CN101838998B - 沿河路肩预应力锚索桩板墙及其施工方法 - Google Patents

沿河路肩预应力锚索桩板墙及其施工方法 Download PDF

Info

Publication number
CN101838998B
CN101838998B CN2010101628823A CN201010162882A CN101838998B CN 101838998 B CN101838998 B CN 101838998B CN 2010101628823 A CN2010101628823 A CN 2010101628823A CN 201010162882 A CN201010162882 A CN 201010162882A CN 101838998 B CN101838998 B CN 101838998B
Authority
CN
China
Prior art keywords
anchor
anchor cable
type post
coupling beam
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101628823A
Other languages
English (en)
Other versions
CN101838998A (zh
Inventor
骆行文
姚海林
杨明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN2010101628823A priority Critical patent/CN101838998B/zh
Publication of CN101838998A publication Critical patent/CN101838998A/zh
Application granted granted Critical
Publication of CN101838998B publication Critical patent/CN101838998B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种沿河路肩预应力锚索桩板墙及其施工方法,涉及山区公路、铁路工程建筑领域中的高填方支挡结构。本沿河路肩预应力锚索桩板墙包括圆桩、连梁、T型柱、挡土板、锚索和锚墩;从下到上,圆桩、连梁和T型柱依次连接;在每两个T型柱内侧放置有挡土板;在T型柱上,从上到下分别设置有上、中、下三个锚墩;上、中、下三根锚索锚固段锚入岩土层中,锚索穿过T型柱上的预留孔后,在相对应的锚墩上对锚索进行张拉、锁定;上、中、下三根锚索的倾角分别设计为15°、18°、21°。本发明结构合理,实施容易,品质优良,适用于沿河路肩预应力锚索桩板墙建设。

