CN101858945A - Laboratory icing simulating test method of optical power ground wires (OPGWs) - Google Patents

Laboratory icing simulating test method of optical power ground wires (OPGWs) Download PDF

Info

Publication number
CN101858945A
CN101858945A CN 201010163169 CN201010163169A CN101858945A CN 101858945 A CN101858945 A CN 101858945A CN 201010163169 CN201010163169 CN 201010163169 CN 201010163169 A CN201010163169 A CN 201010163169A CN 101858945 A CN101858945 A CN 101858945A
Authority
CN
China
Prior art keywords
icing
optical cable
ice
centerdot
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010163169
Other languages
Chinese (zh)
Other versions
CN101858945B (en
Inventor
戚力彦
陈希
赵大平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN 201010163169 priority Critical patent/CN101858945B/en
Publication of CN101858945A publication Critical patent/CN101858945A/en
Application granted granted Critical
Publication of CN101858945B publication Critical patent/CN101858945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the technical field of power system communication, relating to a laboratory icing simulating test method of optical power ground wires (OPGWs), which can simulate and test the performance changes of running lines in various icing thicknesses states in a laboratory. The method carries out an experimental comparative study on the electrical properties, the communication and the mechanical properties of the OPGWs under an icing condition by utilizing a laboratory icing simulating test system, mainly carries out the experimental studies on lightning resistance, short-circuit current, attenuation, tensile strength, stress strain and the like on the OPGWs with different structures, types, technical parameters, materials and the like and then determines a comprehensive solution on resistance of the OPGWs on icing disasters through analyzing test data.

