CN101876184B - Construction method of expansion joint of pool - Google Patents

Construction method of expansion joint of pool Download PDF

Info

Publication number
CN101876184B
CN101876184B CN2010102061340A CN201010206134A CN101876184B CN 101876184 B CN101876184 B CN 101876184B CN 2010102061340 A CN2010102061340 A CN 2010102061340A CN 201010206134 A CN201010206134 A CN 201010206134A CN 101876184 B CN101876184 B CN 101876184B
Authority
CN
China
Prior art keywords
rubber fastening
fastening band
cell foam
foam plate
polyethylene closed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102061340A
Other languages
Chinese (zh)
Other versions
CN101876184A (en
Inventor
杨会有
孙建格
冯广安
高岚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei No2 Construction Engineering Co
Original Assignee
Hebei No2 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei No2 Construction Engineering Co filed Critical Hebei No2 Construction Engineering Co
Priority to CN2010102061340A priority Critical patent/CN101876184B/en
Publication of CN101876184A publication Critical patent/CN101876184A/en
Application granted granted Critical
Publication of CN101876184B publication Critical patent/CN101876184B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a construction method of an expansion joint of a pool, belonging to the field of engineering construction. The method comprises the following steps of: installing a rubber water stopping belt; arranging a tongue-and-groove mould which corresponds to the shape of cross section of the rubber water stopping belt and consists of a wood scaffold board and a wood strip in a supporting way; pouring one side concrete; cleaning the expansion joint; arranging a polyethylene closed cystosepiment, wherein the precut part of the cystosepiment is equal to the depth of the designed polysulphideslealant; pouring the other side concrete; cleaning the polyethylene closed cystosepiment in the expansion joint; and injecting the polysulphideslealant. The construction method can guarantee that a hole at the middle of the rubber water stopping belt is fixed at the center of the expansion joint, greatly saves the labor, reduces the cost, shortens the work period, and guarantees the sealing quality of the polysulphideslealant when cleaning the polyethylene closed cystosepiment.

