CN101839371A - 一种穿墙套管 - Google Patents
一种穿墙套管 Download PDFInfo
- Publication number
- CN101839371A CN101839371A CN200910130634A CN200910130634A CN101839371A CN 101839371 A CN101839371 A CN 101839371A CN 200910130634 A CN200910130634 A CN 200910130634A CN 200910130634 A CN200910130634 A CN 200910130634A CN 101839371 A CN101839371 A CN 101839371A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- plastering
- length
- sleeve pipe
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910130634A CN101839371A (zh) | 2009-03-21 | 2009-03-21 | 一种穿墙套管 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910130634A CN101839371A (zh) | 2009-03-21 | 2009-03-21 | 一种穿墙套管 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101839371A true CN101839371A (zh) | 2010-09-22 |
Family
ID=42742938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910130634A Pending CN101839371A (zh) | 2009-03-21 | 2009-03-21 | 一种穿墙套管 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101839371A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925422A (zh) * | 2014-03-28 | 2014-07-16 | 张书傲 | 一种空调安装用的穿墙套管组件 |
CN107039936A (zh) * | 2017-04-20 | 2017-08-11 | 河南基泰电气有限公司 | 一种穿墙套管 |
CN109506049A (zh) * | 2018-11-30 | 2019-03-22 | 杨威 | 一种快装型穿墙管道防腐套管 |
CN110656680A (zh) * | 2018-06-28 | 2020-01-07 | 科勒公司 | 长度可调的供水适配器 |
-
2009
- 2009-03-21 CN CN200910130634A patent/CN101839371A/zh active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925422A (zh) * | 2014-03-28 | 2014-07-16 | 张书傲 | 一种空调安装用的穿墙套管组件 |
CN103925422B (zh) * | 2014-03-28 | 2016-04-13 | 张书傲 | 一种空调安装用的穿墙套管组件 |
CN107039936A (zh) * | 2017-04-20 | 2017-08-11 | 河南基泰电气有限公司 | 一种穿墙套管 |
CN107039936B (zh) * | 2017-04-20 | 2018-10-23 | 河南基泰电气有限公司 | 一种穿墙套管 |
CN110656680A (zh) * | 2018-06-28 | 2020-01-07 | 科勒公司 | 长度可调的供水适配器 |
CN109506049A (zh) * | 2018-11-30 | 2019-03-22 | 杨威 | 一种快装型穿墙管道防腐套管 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101839371A (zh) | 一种穿墙套管 | |
CN104405128B (zh) | 填充墙暗装配电箱先期直接安装方法 | |
EA200970133A1 (ru) | Проходной канал в стене для пропуска трубы через стену здания | |
US7055863B1 (en) | Containment device and method for hose bibs and the like | |
CN204139377U (zh) | 一种工业化轻质墙板及其装配连接套件 | |
RU2018105312A (ru) | Скважинная обсадная колонна, и система, и способ крепления скважины обсадной колонной | |
CN203834934U (zh) | 一种构造柱模板支设结构 | |
US8272396B2 (en) | Outdoor sillcock mounting kit | |
KR101122052B1 (ko) | 건물 배관의 고정 슬리브 | |
CN102979183B (zh) | 预埋筒式螺母锚座及其使用方法 | |
CN108599041B (zh) | 一种高适应性电缆封堵器 | |
CN207989894U (zh) | 一种水管支吊架 | |
CN105735487A (zh) | 一种墙拉筋组件 | |
CN206036409U (zh) | 一种用于管道穿结构板的套管 | |
KR200288395Y1 (ko) | 건축용 관통슬리브 | |
CN205244625U (zh) | 一种冷热水管道甩口固定装置 | |
CN210421921U (zh) | 一种用于立管套管安装定位的辅助工具 | |
CN101968138B (zh) | Pccp管道现场开孔施工方法 | |
CN107740497B (zh) | 一种水工建筑物过流面预埋地脚螺栓的施工方法 | |
CN205504207U (zh) | 一种管道吊架 | |
JP3198278U (ja) | プラグ付水栓継手 | |
CN219035804U (zh) | 水管的新型穿墙固定套管 | |
KR20110020339A (ko) | 건축물 옹벽 배관 보호용 슬리브의 구조 및 시공방법 | |
WO2018158507A1 (en) | Method for renovating the sewerage of waterproof space | |
CN219623403U (zh) | 基于bim技术的水管暗埋吊装的穿墙预留套管 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: GANSU 7TH CONSTRUCTION GROUP CO., LTD. Free format text: FORMER OWNER: WU XISHENG Effective date: 20110907 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 730020 LANZHOU, GANSU PROVINCE TO: 730000 LANZHOU, GANSU PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20110907 Address after: 730000 No. 347, Pingliang Road, Chengguan District, Gansu, Lanzhou Applicant after: Gansu 7th Construction Group Co., Ltd. Address before: 730020 No. 622 West Jiayuguan Road, Chengguan District, Gansu, Lanzhou Applicant before: Wu Xisheng |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20100922 |