Description

Optical Fiber composite overhead Ground Wire (OPGW) laboratory icing simulating test method
Technical field
The invention belongs to the communication of power system technical field, be specifically related to the laboratory icing simulating test method of a kind of electric power special optical cable Optical Fiber composite overhead Ground Wire (OPGW).
Background technology
At the beginning of in January, 2008 to 2 month, the disastrous on a large scale ice and snow weather that continues has appearred in China south most of area in succession, this time sleet freezing weather process influence scope is wide, intensity big, longer duration, involve a wide range of knowledge, the extent of injury is big, a lot of areas surpass 50 years one chances, some areas surpass 100 years one chances, it is rare to belong to history, has brought for these regional traffic, electric power, communication and people's lives and has a strong impact on.This time freezing disaster has especially caused great harm to the electrical network of China southwest, Central China, East China, and wherein Hunan, Zhejiang, Jiangxi electrical network are impaired particularly serious.Because powerline ice-covering is serious, causes many iron tower of power transmission line, lead, insulator, optical cable, gold utensil etc. to suffer in various degree damage, and, also suffered heavy losses as the optical cable of the main transmission medium of China's communication of power system.The impaired of optical cable directly influenced communication of power system, and then influences the safe operation of electric system.
Though at present most of impaired circuit has obtained repairing,, still exist many problems to require study and solve for transformation circuit and newly-built circuit from now on.Changes of properties before and after Optical Fiber composite overhead Ground Wire (OPGW) icing (especially heavy icing), potential hidden danger and very big to the lightguide cable link influence on system operation, study in great detail at home and abroad and do not appear in the newspapers, especially Optical Fiber composite overhead Ground Wire (OPGW) in application on power system more and more widely, the properties of product of common regional OPGW detect and have comprised as physical dimension, transmission performance, mechanical property, environmental performance, all many-sides such as electric property, can grasp the fundamental characteristics of sample fully by these tests, can guarantee the product quality of OPGW, and the conventional quality test project of stipulating in the industry standard can not satisfy the requirement under the serious disaster situation (as icing etc.).Do not find both at home and abroad at present yet and can not set up corresponding experimental enviroment and method yet and carry out testing research, during in the face of nature icing disaster, be difficult to propose effective and feasible comprehensive solution for the technical indicator and the requirement of optical cable under the ice coating state of practical operation.Therefore, correlative study content and measuring technology need further perfect, so that instruct the engineering practical application.
Summary of the invention
The objective of the invention is to use the problem that exists in order to solve heavy ice-covering area optical cable project, proposed a kind of Optical Fiber composite overhead Ground Wire (OPGW) laboratory icing simulating test method, this method can be in the performance change of laboratory simulation test run circuit under various ice covering thickness states.This method is utilized laboratory icing simulation experiment system, to the comparative study that experimentizes of electric, communication, the mechanical property of OPGW under the icing condition, mainly the OPGW to different structure, different model (different technologies parameter), different materials etc. carries out an experimental study such as anti-thunderbolt, short-circuit current, decay, tensile property, ess-strain, determines that by the analytical test data OPGW resists the comprehensive solution of icing disaster again.
A kind of Optical Fiber composite overhead Ground Wire of the present invention (OPGW) laboratory icing simulating test method may further comprise the steps: the first step: according to the thickness of optical cable model and simulation icing, calculate the weight of icing:
W=π(R 2-r 2)dl
Wherein:
The proportion of the radius d----ice of the OPGW radius r behind the R---icing---optical cable: 0.9 gram/cubic centimetre
The weight π----3.14 of l---cable length W---ice
Second step: the initial tension of optical cable with 16%RTS is fixed on the puller system, and cable length is greater than 100 meters, and the efficiency test length of optical cable sample is not less than 25 meters;
The 3rd step: at least 6 optical fiber serial connections with in the optical cable, make fiber lengths greater than 500 meters, be connected on then on the optical time domain reflectometer, monitoring is with the variation of the increase optical fiber attenuation of ice covering thickness;
The 4th step:, need to cover the weight and the value of thrust of simulation ice under the laboratory condition of actual span of conversion circuit and ice covering thickness correspondence according to the efficiency test length of described optical cable in the middle of the gold utensil stiff end of puller system two ends.Computation process is as follows:
Utilize catenary equation:
y = a ( ch x a - 1 )
In the formula, a is the ratio of the deadweight W of optical cable Horizontal Tension H and unit for introducing parameter, and ch (x) is a hyperbolic cosine function;
Under the optical cable nature suspension status, make t=1/a, catenary equation must be about the relational expression of t:
tl = ln ( ( ty A + 1 ) + ( ty A + 1 ) 2 - 1 ) + ln ( ( ty B + 1 ) + ( ty B + 1 ) 2 - 1 )
