0.000 claims description 2
- 238000012546 transfer Methods 0.000 abstract description 8
- 238000004364 calculation method Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000004422 calculation algorithm Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J3/1807—Arrangements for adjusting, eliminating or compensating reactive power in networks using series compensators
- H02J3/1814—Arrangements for adjusting, eliminating or compensating reactive power in networks using series compensators wherein al least one reactive element is actively controlled by a bridge converter, e.g. unified power flow controllers [UPFC]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J3/1821—Arrangements for adjusting, eliminating or compensating reactive power in networks using shunt compensators
- H02J3/1871—Methods for planning installation of shunt reactive power compensators
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/10—Flexible AC transmission systems [FACTS]
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160873.2A CN106786607B (zh) | 2017-03-17 | 2017-03-17 | 一种确定upfc工程安装位置和安装容量的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160873.2A CN106786607B (zh) | 2017-03-17 | 2017-03-17 | 一种确定upfc工程安装位置和安装容量的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106786607A CN106786607A (zh) | 2017-05-31 |
CN106786607B true CN106786607B (zh) | 2019-04-09 |
Family
ID=58967400
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710160873.2A Active CN106786607B (zh) | 2017-03-17 | 2017-03-17 | 一种确定upfc工程安装位置和安装容量的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106786607B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108306300B (zh) * | 2018-01-30 | 2020-09-01 | 中国电力科学研究院有限公司 | 一种用于确定主网断面上统一潮流控制器容量的方法及系统 |
CN109038640B (zh) * | 2018-08-13 | 2021-12-03 | 深圳供电局有限公司 | 一种基于相量图解法的upfc串联侧换流器定容方法 |
CN112165102B (zh) * | 2020-09-25 | 2022-08-19 | 国网青海省电力公司果洛供电公司 | 一种应用电力电子调压器延长稀疏地区配电网供电半径的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0801833B1 (en) * | 1995-01-05 | 1999-06-30 | Siemens Westinghouse Power Corporation | Transmission line power flow controller with unequal advancement and retardation of transmission angle |
CN104092224A (zh) * | 2014-07-04 | 2014-10-08 | 南京南瑞继保电气有限公司 | 一种可变换静止同步补偿器 |
CN105119277A (zh) * | 2015-08-21 | 2015-12-02 | 国家电网公司 | 一种统一潮流控制器选址的实用化方法 |
EP3125394A1 (en) * | 2014-05-19 | 2017-02-01 | NR Electric Co., Ltd. | Unified power flow controller for double-circuit line |
CN106505595A (zh) * | 2016-12-22 | 2017-03-15 | 山东大学 | 基于mmc‑upfc的输电线路三相不平衡治理系统及方法 |
-
2017
- 2017-03-17 CN CN201710160873.2A patent/CN106786607B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0801833B1 (en) * | 1995-01-05 | 1999-06-30 | Siemens Westinghouse Power Corporation | Transmission line power flow controller with unequal advancement and retardation of transmission angle |
EP3125394A1 (en) * | 2014-05-19 | 2017-02-01 | NR Electric Co., Ltd. | Unified power flow controller for double-circuit line |
CN104092224A (zh) * | 2014-07-04 | 2014-10-08 | 南京南瑞继保电气有限公司 | 一种可变换静止同步补偿器 |
CN105119277A (zh) * | 2015-08-21 | 2015-12-02 | 国家电网公司 | 一种统一潮流控制器选址的实用化方法 |
CN106505595A (zh) * | 2016-12-22 | 2017-03-15 | 山东大学 | 基于mmc‑upfc的输电线路三相不平衡治理系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106786607A (zh) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cai et al. | A hierarchical multi-agent control scheme for a black start-capable microgrid | |
CN105305433B (zh) | 分布式电源接入配电网的最大功率渗透率计算方法 | |
KR20210023127A (ko) | 배전계통 고장구간 식별 시스템 | |
CN106501667B (zh) | 一种含分布式电源配电网单相断线故障选线方法 | |
CN106786607B (zh) | 一种确定upfc工程安装位置和安装容量的方法 | |
CN103337840B (zh) | 大型交直流互联电网短路限流器机电暂态模型的控制方法 | |
CN102982230A (zh) | 一种基于节点阻抗灵敏度的短路电流超标辅助决策方法 | |
Xiao et al. | Flexible distribution network: definition, configuration, operation, and pilot project | |
CN109038568A (zh) | 基于供需协调的电压暂降综合治理方法 | |
Shu et al. | A back-to-back VSC-HVDC system of Yu-E power transmission lines to improve cross-region capacity | |
CN105528653A (zh) | 考虑经济性和安全性的光伏接入优化方法 | |
CN106410812A (zh) | 一种特高压接入后的电网电压越限调整方法 | |
Li et al. | Application of MMC‐UPFC in the 500 kV power grid of Suzhou | |
Panasetsky et al. | Centralized emergency control for multi-terminal VSC-based shipboard power systems | |
Xiao et al. | Operation and control of hybrid HVDC system with LCC and full‐bridge MMC connected in parallel | |
Wang et al. | Study on the site selection for synchronous condenser responding to commutation failures of multi‐infeed HVDC system | |
CN106451446A (zh) | 基于柔性直流技术的城市电网分区互联装置的定容方法 | |
CN105740966A (zh) | 一种含分布式电源的配电网扩展规划方法 | |
Zhang et al. | Voltage control method based on three‐phase four‐wire sensitivity for hybrid AC/DC low‐voltage distribution networks with high‐penetration PVs | |
Zhang et al. | Successive MISOCP algorithm for islanded distribution networks with soft open points | |
EP2325969B1 (en) | Systems and methods for monitoring power devices | |
Trinh et al. | Coordinated voltage control scheme for multi-terminal low-voltage DC distribution system | |
Dong et al. | Local‐area STVS control system | |
CN105048449A (zh) | 基于潮流转移分布因子的统一潮流控制器控制整定方法 | |
NamKoong et al. | Voltage control of distribution networks to increase their hosting capacity in South Korea |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171103 Address after: 210024 Shanghai Road, Jiangsu, China, No. 215, No. Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY Applicant after: ECONOMIC AND TECHNOLOGY RESEARCH INSTITUTE, STATE GRID JIANGSU ELECTRIC POWER COMPANY Applicant after: State Grid Corporation of China Address before: 210024 Shanghai Road, Jiangsu, China, No. 215, No. Applicant before: STATE GRID JIANGSU ELECTRIC POWER COMPANY Applicant before: ECONOMIC AND TECHNOLOGY RESEARCH INSTITUTE, STATE GRID JIANGSU ELECTRIC POWER COMPANY |
|
GR01 | Patent grant | ||
GR01 | Patent grant |