Description

沿河路肩预应力锚索桩板墙及其施工方法
技术领域
本发明涉及山区公路、铁路工程建筑领域中的高填方支挡结构,尤其涉及一种沿河路肩预应力锚索桩板墙及其施工方法。
技术背景
在目前的公路、铁路建设中,部分工程的高填方路段支挡结构采用锚索桩板墙。锚索桩板墙适用于填方高度为12~20m的填方路基中,它比一般挡土墙体积小,结构合理,造价比桥梁低,是一种柔性轻型支挡结构。为了便于锚索在桩体上张拉加载,目前锚索桩板墙结构的桩体通常采用方桩形式,而且采用人工挖孔方法成孔。
目前分离式挡土墙的挡土板一般直接放置于肋柱后,土体对挡土板的作用力相对较大,导致挡土板的配筋较多。目前锚索桩板墙结构为了发挥桩锚的共同作用,锚索的间距通常为3~4m,锚索在岩土体中的间距偏小,容易发生“群锚效应”。
发明内容
本发明的目的是针对现有技术存在的缺点和不足,提供一种沿河路肩预应力锚索桩板墙及其施工方法。
本发明的目的是这样实现的:
本发明针对沿河路基地下水位相对较高,桩孔采用人工成孔极其困难的情况,将一般锚索桩板墙的结构进行了改进。具体的是将桩体的嵌固段由方桩改为圆桩,采用机械成孔;上部肋柱采用T型柱;中部部分采用连梁结构,将土体对肋柱的作用力部分传递到圆桩;
本发明在方形肋柱的两侧增加两个翼缘,增加翼缘后的肋柱呈T型结构。T型柱既有利于挡土板的搭接,有效地增加路基宽度,同时也能充分发挥肋柱的“土拱效应”,减少土体对挡土板的作用力,从而到达减少挡土板的配筋的目的。
本发明将锚索采用不同的倾角锚固于岩土体中,增大了锚索锚固段的间距,能有效地减少锚索发生“群锚效应”的几率。
具体地说,本沿河路肩预应力锚索桩板墙包括圆桩、连梁、T型柱、挡土板、锚索和锚墩;
从下到上,圆桩、连梁和T型柱依次连接;
在每两个T型柱内侧放置有挡土板;
在T型柱上,从上到下分别设置有上、中、下三个锚墩;
上、中、下三根锚索锚固段锚入岩土层中,锚索穿过T型柱上的预留孔后,在相对应的锚墩上对锚索进行张拉、锁定;
上、中、下三根锚索的倾角分别设计为15°、18°、21°。
本发明与现有的技术相比较具有下列优点和积极效果:
1、本发明对一般锚索桩板墙结构进行了改进,从而使之适宜于沿河高填方路基的支挡,在方形肋柱的两侧增加两个翼缘,增加翼缘后的肋柱呈T型结构,T型柱既有利于挡土板的搭接,有效地增加路基宽度,同时又能充分发挥肋柱的“土拱效应”,减少土体对挡土板的作用力,从而到达减少挡土板的配筋的目的;
2、锚索采用不同的倾角锚固于岩土体中,增大了锚索锚固段的间距,能有效地减少锚索发生“群锚效应”的几率。
总之,本发明结构合理,实施容易,品质优良,适用于沿河路肩预应力锚索桩板墙建设。
附图说明
图1为沿河路肩预应力锚索桩板墙的立面图;
图2为沿河路肩预应力锚索桩板墙的平面图;
图3为沿河路肩预应力锚索桩板墙的断面图;
图4为沿河路肩预应力锚索桩板墙的锚墩大样图。
图中:
1-圆桩,2-连梁,3-T型柱, 4-挡土板,
5-锚索,6-锚墩,7-排水沟,8-路面,
9-原地形线,   10-水位线,      11-锚索倾角,12-套装锚具,
13-锚索预留孔,14-挡土板埋置线,15-路基边线,16-路基中线。
具体实施方式
下面结合附图和实施例详细说明:
一、沿河路肩预应力锚索桩板墙
1、总体
如图1、2、3、4,沿河路肩预应力锚索桩板墙包括圆桩1、连梁2、T型柱3、挡土板4、锚索5和锚墩6;
从下到上,圆桩1、连梁2和T型柱3依次连接;
在每两个T型柱3内侧放置有挡土板4;
在T型柱3上,从上到下分别设置有上、中、下三个锚墩6;
上、中、下三根锚索5的锚固段锚入岩土层中,三根锚索5在穿过T型柱上的预留孔13后,分别相应地在上、中、下三个锚墩6上张拉、锁定;
上、中、下三根锚索5的倾角11分别设计为15°、18°、21°。
2、功能部件
1)圆桩1
圆桩1为钢筋混泥土结构,圆柱形;其功能是受力。
2)连梁2
连梁2为钢筋混泥土结构,方形;其功能是受力和连接。
3)T型柱3
T型柱3为钢筋混泥土结构,T型;其功能是受力。
4)挡土板4
挡土板4为钢筋混泥土结构,板形;其功能是受力和挡土。
5)锚索5
锚索5为无粘接钢绞线;其功能是受力。
6)锚墩6
锚墩6为混凝土墩;其功能是受力。
二、沿河路肩预应力锚索桩板墙的施工方法
本施工方法包括下列步骤:
①沿路基边线15放样,机械钻孔,浇注挡土结构下部的圆桩1,预留伸入连梁2内的受力主筋;
②在挡墙内侧的岩土体中,进行上、中、下三点放样,分别按相对应的倾角11进行钻孔,将锚索5放入钻孔后进行锚固段注浆;
③在圆桩1顶部制作连梁2和T型柱3,将伸入连梁2内的圆桩1受力主筋和T型柱3受力主筋与连梁2整体浇注;
④在T型柱3上预埋套装锚具12,设置上、中、下三个锚墩6;浇注T型柱3;
⑤挡土板4预制,安装到T型柱3内侧;
⑥在挡土板4内侧的路基上填土;
⑦当填土分别达到上、中、下三根锚索(5)的设计高程时,相应地进行三根锚索5的自由段施工,将锚索5穿过T型柱3上的预留孔13后,在锚墩6上对锚索5进行张拉,施加预应力;当路基填土达到路面8设计高程时,对所有的锚索5进行补偿张拉后锁定、注浆和封锚;
上、中、下锚索5的倾角11分别设计为15°、18°、21°。

Claims (1)