Description

The job practices of expansion joint of pool
Technical field
The present invention relates to a kind of job practices of structure, refer in particular to a kind of job practices of expansion joint of pool.
Background technology
Along with the strategic plan of national energy-saving and emission-reduction, it is particularly outstanding that comprehensive anti-pollution seems, the construction of Wastewater Treatment Plant is more and more, and scale is also increasing.Water factory structure pond is the key link of water factory's technological process, and the quality of structure directly influences the overall operation of water factory.The design in general water factory structure pond all is overlength, super large structure, and structure itself are divided into many zones, generally all are provided with the shrinkage joint between each zone, to satisfy the performance requirement of expanding with heat and contract with cold of design.In order to prevent that the shrinkage joint from leaking, in the shrinkage joint, add leakage-proof apparatus.Be to have buried rubber fastening band underground at the place, shrinkage joint when constructing the pond in the general engineering, rubber fastening band has Telescopic, fuses with the zones of different of rubber fastening band with the pond, the anti-mutual seepage of sealing.The quality quality that the shrinkage joint is constructed is the key point of restriction structure total quality.Buried rubber fastening band and external labeling type rubber fastening band during the shrinkage joint waterstop generally is divided into, and in shrinkage joint waterproof effect, the anti-flexible ability of buried rubber fastening band strong; But in the construction technology complexity at buried rubber fastening band shrinkage joint, difficulty of construction is bigger.In generally comprise rubber fastening band, polyethylene closed-cell foam plate, poly-sulphur sealing compound in the buried rubber fastening band shrinkage joint.
The job practices at buried rubber fastening band shrinkage joint comprises at present: 1. rubber fastening band is installed, is installed template, build a side concrete, 2. clear up the shrinkage joint, polyethylene closed-cell foam plate is installed, build the opposite side concrete, 3. clear up polyethylene closed-cell foam plate in the shrinkage joint, annotate poly-sulphur sealing compound.Specific practice be according to designing requirement at the bottom of the pond or the relevant position of pool wall set up rubber fastening band, install template then, build the concrete of first side, a side assistant of waterstop is embedded in the concrete of building.After treating that concrete reaches certain intensity, the supporter of stripping and supporting rubber fastening band, projection on the shrinkage joint face of the cleaning concreting first time, the assistant of waterstop opposite side and the members such as reinforcing bar of its homonymy are fixed, add pointings such as polyethylene closed-cell foam plate in the both sides of waterstop, build the opposite side concrete again; After the concrete for the treatment of after-pouring reaches certain intensity, the pointing of the one side that meets water in the shrinkage joint between two block concretes is cleaned out the groove that a part forms certain depth, in groove, inject sealing compound then, close the whole piece shrinkage joint according to designing requirement.There are many shortcomings in this job practices in past, mainly containing the article that set up waterstop does not have solid shape, makes the concrete shrinkage joint face of building for the first time irregular, time-consuming during cleaning, and the face at shrinkage joint contacts imprecision with waterstop, pointing, and sealed waterproof effect is bad; In addition, when before injecting sealing compound behind the concreting second time, clearing up pointing, also there is a lot of difficulties, can only pointing be picked out with instruments such as cutter, shovels, make the face of the pointing that stays very irregular, the sealing compound of filling in uneven thickness, waterproof effect is bad.
Summary of the invention
The technical issues that need to address of the present invention provide at the bottom of a kind of pond, structure pond of constructing or the method at pool wall shrinkage joint, its easy construction, and member position is accurate, and antiseep is effective, can save the engineering time.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
The job practices of expansion joint of pool, carry out according to following method:
1. fixing waterstop
Clamp earlier, the band steel of a side is welded at the bottom of the pond or on the reinforcing bar of first concreting one side of pool wall design position, shrinkage joint then, a side assistant of rubber fastening band is flattened with the assistant of band steel with the rubber fastening band both sides;
2. install template
Be supported on the rubber fastening band both sides with having, and with tongue and groove template supporting ﹠ stablizing, the flat-sided steel that rubber fastening band is exposed is fixed on the template support, makes rubber fastening band keep straight with the identical shaped tongue and groove template of rubber fastening band mider hole; Build the concrete of first side then; One side assistant of rubber fastening band is cast in the concrete;
3. tailor packing material
