CN101838994B - 整体式钢围檩钢板桩围堰施工方法 - Google Patents

整体式钢围檩钢板桩围堰施工方法 Download PDF

Info

Publication number
CN101838994B
CN101838994B CN201010180331XA CN201010180331A CN101838994B CN 101838994 B CN101838994 B CN 101838994B CN 201010180331X A CN201010180331X A CN 201010180331XA CN 201010180331 A CN201010180331 A CN 201010180331A CN 101838994 B CN101838994 B CN 101838994B
Authority
CN
China
Prior art keywords
construction
steel
purlin
steel sheet
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010180331XA
Other languages
English (en)
Other versions
CN101838994A (zh
Inventor
侯建杰
李勇
黄枝花
聂海岩
雷廷新
王民焕
高军庭
张卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201010180331XA priority Critical patent/CN101838994B/zh
Publication of CN101838994A publication Critical patent/CN101838994A/zh
Application granted granted Critical
Publication of CN101838994B publication Critical patent/CN101838994B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于钢板桩围堰施工方法的技术领域,具体涉及一种整体式钢围檩钢板桩围堰施工方法,解决了现有钢板桩围堰常规施工存在质量不易保证,施工难度大,周期长的问题。其特征在于钢围檩整体预制,然后浮吊下放。本发明的有益效果:1、陆地整体制作钢围檩,有效减少了在航道中施工工序,变水中施工为陆地施工,降低了施工难度,保证了施工质量。2、分层浇筑承台砼后进行支撑受力体系转换,工序过程明晰可控,有效保证了水中深基础施工的安全。3、减少了施工机械在使用和维修中产生的废弃物对航道的影响,满足了环保要求。4、钢板桩围堰施工,由于钢板桩与内支撑围檩均属周转使用材料,有效减少了永久性建筑用钢,节能效果明显。

Description

整体式钢围檩钢板桩围堰施工方法
技术领域
本发明属于钢板桩围堰施工方法的技术领域,具体涉及一种整体式钢围檩钢板桩围堰施工方法。
背景技术
常规情况下,在水中施工承台时,采用钢板桩围堰。钢板桩围堰常规施工是先插打钢板桩后分层设置内支撑围檩,一般步骤如下:
步骤一:1、利用钻孔桩护筒设置牛腿,2、施工第一层钢围檩,3、以第一层钢围檩为导向,插打钢板桩;
步骤二:1、钢板桩插打完成后,拆除导向环在钢板桩外侧按1∶1边坡开挖,内侧开挖(清淤)至第二层围檩标高以下不小于1.0m,2、施工第二层围檩和第一层与第二层间竖向连接立杆;
步骤三:1、围堰内继续吸泥开挖并抽水至第三层围檩标高以下不小于1.0m,2、安装中层内支撑并与钢板桩焊接,施工第三层与第二层间竖向连接立杆,
步骤四:1、基坑内抽水、破除钻孔桩桩头,2、在承台第一层混凝土顶面与钢板桩围堰间设置抄紧垫块,3、进行体系转换,使第三道围檩的反力转换至抄紧垫块,4、拆除第三道围檩(保留周边框架)。
该方法存在以下不足:
1、内支撑围檩钢结构焊接施工质量不易保证;
2、内支撑围檩层间连接竖杆施工质量不易保证;
3、钢板桩插打定位困难、合拢精度小;
4、内支撑围檩施工受工序和现场作业空间限制,围堰施工周期长。
发明内容
本发明为了解决现有钢板桩围堰常规施工存在质量不易保证,施工难度大,周期长的问题,提供了一种整体式钢围檩钢板桩围堰施工方法
本发明采用如下的技术方案实现:
一种整体式钢围檩钢板桩围堰施工方法,其特征在于所述的钢围檩整体预制,然后浮吊下放。
具体步骤如下:
步骤一:1)、陆地整体制作钢围檩,
步骤二:1)、利用抓斗、吸泥机清挖钢围檩下方处河床,2)、利用水上浮吊整体下放钢围檩,3)、钢围檩临时固结于四根角桩护筒上。
步骤三:1)、利用钢围檩作为向导,在周边插打钢板桩围堰,2)、在保证内外水头一致的情况下,吸泥、清理河床至封底混凝土底面,3)、封底混凝土施工。
步骤四:1)、基坑抽水、切除钢护筒、破桩头,2)、在承台第一层混凝土顶面与钢板桩围堰间设置抄紧垫块,3)、进行体系受力转换,使第三道围檩的反力转换至抄紧垫块,4)、拆除第三道围檩(保留周边框架)。
步骤五:1)、浇注承台第二层混凝土,2)、浇注加台混凝土,3)、第一、二道内支撑框架中间两根内支撑(桥轴线方向与墩身相碰的)转换,4)、进行体系转换,拆除第二道钢围檩(保留周边框架),施工墩身。
本发明不同于钢板桩常规施工,由常规的先插打钢板桩后分层设置内支撑围檩,改为一次性整体下放内支撑围檩后插打钢板桩。
本发明具有如下有益效果:
1、陆地整体制作钢围檩,有效减少了在航道中施工工序,变水中施工为陆地施工,降低了施工难度,保证了施工质量。
2、分层浇筑承台砼后进行支撑受力体系转换,工序过程明晰可控,有效保证了水中深基础施工的安全。
3、减少了施工机械在使用和维修中产生的废弃物对航道的影响,满足了环保要求。
4、钢板桩围堰施工,由于钢板桩与内支撑围檩均属周转使用材料,有效减少了永久性建筑用钢,节能效果明显。
附图说明
图1为本发明具体步骤一整体制作的钢围檩横桥向示意图
图2为本发明具体步骤一整体制作的钢围檩纵桥向示意图
图3为本发明具体步骤二的示意图
图4为本发明具体步骤三的示意图(a侧为插打钢板桩围堰工况,b侧为封底砼施工工况)
图5为本发明具体步骤四的示意图(c侧为支撑转换前工况,d侧为支撑转换工况)
图6为本发明具体步骤五的示意图(e侧为浇注承台第二层砼工况,f侧为浇注加台、墩身工况)
图中:1-内支撑框架,2-施工水位,3-施工常水位,4-承台顶,5-河床,6-钻孔桩,7-钢板桩围堰顶,8-钢板桩,9-承台底,10-砂垫层,11-封底砼,12-封底砼底,13-钢板围堰底,14-抄紧垫块,15-周边框架,16-承台第一层混凝土,17-承台第二层混凝土,18-加台,19-墩身,20-支撑牛腿。
具体实施方式
结合附图对本发明的具体实施方式作进一步说明。
整体式钢围檩钢板桩围堰施工方法,具体步骤如下:
步骤一:1、陆地整体制作钢围檩。
步骤二:1、利用抓斗、吸泥机清挖钢围檩下方处河床,2、利用水上浮吊整体下放钢围檩,3、钢围檩固结于四根角桩护筒上。
步骤三:1、利用钢围檩作为向导,在周边插打钢板桩围堰,2、在保证内外水头一致的情况下,吸泥、清理河床至封底混凝土底面,3、封底混凝土施工。
步骤四:1、基坑抽水、切除钢护筒、破桩头,2、在承台第一层混凝土顶面与钢板桩围堰间设置抄紧垫块,3、进行体系受力转换,使第三道围檩的反力转换至抄紧垫块,4、拆除第三道围檩(保留周边框架)。
步骤五:1、浇注承台第二层混凝土,2、浇注加台混凝土,3、第一、二道内支撑框架中间两根内支撑(桥轴线方向与墩身相碰的)转换,4、进行体系转换,拆除第二道钢围檩(保留周边框架),施工墩身。

