CN101833711A - Method for planning enterprise resources - Google Patents

Method for planning enterprise resources Download PDF

Info

Publication number
CN101833711A
CN101833711A CN201010179196A CN201010179196A CN101833711A CN 101833711 A CN101833711 A CN 101833711A CN 201010179196 A CN201010179196 A CN 201010179196A CN 201010179196 A CN201010179196 A CN 201010179196A CN 101833711 A CN101833711 A CN 101833711A
Authority
CN
China
Prior art keywords
production
enterprise resources
enterprise
planning method
planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010179196A
Other languages
Chinese (zh)
Inventor
查昭
王荣权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Valogin Technology Co., Ltd.
Original Assignee
YUHUAN HUALONG VALVES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUHUAN HUALONG VALVES CO Ltd filed Critical YUHUAN HUALONG VALVES CO Ltd
Priority to CN201010179196A priority Critical patent/CN101833711A/en
Publication of CN101833711A publication Critical patent/CN101833711A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a method for planning enterprise resources, belongs to the technical field of enterprise resource management, and solves the problems of complicated production dispatching and high error rate when the conventional enterprise performs production planning by using enterprise resource planning (ERP) software. The method for planning the enterprise resources implemented through an enterprise resource planning system which comprises an information inquiring part, an information input part and a control center with a database, wherein the information inquiring part and the information input part are both connected with the control center. The method for planning the enterprise resources comprise the following steps of: a, inputting an order; b, configuring a material list; c, making a material requirement plan; d, making a production task order; e, issuing a purchasing application form; f, releasing the production task order; g, producing; h, putting products in a storage and recording; and I, finishing the production task. The method for planning the enterprises has the advantages of convenient information sharing, low work load, high working efficiency and high accuracy.