In the formula, l is the horizontal range of adjacent two shaft towers, and unit is m; y ABe the vertical range of optical cable left side hanging point A from minimum point, unit is m; y BBe the vertical range of optical cable the right hanging point B from minimum point, unit is m, separates the above-mentioned relation formula with Newton method, draw parametric t, release parameter a, draw the former long Lo of optical cable again by the relational expression of parameter a and cable length and elongation, the starting condition that this former long Lo calculates as icing;
Behind the icing, the tension force of cable, elongation and suspension cable length overall all can change, and reach another balance again, suc as formula Lo=L 2-e 2, Lo is dangle the down former length of the suspension optical cable that obtains of nature, is known conditions, L 2And e 2Represent with the expression formula of containing parameter a ' that all the parameter a that changed for icing is caused of a ' wherein draws relational expression:
Lo = ( 2 a ′ · sh l 2 a ′ ) 2 + h 2 - a ′ γ 3 E ( l 2 + h 2 2 a ′ · coth l 2 a ′ + a ′ 2 · sh l a ′ ) · 10 - 3
In the formula, γ 3Be the icing load of optical cable, unit is N/mmm 2: γ 31+ γ 2
Wherein,
Figure GSA00000111649800032
M is the optical cable deadweight in the formula, and unit is kg/km.S-optical cable sectional area, unit are mm 2
Figure GSA00000111649800033
In the formula, b is an ice thickness, and unit is mm; D is a cable outer diameter, and unit is mm,
G-gravity constant, value are 9.8N/kg; S-optical cable sectional area, unit are mm 2
Following formula is solved parameter a ' with Newton method, a ' substitution relational expression:
T max = a ′ · γ 3 · S · cosh ( l B / a ′ ) · 10 - 3 T max = a ′ · γ 3 · S · cosh ( l A / a ′ ) · 10 - 3
l A---optical cable left side hanging point A is from the horizontal range of minimum point, and unit is m;
l B---optical cable the right hanging point B is from the horizontal range of minimum point, and unit is m;
Thereby obtain parameters such as the suffered maximum tension value of optical cable;
The 5th step: repeatedly evenly overlay on the optical cable simulation ice weight fraction of covering that calculates, each 1 to 2 hour at interval, cover when weighing and consider that mainly the optical cable sag is not too big, in order to avoid run on the ground, add pulling force then to calculated value, finally make its emulation mode that reaches actual span length and actual ice covering thickness, optical fiber attenuation The performance test results before and after the record icing;
The 6th step: utilize optical cable behind this icing can continue to do every performance test behind the cable ice coatings of stipulating in Optical Fiber composite overhead Ground Wire (OPGW) industry standard such as tensile property, ess-strain, thunderbolt and short-circuit current.
Wherein, in described the 5th step simulation ice weight fraction of covering that calculates is evenly overlayed on the optical cable for 3-10 time.
Wherein, covering the simulation ice time in described the 5th step is more than 48 hours.
The principal feature of technical solution of the present invention is utilized the existing puller system in laboratory exactly, to cover and heavily be converted to value of thrust, make the optical cable sample promptly be subjected to covering longitudinally heavily, be subjected to horizontal pulling force again, need not set up longly, only need the laboratory of condition correspondences such as actual track span that correct calculation need simulate, ice covering thickness to cover heavy and value of thrust gets final product outdoor apart from shaft tower.
The invention has the beneficial effects as follows: method of the present invention is a scheme the simplest and the most direct under laboratory condition, do not need actual spray water mist and low temperature environment to form real icing, can reduce test space, equipment is simple, the time is easy to control, big span actual track situation be can simulate by converting, experimentation cost and test difficulty reduced greatly.And this scheme proves very effective through the overtesting contrast.
Description of drawings
The present invention is further described below in conjunction with accompanying drawing.
Fig. 1 is the OPGW structural representation of example among the present invention;
Fig. 2 is that 400 meters span 40mm ice covering thickness 96h optical fiber attenuations of optical cable simulation change broken line graph and 400 meters span 40mm ice covering thickness 96h optical fiber attenuations of optical cable simulation change broken line graph in time;
Fig. 3 is the strain curve synoptic diagram of 60%RTS stress-strain tester result behind the cable ice coating;
Fig. 4 is the process flow diagram according to method of the present invention.
Embodiment
At first utilize the icing laboratory to spray freezing mode, OPGW is carried out the icing test, simulation weighs up the ice tuple certificate under the nature icing different-thickness situation, and compares with Theoretical Calculation.
Icing calculated value and actual value verification:
(1) OPGW of icing is not weighed
To length is that the optical cable sample of 120cm is weighed, and weight is 795g.
(2) the OPGW weight of icing is weighed
To length is the optical cable of 120cm, and icing length is that 90cm weighs, and weight is 1580g.
(3) diameter of OPGW and the external diameter behind the icing are measured
By kind of calliper OPGW diameter is 15.2mm, and the external diameter behind the icing is 37mm.
(4) the ice weight of OPGW icing
It is that the cable ice coating length of 120cm is that the general assembly (TW) of 90cm deducts not that icing length is the OPGW weight of 120cm that the ice weight of OPGW icing equals length:
1580g-795g=785g
(5) calculate the weight of icing
W=π(R 2-r 2)dl
Sample radius r behind the R---icing--the radius of-OPGW
The proportion 0.9g/cm of d----ice 3L---icing length
W=(1.85 2-0.76 2)*3.14*90*0.9=724g
(6) proportion is 0.9g/cm 3Actual icing value is poor with calculating icing value:
785-724=61g