Claims (1)

1.一种整体式钢围檩钢板桩围堰施工方法,其特征在于所述的钢围檩陆地整体预制,然后浮吊下放,具体步骤如下:
步骤一:1)、陆地整体制作钢围檩,
步骤二:1)、利用抓斗、吸泥机清挖钢围檩下方处河床,2)、利用水上浮吊整体下放钢围檩,3)、钢围檩临时固结于四根角桩护筒上,
步骤三:1)、利用钢围檩作为向导,在周边插打钢板桩围堰,2)、在保证内外水头一致的情况下,吸泥、清理河床至封底砼底面,3)、封底砼施工,
步骤四:1)、基坑抽水、切除钢护筒、破桩头,2)、在承台第一层混凝土顶面与钢板桩围堰间设置抄紧垫块,3)、进行体系受力转换,使第三道围檩的反力转换至抄紧垫块,4)、保留周边框架,拆除第三道围檩,
步骤五:1)、浇注承台第二层混凝土,2)、浇注加台混凝土,3)、第一、二道内支撑框架中间两根内支撑转换,4)、进行体系转换,保留周边框架,拆除第二道钢围檩,施工墩身。
CN201010180331XA 2010-05-20 2010-05-20 整体式钢围檩钢板桩围堰施工方法 Expired - Fee Related CN101838994B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010180331XA CN101838994B (zh) 2010-05-20 2010-05-20 整体式钢围檩钢板桩围堰施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010180331XA CN101838994B (zh) 2010-05-20 2010-05-20 整体式钢围檩钢板桩围堰施工方法

Publications (2)

Publication Number Publication Date
CN101838994A CN101838994A (zh) 2010-09-22
CN101838994B true CN101838994B (zh) 2012-05-30

Family

ID=42742638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010180331XA Expired - Fee Related CN101838994B (zh) 2010-05-20 2010-05-20 整体式钢围檩钢板桩围堰施工方法

Country Status (1)