Description

A kind of Enterprise Resources Planning method
Technical field
The invention belongs to the ERP technical field, relate to a kind of Enterprise Resources Planning method.
Background technology
The Internet era that the world today having entered, the globalization competition in the face of growing with each passing day as how lower cost, the fastest speed, the needs that provide higher-quality product to satisfy the client, has become the challenge that all enterprises must face.Under such challenge, enterprise need adopt new instrument when planning operates internal resource well, integrate the external resource that it has, for example: supplier, agency, common carrier etc., improve the accuracy of its production, buying and delivery plan, thereby when tackling market fast, improve the accuracy to client's sale and service promise, this will be enterprise obtains competitive edge in the economic environment of global integration only way.
Give enterprise in economic whole cost control based on the new management pattern of computer digital management, enter and permeate the speed in market, to the grasp of customer demand, unprecedented chance has been brought in aspects such as raising customer loyalty, also brings the traditional forms of enterprises to impact greatly and challenge simultaneously.ERP is a kind of enterprise information management system that produces under this background.
ERP is the abbreviation of English Enterprise Resource Planning, and the Chinese meaning is Enterprise Resources Planning (ERP).It is one is the infosystem of core with accounting for management, identification and planning Enterprise Resource, thus obtain customer order, finish processing and payment, obtain client's payment at last.In other words, ERP plans buying, production, cost, stock, distribution, transportation, finance, human resources with all resource consolidations of enterprises together, thereby reaches the best resource combination, obtain optimum efficiency, also help enterprise simultaneously the market demand is reacted rapidly.
At present, the supvr of existing many enterprises will be based on the information that the enterprise information management system provided of ERP management software framework as one of important evidence of business decision.Yet enterprise uses this ERP management software in the process of carrying out production planning at present, and the method for operating that also lacks a whole set of standard is implemented, and production scheduling work is loaded down with trivial details, the error rate height.
Summary of the invention
The objective of the invention is at existing the problems referred to above in the existing Enterprise Resources Planning process, and proposed a kind of finishing from accepting an order in the order process, internal enterprise resources is effectively planned Enterprise Resources Planning method with overall arrangement.
Purpose of the present invention can realize by following technical proposal: a kind of Enterprise Resources Planning method, implement by ERP (Enterprise Resource Planning), described ERP (Enterprise Resource Planning) comprises the control center that information inquiry part, information input unit are divided and had database, described information inquiry part, information input unit are divided and are all connected with control center, it is characterized in that described Enterprise Resources Planning method comprises the steps:
A, order input, the user divides the input order by information input unit;
B, finish the configuration of Bill of Material (BOM);
The formulation of c, MRP is analyzed, is calculated according to Bill of Material (BOM), extrapolates various parts and raw-material requirement, if tank farm stock satisfies the production demand, then enters steps d; If stock material quantity not sufficient, then administration step e when entering steps d;
The task of all departments is made in the formulation of d, production task list, enters step f;
E, granting procurement request list allow purchasing department that the material that lacks is purchased;
F, to assign production task single, and it is single to send production task to all departments;
G, production, each workshop is singly produced according to the production task that receives separately;
H, product warehousing, and by the warehouse by information input unit member record warehouse situation, be stored in the database section;
I, production task are finished.
In above-mentioned a kind of Enterprise Resources Planning method, among the described step a, also to carry out material information input storage before the order input.Divide stockpile number, specification information and the Bill of Material (BOM) of all materials such as the various starting material of input, blank, semi-manufacture in advance by information input unit, so that the user inquires about and formulate MRP.
In above-mentioned a kind of Enterprise Resources Planning method, among the described step e, after finishing, buying simulates the neck material, check whether material satisfies production requirement, then enter step f if satisfy.Whether the material of affirmation buying puts in place and registers, and is convenient to produce carry out smoothly.
In above-mentioned a kind of Enterprise Resources Planning method, described step g comprises successively: row produces, neck is expected and production.
In above-mentioned a kind of Enterprise Resources Planning method, among the described step f, production task is single to be assigned simultaneously to workshop, warehouse and quality control department, and the warehouse carries out step g 2 after receiving the production task list: get the raw materials ready.When production task is singly assigned, assign simultaneously to workshop, warehouse and quality control department for printable many parts, make three department's co-ordinations mutually, improve production effect.
In above-mentioned a kind of Enterprise Resources Planning method, in the described step g 2, behind workshop neck material, lead the material record.Note the neck material information of each workshop, be convenient to state and the tank farm stock of each material of user inquiring in the logistics link.
In above-mentioned a kind of Enterprise Resources Planning method, among the described step h, also need to carry out product inspection before the product warehousing, whether testing product is qualified.Production goes out the back is tested by quality control department, again with specification product warehouse-ins, shows intuitively and has finished number, and also need finish number, is convenient to the job order performance is inquired about and followed and urge.
In above-mentioned a kind of Enterprise Resources Planning method, in the described step g, also has step g 6 in the production run: produce feedback,, then enter step g 7: replenish buying, send additional buying order to purchasing department and replenish buying as if feedback material deficiency.Owing to exist certain scrappage in the production run, cause the material deficiency originally got, so each workshop can be according to production status separately, propose to replenish buying under the situation of the shortage of stock inquiring about.
Compared with prior art, this Enterprise Resources Planning method is by the logistics and the feedack stream of feedback, the client is needed to be in the same place with the production and operating activities of enterprises and supplier's resource consolidation, embody a kind of brand-new management method that to carry on the work and manage by the user fully.The user can make things convenient for the information sharing between each functional official by all data that are authorized to inquire about in the information inquiry partial query system.In addition, it also have increase work efficiency, accuracy and reduce the advantage of workload.
Description of drawings
Fig. 1 is the functional-block diagram of ERP (Enterprise Resource Planning) provided by the present invention.
Fig. 2 is this Enterprise Resources Planning method schematic flow sheet in the specific implementation.
Embodiment
Below be specific embodiments of the invention and in conjunction with the accompanying drawings, technical scheme of the present invention is further described, but the present invention be not limited to these embodiment.
As shown in Figure 1, this Enterprise Resources Planning method is implemented by an Enterprise Resources Planning (ERP) system, described Enterprise Resources Planning (ERP) system comprises information inquiry part, information input unit branch and has the control center of database that information inquiry part wherein, information input unit are divided and all connected with control center.The information input unit branch is divided into the warehouse information importation, the workshop information input unit is divided and control center's information input unit branch, and the information inquiry part is divided into workshop information inquiry part, warehouse information query portion and control center's information inquiry part.