Because actual track OPGW icing is for mixing the river in Jiangsu Province which flows into the Huangpu River of Shanghai, mixing river in Jiangsu Province which flows into the Huangpu River of Shanghai proportion is 0.6g/cm 3---0.9g/cm 3, the corresponding proportion of the heavy 785g of actual ice is 0.83g/cm 3, be more or less the same with calculated value, simultaneously, the ice coating state of optical cable should be examined or check in the laboratory under the strictest situation, so icing weight selects to calculate the icing value in the icing test.
Concrete implementation step is as follows:
The first step:, calculate the weight of icing according to the thickness of optical cable model and simulation icing:
W=π(R 2-r 2)dl
The proportion 0.9 gram/cubic centimetre of the radius d----ice of the OPGW radius r behind the R---icing---optical cable
The weight π----3.14 of l---cable length W---ice
Second step: the initial tension of optical cable with 16%RTS is fixed on the puller system, 100 meters of cable lengths, sample efficiency test length is not less than 25 meters.
The 3rd step: at least 6 optical fiber serial connections with in the optical cable make fiber lengths greater than 500 meters.Be connected on then on the optical time domain reflectometer, monitoring is with the variation of the increase optical fiber attenuation of ice covering thickness.
The 4th step: according to efficiency test length in the middle of the gold utensil stiff end of puller system two ends, the laboratory condition of actual span of conversion circuit and ice covering thickness correspondence need cover the weight and the value of thrust of simulation ice down, and wherein the actual computation process is with reference to Chinese patent application 200910092540.6.
The 5th step: simulation ice weight fraction is covered in calculating evenly overlayed on the optical cable for 3 to 4 times, each 1 to 2 hour at interval, cover when weighing and consider that mainly the optical cable sag is not too big, in order to avoid run on the ground, add pulling force then to calculated value, finally make its emulation mode that reaches actual span length and actual ice covering thickness, cover the 96 hours ice time of simulation.Optical fiber attenuation The performance test results before and after the record icing.The 6th step: every performance test behind the cable ice coatings such as the tensile property of utilizing optical cable behind this icing can continue to do to stipulate in the OPGW industry standard, ess-strain, thunderbolt, short-circuit current.
Below with OPGW-24B1-89[74.2; 50.3] be example, provide the test of adopting the present invention to carry out under the 40mm ice covering thickness situation.The OPGW structure as shown in Figure 1, optic cable diameter 12.6mm, the center is the aluminum-clad steel wire of a 2.6mm diameter, ground floor is the stainless steel tube optical unit that the aluminum-clad steel wire of 5 2.5mm diameters adds a 2.5mm diameter, the second layer is the aluminum-clad steel wire of 12 2.5mm diameters, and its concrete technical parameter sees Table 1.
Table 1 OPGW technical parameter table
Figure GSA00000111649800051
Figure GSA00000111649800061
6 optical fiber serial connections with in 100 meters long optical cables are connected on the optical time domain reflectometer then, and monitoring optical fiber is with the variation of the increase decay of ice covering thickness.(span is 25 meters) is covered with certain simulation ice on puller system earlier, applies pulling force simultaneously, and making it reach span is 400 meters, and ice covering thickness is the emulation mode of 40mm, 96 hours icing time.
Concrete ice covering thickness counter stress value sees Table 2, under the actual 400 meters span 40mm ice covering thickness situations of test simulation, the 25 meters effective optical cable test lengths in corresponding laboratory equivalent ice covering thickness be 175mm, the counter stress value is 66.72kN (90%RTS), corresponding icing weight 92.83kN.
The optical fiber attenuation The performance test results sees Table 3 before and after the icing, has write down respectively that wavelength is the optical fiber attenuation performance of 1310nm and 1550nm under icing time and the corresponding state.
Optical fiber attenuation changes increase behind the icing, icing removed icing after 96 hours, optical fiber attenuation does not return to original state, compare with original state and to have increased approximately 30%, as shown in Figure 2, icing was compared with original state after 96 hours, under 1310mm and 1550mm wavelength, decay and all increased, therefore, this pattern optical cable performance under 400 meters span ice covering thickness 40mm situations is affected, and causes the transmission quality of optical fiber to descend simultaneously.In the stress-strain tester behind the icing optical fiber attenuation change greatly, Fig. 3 is stress-strain tester result behind the cable ice coating, among the figure, horizontal ordinate is the suffered value of thrust of optical cable (N of unit); Last figure ordinate is decay (dB of unit), and figure below ordinate is fibre strain (% of unit).Attenuation change exceeds standard-required greater than 0.08 as can be seen.Break test and satisfy the power industry standard requirement, tensile property does not reduce.
The corresponding parameter value of 400 meters span 40mm icing of table 2 simulation
Ice covering thickness (mm) Counter stress value (kN) Corresponding icing weight
(kg/m)
400 meters spans 40 66.72(90%RTS) 5.95
25 meters spans 175 66.72(90%RTS) 92.83
OPGW fade performance test result (G.652) before and after table 3 icing
Figure GSA00000111649800071
Invention has been described according to specific exemplary embodiment herein.It will be conspicuous carrying out suitable replacement to one skilled in the art or revise under not departing from the scope of the present invention.Exemplary embodiment only is illustrative, rather than to the restriction of scope of the present invention, scope of the present invention is by appended claim definition.

