CN101886486B - Communication base station with lifting function - Google Patents

Communication base station with lifting function Download PDF

Info

Publication number
CN101886486B
CN101886486B CN2010102461269A CN201010246126A CN101886486B CN 101886486 B CN101886486 B CN 101886486B CN 2010102461269 A CN2010102461269 A CN 2010102461269A CN 201010246126 A CN201010246126 A CN 201010246126A CN 101886486 B CN101886486 B CN 101886486B
Authority
CN
China
Prior art keywords
tower
fixed pulley
base station
communication base
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102461269A
Other languages
Chinese (zh)
Other versions
CN101886486A (en
Inventor
黄永文
孙义红
吴爱华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG RUINENG COMMUNICATION TECHNOLOGY CO., LTD.
Original Assignee
Zhejiang Ruineng Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ruineng Communication Technology Co Ltd filed Critical Zhejiang Ruineng Communication Technology Co Ltd
Priority to CN2010102461269A priority Critical patent/CN101886486B/en
Publication of CN101886486A publication Critical patent/CN101886486A/en
Application granted granted Critical
Publication of CN101886486B publication Critical patent/CN101886486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to the technical field of communication equipment, in particular to a communication base station with a lifting function. The communication base station comprises a lifting iron tower, a lifting mechanism and a communication machine room, wherein the lifting iron tower at least comprises a fixed section tower body and a lifting section tower body provided with an antenna mounting rack; the tower body sizes of the lifting iron tower are reduced in turn from top to bottom, and in each two sections of adjacent tower bodies, an upper section tower body is nested in a lower section tower body; and all the lifting tower bodies are lifted and positioned in a slipping mode according to a set height by the lifting mechanism. The lifting mechanism mainly comprises a motor, a twin-roll hoisting machine, a fixed pulley, a movable pulley, a main steel wire rope, a protective steel wire rope and the like. All the tower bodies of the communication base station adopt a nesting mode, perform free lifting in a slipping mode according to the set height, are labor-saving to mount and can save materials. In use, the communication base station can realize a quick, high-efficiency and low-cost concept and has the advantages of energy saving, emission reduction and environmental protection by using the function of using the lifting mechanism to change different coverage areas.

