CN101858149A - Large-sized steel structure integral translation and hoisting combination construction process - Google Patents

Large-sized steel structure integral translation and hoisting combination construction process Download PDF

Info

Publication number
CN101858149A
CN101858149A CN200910048975A CN200910048975A CN101858149A CN 101858149 A CN101858149 A CN 101858149A CN 200910048975 A CN200910048975 A CN 200910048975A CN 200910048975 A CN200910048975 A CN 200910048975A CN 101858149 A CN101858149 A CN 101858149A
Authority
CN
China
Prior art keywords
roof truss
translation
internodes
steel structure
translation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910048975A
Other languages
Chinese (zh)
Inventor
沈新华
吴轶
张兵
冯琰
袁鼎
陈枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN200910048975A priority Critical patent/CN101858149A/en
Publication of CN101858149A publication Critical patent/CN101858149A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a large-sized steel structure integral translation and hoisting combination construction process, which is characterized in that a large-sized steel structure is divided into a plurality of roof truss internodes, and comprises the following steps that: A. internodes assembling the plurality of roof truss internodes on a translation device, and adopting the plurality of roof truss internodes which are assembled on the translation device as a section; B. utilizing the translation device to move the plurality of roof truss internodes which are used as the same section to a hoisting position; C. and utilizing a hoisting device to integrally hoist the plurality of roof truss internodes of the same section to a designed position so as to assemble and join the connection of the roof truss. The process solves the problems that when constructing the large-sized steel structure that the size of the integral structure is large, the span of a specially-shaped structure is large, the control difficulty of the structure stability and deformation is large, the restriction on the peripheral environment and the additional structure is multiple, the cross of the previous and the next procedures is multiple, the node structure is unique, and the like, and has the advantages of high installation precision and short construction period.

Description

A kind of large-sized steel structure integral translation and lifting combination construction process
Technical field:
The present invention relates to field of steel structure construction, particularly a kind of large-sized steel structure integral translation and lifting combination construction process.
Background technology:
Often meet with following difficult point at present when large-scale steel structure is constructed: the overall structure scale of construction is big, different capable structural span is big, Stability Analysis of Structures and Deformation Control difficulty are big, the restriction of surrounding enviroment and accessory structure is many, upper and lower procedure intersects many, and joint structure is special, installation accuracy is high, the construction period is tight.
Summary of the invention:
The purpose of this invention is to provide large-sized steel structure integral translation and promote combination construction process, can address the above problem.
To achieve these goals, technical scheme of the present invention is: large-sized steel structure integral translation and lifting combination construction process, it is characterized in that this large-scale steel structure is divided into a plurality of roof truss internodes, this technology may further comprise the steps: A, on translation device a plurality of roof truss internodes are carried out internode and always piece together, will always piece together a plurality of roof truss internodes on translation device as a section; B, utilize translation device to move to raised position as these a plurality of roof truss internodes of same section; C, utilize lifting means that these a plurality of roof truss internode integral body of same section are risen to the assembling butt joint that design attitude carries out the roof truss junction.
The overall structure scale of construction that the present invention exists in the time of can solving the large-scale steel structure construction is big, different capable structural span is big, Stability Analysis of Structures and Deformation Control difficulty are big, the restriction of surrounding enviroment and accessory structure is many, upper and lower procedure intersects many, problems such as joint structure is special, its advantage is the installation accuracy height, the construction period is short.
Description of drawings:
Fig. 1 is a structure elevation of the present invention
Fig. 2 is structural plan figure of the present invention
Fig. 3 is the structural representation of lifting base of the present invention
The specific embodiment:
Below in conjunction with drawings and Examples the present invention is further described.
Large-sized steel structure integral translation and lifting combination construction process, it is characterized in that this large-scale steel structure is divided into a plurality of roof truss internodes, this technology may further comprise the steps: A, on translation device 1 a plurality of roof truss internodes are carried out internode and always piece together, will always piece together a plurality of roof truss internodes on translation device as a section 2; B, utilize translation device 1 to move to raised position as these a plurality of roof truss internodes of same section 2; C, utilize lifting means 3 that these a plurality of roof truss internode integral body of same section 2 are risen to the assembling butt joint that design attitude carries out the roof truss junction.
Wherein translation device comprises track 4 and the synchronous translation device 5 that matches with track.Lifting means comprises the hoisting frame 6 that is located on each hoist point, each hoisting frame 6 is provided with lift cylinder 7 and guiding steady rest 8, lift cylinder 7 and guiding steady rest 8 are installed the back that links into an integrated entity install steel strand 9 on ground, install and it is installed on the hoisting frame 6 together after finishing, supporting oil pipe, pumping plant and electrical control system are installed then.Steel strand 9 ends are with sheath 10, and the end of steel strand 9 is provided with and promotes base 11, and roof truss internode 13 is provided with corresponding limited block 12.
Wherein among the step C, when the translation of roof truss internode puts in place, will promote base and be installed to below the roof truss internode, and at the terminal sheath of installing of steel strand; The starting lift cylinder promotes base and rises, and after a plurality of roof truss internodes promoted and leave translation device, translation device was back to original position; Lifting put in place and locate after carry out the assembling butt joint of roof truss junction, treat after butt joint is finished lifting means to be unloaded.

