CN101876824B - Computer control system for urban electric power central heating and control method thereof - Google Patents

Computer control system for urban electric power central heating and control method thereof Download PDF

Info

Publication number
CN101876824B
CN101876824B CN2010101791026A CN201010179102A CN101876824B CN 101876824 B CN101876824 B CN 101876824B CN 2010101791026 A CN2010101791026 A CN 2010101791026A CN 201010179102 A CN201010179102 A CN 201010179102A CN 101876824 B CN101876824 B CN 101876824B
Authority
CN
China
Prior art keywords
control system
command
data
temperature
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101791026A
Other languages
Chinese (zh)
Other versions
CN101876824A (en
Inventor
刘树伟
宋文波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING XINYUAN TEMPERATURE CONTROL TECHNOLOGY Co.,Ltd.
Original Assignee
刘树伟
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘树伟 filed Critical 刘树伟
Priority to CN2010101791026A priority Critical patent/CN101876824B/en
Publication of CN101876824A publication Critical patent/CN101876824A/en
Application granted granted Critical
Publication of CN101876824B publication Critical patent/CN101876824B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention relates to the technical field of urban electric power heating, in particular to a computer control system for urban electric power central heating and a control method thereof. The control system comprises a command control center, a region work station and a main control system; the command control center is connected with the region work station through internet, and the region work station is connected with the main control system of a user terminal. The control method comprises the following steps of: (1) starting a program and verifying; (2) reading data from a service center, and meanwhile starting a data server; and (3) waiting for a control command of a user, if the command of the user exists, executing the command of the user, and uploading an execution result to the data server, if no command of the user exists, executing a routing inspection command and uploading a routing inspection result to the data server. The invention can realize the interaction between electric energy and heat energy and central control of the system, is beneficial to peak load shifting of a power grid, has low electricity consumption cost, realizes the utilization of electricity at the valley period while solving the problem of urban heat supply, and achieves the aim of peak shaving and valley filling.