1.一种沿河路肩预应力锚索桩板墙的施工方法,其特征在于:
该板墙包括圆桩(1)、连梁(2)、T型柱(3)、挡土板(4)、锚索(5)和锚墩(6);
从下到上,圆桩(1)、连梁(2)和T型柱(3)依次连接;
在每两个T型柱(3)内侧放置有挡土板(4);
在T型柱(3)上,从上到下分别设置有上、中、下三个锚墩(6);
上、中、下三根锚索(5)锚固段锚入岩土层中,锚索(5)穿过T型柱(3)上的预留孔(13)后,在相对应的锚墩(6)上对锚索(5)进行张拉、锁定;
上、中、下三根锚索(5)的倾角(11)分别设计为15°、18°、21°;
该施工方法包括下列步骤:
①沿路基边线(15)放样,机械钻孔,浇注挡土结构下部的圆桩(1),预留伸入连梁(2)内的受力主筋;
②在挡墙内侧的岩土体中,进行上、中、下三点放样,分别按相对应的倾角(11)进行钻孔,将锚索(5)放入钻孔后进行锚固段注浆;
③在圆桩(1)顶部制作连梁(2)和T型柱(3),将伸入连梁(2)内的圆桩(1)受力主筋和T型柱(3)受力主筋与连梁(2)整体浇注;
④在T型柱(3)上预埋套装锚具(12),设置上、中、下三个锚墩(6);浇注T型柱(3);
⑤挡土板(4)预制,安装到T型柱(3)内侧;
⑥在挡土板(4)内侧的路基上填土;
⑦当填土分别达到上、中、下三根锚索(5)的设计高程时,相应地进行三根锚索(5)的自由段施工,将锚索(5)穿过T型柱(3)上的预留孔(13)后,在锚墩(6)上对锚索(5)进行张拉,施加预应力,当路基填土达到路面(8)设计高程时,对所有的锚索(5)进行补偿张拉后锁定、注浆和封锚;
上、中、下锚索(5)的倾角(11)分别设计为15°、18°、21°。
CN2010101628823A 2010-04-27 2010-04-27 沿河路肩预应力锚索桩板墙及其施工方法 Expired - Fee Related CN101838998B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101628823A CN101838998B (zh) 2010-04-27 2010-04-27 沿河路肩预应力锚索桩板墙及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101628823A CN101838998B (zh) 2010-04-27 2010-04-27 沿河路肩预应力锚索桩板墙及其施工方法

Publications (2)

Publication Number Publication Date
CN101838998A CN101838998A (zh) 2010-09-22
CN101838998B true CN101838998B (zh) 2011-07-27

Family

ID=42742642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101628823A Expired - Fee Related CN101838998B (zh) 2010-04-27 2010-04-27 沿河路肩预应力锚索桩板墙及其施工方法

Country Status (1)

Country Link
CN (1) CN101838998B (zh)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352632B (zh) * 2011-07-29 2013-09-18 重庆大学 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法
CN102518147B (zh) * 2011-11-28 2013-12-25 湖南大学 一种用于降低现有过高挡土墙支护高度的锚固支挡结构
CN102839680B (zh) * 2012-09-27 2015-08-05 中国建筑第八工程局有限公司 高边坡土方及支护工程施工方法
CN103046458B (zh) * 2013-01-09 2014-11-26 陈洪凯 沿河公路钢筋混凝土路面板悬空段锚拉加固结构
CN103321210A (zh) * 2013-06-08 2013-09-25 郭红标 预应力锚索桩板墙
CN103334450B (zh) * 2013-07-03 2015-03-25 中国科学院亚热带农业生态研究所 一种带排水沟的桩柱预制板挡土墙的施工方法
CN103452130B (zh) * 2013-08-20 2016-08-31 中铁第四勘察设计院集团有限公司 预应力钢筋网加筋土柱板式挡墙
CN103603369B (zh) * 2013-12-09 2015-07-15 中国石油集团工程设计有限责任公司 一种锚拉桩扶壁式挡土墙施工方法
CN103821071B (zh) * 2014-03-04 2015-11-18 西南交通大学 准平原地区软弱地基土高路堤装配式修筑方法及装置
CN104480858A (zh) * 2014-10-20 2015-04-01 中建三局第二建设工程有限责任公司 一种预应力混凝土箱梁横梁锚槽封锚的施工方法
CN104404979B (zh) * 2014-11-28 2016-05-11 中铁二十三局集团有限公司 H型桩板墙施工方法
CN105002903A (zh) * 2015-07-14 2015-10-28 周兆弟 围护桩
CN108532397A (zh) * 2018-06-19 2018-09-14 云南建投中航建设有限公司 一种采用组合型抗滑桩稳固路基的方法及组合型抗滑桩
CN109322315A (zh) * 2018-11-08 2019-02-12 中铁第四勘察设计院集团有限公司 一种用于高陡坡路堤地段的支挡结构及其施工方法
CN109914448A (zh) * 2019-04-16 2019-06-21 大连交通大学 一种用于岩质路堤加宽的复合支护结构及施工方法
CN110067259A (zh) * 2019-04-23 2019-07-30 广州市市政工程设计研究总院有限公司 一种边坡抗滑墙结构
CN110080775A (zh) * 2019-04-30 2019-08-02 中交第三航务工程局有限公司宁波分公司 复杂环境挖井基础小扰动开挖方法
CN112095656A (zh) * 2020-09-24 2020-12-18 湖南工业大学 一种拉压复合式预应力锚索挡土墙结构
CN114032932B (zh) * 2021-12-15 2023-08-01 中煤科工重庆设计研究院(集团)有限公司 混合支挡结构的施工方法
CN114592537A (zh) * 2022-03-22 2022-06-07 中国电建集团昆明勘测设计研究院有限公司 一种适用于填方边坡的桩板挡墙结构及施工方法
CN115162379A (zh) * 2022-08-19 2022-10-11 中煤科工重庆设计研究院(集团)有限公司 一种混合支挡结构施工工艺