Claims (7)

1. large-sized steel structure integral translation and promote combination construction process, it is characterized in that this large-scale steel structure is divided into a plurality of roof truss internodes, this technology may further comprise the steps: A, on translation device a plurality of roof truss internodes are carried out internode and always piece together, will always piece together a plurality of roof truss internodes on translation device as a section; B, utilize translation device to move to raised position as these a plurality of roof truss internodes of same section; C, utilize lifting means that these a plurality of roof truss internode integral body of same section are risen to the assembling butt joint that design attitude carries out the roof truss junction.
2. large-sized steel structure integral translation as claimed in claim 1 and lifting combination construction process is characterized in that translation device comprises track and the synchronous translation device that matches with track.
3. large-sized steel structure integral translation as claimed in claim 1 and lifting combination construction process, it is characterized in that lifting means comprises the hoisting frame that is located on each hoist point, each hoisting frame is provided with lift cylinder and guiding steady rest, lift cylinder and guiding steady rest are installed the back that links into an integrated entity install steel strand, install and it is installed on the hoisting frame together after finishing on ground.
4. large-sized steel structure integral translation as claimed in claim 3 and lifting combination construction process is characterized in that the steel strand end is with sheath, and the end of steel strand is provided with the lifting base, and the roof truss internode is provided with corresponding limited block.
5. large-sized steel structure integral translation as claimed in claim 1 and lifting combination construction process is characterized in that among the step C, when the translation of roof truss internode puts in place, will promote base and be installed to below the roof truss internode, and at the terminal sheath of installing of steel strand; The starting lift cylinder promotes base and rises, and after a plurality of roof truss internodes promoted and leave translation device, translation device was back to original position; Lifting put in place and locate after carry out the assembling butt joint of roof truss junction, treat after butt joint is finished lifting means to be unloaded.
6. a large-sized steel structure integral translation and promote the combination construction system, it is characterized in that this construction system comprises translation device and lifting means, wherein translation device comprises track and the synchronous translation device that matches with track, lifting means comprises the hoisting frame that is located on each hoist point, each hoisting frame is provided with lift cylinder and guiding steady rest, and lift cylinder installs steel strand after linking into an integrated entity with the installation of guiding steady rest.
7. large-sized steel structure integral translation as claimed in claim 6 and lifting combination construction system is characterized in that the steel strand end is with sheath, and the end of steel strand is provided with the lifting base, and the roof truss internode is provided with corresponding limited block.
CN200910048975A 2009-04-08 2009-04-08 Large-sized steel structure integral translation and hoisting combination construction process Pending CN101858149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910048975A CN101858149A (en) 2009-04-08 2009-04-08 Large-sized steel structure integral translation and hoisting combination construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910048975A CN101858149A (en) 2009-04-08 2009-04-08 Large-sized steel structure integral translation and hoisting combination construction process

Publications (1)

Publication Number Publication Date
CN101858149A true CN101858149A (en) 2010-10-13

Family

ID=42944288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910048975A Pending CN101858149A (en) 2009-04-08 2009-04-08 Large-sized steel structure integral translation and hoisting combination construction process

Country Status (1)

Country Link
CN (1) CN101858149A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383613A (en) * 2011-11-11 2012-03-21 天津电力工程监理有限公司 Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN102496771A (en) * 2011-12-19 2012-06-13 宝钢钢构有限公司 Method and device for installing large-sized steel structural antenna
CN102852338A (en) * 2012-03-26 2013-01-02 上海通用金属结构工程有限公司 Large-span roof displacement unloading construction method
CN103938875A (en) * 2013-01-18 2014-07-23 上海宝冶集团有限公司 Ground single body tensioning lifting construction method of single layer suspendome
CN104389432A (en) * 2014-10-21 2015-03-04 北京建工土木工程有限公司 Integral lifting equipment of steel truss-supported concrete house roof system and construction method
CN107366433A (en) * 2017-06-20 2017-11-21 河北卓达建材研究院有限公司 A kind of steel building Intelligent assembly system and its assembly method
CN110130652A (en) * 2019-05-10 2019-08-16 中铁四局集团有限公司 Integral lifting construction method for large-scale complex combined structure steel roof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383613A (en) * 2011-11-11 2012-03-21 天津电力工程监理有限公司 Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN102383613B (en) * 2011-11-11 2014-09-17 天津电力工程监理有限公司 Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN102496771A (en) * 2011-12-19 2012-06-13 宝钢钢构有限公司 Method and device for installing large-sized steel structural antenna
CN102496771B (en) * 2011-12-19 2013-11-06 宝钢钢构有限公司 Method and device for installing large-sized steel structural antenna
CN102852338A (en) * 2012-03-26 2013-01-02 上海通用金属结构工程有限公司 Large-span roof displacement unloading construction method
CN102852338B (en) * 2012-03-26 2015-09-09 上海通用金属结构工程有限公司 Long-span roofing displacement method for discharging construction
CN103938875A (en) * 2013-01-18 2014-07-23 上海宝冶集团有限公司 Ground single body tensioning lifting construction method of single layer suspendome
CN104389432A (en) * 2014-10-21 2015-03-04 北京建工土木工程有限公司 Integral lifting equipment of steel truss-supported concrete house roof system and construction method
CN107366433A (en) * 2017-06-20 2017-11-21 河北卓达建材研究院有限公司 A kind of steel building Intelligent assembly system and its assembly method
CN110130652A (en) * 2019-05-10 2019-08-16 中铁四局集团有限公司 Integral lifting construction method for large-scale complex combined structure steel roof

Similar Documents

Publication Publication Date Title
CN101858149A (en) Large-sized steel structure integral translation and hoisting combination construction process
US9032620B2 (en) Method for moving and aligning heavy device
CN201224671Y (en) Hoisting device for reversely mounting storage tank
CN102016202A (en) Erection method for solar receiver and support tower
CN102102444B (en) Assembling and positioning construction method of large steel casting members
CN102704676A (en) Jacking formwork mechanism
CN102691420A (en) Installation and construction method for multilayer large-span steel truss
CN105804400A (en) Curved surface net frame lifting construction method
CN202188515U (en) Multi-side detachable bound overhead torch
CN107269025B (en) The set posture position-limit mechanism of building jacking control lateral displacement
CN103693547A (en) Self-balance hoisting tool and hoisting method for specially-shaped component
CN102926547B (en) Installation method of curved-surface net rack of roof
CN101858165B (en) Tower mast structural segmented sheathing and piercing drawout integral installation technology
CN205099288U (en) Work platform of climbing certainly from climbing device and use device
CN112663792B (en) Construction method of large-scale overhanging multi-surface folded plate diamond body reticulated shell steel structure
CN105719711A (en) Earthquake-resistant support structure for reactor internal lifting tools of pressurized water reactor nuclear power plants
CN109881896B (en) Connector lifting method for super high-rise building
CN108487212B (en) Hoisting process for jacket skirt pile sleeve combined piece
CN103255837B (en) A kind of removable modular combination room
CN202718385U (en) Jack-raising formwork mechanism
CN106182068A (en) A kind of industry cantilever connects assembly
CN209369330U (en) A kind of rail brackets of jumping formwork
CN205276843U (en) Instrument formula protection frame suitable for assemble protruding type component of integral concrete
CN104153590A (en) Quick positioning and adjusting device for prefabricated residence superimposed wallboard
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101013