Description

Urban electric power central heating computer control system and control method thereof
Technical field
The present invention relates to urban electric power heating technology field, a kind of specifically electric energy-heat energy interaction, ultra-large urban electric power central heating computer control system and control method thereof.
Background technology
At present, the heating system in city has two kinds: the family electricity heating of central heating (hot-water heating) and part.Concerning the user, central heating mode technology comparative maturity, safety, reliable, low price, but thermal conversion rate is low, and thermal loss is bigger in the heat delivered process, and boiler, pipeline etc. takies a large amount of lands used, in the city, causes serious pollution.
Family electricity heating is to be the energy with electric power, without centralized control (each family independently controls), makes urban power consumption irregularities variation, has increased electrical network peak phase power consumption, can not unified management, unified planning, and a large amount of valley period powers can be existed.So not only can make a large amount of energy cause waste, also can the safe operation of electrical network be caused a hidden trouble simultaneously.
Through analysis-by-synthesis, existing system can't form on a large scale and stablize power load, and the price of non-low ebb electricity is high more a lot of than low ebb electricity price lattice, and the heating cost is high, has seriously hindered the development of electric heating.
Summary of the invention
The present invention is intended to overcome the weak point of prior art; And provide a kind of electric energy one heat energy of can realizing interactive; Completion system centralized control helps the electrical network peak load shifting, and effectively reduces the urban electric power central heating computer control system of user power utilization cost.This system has realized the utilization to valley period power when having solved the city heat supply problem, reach the purpose of " peak load shifting ", and the utilization factor of electrical network is significantly improved.
The present invention also provides a kind of control method that matches with urban electric power central heating computer control system.
For achieving the above object, control system of the present invention is achieved in that
Urban electric power central heating computer control system, it comprises command and control center, regional work station and master control system;
Said command and control center is connected with the regional work station through Internet, and the regional work station is connected with the master control system of user terminal;
Said master control system control is positioned at the unlatching of user's indoor electric thermal cross over heat-storing device or closes;
The paddy phase electricity consumption plan that said command and control center provides according to electrical network, the operation of control system, and,, use paddy phase low price electric energy to guarantee to satisfy under the prerequisite of heating quality to power supply area implementation monitoring.
As a kind of preferred version, the present invention also comprises remote server; Described remote server is connected with the command and control center through Internet.
As another kind of preferred version, master control system according to the invention can be selected family formula control system or unit control system.
Further, family of the present invention formula control system comprises family formula controller and temperature controller, and the port of said family formula controller is connected with the temperature controller port.
Further, unit control system of the present invention comprises cell controller and temperature controller; The port of said cell controller and temperature controller port join.
A kind of control method of urban electric power central heating computer control system, can implement successively as follows:
1) program start, checking;
2) from service centre's reading of data, while log-on data server;
3) wait for user's steering order,, then carry out user instruction, show execution result and execution result is uploaded to data server if user instruction is arranged; If no user instruction is then carried out and patrolled and examined instruction, and will patrol and examine the result and be uploaded to data server.
Utilize urban electric power central heating computer control system of the present invention, can entire city heating unified planning be become the power load that can be interrupted, utilize the valley period power amount to realize the interaction of electric energy-heat energy, substituted traditional heat-supplying mode.When having solved the city heat supply problem, realized utilization to valley period power, reach the purpose of " peak load shifting ", the utilization factor of electrical network is significantly improved.
As a kind of preferred version, system of the present invention control is in service, through reading of data server history run temperature data and second day weather situation, adopts the artificial intelligence computing method, makes operation plan in second day, thereby reaches best heating effect.
The present invention has following advantage:
1, the present invention is to be the urban electric power central heating computer control system of the energy with the valley period power.
2, network structure of the present invention is simple, and communication is reliable, and the construction wiring is simple, is convenient to safeguard.
3, it is low to the invention solves the traditional heating system in city (hot-water heating) thermal conversion rate, and thermal loss is bigger in the heat delivered process, and boiler, pipeline etc. take problems such as a large amount of lands used, have reduced the pollution in city.
4, it is big to the invention solves the heating electric weight of family electricity, can not unified management etc. problem.Making urban heat supplying can be the master with valley period power, and can participate in the adjustment of grid balance directly through the uniform dispatching commander of Surveillance center.When having solved the city heat supply problem, realized utilization to valley period power, reach the purpose of " peak load shifting ", the utilization factor of electrical network is significantly improved.
5, the computer monitoring software at regional work of the present invention station has self-learning function, can make each room adjust the heat accumulation time of valley period power automatically through the record of system's operation and second day weather condition.When reaching the heating requirement, play the effect of energy savings.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further.Protection scope of the present invention not only is confined to the statement of following content.