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125354Y (zh) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 陡坡路基支挡加固结构
KR20090078684A (ko) * 2008-01-15 2009-07-20 주식회사 스마텍엔지니어링 H빔으로 이루어진 엄지 말뚝을 구비한 지지말뚝, 이를이용한 합성 벽체 및 그 시공방법
CN101298780A (zh) * 2008-06-23 2008-11-05 云南省公路规划勘察设计院 一种高轻型锚索桩板墙及其施工方法
CN201671108U (zh) * 2010-04-27 2010-12-15 中国科学院武汉岩土力学研究所 一种沿河路肩预应力锚索桩板墙

Also Published As

Publication number Publication date
CN101838998A (zh) 2010-09-22

Similar Documents

Publication Publication Date Title
CN101838998B (zh) 沿河路肩预应力锚索桩板墙及其施工方法
CN201671108U (zh) 一种沿河路肩预应力锚索桩板墙
CN108678000B (zh) 一种路基下穿公路u型支挡结构及其施工方法
CN106758841B (zh) 一种双塔双索面矮塔斜拉桥的整体施工工艺
CN105155558A (zh) 一种组合支挡结构及其施工方法
CN107100180A (zh) 超高轻型支挡结构及治理高填方、高边坡工程的方法
CN110158389A (zh) 一种轻质土道路结构及其施工方法
CN102828518A (zh) 人工挖孔支护桩预应力锚索锚固构造及其施工方法
CN106758623B (zh) 一种无筋轻质土台背的填筑方法
CN108103871A (zh) 一种邻近既有地铁设施的路基泡沫砼填筑技术的施工方法
CN109750571A (zh) 一种道路塌方应急与永久支挡一体化结构及施工方法
CN210262555U (zh) 一种轻质土道路结构
CN109184699A (zh) 明挖隧道下穿既有河道施工工法
CN103866766A (zh) 用于滑坡应急处理的钢质锚墩及其施工方法
CN103343532B (zh) 预应力锚索桩板墙
CN112012763B (zh) 一种双层初期支护的多连拱隧道结构的施工方法
CN206359995U (zh) 钢筋混凝土现浇挡土墙
CN108468341A (zh) 抗滑桩-波纹钢拱-拉锚组合边坡防护结构及施工方法
CN104452805A (zh) 下穿高速公路紧邻桥梁墩台的路基结构
CN209669718U (zh) 一种危岩落石防护的既有棚洞组合拦石墙结构
CN106498977A (zh) 挑梁式挡土墙结构
CN109750567A (zh) 道路扩建结构及道路扩建方法
CN203668978U (zh) 一种用于地铁隧道的抗浮结构
CN114508119A (zh) 一种基于微型钢管桩的山体护坡施工结构及施工方法
CN204940310U (zh) 一种组合支挡结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

Termination date: 20170427