According at the bottom of the pond or pool wall thickness, polyethylene closed-cell foam plate is tailored the two parts that become to be positioned at the rubber fastening band both sides; And then according to the poly-sulphur sealing compound thickness that designs, the polyethylene closed-cell foam plate of upstream face part is tailored into two parts, wherein a part equals the thickness of poly-sulphur sealing compound, another part is just stayed in the shrinkage joint after the shrinkage joint forms, tailor finish after, two parts reduction of the polyethylene closed-cell foam plate of the upstream face that will cut apart with a knife or scissors again part is docking together and fixes with iron nail;
4. polyethylene closed-cell foam plate is installed
After the concrete for the treatment of first side reaches certain intensity, remove the tongue and groove template, cleaning is the shrinkage joint face of concreting for the first time, the band steel on the rubber fastening band opposite side assistant and the steel bars in concrete of its homonymy are fixed, add the polyethylene closed-cell foam plate of tailoring in the both sides of waterstop, wherein the part of the poly-sulphur sealing compound thickness of polyethylene closed-cell foam plate representative of upstream face part is positioned at the outside at shrinkage joint;
5. build the opposite side concrete
6. the dismounting representative gathers the polyethylene closed-cell foam plate of sulphur sealing compound thickness part
After the concrete for the treatment of after-pouring reaches certain intensity, the iron nail that connects polyethylene closed-cell foam plate is taken off, from the end at shrinkage joint begin will the poly-sulphur sealing compound thickness part of representative polyethylene closed-cell foam plate pull out;
7. fill poly-sulphur sealing compound
The shrinkage joint is cleaned out, in groove, injected sealing compound, close the whole piece shrinkage joint.
The tongue and groove template that above-mentioned steps of the present invention installs rubber fastening band in 2. is to be main body with the wooden scaffold floor that uses in the construction, be fixed with batten in wooden scaffold floor one side, batten is relative with rubber fastening band during installation, be fixed on the wooden scaffold floor with iron nail, the arranged outside of batten has the tongue and groove with rubber fastening band shape of cross section corresponding matching.Because the cross sectional shape of rubber fastening band is generally circle or regular hexagon, so the one side of the corresponding rubber fastening band of batten is semicircle or splayed.
Owing to adopted technique scheme, the obtained technological progress of the present invention is:
Job practices of the present invention makes at the bottom of the pond, pond or the shrinkage joint easy construction of pool wall when building the pond, and the rubber fastening band accurate positioning guarantees the construction quality and the waterproof sealing effect at shrinkage joint, can save the engineering time greatly.Adopt job practices of the present invention, can guarantee shrinkage joint central authorities accurately are fixed in the mider hole portion of rubber fastening band.The present invention cuts polyethylene closed-cell foam plate earlier with the thickness of wallpaper cutter by poly-sulphur sealing compound, and then fix with iron nail, like this in cleaning polyethylene closed-cell foam plate link, can very accurately cystosepiment be extracted out very soon, needn't shave by shovel more on one point, saved clearance time and artificial greatly, the reduction expense, reduction of erection time, can better guarantee to gather the thickness and the airtight quality of sulphur sealing compound.The present invention utilizes the fixedly form making tongue and groove template of batten of the wooden scaffold floor outside, can gather materials on the spot, and the center of rubber fastening band can be fixed in accurately the central authorities at shrinkage joint, guarantees the tram of rubber fastening band.Batten simultaneously is semicircle or the splayed corresponding with rubber fastening band, makes the position of rubber fastening band more accurate, can make the face at shrinkage joint cleaner and tidier.
Description of drawings
Fig. 1 is the mounting structure schematic diagram of polyethylene closed-cell foam plate and waterstop at the bottom of the pond;
Fig. 2 is the mounting structure schematic diagram of pool wall polyethylene closed-cell foam plate and waterstop;
Fig. 3 is the formwork schematic diagram of waterstop at the bottom of the pond;
Fig. 4 is the formwork schematic diagram of pool wall waterstop;
Fig. 5 is a structural representation after the completion at shrinkage joint at the bottom of the pond;
Fig. 6 is a structural representation after the completion at pool wall shrinkage joint.
Wherein: 1, concrete, 2, rubber fastening band, 3, polyethylene closed-cell foam plate, 4, iron nail, 5, wooden scaffold floor, 6, batten, 7, the strengthening frame pipe, 8, reinforced steel, 9, poly-sulphur sealing compound.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described in further details:
Fig. 3, Fig. 1, Fig. 5 are pond, pond bottom application man-hours, behind formwork, inject before the fluid sealant and shrinkage joint completion moulding after structural representation.Fig. 4, Fig. 2, Fig. 6 are pool wall of pool whens construction, behind formwork, inject before the fluid sealant and shrinkage joint completion moulding after structural representation.
Embodiment 1
The job practices at shrinkage joint at the bottom of the pond, structure pond, carry out according to the following step:
1. fixing waterstop