Description

A kind of band elevating function communication base station
Technical field
Content of the present invention relates to the communication equipment technical field, relates in particular to the communication base station of band elevating function.
Background technology
Along with the construction of 3G, 4G development communication technologies maturation and the network coverage, the layout density requirements of communication base station is increasingly high, and this and 3G, 4G wireless technology and characteristics have significant relationship, could satisfy normal the use because of it needs wideer capacity, faster speed.Particularly in the city or the bigger zone of some population density, outskirts of a town, higher requirement is proposed for the construction of communication base station.And " energy-saving and emission-reduction " are the slogans that the whole society proposes now, how in communication base station is built, to respond current policy, can meet present construction present situation, can satisfy radio network technique again, become the difficult problem that each operator and Construction unit face.
The construction of original communication base station usually needs the construction of marching into the arena of three tame Construction units could accomplish the construction of a communication, and the integral body construction period is long, personnel's complicacy, in the city or the city imitate responsive location and be easy to cause the people to disturb, cause and can't build a station.And the supporting iron tower in traditional base station all is a specified altitude assignment, and tower body need could be fixed through flange bolt or connection types, and installation process is more loaded down with trivial details, requires great effort more when needing dismounting, also can cause the waste of a lot of materials; Particularly buried construction all need be excavated in iron tower and machine room basis, and its concrete and reinforcing bar cast back total quality reach more than 50 tons, are difficult to remove from former base station location remove again, and cost is high, destroys very serious to the locality.
Summary of the invention
The present invention is directed to the deficiency that the existing communication base station construction exists, and provide a kind of guarantee signal cover with the general safety prerequisite under, body of the tower can go up and down, integral body can simple installation, removal repeatedly, rationally distributed communication base station.
A kind of band elevating function communication base station; Comprise up-down iron tower, elevating mechanism and communications equipment room; Said up-down iron tower comprises the dropping section body of the tower of canned paragraph body of the tower and band antenna installing rack at least, the body of the tower size of said up-down iron tower from down and on dwindle successively, and in every adjacent two sections bodies of the tower; The epimere body of the tower is nested in the hypomere body of the tower, and makes between liftable each section body of the tower to go up and down and the location by the setting height slip through elevating mechanism.Each section of the present invention body of the tower adopts nested mode, is free to slide up-down by setting height, installs comparatively laborsavingly, and can save material again, can change the function of different coverages in the use through elevating mechanism, realization fast, efficiently, notion cheaply.
Dropping section body of the tower in the middle of said up-down iron tower also comprises, said elevating mechanism comprises motor, twin-roll hoist engine, fixed pulley A, fixed pulley B, fixed pulley C, movable pulley A, movable pulley B, main rope, protection wire rope, interlock wire rope:
Said motor drives twin-roll hoist engine rotates; Make main rope and protection steel wire disk line or off-line simultaneously; Both sides, said canned paragraph body of the tower bottom are respectively equipped with fixed pulley A, its both sides, top are respectively equipped with fixed pulley B; The both sides, dropping section body of the tower bottom of band antenna installing rack are provided with movable pulley B, and the both sides, bottom of middle dropping section body of the tower are respectively equipped with movable pulley A, its top is respectively equipped with fixed pulley C;
One end of one end of said main rope and protection wire rope connects the twin-roll hoist engine; The other end of its main rope is fixed in the node A, the protection wire rope that are located at the canned paragraph body of the tower through fixed pulley A, fixed pulley B and movable pulley A and is fixed in the Node B that is located at middle dropping section body of the tower through fixed pulley A, fixed pulley B; Said interlock wire rope warp is around fixed pulley C, movable pulley B, and the node C that is located at canned paragraph body of the tower top is fixed at its two ends.
The present invention adopts the twin-roll hoist engine, and main rope and protection wire rope are set, and makes elevating mechanism play double protection to the up-down of body of the tower.
As preferably, also be provided with the reservation node above the said middle dropping section body of the tower.Reserve node and be convenient to install the more interlude body of the tower of multistage.
As preferably, said up-down iron tower is a three-tube structure, and said motor and moving twin-roll hoist engine are positioned at the central lower of canned paragraph body of the tower.Adopt three-tube structure, and the set center of motor and twin-roll hoist engine, make the theftproof of elevating mechanism stronger, stressed even, and not occupy-place again is installed.
As preferably, said elevating mechanism is hydraulic mechanism or big stroke scissors expansion mechanism.
In a word, adopt communication base station of the present invention, can realize that base station towers height degree is variable, the construction period is short; Advantages such as engineering management is simple, and integrated degree is high, and the whole floor space in base station is little; And its overall structure detachable dismounting, characteristics such as body of the tower liftable, resettlement is fast; With low cost, can have enough to meet the need use, reach the effect of energy-saving and emission-reduction, environmental protection.
Description of drawings
Fig. 1 structural representation of the present invention
Fig. 2 is an A-A sectional view among Fig. 1.
The specific embodiment
Embodiment 1