Fig. 1 is a monitor network framework map of the present invention;
Fig. 2 is the network structure at regional work of the present invention station;
Fig. 3 is the FB(flow block) of system control method of the present invention;
Fig. 4 is the operational scheme block diagram of command centre of the present invention;
Fig. 5 is the operational scheme block diagram at regional work of the present invention station, district;
Fig. 6-1 is an indoor temperature curve map of the present invention;
Fig. 6-2 is a ST curve map of the present invention;
Fig. 6-3 is curve map conduction time of the present invention;
Fig. 6-4 changes heat-storing device reservoir thetagram for the electric heating that the present invention controlled;
Fig. 7 is the schematic block circuit diagram of cell controller of the present invention;
Fig. 8 is the software flow pattern of cell controller of the present invention;
Fig. 9 is the schematic block circuit diagram of family of the present invention formula controller;
Figure 10 is the software flow block diagram of family of the present invention formula controller;
Figure 11 is the schematic block circuit diagram of temperature controller of the present invention;
Figure 12 is the software flow block diagram of temperature controller of the present invention;
Figure 13 is a control system theory diagram of the present invention.
Among the figure: 1 is the command and control center; 2 are the regional work station; 3 is family formula control system; 4 are electric heating conversion heat-storing device.
Embodiment
As shown in the figure, urban electric power central heating computer control system comprises remote server, command and control center, regional work station and master control system;
Said command and control center is connected with the regional work station through Internet, and the regional work station is connected with the master control system of user terminal;
Said master control system control is positioned at the unlatching of user's indoor electric thermal cross over heat-storing device or closes;
The paddy phase electricity consumption plan that said command and control center provides according to electrical network, the operation of control system, and,, use paddy phase low price electric energy to guarantee to satisfy under the prerequisite of heating quality to power supply area implementation monitoring.Described remote server is connected with the command and control center through Internet.
According to actual needs, master control system according to the invention can adopt family formula control system, also can adopt unit control system certainly.
Family of the present invention formula control system comprises family formula controller and temperature controller, and the port of said family formula controller is connected with the temperature controller port.
Unit control system of the present invention comprises cell controller and temperature controller; The port of said cell controller and temperature controller port join.
A kind of control method of urban electric power central heating computer control system, can implement successively as follows:
1) program start, checking;
2) from service centre's reading of data, while log-on data server;
3) wait for user's steering order,, then carry out user instruction, show execution result and execution result is uploaded to data server if user instruction is arranged; If no user instruction is then carried out and patrolled and examined instruction, and will patrol and examine the result and be uploaded to data server.
System of the present invention control is in service, through reading of data server history run temperature data and second day weather situation, adopts the artificial intelligence computing method, makes operation plan in second day, thereby reaches best heating effect (referring to Fig. 6).
The artificial intelligence computing method embodies a kind of optimization energy conservation model, has self-learning function, and it is based on following theory:
Operational plan=f of second day (the thermal load characteristic in room, second day outdoor temperature).
Say that from the statistics angle artificial intelligence computing method can be selected variance analysis and regression analysis.
Urban electric power central heating computer control system of the present invention is made up of command and control center, regional work station, cell controller (family formula controller) and temperature control device.
Referring to shown in Figure 1, be monitor network framework map of the present invention.The network of forming by the command and control center and the regional work station of urban electric power central heating computer control system.
Referring to shown in Figure 2, be the network structure at regional work of the present invention station.The network of forming by regional work station, master controller and the temperature control device of urban electric power central heating computer control system.
Referring to shown in Figure 3, be the FB(flow block) of system control method of the present invention.Its workflow is following: at first behind the program start checking whether land password correct.After password was correct, program got into duty from service centre's reading of data.Start the back-end data service simultaneously, after the data, services password authentication is correct, start corresponding data service real-time update data.After the normal startup of system software, wait for user's steering order.If user command is arranged, then carry out user instruction, show execution result and execution result is uploaded to data service center.As do not have the user to instruct, and then carry out and patrol and examine instruction, will patrol and examine the result and be uploaded to data server, show simultaneously.
Referring to shown in Figure 4, be the command and control center operational flow diagram of urban electric power central heating computer control system of the present invention.Its workflow is following: at first get into system initialization, and the input password, whether system detects password correct.Re-enter password if password bad can be pointed out, correctly can open database as if password and carry out data processing, for workstation provides data source.Open monitoring function, the ruuning situation of real-time monitor workstation, and can data resource be provided for electric power command centre, make full use of the valley period power ability.