Rubber fastening band is set up in the position at design shrinkage joint at the bottom of the pond, clamps with the assistant of band steel with rubber fastening band 2 both sides earlier, then the band steel of a side is welded on the reinforcing bar of concreting one side structure formerly, and a side assistant of rubber fastening band 2 is flattened;
2. make the tongue and groove template
Template is set up in the both sides up and down that before the concreting need be rubber fastening band in the position at shrinkage joint.The main body of template adopts the wooden scaffold floor 5 that uses in the construction.The cross-sectional profile of the mider hole of general rubber fastening band mostly is circle or regular hexagon, shape according to rubber fastening band 2 mider holes, make the template tongue and groove that matches with the shape of rubber fastening band 2 mider holes of batten, if rubber fastening band mider hole position is round, just at the batten of scaffold floor fixed outside band 1/4 circle or semicircle, if the rubber fastening band mider hole is a regular hexagon, just at scaffold floor fixed outside splay configuration batten.Batten 6 is fixed on a side of wooden scaffold floor 5 corresponding rubber fastening bands 2, makes the tongue and groove and the rubber fastening band shape corresponding matching of batten 6.
3. install template
Be supported on the both sides up and down of rubber fastening band 2 with the tongue and groove tongue and groove template identical with rubber fastening band mider hole shape, batten tongue and groove on the template is relative with rubber fastening band 2, the tongue and groove of two tongue and groove templates surrounds the centre bore of rubber fastening band 2, and with tongue and groove template supporting ﹠ stablizing; When the cushion construction at the bottom of the pond,, when installing the pond soffit formwork, withstand between reinforced steel 8 and the wooden scaffold floor 5, make template firm with strengthening frame pipe 7 at the pre-buried good shrinkage joint of a side of shrinkage joint after-pouring reinforced steel 8.The side that rubber fastening band 2 is exposed is that the band steel of after-pouring concrete one side is fixed on the strengthening frame pipe 7 then, makes rubber fastening band 2 keep straight; Build the concrete 1 of first side then; One side assistant of rubber fastening band 2 is cast in the concrete 1.
4. tailor packing material
According to the thickness of pond base concrete 1, polyethylene closed-cell foam plate is tailored the two parts that become to be positioned at rubber fastening band both sides about in the of 2, the width of every part just in time flushes with concrete surface after it is installed.And then according to the thickness of poly-sulphur sealing compound of design, the polyethylene closed-cell foam plate 3 that upstream face promptly is positioned at a part above the rubber fastening band 2 is tailored into two parts, wherein a part equals the thickness of the poly-sulphur sealing compound of needs filling, tailor finish after, two parts reduction of again the polyethylene closed-cell foam plate of upstream face part being cut apart with a knife or scissors is docking together and fixes with iron nail 4.
5. polyethylene closed-cell foam plate is installed
After the concrete for the treatment of first side reaches the intensity of design, remove strengthening frame pipe 7, wood scaffold floor 5 and batten 6, clean out the projection on the shrinkage joint face of concreting for the first time, the band steel on the rubber fastening band 2 opposite side assistants and the reinforcement component of its homonymy are fixed, add the polyethylene closed-cell foam plate 3 of tailoring in the both sides of rubber fastening band 2, wherein the polyethylene closed-cell foam plate 3 below the rubber fastening band 2 is monoblocks, its width just in time equals the thickness of rubber fastening band 2 bottom surfaces to the pond foot mat, polyethylene closed-cell foam plate 3 above the rubber fastening band 2 is splits, its integral width just in time equals above the rubber fastening band 2 to the thickness above the concrete 1, during polyethylene closed-cell foam plate 3 above installing, there is one side that the one side of iron nail 4 promptly needs to fill poly-sulphur sealing compound upwards.
6. build the opposite side concrete.
7. the dismounting representative gathers the polyethylene closed-cell foam plate of sulphur sealing compound thickness part
After the concrete 1 for the treatment of after-pouring reaches design strength, the iron nail 4 that connects polyethylene closed-cell foam plate is taken off, to represent the polyethylene closed-cell foam plate of poly-sulphur sealing compound thickness part to pull out from a side at shrinkage joint, another part polyethylene closed-cell foam plate 3 is just stayed in the shrinkage joint.
8. fill poly-sulphur sealing compound
Once more the shrinkage joint is cleaned out, in groove, injected poly-sulphur sealing compound 9, close the whole piece shrinkage joint.So far pond bottom application worker finishes.
Embodiment 2
The job practices at pool wall of the present invention shrinkage joint is identical with the construction sequence at shrinkage joint at the bottom of the pond, difference only is, the packing material polyethylene closed-cell foam plate 3 of rubber fastening band 2 both sides at pool wall shrinkage joint (being the upstream face and back side at pool wall shrinkage joint) all need be tailored the two parts that become to comprise poly-sulphur sealing compound thickness, and then link together with iron nail 4, install, remove, the upstream face at the pool wall shrinkage joint of pool wall and back side are all filled poly-sulphur sealing compound.