In the present embodiment, ERP (Enterprise Resource Planning) is made of a main frame and some extension sets, and main frame is divided by control center, control center's information input unit and control center's information inquiry partly constitutes, and can inquire about and edit the every information material in the database.Extension set is arranged on departments such as warehouse, workshop, and the client that can login inquiry and information input function is installed.The extension set that is arranged on the warehouse has warehouse information importation and warehouse information query portion, be connected to by network in the control center of main frame, can inquire about every data that are authorized to and the registration typing of carrying out related data, for example, the tank farm stock of various materials, the turnover registration of material.The extension set that is arranged on workshop then has the workshop information input unit and divides and workshop information inquiry part, be connected in the control center of main frame by network equally, can inquire about the every data and input row's product task situation and the additional procurement request etc. that are authorized to.
Database storing wherein has stockpile number, specification information and the Bill of Material (BOM) (BOM) of all materials such as various starting material, blank, semi-manufacture, and Bill of Material (BOM) wherein (BOM) is the formation that will produce product and the inventory that will relate to material.
As shown in Figure 2, this Enterprise Resources Planning method comprises the steps: when implementing
A0, material information input storage, divide stockpile number, specification information and the Bill of Material (BOM) (BOM) of all materials such as the various starting material of input, blank, semi-manufacture in advance by control center's information input unit, so that the user inquires about and formulate MRP;
A, order input, the user divides the input order by control center's information input unit;
B, finish the configuration of Bill of Material (BOM) (BOM); As order is new product, and then control center in conjunction with the details of each guest's actual requirement and the technology requirement of order product, finishes the configuration of Bill of Material (BOM) (BOM) according to the order of input; If order is an old product, then directly call the Bill of Material (BOM) that original configuration is finished in the database (BOM) configuration.
The formulation of c, MRP (MRP), (BOM) analyzes, calculates according to Bill of Material (BOM), extrapolates various parts and raw-material requirement, if tank farm stock satisfies the production demand, then enters steps d; If stock material quantity not sufficient, then administration step e when entering steps d;
The task of all departments is made in the formulation of d, production task list, comprises that all departments need the workload of finishing in the prescribed timelimit, enter step e1;
E, granting procurement request list allow purchasing department that the material that lacks is purchased, and enter step e1 after buying is finished;
E1, simulation neck material check whether material satisfies production requirement, then enter step f if satisfy, and do not continue then to wait for that purchasing department finishes buying if material puts in place;
F, to assign production task single, and it is single to assign production task to workshop, warehouse and quality control department simultaneously; Workshop enters step g 1 after receiving the production task list;
G1, row produce, and each workshop is singly arranged product according to production task, and will arrange product information and input in the database and store, and carry out step g 3 before production;
G2, getting the raw materials ready, gets the raw materials ready after inquiring row's product task of workshop in advance in the warehouse;
G4, neck material record, after workshop was finished the neck material, the warehouse carried out record by the warehouse information importation;
G3, neck material, workshop enters step g 5 behind warehouse neck material;
G5, production, workshop is produced according to single requirement of production task, and produces feedback g6 constantly, enters step h1 simultaneously;
G6, production feedback, workshop feeds back the various situations in the production run, if feedback material deficiency then enters step g 7; In the production run, if because of the scrappage reason causes deficiencies of stores, each workshop can be according to production status separately, enters step g 7 under the situation of the shortage of stock inquiring about;
G7: replenish buying, workshop sends additional buying order to purchasing department and replenishes buying, and the warehouse-in registration of buying back is convenient to workshop and partly material inventory is inquired about by the workshop information inquiry, check that whether the material that replenishes buying puts in place, in time leads material;
H1: product inspection, quality control department tests to the product of producing according to the production task that receives is single;
H, product warehousing; Just put in storage through the product that is up to the standards, and qualified product is registered by the warehouse information importation, reach the single requirement of production task until qualified output; Register information is stored in the database, and the user can recognize intuitively and finish number by inquiry, and also need finish number, is convenient to the job order performance is inquired about and followed and urge;
I, production task are finished.
In the whole program operation process, all departments register in real time to various material informations and product, and the user can be by workshop information inquiry part, warehouse information query portion and control center's information inquiry part etc. to inventory status, sales order practice condition, inquire about in goods statistical report form, weight of material and Bill of Material (BOM) multinomial contents such as (BOM).
When inventory status is inquired about, the material that system is selected according to the user, can list the state of material in each logistics link, comprise Scheduled Receipt and Allocation, the user can determine amount of plan according to the data of inventory status, according to the inventory status result when making a plan, determine quota, efficient that the raising plan is assigned and accuracy.
When sales order was carried out, system can show the description and quantity that each sales slip domestic demand is finished in succinct mode, and number has been finished in demonstration intuitively and present stock can assemble number.But workshop row product personnel also can view the production quantity of every order apace, and convenient row produces, and the order of need arrangement is still assisted with urging to the object of material.
To when the inquiry of goods statistic behavior, the performance of system combination Order Scheduling list, show various data and date in a concentrated manner, instruct the scheduling of production scheduling of each workshop, and the abortive tracking and the inquiry of having finished the work, make things convenient for workshop and production schedule personnel's information to consult.
To inventory documents and go out to put in storage document and gather, the user can inquire about each state of material and historical only heavy, so that purchasing department and technology department are to the following feedback of product weight.
The user can obtain the BOM information of appointed product or designated sale odd numbers according to name of product or the typing of selling odd numbers, understands the material configuring condition fast, and the convenient neck material or sample materials and warehouse personnel's ingredient information produced checked.
As a kind of prioritization scheme, in steps d, after MRP (MRP) calculates and to finish, can also according to situations such as the actual production capacity of each workshop, supplier's deliverability, processing family working ability to the planned order of result of calculation carry out the date, quantity is adjusted.
Specific embodiment described herein only is that the present invention's spirit is illustrated.The technician of the technical field of the invention can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present invention or surmount the defined scope of appended claims.