Country Link
CN (1) CN101838994B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912809B (zh) * 2012-11-06 2014-12-10 中铁大桥局股份有限公司 底面位于坚硬不透水层的承台施工方法
CN103362068B (zh) * 2013-07-22 2015-08-12 中铁大桥局集团有限公司 预制承台的安装方法
CN107190760B (zh) * 2017-06-12 2019-04-02 南通大学 一种基底降压排水及z型托底支护钢板桩围堰施工方法
CN110185050A (zh) * 2019-04-25 2019-08-30 上海市政建设有限公司 一种预制混凝土围堰及施工方法
CN110512522A (zh) * 2019-07-31 2019-11-29 中铁大桥局集团有限公司 一种用于钢套箱围堰大体积封底的隔舱方法及结构
CN112281898A (zh) * 2020-10-21 2021-01-29 中铁大桥勘测设计院集团有限公司 一种浮力补偿式组合基础及施工方法
CN113463518B (zh) * 2021-06-21 2022-12-09 中铁十九局集团第五工程有限公司 既有桥梁桩基桩间土的防泄流施工方法
CN114411781A (zh) * 2022-01-06 2022-04-29 中交第二航务工程局有限公司 岩石地质板桩围堰的施工方法
CN114517486B (zh) * 2022-03-15 2023-03-24 中铁上海工程局集团第五工程有限公司 一种水中围堰的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1446988A (zh) * 2003-01-21 2003-10-08 上海市第二建筑有限公司 水下钢筋混凝土构筑物的施工方法
CN1837510A (zh) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 一种钢管桩围堰及其制作方法
CN101033606A (zh) * 2007-03-23 2007-09-12 中铁大桥局集团第二工程有限公司 一种桥梁大型钢围堰气囊下河方法
CN101074561A (zh) * 2006-05-19 2007-11-21 中船第九设计研究院 一种水中大直径圆形钢板桩围堰及其施工方法
CN101205720A (zh) * 2007-12-05 2008-06-25 中铁大桥局股份有限公司 一种超大型钢围堰下放、着床、下沉控制技术

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10168915A (ja) * 1996-12-13 1998-06-23 Hazama Gumi Ltd 締切矢板内の地盤掘削工法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1446988A (zh) * 2003-01-21 2003-10-08 上海市第二建筑有限公司 水下钢筋混凝土构筑物的施工方法
CN1837510A (zh) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 一种钢管桩围堰及其制作方法
CN101074561A (zh) * 2006-05-19 2007-11-21 中船第九设计研究院 一种水中大直径圆形钢板桩围堰及其施工方法
CN101033606A (zh) * 2007-03-23 2007-09-12 中铁大桥局集团第二工程有限公司 一种桥梁大型钢围堰气囊下河方法
CN101205720A (zh) * 2007-12-05 2008-06-25 中铁大桥局股份有限公司 一种超大型钢围堰下放、着床、下沉控制技术

Also Published As

Publication number Publication date
CN101838994A (zh) 2010-09-22

Similar Documents

Publication Publication Date Title
CN101838994B (zh) 整体式钢围檩钢板桩围堰施工方法
CN101368389B (zh) 单双壁结合钢围堰施工方法及其单双壁结合钢围堰
CN101962956B (zh) 一种桥梁预制基础及其埋床法
CN101148890B (zh) 桥梁沉箱复合桩基础及其逆作建造方法
CN103967031A (zh) 一种加固地基的沉箱与桩组合基础及其施工方法
CN104805854A (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN101033614A (zh) 水下真空预压加固软基技术方法
CN210086275U (zh) 一种双壁中空沉井基础
CN101225664A (zh) 一种沉箱船坞结构及其施工方法
CN211200441U (zh) 具有压密注浆加固地基的海上单桩基础
CN102561371A (zh) 岛遂结合部钢沉箱围护结构
CN101260664A (zh) 一种软土地基大型钢浮箱闸首的施工方法
CN110439022A (zh) 具有压密注浆加固地基的海上单桩基础
CN202559368U (zh) 一种沉管隧道带帽钢管减沉桩结构
CN103572770B (zh) 一种桩箱水工结构物及其建造方法
CN105714748A (zh) 一种碎石沙土层中的调压井开挖施工方法
CN211172056U (zh) 具有高压旋喷桩加固地基的海上单桩基础
CN209923959U (zh) 一种高地下水位软弱土场地干法作业沉井结构
CN203654309U (zh) 一种桩箱水工结构物
CN102535446B (zh) 大断面沉管灌注混凝土后压浆空心方桩及其制作方法
CN110485443A (zh) 8字形双壁钢围堰及施工操作工艺
CN106223355A (zh) 一种深水高桩承台抱箍法有底钢套箱的装置及施工方法
CN211849560U (zh) 海上风电多桩-吸力桶-导管架基础结构
CN217105183U (zh) 基于微顶管摇管井技术的钢沉井施工系统
CN206599803U (zh) 一种抑制海洋建筑物桩基础海底冲刷的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20140520