Referring to shown in Figure 5, be the operational flow diagram at the regional work station of urban electric power central heating computer control system of the present invention.Its workflow is following: at first get into system initialization, and the input password, whether system detects password correct.If can pointing out, password bad re-enters password; If password correctly can be from the command and control center reading of data; And utilize intelligent algorithm through data electric energy meter, historical temperature data, second day weather condition, calculate best accumulation of energy temperature value and offer database.The in real time temperature of explicit user and the ruuning situation of system, and the monitor data packing is uploaded to the command and control center, and whether detection in real time has user command.If fruit has user command, will carry out user command, and confirm the execution result of order, execution result is returned to the user.If there is not user command, order is patrolled and examined in execution, obtain to Update Information information and real-time the demonstration after the rreturn value.
Shown in Fig. 6-1, be indoor temperature curve of the present invention.Its temperature range is between 19 ℃-21 ℃, and its temperature is determined by the ST curve, is the final heating purposes of native system.
Shown in Fig. 6-2, be ST curve of the present invention.Its temperature range is between 22 ℃-28 ℃, and its temperature value is determined by the heat accumulation temperature curve.
Shown in Fig. 6-3, be conduction time of the present invention.Its time scope is between 0:00-6:00.Be foundation its conduction time with the intelligent algorithm, determined by the self-learning function of workstation computer software.
Shown in Fig. 6-4, be the temperature curve of reservoir of the present invention.Its temperature range is between 45 ℃-25 ℃, and its temperature value is by determining heat time heating time.
Referring to shown in Figure 7, be the schematic block circuit diagram of cell controller of the present invention.The cell controller circuit is made up of CPU (ATMEGA128), data-carrier store (UT62256), LCD LCM, communication module (MAX487), power module (MC34063) and keyboard.Wherein: CPU has the program of cell controller, links to each other with data-carrier store and LCD LCM respectively through bus.Carry out 485 through communication module A with workstation and communicate by letter, carry out 485 through communication module B with temperature control device simultaneously and communicate by letter.Power module is that entire circuit provides power supply.Through the parameter of keyboard (UP, DOWN, SET, OK, ESC) initialization system, carry out data processing and pass through LCD LCM showing through CPU.
Unit control system is made up of cell controller and temperature controller.
Referring to shown in Figure 8, be the software flow pattern of cell controller of the present invention.Its software workflow is following:
A) electrifying startup carries out port initialization;
B) carry out system's registration;
C) judged whether host computer order, if the host computer order is arranged then get into the D step after carrying out command process.If there is not the host computer order then to get into the D step;
D) carry out temperature patrol inspection;
E) screen display is handled;
F) judged whether button operation, handled back entering C step if button operation is arranged then get into button.If there is not button operation, then directly get into the C step.
Referring to shown in Figure 9, be the schematic block circuit diagram of family of the present invention formula controller.The circuit of family formula controller is made up of CPU (46RU66), data-carrier store (AT93C66), LCD (GV10509-WG2), communication module (MAX487), power module and keyboard.Wherein: CPU has the program of temperature control device, links to each other with data-carrier store and LCD respectively through bus.Carry out carrying out 485 through communication module and communicate by letter with temperature controller, and through output module output control signal.Through keyboard parameter is set, and parameter value is set through liquid crystal display displays.
Family formula control system is made up of family formula controller and temperature controller.
Referring to shown in Figure 10, be the software flow block diagram of family of the present invention formula controller.Its software workflow is following:
A) electrifying startup carries out data initialization;
B) judged whether host computer order, if the host computer order is arranged then get into the D step after answering command process.If there is not the host computer life then directly to get into the D step;
D) carry out temperature patrol inspection;
E) start heating load;
F) displays temperature;
F) judged whether button operation, if button operation is arranged then get into the B step after calling button operation.If no button operation then directly gets into the B step.
Referring to shown in Figure 11, be the schematic block circuit diagram of temperature controller.Described temperature-control circuit is made up of CPU (46RU66), data-carrier store (AT93C66), temperature sensor, LCD (GV10509-WG2), communication module (MAX487), power module and keyboard.Wherein: CPU has the program of temperature control device, links to each other with data-carrier store and LCD respectively through bus.Carrying out 485 through communication chip with cell controller or family formula controller communicates by letter.Temperature sensor is gathered indoor temperature, through keyboard parameter is set, and through liquid crystal display displays parameter value and temperature value is set.Through output module output control signal, open and close the control of load.
Referring to shown in Figure 12, be the software flow block diagram of temperature controller of the present invention, its software workflow is following:
A) electrifying startup carries out data initialization;
B) judged whether host computer order, if the host computer order is arranged then get into the D step after carrying out command process.If there is not the host computer life then directly to get into the D step;
D) carry out temperature acquisition;
E) displays temperature;
F) need to judge whether starting load, starting load then gets into the B step behind the starting load if desired.If do not need starting load, then directly get into the B step.
Figure 13 is a control system theory diagram of the present invention.Its annexation is following: command centre links to each other through the internet with each regional work station, is directly monitored the ruuning situation at each regional work station by the command and control center.Link to each other through 485 buses between workstation and the master control system, carry out data communication.The port of master control system directly links to each other with the port of electric heating conversion heat-storing device.
Be with being appreciated that; More than about specific descriptions of the present invention; Only be used to the present invention is described and be not to be subject to the described technical scheme of the embodiment of the invention; Those of ordinary skill in the art should be appreciated that still and can make amendment or be equal to replacement the present invention, to reach identical technique effect; As long as satisfy the use needs, all within protection scope of the present invention.