Claims (8)

1. Enterprise Resources Planning method, implement by ERP (Enterprise Resource Planning), described ERP (Enterprise Resource Planning) comprises the control center that information inquiry part, information input unit are divided and had database, described information inquiry part, information input unit are divided and are all connected with control center, it is characterized in that described Enterprise Resources Planning method comprises the steps:
A, order input, the user divides the input order by information input unit;
B, finish the configuration of Bill of Material (BOM);
The formulation of c, MRP is analyzed, is calculated according to Bill of Material (BOM), extrapolates various parts and raw-material requirement, if tank farm stock satisfies the production demand, then enters steps d; If stock material quantity not sufficient, then administration step e when entering steps d;
The task of all departments is made in the formulation of d, production task list, enters step f;
E, granting procurement request list allow purchasing department that the material that lacks is purchased;
F, to assign production task single, and it is single to send production task to all departments;
G, production, each workshop is singly produced according to the production task that receives separately;
H, product warehousing, and by the warehouse by information input unit member record warehouse situation, be stored in the database section;
I, production task are finished.
2. a kind of Enterprise Resources Planning method according to claim 1 is characterized in that, among the described step a, also will carry out material information input storage before the order input.
3. a kind of Enterprise Resources Planning method according to claim 1 and 2 is characterized in that, among the described step e, simulates the neck material after buying is finished, and checks whether material satisfies production requirement, then enters step f if satisfy.
4. a kind of Enterprise Resources Planning method according to claim 1 and 2 is characterized in that described step g comprises successively: row produces, neck is expected and production.
5. a kind of Enterprise Resources Planning method according to claim 1 and 2 is characterized in that, among the described step f, production task is single to be assigned simultaneously to workshop, warehouse and quality control department, and the warehouse carries out step g 2 after receiving the production task list: get the raw materials ready.
6. a kind of Enterprise Resources Planning method according to claim 5 is characterized in that, in the described step g 2, leads the material record behind workshop neck material.
7. a kind of Enterprise Resources Planning method according to claim 1 and 2 is characterized in that, among the described step h, also needs to carry out product inspection before the product warehousing, and whether testing product is qualified.
8. a kind of Enterprise Resources Planning method according to claim 4 is characterized in that, in the described step g, also has step g 6 in the production run: produce feedback, if feedback material deficiency then enters step g 7: replenish buying, replenish buying order to purchasing department's transmission and replenish buying.
CN201010179196A 2010-05-21 2010-05-21 Method for planning enterprise resources Pending CN101833711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010179196A CN101833711A (en) 2010-05-21 2010-05-21 Method for planning enterprise resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010179196A CN101833711A (en) 2010-05-21 2010-05-21 Method for planning enterprise resources