Claims (2)

1. the job practices of expansion joint of pool is characterized in that carrying out according to following method:
1. fixing waterstop
Clamp earlier, the band steel of a side is welded at the bottom of the pond or on the reinforcing bar of first concreting one side of pool wall design position, shrinkage joint then, a side assistant of rubber fastening band is flattened with the assistant of band steel with the rubber fastening band both sides;
2. install template
Be supported on the rubber fastening band both sides with having, and with tongue and groove template supporting ﹠ stablizing, the band steel that rubber fastening band is exposed a side is fixed on the template support, makes rubber fastening band keep straight with the identical shaped tongue and groove template of rubber fastening band mider hole; Build the concrete of first side then, a side assistant of rubber fastening band is cast in the concrete;
3. tailor packing material
According at the bottom of the pond or pool wall thickness, polyethylene closed-cell foam plate is tailored the two parts that become to be positioned at the rubber fastening band both sides; And then according to the poly-sulphur sealing compound thickness that designs, the polyethylene closed-cell foam plate of upstream face part is tailored into two parts, wherein a part equals the thickness of poly-sulphur sealing compound, tailor finish after, two parts reduction of the polyethylene closed-cell foam plate of the upstream face that will cut apart with a knife or scissors again part is docking together and fixes with iron nail;
4. polyethylene closed-cell foam plate is installed
After the concrete for the treatment of first side reaches certain intensity, remove the tongue and groove template, cleaning is the face at concreting shrinkage joint for the first time, the band steel on the rubber fastening band opposite side assistant and the steel bars in concrete of its homonymy are fixed, add the polyethylene closed-cell foam plate of tailoring in the both sides of waterstop, wherein the part of the poly-sulphur sealing compound thickness of polyethylene closed-cell foam plate representative of upstream face part is positioned at the outside at shrinkage joint;
5. build the opposite side concrete
6. the dismounting representative gathers the polyethylene closed-cell foam plate of sulphur sealing compound thickness part
After the concrete for the treatment of after-pouring reaches certain intensity, the iron nail that connects polyethylene closed-cell foam plate is taken off, from the end at shrinkage joint begin will the poly-sulphur sealing compound thickness part of representative polyethylene closed-cell foam plate pull out;
7. fill poly-sulphur sealing compound
The shrinkage joint is cleaned out, in groove, injected sealing compound, close the whole piece shrinkage joint.
2. the job practices of expansion joint of pool according to claim 1, it is characterized in that: the tongue and groove template that described step installs rubber fastening band in 2. is to be main body with the wooden scaffold floor that uses in the construction, be fixed with batten in wooden scaffold floor one side, the arranged outside of batten has the tongue and groove with rubber fastening band shape of cross section corresponding matching.
CN2010102061340A 2010-06-23 2010-06-23 Construction method of expansion joint of pool Expired - Fee Related CN101876184B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102061340A CN101876184B (en) 2010-06-23 2010-06-23 Construction method of expansion joint of pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102061340A CN101876184B (en) 2010-06-23 2010-06-23 Construction method of expansion joint of pool

Publications (2)

Publication Number Publication Date
CN101876184A CN101876184A (en) 2010-11-03
CN101876184B true CN101876184B (en) 2011-08-10

Family

ID=43018851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102061340A Expired - Fee Related CN101876184B (en) 2010-06-23 2010-06-23 Construction method of expansion joint of pool

Country Status (1)

Country Link
CN (1) CN101876184B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140848B (en) * 2011-03-02 2012-08-22 中设建工集团有限公司 Expansion joint-adjustable dual-waterproof installation construction process
CN102409767B (en) * 2011-11-15 2013-09-18 吴兆圣 Construction method of waterproof leaking stoppage structure of building seam
CN102808508B (en) * 2012-06-05 2015-02-25 中国建筑第四工程局有限公司 Method for pouring reinforced concrete structure provided with deformation joint and deformation joint steel fly die template
CN102943564A (en) * 2012-10-23 2013-02-27 中国华冶科工集团有限公司 Flexible concrete rabbet connecting construction method
CN103233408B (en) * 2013-05-08 2015-11-11 李永奎 A kind of cement concrete expansion joint structure of Ground and implementation method thereof
CN105019650A (en) * 2014-04-18 2015-11-04 集佳绿色建筑科技有限公司 Wire slot filling technology for wire slot formed in hollow brick wall body
CN103924694B (en) * 2014-04-29 2016-04-20 中铁四局集团有限公司 Leakage repairing treatment method for waterproof concrete expansion joint
CN105484202B (en) * 2014-11-10 2017-04-12 德州黄河建业工程有限责任公司 Manufacturing method for detachable type water-stop cavity die of concrete deformation joint
CN104727351A (en) * 2015-03-24 2015-06-24 上海市政工程设计研究总院(集团)有限公司 Middle embedded type water stop belt and construction method thereof
CN105888247A (en) * 2016-04-26 2016-08-24 中国化学工程第三建设有限公司 Construction method for expansion joint of industrial pond
CN105970880B (en) * 2016-05-30 2018-02-16 中建五局第三建设有限公司 Construction method of multi-channel waterproof fortification expansion joint structure
CN106869084A (en) * 2017-03-14 2017-06-20 辽宁华三建设工程技术有限公司 A kind of high tenacity filleting waterstop and its construction method for channel structure
CN107859187B (en) * 2017-10-11 2023-07-18 中铁第四勘察设计院集团有限公司 Protection device for expansion joint water stop and water stop mounting method
CN110080538A (en) * 2019-04-19 2019-08-02 中国二十二冶集团有限公司 Remove the cutter and preparation method thereof that cystosepiment is reserved at expansion joint
CN111074851B (en) * 2019-12-20 2021-09-10 湖北锦天禹建设工程有限公司 Construction method for concrete lining at bottom of channel
CN111705971A (en) * 2020-06-24 2020-09-25 北京翔鲲水务建设有限公司 Construction method and structure of thin-wall concrete wall of constructed wetland unit pool
CN112575912A (en) * 2020-12-05 2021-03-30 中冶天工集团有限公司 Method for retaining vertical construction joint
CN113216252A (en) * 2021-05-11 2021-08-06 中国十七冶集团有限公司 Expansion joint reinforcing device and method for multi-section continuous casting of underground pipe gallery
CN113322892A (en) * 2021-05-28 2021-08-31 安徽水安建设集团股份有限公司 River course slope protection surface lining cast-in-place concrete expansion joint structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2111978U (en) * 1992-01-28 1992-08-05 上海市政工程设计院 Large deformation elastic water stop belt
CN2703807Y (en) * 2004-01-13 2005-06-08 河南省水利科学研究所 Concrete deformed joint waterstop
CN201121369Y (en) * 2007-10-16 2008-09-24 华东建筑设计研究院有限公司 Expanded joint drainage construction
CN101307622A (en) * 2008-06-30 2008-11-19 上海市城市建设设计研究院 Water proof method for underground structure top board expansion joint also serving as urban roads base and the structure
CN201165709Y (en) * 2007-08-13 2008-12-17 李树林 Water-proof structure between underground penetrating structures