As shown in Figure 1; A kind of band elevating function communication base station; Comprise up-down iron tower, elevating mechanism and communications equipment room 6; Said up-down iron tower comprises the dropping section body of the tower 2 of canned paragraph body of the tower 4, middle dropping section body of the tower 3 and band antenna installing rack 1, and the size of the dropping section body of the tower 2 of said band antenna installing rack 1 is less than the size of middle dropping section body of the tower 3, and the size of said middle dropping section body of the tower 3 is less than the size of canned paragraph body of the tower 4.
Said elevating mechanism comprises motor 9, twin-roll hoist engine 10, fixed pulley A11, fixed pulley B15, fixed pulley C18, movable pulley A14, movable pulley B17, main rope 12, protection wire rope 13, interlock wire rope 19:
Said motor 9 drives twin-roll hoist engine 10 and rotates; Make main rope 12 and 13 dish line or the off-lines of protection wire rope simultaneously; Both sides, said canned paragraph body of the tower 4 bottom are respectively equipped with fixed pulley A11, its both sides, top are respectively equipped with fixed pulley B15; The both sides, dropping section body of the tower 2 bottom of band antenna installing rack 1 are provided with movable pulley B17, and the both sides, bottom of middle dropping section body of the tower 3 are respectively equipped with movable pulley A14, its top is respectively equipped with fixed pulley C18;
One end of one end of said main rope 12 and protection wire rope 13 connects twin-roll hoist engine 10; The other end of its main rope 12 is fixed in the node A20, the protection wire rope 13 that are located at canned paragraph body of the tower 4 through fixed pulley A11, fixed pulley B15 and movable pulley A14 and is fixed on the Node B 21 that is located at middle dropping section body of the tower 3 through fixed pulley A11, fixed pulley B15; Said interlock wire rope 19 warps are around fixed pulley C18, movable pulley B17, and the node C16 that is located at canned paragraph body of the tower 4 tops is fixed at its two ends.
Said up-down iron tower is three-tube structure, and is as shown in Figure 2, and said motor 9 reaches the central lower that moving twin-roll hoist engine 10 is positioned at canned paragraph body of the tower 3.
Dropping section body of the tower 3 tops also are provided with and reserve node 22 in the middle of said.
A kind of band elevating function communication base station also comprises Weighting system and anti-pulling device 7, and said communications equipment room 6, up-down iron tower all independently are installed on the Weighting system 8, and the area design of said communications equipment room 6 is comparatively flexible, and communications equipment room 6 areas are at 12m 2Adopt all-in-one-piece color steel machine room of batch production or armor machine room when following, satisfy the requirement of machine room whole Transporting; Area is at 12m 2Can adopt the on-site consolidation mode when above.
Be provided with braced structures 5 between said communications equipment room 6 and the up-down iron tower, said braced structures 5 is made up of rigid support that strides across machine room and brace, and said Weighting system 8 is made up of split type grade beam and girder steel.Said anti-pulling device 7 is arranged on the bottom of Weighting system 8, and its structure increases the vane type spiral great institutions for band is local.
During operation; Motor 9 drives twin-roll hoist engine 10 and rotates; Under main rope 12 drive of a cylinder hoist engine therein through fixed pulley A11, fixed pulley B15 and movable pulley A14; Dropping section body of the tower 3 goes up and down and the location in the middle of making, and middle dropping section body of the tower 3 drives interlock wire rope 19 again goes up and down and the location dropping section body of the tower 2 of antenna installing rack 1.And protection wire rope 13 to be when emergency such as fractures main rope 12 being occurred one protect and the preparation effect.
The up-down iron tower of present embodiment is 3 sections bodies of the tower, and certainly according to the needs in different communication place, the hop count of middle dropping section body of the tower 3 also can suitably be adjusted increase, and the reservation node 22 that middle dropping section body of the tower 3 tops are provided with also just because of this and prepare.
Embodiment 2
A kind of band elevating function communication base station; Comprise up-down iron tower, elevating mechanism and communications equipment room 7; Said up-down iron tower comprises the dropping section body of the tower 2 of canned paragraph body of the tower 4 and band antenna installing rack 1; The size of the dropping section body of the tower 2 of said band antenna installing rack 1 is littler than the size of canned paragraph body of the tower 4, and the dropping section body of the tower 2 of antenna installing rack 1 is nested in the canned paragraph body of the tower 4, and makes the dropping section body of the tower 2 of band antenna installing rack 1 slide and the location by setting height through elevating mechanism.The technical scheme of this instance relatively is fit to be lower than the communication base station of 15M.
Simultaneously, said elevating mechanism can adopt the structure like embodiment 1, just middle dropping section body of the tower 3 positions and setting dependency structure removal is above that got final product.
The present invention is a kind of with the basic two-in-one of elevating function communication base station with traditional base station iron tower and machine room, and whole occupation of land is very little, builds addressing and is more prone to; And changing original base into split type basis replaces; Can the batch production making be realized on the basis, when need remove in the base station, can not stay nonvolatil destruction in addition the scene; Can not cause waste yet, improve stock utilization to the Construction Party.The body of the tower belt lifting mechanism also can be regulated height as required in the use simultaneously, for the thinking that the communication base station construction provides quick, low-cost, turnover is used, can practice thrift social resources, and the novel communication base station of environmental protection.
Certainly; Elevating mechanism among the present invention is hydraulic mechanism or big stroke scissors expansion mechanism, and in a word, the above is merely content preferred embodiment of the present invention; Allly apply for a patent the equalization done according to content of the present invention and change and decorate, all should belong to the covering scope of patent of the present invention.