Claims (3)

1. an Optical Fiber composite overhead Ground Wire (OPGW) laboratory icing simulating test method may further comprise the steps: the first step: according to the thickness of optical cable model and simulation icing, calculate the weight of icing:
W=π(R 2-r 2)dl
Wherein:
The proportion of the radius d----ice of the OPGW radius r behind the R---icing---optical cable: 0.9 gram/cubic centimetre
The weight π----3.14 of l---cable length W---ice
Second step: the initial tension of optical cable with 16%RTS is fixed on the puller system, and cable length is greater than 100 meters, and the efficiency test length of optical cable sample is not less than 25 meters;
The 3rd step: at least 6 optical fiber serial connections with in the optical cable, make fiber lengths greater than 500 meters, be connected on then on the optical time domain reflectometer, monitoring is with the variation of the increase optical fiber attenuation of ice covering thickness;
The 4th step:, need to cover the weight and the value of thrust of simulation ice under the laboratory condition of actual span of conversion circuit and ice covering thickness correspondence according to the efficiency test length of described optical cable in the middle of the gold utensil stiff end of puller system two ends.Computation process is as follows:
Utilize catenary equation:
y = a ( ch x a - 1 )
In the formula, a is the ratio of the deadweight W of optical cable Horizontal Tension H and unit for introducing parameter, and ch (x) is a hyperbolic cosine function;
Under the optical cable nature suspension status, make t=1/a, catenary equation must be about the relational expression of t:
tl = ln ( ( ty A + 1 ) + ( ty A + 1 ) 2 - 1 ) + ln ( ( ty B + 1 ) + ( ty B + 1 ) 2 - 1 )
In the formula, l is the horizontal range of adjacent two shaft towers, and unit is m; y ABe the vertical range of optical cable left side hanging point A from minimum point, unit is m; y BBe the vertical range of optical cable the right hanging point B from minimum point, unit is m, separates the above-mentioned relation formula with Newton method, draw parametric t, release parameter a, draw the former long Lo of optical cable again by the relational expression of parameter a and cable length and elongation, the starting condition that this former long Lo calculates as icing;
Behind the icing, the tension force of cable, elongation and suspension cable length overall all can change, and reach another balance again, suc as formula Lo=L 2-e 2, Lo is dangle the down former length of the suspension optical cable that obtains of nature, is known conditions, L 2And e 2Represent with the expression formula of containing parameter a ' that all the parameter a that changed for icing is caused of a ' wherein draws relational expression:
Lo = ( 2 a ′ · sh l 2 a ′ ) 2 + h 2 - a ′ γ 3 E ( l 2 + h 2 2 a ′ · coth l 2 a ′ + a ′ 2 · sh l a ′ ) · 10 - 3
In the formula, γ 3Be the icing load of optical cable, unit is N/mmm 2: γ 31+ γ 2
Wherein, M is the optical cable deadweight in the formula, and unit is kg/km.S-optical cable sectional area, unit are mm 2
Figure FSA00000111649700022
In the formula, b is an ice thickness, and unit is mm; D is a cable outer diameter, and unit is mm,
G-gravity constant, value are 9.8N/kg; S-optical cable sectional area, unit are mm 2Following formula is solved parameter a ' with Newton method, a ' substitution relational expression:
T max = a ′ · γ 3 · S · cosh ( l B / a ′ ) · 10 - 3 T max = a ′ · γ 3 · S · cosh ( l A / a ′ ) · 10 - 3
l A---optical cable left side hanging point A is from the horizontal range of minimum point, and unit is m;
l B---optical cable the right hanging point B is from the horizontal range of minimum point, and unit is m; Thereby obtain parameters such as the suffered maximum tension value of optical cable;
The 5th step: repeatedly evenly overlay on the optical cable simulation ice weight fraction of covering that calculates, each 1 to 2 hour at interval, cover when weighing and consider that mainly the optical cable sag is not too big, in order to avoid run on the ground, add pulling force then to calculated value, finally make its emulation mode that reaches actual span length and actual ice covering thickness, optical fiber attenuation The performance test results before and after the record icing;
The 6th step: utilize optical cable behind this icing can continue to do every performance test behind the cable ice coatings of stipulating in Optical Fiber composite overhead Ground Wire (OPGW) industry standard such as tensile property, ess-strain, thunderbolt and short-circuit current.
2. the method for claim 1 is characterized in that in described the 5th step simulation ice weight fraction of covering that calculates evenly being overlayed on the optical cable for 3-10 time.
3. as the described method of claim 1-2, it is characterized in that covering the simulation ice time in described the 5th step is more than 48 hours.
CN 201010163169 2010-04-29 2010-04-29 Laboratory icing simulating test method of optical power ground wires (OPGWs) Active CN101858945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010163169 CN101858945B (en) 2010-04-29 2010-04-29 Laboratory icing simulating test method of optical power ground wires (OPGWs)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010163169 CN101858945B (en) 2010-04-29 2010-04-29 Laboratory icing simulating test method of optical power ground wires (OPGWs)