Publications (1)

Publication Number Publication Date
CN101833711A true CN101833711A (en) 2010-09-15

Family

ID=42717774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010179196A Pending CN101833711A (en) 2010-05-21 2010-05-21 Method for planning enterprise resources

Country Status (1)

Country Link
CN (1) CN101833711A (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102799979A (en) * 2012-08-09 2012-11-28 常熟市宏华外贸包装有限责任公司 ERP (enterprise resource planning) management system for paperboard manufacturing enterprises
CN103106547A (en) * 2013-02-21 2013-05-15 广州宝钢南方贸易有限公司 Device and method for forecasting steel product procurement demands
CN103116829A (en) * 2013-02-21 2013-05-22 广州宝钢南方贸易有限公司 Device and method for scheduling delivery based on business collaboration of two sides
WO2013166869A1 (en) * 2012-05-09 2013-11-14 上海望友信息科技有限公司 Quick processing system and method for smt device
CN103679322A (en) * 2012-10-24 2014-03-26 杭州金色能源科技有限公司 Production data processing method, device thereof, and system thereof
CN103870903A (en) * 2012-12-11 2014-06-18 广东科达机电股份有限公司 Lean pulling production data processing system
CN103942660A (en) * 2014-05-12 2014-07-23 深圳市德永信企业管理咨询有限公司 Agency account service system
CN103955790A (en) * 2014-04-21 2014-07-30 山西太钢不锈钢股份有限公司 Material management system based on PDA device and enterprise resource planning system
CN105023079A (en) * 2014-04-24 2015-11-04 山西太钢不锈钢股份有限公司 Resource planning system material inspection plan automatic selection method
CN106096848A (en) * 2016-06-16 2016-11-09 杭州笛佛软件有限公司 A kind of e-commerce platform production management method and system
CN106803161A (en) * 2017-02-10 2017-06-06 常州工学院 Intelligent dispensing work station
CN107578191A (en) * 2017-09-28 2018-01-12 东莞嘉泰钟表有限公司 The automatic method for carrying out PMC burdening calculations
CN107578142A (en) * 2017-07-31 2018-01-12 厦门乐石信息科技有限公司 A kind of singulated management method and system of bathroom cabinet customization system
CN108364216A (en) * 2018-02-09 2018-08-03 东莞嘉泰钟表有限公司 It is a kind of quotation material generation and management method
CN109360043A (en) * 2018-09-18 2019-02-19 中国路桥工程有限责任公司 A kind of engineering corporation Information Integration Management System and method
CN109447430A (en) * 2018-10-15 2019-03-08 宁波吉利汽车研究开发有限公司 Production planning and the integrated method, apparatus of scheduled production and electronic equipment
CN109508929A (en) * 2018-11-15 2019-03-22 广西科技大学 A kind of purchasing management method, apparatus and system based on Excel server
CN109685421A (en) * 2018-12-21 2019-04-26 佛山市南海区微高软件有限公司 A kind of commodity inventory control method, apparatus, storage medium and terminal
CN109800966A (en) * 2018-12-29 2019-05-24 广州翰思信息科技有限公司 MRP plan auxiliary method, device, equipment and storage medium
CN110175801A (en) * 2019-05-18 2019-08-27 上海界龙艺术印刷有限公司 A kind of automatic batching system
CN110414820A (en) * 2019-07-20 2019-11-05 中图数字科技(北京)有限公司 It is a kind of for printing the system and method for scheduled production
CN110428180A (en) * 2019-08-06 2019-11-08 罗玉清 ERP System
CN110782202A (en) * 2019-09-25 2020-02-11 广州花都宝井汽车钢材部件有限公司 EDS management system
CN111242477A (en) * 2020-01-13 2020-06-05 湖州朗讯信息科技有限公司 ERP commodity management system and method
CN111861633A (en) * 2020-06-08 2020-10-30 青岛奥利普自动化控制系统有限公司 Resource scheduling method, device, equipment and storage medium
CN112949993A (en) * 2021-02-03 2021-06-11 浙江富安莱科技有限公司 Sharing collaboration platform and method for one-wire-flow intelligent production line
CN113159652A (en) * 2021-05-24 2021-07-23 汇信软投(佛山)软件科技发展有限公司 Method and device for down-regulating inventory rate of heat-insulating rubber strips