Claims (4)

1. be with the elevating function communication base station for one kind; Comprise up-down iron tower, elevating mechanism and communications equipment room (6), it is characterized in that said up-down iron tower comprises the dropping section body of the tower (2) of canned paragraph body of the tower (4) and band antenna installing rack (1) at least; The body of the tower size of said up-down iron tower from down and on dwindle successively; And in every adjacent two sections bodies of the tower, the epimere body of the tower is nested in the hypomere body of the tower, and makes between liftable each section body of the tower to go up and down and the location by the setting height slip through elevating mechanism; Dropping section body of the tower (3) in the middle of said up-down iron tower also comprises, said elevating mechanism comprises motor (9), twin-roll hoist engine (10), fixed pulley A (11), fixed pulley B (15), fixed pulley C (18), movable pulley A (14), movable pulley B (17), main rope (12), protection wire rope (13), interlock wire rope (19):
Said motor (9) drives twin-roll hoist engine (10) and rotates; Make main rope (12) and protection wire rope (13) dish line or off-line simultaneously; Said canned paragraph body of the tower (4) both sides, bottom are respectively equipped with fixed pulley A (11), its both sides, top are respectively equipped with fixed pulley B (15); Dropping section body of the tower (2) both sides, bottom of band antenna installing rack (1) are provided with movable pulley B (17), and the both sides, bottom of middle dropping section body of the tower (3) are respectively equipped with movable pulley A (14), its top is respectively equipped with fixed pulley C (18); One end of one end of said main rope (12) and protection wire rope (13) connects twin-roll hoist engine (10), and the other end of its main rope (12) is fixed in the node A (20), the protection wire rope (13) that are located at canned paragraph body of the tower (4) through fixed pulley A (11), fixed pulley B (15) and movable pulley A (14) and is fixed in the Node B (21) that is located at middle dropping section body of the tower (3) through fixed pulley A (11), fixed pulley B (15);
Said interlock wire rope (19) warp is around fixed pulley C (18), movable pulley B (17), and the node C (16) that is located at canned paragraph body of the tower (4) top is fixed at its two ends.
2. according to the said a kind of band elevating function communication base station of claim 1, it is characterized in that said middle dropping section body of the tower (3) top also is provided with reserves node (22).
3. according to claim 1 or 2 said a kind of band elevating function communication base stations, it is characterized in that said up-down iron tower is a three-tube structure, and said motor (9) reaches the central lower that moving twin-roll hoist engine (10) is positioned at canned paragraph body of the tower (3).
4. a kind of band elevating function communication base station according to claim 1 is characterized in that, said elevating mechanism is hydraulic mechanism or big stroke scissors expansion mechanism.
CN2010102461269A 2010-08-05 2010-08-05 Communication base station with lifting function Active CN101886486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102461269A CN101886486B (en) 2010-08-05 2010-08-05 Communication base station with lifting function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102461269A CN101886486B (en) 2010-08-05 2010-08-05 Communication base station with lifting function

Publications (2)

Publication Number Publication Date
CN101886486A CN101886486A (en) 2010-11-17
CN101886486B true CN101886486B (en) 2012-02-29