Claims (2)

1. urban electric power central heating computer control system is characterized in that: comprise command and control center, regional work station, master control system and remote server;
Said command and control center is connected with the regional work station through Internet, and the regional work station is connected with the master control system of user terminal;
Said master control system control is positioned at the unlatching of user's indoor electric thermal cross over heat-storing device or closes;
The paddy phase electricity consumption plan that said command and control center provides according to electrical network, the operation of control system, and to power supply area implementation monitoring, to guarantee satisfying under the prerequisite of heating quality use paddy phase low price electric energy;
Described remote server is connected with the command and control center through Internet;
Said master control system is family formula control system or unit control system; Described family formula control system comprises family formula controller and temperature controller, and the port of said family formula controller is connected with the temperature controller port; Described unit control system comprises cell controller and temperature controller; The port of said cell controller is connected with the port of temperature controller;
Said cell controller is made up of CPU, data-carrier store, LCD, communication module, power module and keyboard; CPU links to each other with data-carrier store and LCD respectively through bus, carries out 485 through communication module A with workstation and communicates by letter, and carries out 485 through communication module B with temperature control device simultaneously and communicates by letter; Power module is that entire circuit provides power supply;
Said family formula controller is made up of CPU, data-carrier store, LCD, communication module, power module and keyboard; CPU links to each other with data-carrier store and LCD respectively through bus, and carry out 485 through communication module with temperature controller and communicate by letter, and through output module output control signal;
Said temperature controller is made up of CPU, data-carrier store, temperature sensor, LCD, communication module, power module and keyboard; CPU links to each other with data-carrier store and LCD respectively through bus, carries out 485 through communication chip with cell controller or family formula controller and communicates by letter; Temperature sensor is gathered indoor temperature, through keyboard parameter is set, and through liquid crystal display displays parameter value and temperature value is set, and through output module output control signal, opens and close the control of load.
2. the control method of urban electric power central heating computer control system according to claim 1 is characterized in that, implements successively as follows:
1) program start, checking;
2) from service centre's reading of data, while log-on data server; From service centre's reading of data, the log-on data server through history run temperature data and second day weather situation, adopts the artificial intelligence computing method simultaneously, makes operation plan in second day, thereby reaches best heating effect; Operational plan=f of second day (the thermal load characteristic in room, second day outdoor temperature);
3) wait for user's steering order,, then carry out user instruction, show execution result and execution result is uploaded to data server if user instruction is arranged; If no user instruction is then carried out and patrolled and examined instruction, and will patrol and examine the result and be uploaded to data server.
CN2010101791026A 2010-05-21 2010-05-21 Computer control system for urban electric power central heating and control method thereof Active CN101876824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101791026A CN101876824B (en) 2010-05-21 2010-05-21 Computer control system for urban electric power central heating and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101791026A CN101876824B (en) 2010-05-21 2010-05-21 Computer control system for urban electric power central heating and control method thereof

Publications (2)

Publication Number Publication Date
CN101876824A CN101876824A (en) 2010-11-03
CN101876824B true CN101876824B (en) 2012-04-25

Family

ID=43019399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101791026A Active CN101876824B (en) 2010-05-21 2010-05-21 Computer control system for urban electric power central heating and control method thereof

Country Status (1)