Publications (2)

Publication Number Publication Date
CN101858945A true CN101858945A (en) 2010-10-13
CN101858945B CN101858945B (en) 2013-03-27

Family

ID=42944963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010163169 Active CN101858945B (en) 2010-04-29 2010-04-29 Laboratory icing simulating test method of optical power ground wires (OPGWs)

Country Status (1)

Country Link
CN (1) CN101858945B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499300A (en) * 2013-10-18 2014-01-08 国家电网公司 Conducting wire icing on-line monitoring device and method based on OPGW (optical fiber composite overhead ground wire) optical fiber
CN103616100A (en) * 2013-11-25 2014-03-05 国家电网公司 Distributed optical fiber composite ground wire icing monitoring system for optical fiber power transmission line
CN106482650A (en) * 2016-10-20 2017-03-08 国家电网公司 Ice coating of power line monitoring method and device
WO2018045833A1 (en) * 2016-09-09 2018-03-15 中国电力科学研究院有限公司 Opgw single wire torsional fatigue test method, apparatus and storage medium
CN109039449A (en) * 2018-08-22 2018-12-18 安徽问天量子科技股份有限公司 A kind of detection method and its detection device of fiber optic cable icing
CN109959415A (en) * 2019-03-13 2019-07-02 国家电网有限公司 The test method of performance is waved in a kind of resistance to wind of OPGW optical cable
CN111007344A (en) * 2019-12-26 2020-04-14 国网河南省电力公司周口供电公司 Large circuit load test method for carbon fiber composite core wire

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004099840A1 (en) * 2003-05-06 2004-11-18 Pirelli Telecom Cables Y Sistemas España, S.L. Optical aerial line and method of installation thereof
CN101075733A (en) * 2007-04-19 2007-11-21 高雯 Transmission-line damping lightning arrester against winding shock
CN101464549A (en) * 2009-01-14 2009-06-24 江西省电力信息通讯有限公司 Anti-ice cover optical fiber composite overhead ground wire based on optical fiber temperature measurement
CN101655588A (en) * 2009-09-17 2010-02-24 中国电力科学研究院 Method for simulating mechanical properties of OPGW optical cable ice coating

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004099840A1 (en) * 2003-05-06 2004-11-18 Pirelli Telecom Cables Y Sistemas España, S.L. Optical aerial line and method of installation thereof
CN101075733A (en) * 2007-04-19 2007-11-21 高雯 Transmission-line damping lightning arrester against winding shock
CN101464549A (en) * 2009-01-14 2009-06-24 江西省电力信息通讯有限公司 Anti-ice cover optical fiber composite overhead ground wire based on optical fiber temperature measurement
CN101655588A (en) * 2009-09-17 2010-02-24 中国电力科学研究院 Method for simulating mechanical properties of OPGW optical cable ice coating