Family

ID=43072559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102461269A Active CN101886486B (en) 2010-08-05 2010-08-05 Communication base station with lifting function

Country Status (1)

Country Link
CN (1) CN101886486B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019712B (en) * 2015-07-27 2017-10-13 无锡市华鹰移动照明有限公司 Self-unloading cabin formula Pneumatic elevation tower
CN106522832B (en) * 2016-12-16 2019-05-24 四川宏华石油设备有限公司 Vertical raising drilling machine
CN110540115A (en) * 2019-09-18 2019-12-06 淮安信息职业技术学院 Outdoor emergency mobile communication vehicle
CN110685488B (en) * 2019-09-23 2020-10-27 常州市飞黄钢杆有限公司 Prefabricated communication base station iron tower and construction method thereof
CN113395790B (en) * 2021-04-29 2022-10-14 江苏锡沂高新材料产业技术研究院有限公司 Steel skeleton type multi-frequency-band mobile communication base station
CN115217361A (en) * 2022-08-26 2022-10-21 上海动漫公共技术服务平台运营管理有限公司 Ferris tower

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2467779Y (en) * 2001-03-05 2001-12-26 丁桂秋 Safety lifting and lowering tower ladder
CN2688825Y (en) * 2004-01-05 2005-03-30 浙江电联设备工程有限公司 Rapid telecommunication towers
JP2009180081A (en) * 2009-05-19 2009-08-13 Tetsuo Murayama Multistory storage device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2467779Y (en) * 2001-03-05 2001-12-26 丁桂秋 Safety lifting and lowering tower ladder
CN2688825Y (en) * 2004-01-05 2005-03-30 浙江电联设备工程有限公司 Rapid telecommunication towers
JP2009180081A (en) * 2009-05-19 2009-08-13 Tetsuo Murayama Multistory storage device

Also Published As

Publication number Publication date
CN101886486A (en) 2010-11-17

Similar Documents

Publication Publication Date Title
CN101886486B (en) Communication base station with lifting function
CN201771222U (en) Communication base station with lifting function
CN102561744B (en) Integrated base station capable of realizing one-click maintenance without ascending height
US8727145B2 (en) Large mobile crane
CN103086279B (en) Vertical transportation construction method for building construction
CN102635256B (en) Self-unloading emergency communication base station
CN102482892A (en) Telescopic tower assembly and method
KR102529595B1 (en) Apparatus for lifting heavy loads
CN202544437U (en) Emergency communication base station
EP3786393B1 (en) Movable module for hoisting telescopic towers and method for hoisting telescopic towers
EP3311024B1 (en) Portable and modular hoisting assembly for a wind turbine
CN201865396U (en) Emergent mobile communication base station device
CN201687254U (en) Communication base-station iron tower capable of rising and falling
CN211775667U (en) Power transmission line crossing tower assembly high-altitude construction platform
CN102605973A (en) Space station
CN201863754U (en) Outdoor mobile communication truck
CN201614757U (en) Unit structure of performance state
CN208120699U (en) A kind of multifunction power construction auxiliary device
CN102409877A (en) Fast communication base station
CN209780399U (en) movable intelligent lifting radar tower
CN205500636U (en) Water conservancy project component handling device
CN209647186U (en) A kind of rain-proof top cover and rigid burying base for rigid burying base
CN207228737U (en) More specification section cylinder group storehouses and its sliding formwork system
CN211455925U (en) Fixed short wave antenna
CN208716777U (en) Height platen cabinet transport installation vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 311500 Tonglu Zhejiang Economic Development Zone, Hangzhou, Shu Shu Road, No. 17, No.

Patentee after: ZHEJIANG RUINENG COMMUNICATION TECHNOLOGY CO., LTD.

Address before: Hangzhou City, Zhejiang province 310020 Phoenix Road No. 137 Zhonghao Fengqi Plaza A block 805.

Patentee before: Zhejiang Ruineng Communication Technology Co., Ltd.