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006097290A (en) * 2004-09-29 2006-04-13 Asahi Denka Kogyo Kk Grout injection hose doubling as water-swelling cutoff board

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2111978U (en) * 1992-01-28 1992-08-05 上海市政工程设计院 Large deformation elastic water stop belt
CN2703807Y (en) * 2004-01-13 2005-06-08 河南省水利科学研究所 Concrete deformed joint waterstop
CN201165709Y (en) * 2007-08-13 2008-12-17 李树林 Water-proof structure between underground penetrating structures
CN201121369Y (en) * 2007-10-16 2008-09-24 华东建筑设计研究院有限公司 Expanded joint drainage construction
CN101307622A (en) * 2008-06-30 2008-11-19 上海市城市建设设计研究院 Water proof method for underground structure top board expansion joint also serving as urban roads base and the structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2006-97290A 2006.04.13
候育.橡胶止水带施工的工程监理质量控制措施.《黑龙江科技信息》.2004,(第7期),论文全文. *

Also Published As

Publication number Publication date
CN101876184A (en) 2010-11-03

Similar Documents

Publication Publication Date Title
CN101876184B (en) Construction method of expansion joint of pool
CN103669562B (en) The construction method of cantilever bay window board concrete monobloc cast structure
CN103982199B (en) Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking
CN103437791B (en) The mounting method of buried water stop in a kind of tunnel lining trolley termination
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN108999212A (en) The template construction method of underground concrete pool wall antiseep
CN110144853A (en) A kind of seepage control of dam panel anti-crack construction method
CN111705971A (en) Construction method and structure of thin-wall concrete wall of constructed wetland unit pool
CN105064398A (en) One-time overall pouring construction method for nuclear powder single-hole GD gallery
KR20110029489A (en) Method execution for jointing between precast concrete panels for building remodeling
CN109778911B (en) Underground pipe gallery composite plastic formwork assembling and disassembling construction method
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining
CN110670741A (en) Method for processing deformation joint of building wall body
CN110409600A (en) Unit-combination type cesspool construction method
CN113217034A (en) Combined primary supporting structure and construction method thereof
KR101300317B1 (en) Replacement method of expansion joint of bridge
CN110130271B (en) Construction method for reinforcing side wall concrete single-face formwork
JP2010024766A (en) Timbering for holding form
CN208122041U (en) A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system
CN116378715A (en) Construction method of large-span composite special-shaped straight thin intermediate wall multi-arch tunnel
CN204645616U (en) Side wall rubber watertight strip fixed mould
CN206646549U (en) Underground engineering assembly concrete air channel
CN206328777U (en) A kind of prefabricated piping lane suitable for narrow construction site
CN104594388A (en) Advancing waterstop sedimentation post-cast strip of foundation slab
CN104032741A (en) Rapid construction method for large-size temperature control in water conservancy project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110810

Termination date: 20210623