Country Link
CN (1) CN101876824B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102042638A (en) * 2011-01-07 2011-05-04 沈阳市鑫源电器有限公司 Computer concentrating control system of urban heating end equipment and temperature end control method thereof
CN103528114B (en) * 2013-09-24 2016-09-28 芜湖市科华新型材料应用有限责任公司 Electric power storage distributed, non-, non-inversion solar photovoltaic Variable power accumulation of energy electric heating system and control method
CN103604162B (en) * 2013-12-05 2016-08-17 黑龙江隆宇科技开发有限责任公司 Intelligence public building electric heating control method and system
CN104833038B (en) * 2014-02-11 2018-03-06 珠海格力电器股份有限公司 Multi-gang air-conditioner centralized Control method and Centralized Controller
CN107017628B (en) * 2017-05-15 2023-08-25 珠海格力电器股份有限公司 Unit and control method and system thereof
CN107220783A (en) * 2017-07-07 2017-09-29 上海热丽科技集团有限公司 Concentrate electric heating operation management system
CN109426285A (en) * 2017-08-31 2019-03-05 沈阳兰昊新能源科技有限公司 The control system of electric heat storage energy device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101089766A (en) * 2006-06-14 2007-12-19 北京硕人时代科技有限公司 Room temp. control method in integral heat supply system
CN101464697B (en) * 2007-12-17 2011-01-26 纪周 Intelligent heating room temperature control system
CN201396887Y (en) * 2009-03-18 2010-02-03 北京佩尔优科技有限公司 Energy storage air conditioner optimizing system
CN201429177Y (en) * 2009-05-14 2010-03-24 杭州光泽科技有限公司 System for remote intelligent real-time monitoring and optimization evaluation of air conditioner energy conservation

Also Published As

Publication number Publication date
CN101876824A (en) 2010-11-03

Similar Documents

Publication Publication Date Title
CN101876824B (en) Computer control system for urban electric power central heating and control method thereof
CN103257619B (en) A kind of intelligent building energy Internet of Things and integrated approach thereof
CN104571068A (en) Optimized operation control method and system of distributed energy system
CN104654449B (en) Distributed electric heat energy storage heating control system and method
CN104901307A (en) Multi-network-combined home microgrid electric-energy consumption interactive management system and method thereof
CN110378058A (en) A kind of method for building up for the electro thermal coupling microgrid optimal response model comprehensively considering reliability and economy
CN107274303A (en) City heat supply energy consumption wisdom management and control technology platform
CN202166122U (en) Heating station energy-saving control system
CN103187735A (en) Bidirectional intelligent gateway device for distributed new energy grid connection
CN207407490U (en) A kind of energy Savings control system
CN202647980U (en) Remote monitor system based on wireless room-temperature control heat-exchange station valve opening
CN107248017B (en) Real-time power generation plan optimization method considering cogeneration
CN103453580A (en) Integrated and intelligent control method for heat exchange station
CN101917023A (en) Automatic control method of wind electric active power for wind farm monitoring system
CN111102646A (en) Intelligent climate compensation method and device based on data driving
CN110212560B (en) Remote control photovoltaic power generation-based common-network countercurrent-preventing thermal energy storage control device and method
CN201706602U (en) Intelligent master control system for centralized heat-collection and individual household heat-storage type solar water heating
CN101330211A (en) Micro-electric network system capable of generating and using electricity using renewable energy resources comprehensively
CN106765519A (en) Pneumoelectric complementation electric heating demand response control system
CN111919731A (en) Internet of things agricultural irrigation controller
CN203414526U (en) Intelligent electrical parameter monitoring meter
CN203324736U (en) Climate-compensation controller
CN201944946U (en) City heating tail end computer integrated control system
CN205509496U (en) Commercial building electrical load management device based on automatic demand response
CN114218865A (en) Multi-target collaborative optimization method and device for distributed heating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160523

Address after: 110145 Liaoning city of Shenyang Province on three street town area Ma Lamar Taiwan

Patentee after: Shenyang City Xinyuan Electric Appliance Co., Ltd.

Address before: 110145 Liaoning city of Shenyang Province on three street town area Ma Lamar Taiwan

Patentee before: Liu Shuwei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210506

Address after: 110000 No.11, area 5, No.888 Puhe Road, Shenbei New District, Shenyang City, Liaoning Province

Patentee after: LIAONING XINYUAN TEMPERATURE CONTROL TECHNOLOGY Co.,Ltd.

Address before: 110145 lamatai East Street, Masanjia town, Yuhong District, Shenyang City, Liaoning Province

Patentee before: SHENYANG XINYUAN ELECTRIC APPLIANCE Co.,Ltd.