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《南方电网技术》 20091231 曹敏等 基于覆冰增长速度的覆冰在线监测系统动态预警方案研究与探讨 187-189 1-3 第3卷, *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499300A (en) * 2013-10-18 2014-01-08 国家电网公司 Conducting wire icing on-line monitoring device and method based on OPGW (optical fiber composite overhead ground wire) optical fiber
CN103499300B (en) * 2013-10-18 2016-03-02 国家电网公司 Based on wire icing on-Line Monitor Device and the method for OPGW optical fiber
CN103616100A (en) * 2013-11-25 2014-03-05 国家电网公司 Distributed optical fiber composite ground wire icing monitoring system for optical fiber power transmission line
WO2018045833A1 (en) * 2016-09-09 2018-03-15 中国电力科学研究院有限公司 Opgw single wire torsional fatigue test method, apparatus and storage medium
US10712247B2 (en) 2016-09-09 2020-07-14 China Electric Power Research Institute Co. Ltd. OPGW single wire torsional fatigue test method, apparatus and storage medium
CN106482650A (en) * 2016-10-20 2017-03-08 国家电网公司 Ice coating of power line monitoring method and device
CN109039449A (en) * 2018-08-22 2018-12-18 安徽问天量子科技股份有限公司 A kind of detection method and its detection device of fiber optic cable icing
CN109959415A (en) * 2019-03-13 2019-07-02 国家电网有限公司 The test method of performance is waved in a kind of resistance to wind of OPGW optical cable
CN109959415B (en) * 2019-03-13 2024-01-12 国家电网有限公司 Method for testing wind-blowing-resistant galloping performance of OPGW optical cable
CN111007344A (en) * 2019-12-26 2020-04-14 国网河南省电力公司周口供电公司 Large circuit load test method for carbon fiber composite core wire

Also Published As

Publication number Publication date
CN101858945B (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN101858945B (en) Laboratory icing simulating test method of optical power ground wires (OPGWs)
CN110927524B (en) OPGW optical cable core breaking reason analysis and accurate positioning method based on BOTDR technology
CN110285909B (en) Method for calculating instantaneous cable force of cable-supported bridge based on synchronous compression transformation
CN104913727B (en) A kind of method of distributed measurement OPGW ice covering thickness
CN113691307B (en) OPGW fault positioning and early warning method based on BOTDR and OTDR
CN203163769U (en) Overhead line safety monitoring system based on distributed fiber sensors
He et al. A method for analyzing stability of tower-line system under strong winds
CN104406777A (en) Three-dimensional space variable angle loading device
CN1743861A (en) Optical fiber combined overhead earth wire
CN103048557B (en) Optical phase conductor allows current-carrying capacity performance test apparatus and test method thereof
CN109300605A (en) Wisdom cable
CN201569523U (en) Stress and strain measuring device applied for optical phase conductor OPPC
CN103760474A (en) OPGW optical cable stress testing method
CN101694538A (en) Method for designing ADSS optical cables controlled by conductor sag
CN104614017A (en) Distributed strain and stress monitoring method of electric aerial optical cables based on double-tube special-shaped structure
CN209087448U (en) Wisdom cable
CN203688111U (en) Steel strand stress measurement device for prestressed concrete
CN104266600B (en) Based on the Optical Fiber composite overhead Ground Wire optical cable strain detecting method of support vector regression
CN201732192U (en) Armor sensing optical cable
CN104614644A (en) High-voltage overhead transmission line icing diagnosis method
CN111609807B (en) Power transmission line dynamic deformation reconstruction method based on OPGW (optical fiber composite overhead ground wire) multi-core stress sensing
CN104535220A (en) Electric power aerial optical cable distributive on-line monitoring device
CN106404556A (en) Method for determining availability of damaged OPGW (optical fiber composite overhead ground wire) cable by torsion test
CN204359461U (en) A kind of electric aerial optical cable distributed on line monitoring device
CN102589992B (en) Method for forecasting residual service life of steel-cored aluminum strand overhead conductor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130217

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130217

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant