CN101851694A - Fast change method of large-scale converter movable gas hood - Google Patents

Fast change method of large-scale converter movable gas hood Download PDF

Info

Publication number
CN101851694A
CN101851694A CN200910048597A CN200910048597A CN101851694A CN 101851694 A CN101851694 A CN 101851694A CN 200910048597 A CN200910048597 A CN 200910048597A CN 200910048597 A CN200910048597 A CN 200910048597A CN 101851694 A CN101851694 A CN 101851694A
Authority
CN
China
Prior art keywords
gas hood
movable gas
converter
furnace bottom
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910048597A
Other languages
Chinese (zh)
Other versions
CN101851694B (en
Inventor
向鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Co Ltd
Priority to CN200910048597A priority Critical patent/CN101851694B/en
Publication of CN101851694A publication Critical patent/CN101851694A/en
Application granted granted Critical
Publication of CN101851694B publication Critical patent/CN101851694B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Abstract

The invention relates to the field of exhaust or separation devices of gas or smoke dusts in converters for processing and treating pig irons and discloses a fast change method of a large-scale converter movable gas hood. After a fixed gas hood is disassembled, the method sequentially comprises the following steps of: firstly, disassembling a cooling water pipe and rocking a converter (1) until the furnace bottom is arranged upwards; secondly, fixing a movable gas hood (2) on the converter (1) through a chain fall (4); thirdly, hoisting the movable gas hood (2) down through a crane (3); fourthly, hoisting a new movable gas hood onto the furnace bottom of the converter (1) through the crane (3) and fixing the new movable gas hood through the chain fall (4); fifthly, rocking the converter (1) until the furnace bottom is arranged upwards; and sixthly, reassembling a lifting chain of a hoisting device of the movable gas hood (2) and removing the chain fall (4). The invention has the advantages of simple steps, convenient operation, short construction period, less influence to production and high production efficiency.

Description

Fast change method of large-scale converter movable gas hood
Technical field
The present invention relates to be used for the discharge or the tripping device field of the converter waste gas or the flue dust of the processing treatment pig iron, be specially a kind of fast change method of large-scale converter movable gas hood.
Background technology
Converter steelmaking is the common method that pig iron smelting is become steel, and converter steelmaking is to carry out in converter.During steel-making, converter originally is in horizontality, blasts air or oxygen after injecting liquid pig iron and corresponding auxiliary material, and rotates converter and make it upright, and the steel-making reaction takes place in converter this moment.Turn off the blast when steel-making reaction is tending towards finishing constantly, and converter is gone back to level attitude, the molten steel that is smelt is finished steelmaking process in from the converter introversion to ladle.The converter mouth can be discharged a large amount of waste gas and flue dust during steel-making, and these waste gas and flue dust are concentrated by movable gas hood and reclaimed.Movable gas hood links to each other with hoisting appliance by erecting by overhang, cooperates the recovery requirement of bessemerizing process kind furnace gas, but the movable gas hood free lifting.Movable gas hood adopts the vaporization type of cooling, reaches the purpose of cooled flue gas when reclaiming heat, is control RECOVERY OF CONVERTER GAS quality, realizes the key equipment that flue gas waste heat recovery and converter first and second dust removing effects are guaranteed.When the large-scale converter movable gas hood of present smelter is changed, traditional method adopts removes movable gas hood, petticoat pipe hangs out to utilize the oxygen rifle to hang directly over the converter fixedly, remove the movable gas hood water-cooled tube then, unclamp the movable gas hood elevating chain, utilize the oxygen rifle to hang it is sling, adjust angle then, hang out the converter factory building from the top.There are three problems in this method for dismounting: 1. because the movable gas hood diameter is bigger, and the converter superjacent air space is narrow and small, cuts off steel structure platform or the crossbeam that may run in the hoisting process, the destructiveness of having to before the lifting give, treating needs the structure of recovery many after movable gas hood returns dress, the construction cost height; 2. need indexing after movable gas hood is sling, so that by the converter mill construction, it is big to adjust the angle difficulty, and potential safety hazard is many; 3. because of the many difficulty of lifting operation cause long construction period greatly, the converter off-time is long.Reduced production efficiency.
Summary of the invention
In order to overcome the defective of prior art, provide that a kind of step is simple, easy to operate, short construction period, little impact on production, replacing method that production efficiency is high, the invention discloses a kind of fast change method of large-scale converter movable gas hood.
The present invention reaches goal of the invention by following technical solution:
A kind of fast change method of large-scale converter movable gas hood fixedly carries out behind the petticoat pipe in dismounting, and after changing movable gas hood water-cooled tube is implemented pipe arrangement, flaw detection, work pressure test, it is characterized in that: carry out successively as follows:
A. remove the water-cooled tube of movable gas hood, converter is shaken to furnace bottom state up;
B. unclamp the elevating chain of movable gas hood lifting gear, movable gas hood is dropped on the furnace bottom, movable gas hood is fixed in the converter with jack;
C. then converter is shaken toward the stokehold direction, shake position of platform to the converter, movable gas hood is hung down with crane at movable gas hood;
D. with crane new movable gas hood is winched on the converter furnace bottom, and fix with jack;
E. converter is shaken in the opposite direction, to furnace bottom position up;
F. return the elevating chain of dress movable gas hood lifting gear, extract jack.
Described fast change method of large-scale converter movable gas hood is characterized in that: the b step, its lifting weight of used jack was not less than 10 tons when being fixed on movable gas hood in the converter with jack.
The present invention cooperates by grate, on the platform of converter the place ahead, lift, old movable gas hood is turned down from the stokehold, do not need to remove a large amount of steel structure platform and the crossbeams in converter top, on only old movable gas hood need being dropped at the bottom of the converter before the lifting, fix with jack, cooperate by grate and finish petticoat pipe and hang down, it is identical to return the dress method.The invention has the beneficial effects as follows: step is simple, easy to operate, can change large-scale converter movable gas hood fast, can shorten construction period greatly, tradition replacing method needs 24 hours at least, adopt method of the present invention only to need to finish in 2 hours, because short construction period, so little impact on production, production efficiency height, construction cost are low, simultaneously can also guarantee construction quality, improve operational security.
Description of drawings
Fig. 1 is the structural representation of the converter of movable gas hood to be replaced among the present invention.
Embodiment
Below further specify the present invention by specific embodiment.
Embodiment 1
An existing converter 1 needs to change movable gas hood 2, as shown in Figure 1.Carry out successively as follows:
A. remove fixedly petticoat pipe;
B. remove the water-cooled tube of movable gas hood 2, converter 1 is shaken to furnace bottom state up;
C. unclamp the elevating chain of movable gas hood 2 lifting gears, movable gas hood 2 is dropped on the furnace bottom, with jack 4 movable gas hood 2 is fixed in the converter 1, used jack 4 its lifting weight are not less than 10 tons, and present embodiment employing lifting weight is 10 tons jack;
D. then converter 1 is shaken toward the stokehold direction, shakes platform 12 positions to the converter at movable gas hood 2, platform 12 be 9.6 meters square, with crane 3 movable gas hood 2 is hung down;
E. with crane 3 new movable gas hood 2 is winched on converter 1 furnace bottom, and fix with jack 4;
F. converter 1 is shaken in the opposite direction, to furnace bottom position up;
G. return the elevating chain of dress movable gas hood 2 lifting gears, extract jack 4.
H. water-cooled tube is implemented pipe arrangement, flaw detection, work pressure test, finish more changing jobs of movable gas hood 2.

Claims (2)

1. a fast change method of large-scale converter movable gas hood fixedly carries out behind the petticoat pipe in dismounting, and after changing movable gas hood water-cooled tube is implemented pipe arrangement, flaw detection, work pressure test, it is characterized in that: carry out successively as follows:
A. remove the water-cooled tube of movable gas hood (2), converter (1) is shaken to furnace bottom state up;
B. unclamp the elevating chain of movable gas hood (2) lifting gear, movable gas hood (2) is dropped on the furnace bottom, movable gas hood (2) is fixed in the converter (1) with jack (4);
C. then converter (1) is shaken toward the stokehold direction, shake platform (12) position to the converter, movable gas hood (2) is hung down with crane (3) at movable gas hood (2);
D. use crane (3) that new movable gas hood is winched on converter (1) furnace bottom, and fix with jack (4);
E. converter (1) is shaken in the opposite direction, to furnace bottom position up;
F. return the elevating chain of dress movable gas hood lifting gear, extract jack (4).
2. fast change method of large-scale converter movable gas hood as claimed in claim 1 is characterized in that: the b step, its lifting weight of used jack (4) was not less than 10 tons when being fixed on movable gas hood (2) in the converter (1) with jack (4).
CN200910048597A 2009-03-31 2009-03-31 Fast change method of large-scale converter movable gas hood Expired - Fee Related CN101851694B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910048597A CN101851694B (en) 2009-03-31 2009-03-31 Fast change method of large-scale converter movable gas hood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910048597A CN101851694B (en) 2009-03-31 2009-03-31 Fast change method of large-scale converter movable gas hood

Publications (2)

Publication Number Publication Date
CN101851694A true CN101851694A (en) 2010-10-06
CN101851694B CN101851694B (en) 2012-09-05

Family

ID=42803374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910048597A Expired - Fee Related CN101851694B (en) 2009-03-31 2009-03-31 Fast change method of large-scale converter movable gas hood

Country Status (1)

Country Link
CN (1) CN101851694B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102717365A (en) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 Device and method for replacing lower rows of burners of quenching furnace, tempering furnace and normalizing furnace
CN105256098A (en) * 2015-11-17 2016-01-20 莱芜钢铁集团有限公司 Method for replacing movable smoke hood of revolving furnace
CN107513599A (en) * 2016-06-17 2017-12-26 中冶宝钢技术服务有限公司 Upper petticoat pipe hanging method based on BIM technology
CN108723317A (en) * 2017-04-25 2018-11-02 中冶宝钢技术服务有限公司 A kind of on-bne repair method of hot scarfing machine
CN109022672A (en) * 2018-08-24 2018-12-18 中国二十冶集团有限公司 The installation method of converter evaporation cooling air flue when a kind of maintenance
CN109746542A (en) * 2017-11-08 2019-05-14 中冶宝钢技术服务有限公司 Hot scarfing machine petticoat pipe replacing options
CN109941899A (en) * 2017-12-21 2019-06-28 广东韶钢松山股份有限公司 A kind of hanging method of movable gas hood movable type replacement
CN115109888A (en) * 2021-03-19 2022-09-27 中冶宝钢技术服务有限公司 Converter skirt cover spanning installation and disassembly method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2487740Y (en) * 2001-07-07 2002-04-24 重庆钢铁设计研究院 Device for lifting and side-sliding hood of converter
CN101063177A (en) * 2006-04-29 2007-10-31 上海宝冶建设有限公司 Integral installation method for mammoth steel converter outer assemblage
CN201040699Y (en) * 2007-05-16 2008-03-26 鞍钢集团设计研究院 Lifting device for converter smoke helmet

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102717365A (en) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 Device and method for replacing lower rows of burners of quenching furnace, tempering furnace and normalizing furnace
CN105256098A (en) * 2015-11-17 2016-01-20 莱芜钢铁集团有限公司 Method for replacing movable smoke hood of revolving furnace
CN107513599A (en) * 2016-06-17 2017-12-26 中冶宝钢技术服务有限公司 Upper petticoat pipe hanging method based on BIM technology
CN108723317A (en) * 2017-04-25 2018-11-02 中冶宝钢技术服务有限公司 A kind of on-bne repair method of hot scarfing machine
CN108723317B (en) * 2017-04-25 2020-04-03 中冶宝钢技术服务有限公司 Online maintenance method of scarfing machine
CN109746542A (en) * 2017-11-08 2019-05-14 中冶宝钢技术服务有限公司 Hot scarfing machine petticoat pipe replacing options
CN109941899A (en) * 2017-12-21 2019-06-28 广东韶钢松山股份有限公司 A kind of hanging method of movable gas hood movable type replacement
CN109022672A (en) * 2018-08-24 2018-12-18 中国二十冶集团有限公司 The installation method of converter evaporation cooling air flue when a kind of maintenance
CN115109888A (en) * 2021-03-19 2022-09-27 中冶宝钢技术服务有限公司 Converter skirt cover spanning installation and disassembly method

Also Published As

Publication number Publication date
CN101851694B (en) 2012-09-05

Similar Documents

Publication Publication Date Title
CN101851694B (en) Fast change method of large-scale converter movable gas hood
CN202492540U (en) Energy saving vacuum degassing (VD)/vacuum oxygen degassing (VOD) vacuum refining furnace based on full automatic mechanical pump group
CN104962680A (en) Converter dry method dust-removing explosion-venting control method
CN107475478A (en) Pneumatic steelmaking stays slag melting to open to blow non-ignitable operating method
CN105177202A (en) Iron-making blast furnace overhaul method
CN102228895A (en) Movable type multistation suction hood
CN102912074A (en) Method for preventing dry process dust removal system from exhausting yellow smoke
CN102259106B (en) Cantilever type movable dust suction hood
CN102719592A (en) Method for bricklaying furnace lining of large converter
CN105671242A (en) Maintenance method for converter lining
CN104789733B (en) A kind of maintaining method of converter lining
CN201411470Y (en) Light-tonnage environment-friendly VOD steel ladle refining furnace
CN104060104B (en) Bottom blowing tin-making process
CN106555029A (en) VOD stove vacuum cover fast repairing methods
CN102399925A (en) Method for replacing cooling wall of blast furnace
CN208748139U (en) A kind of electric furnace smelting device
CN102912075A (en) Method for improving coal gas recovery of semi-steel steel-making dry dedusting system
CN113215352B (en) Method for efficiently removing refractory bricks of converter
CN102912076A (en) Method for preventing dry process dust removal pipeline of vanadium extraction converter from scaling
CN102409120A (en) Method for replacing bottom of blast furnace
CN109280739B (en) Method for improving molten steel yield of electric furnace
CN104178595B (en) The replacing options of steelshop cleaning shaft
CN202558907U (en) Continuous blowing furnace for blowing water quenched matte
CN202174098U (en) Movable multi-station suction hood
CN216473420U (en) Continuous refining device of blister copper pyrogenic process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168

Patentee after: Shanghai Baoye Group Corp., Ltd.

Address before: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168

Patentee before: Baoye Construction Co., Ltd., Shanghai

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20170331

CF01 Termination of patent right due to non-payment of annual fee