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9791851B2 (en) 2012-05-09 2017-10-17 Vayo (Shanghai) Technology Co., Ltd. Quick processing system and method for SMT equipment
WO2013166869A1 (en) * 2012-05-09 2013-11-14 上海望友信息科技有限公司 Quick processing system and method for smt device
CN102799979A (en) * 2012-08-09 2012-11-28 常熟市宏华外贸包装有限责任公司 ERP (enterprise resource planning) management system for paperboard manufacturing enterprises
CN103679322A (en) * 2012-10-24 2014-03-26 杭州金色能源科技有限公司 Production data processing method, device thereof, and system thereof
CN103679322B (en) * 2012-10-24 2017-11-28 杭州金色能源科技有限公司 Production data processing method, apparatus and system
CN103870903A (en) * 2012-12-11 2014-06-18 广东科达机电股份有限公司 Lean pulling production data processing system
CN103106547A (en) * 2013-02-21 2013-05-15 广州宝钢南方贸易有限公司 Device and method for forecasting steel product procurement demands
CN103116829A (en) * 2013-02-21 2013-05-22 广州宝钢南方贸易有限公司 Device and method for scheduling delivery based on business collaboration of two sides
CN103955790A (en) * 2014-04-21 2014-07-30 山西太钢不锈钢股份有限公司 Material management system based on PDA device and enterprise resource planning system
CN105023079A (en) * 2014-04-24 2015-11-04 山西太钢不锈钢股份有限公司 Resource planning system material inspection plan automatic selection method
CN103942660A (en) * 2014-05-12 2014-07-23 深圳市德永信企业管理咨询有限公司 Agency account service system
CN103942660B (en) * 2014-05-12 2017-12-08 深圳市德永信企业管理咨询有限公司 One kind acts on behalf of billed services system
CN106096848A (en) * 2016-06-16 2016-11-09 杭州笛佛软件有限公司 A kind of e-commerce platform production management method and system
CN106803161A (en) * 2017-02-10 2017-06-06 常州工学院 Intelligent dispensing work station
CN107578142A (en) * 2017-07-31 2018-01-12 厦门乐石信息科技有限公司 A kind of singulated management method and system of bathroom cabinet customization system
CN107578191A (en) * 2017-09-28 2018-01-12 东莞嘉泰钟表有限公司 The automatic method for carrying out PMC burdening calculations
CN108364216A (en) * 2018-02-09 2018-08-03 东莞嘉泰钟表有限公司 It is a kind of quotation material generation and management method
CN109360043A (en) * 2018-09-18 2019-02-19 中国路桥工程有限责任公司 A kind of engineering corporation Information Integration Management System and method
CN109447430A (en) * 2018-10-15 2019-03-08 宁波吉利汽车研究开发有限公司 Production planning and the integrated method, apparatus of scheduled production and electronic equipment
CN109508929A (en) * 2018-11-15 2019-03-22 广西科技大学 A kind of purchasing management method, apparatus and system based on Excel server
CN109685421A (en) * 2018-12-21 2019-04-26 佛山市南海区微高软件有限公司 A kind of commodity inventory control method, apparatus, storage medium and terminal
CN109800966A (en) * 2018-12-29 2019-05-24 广州翰思信息科技有限公司 MRP plan auxiliary method, device, equipment and storage medium
CN110175801A (en) * 2019-05-18 2019-08-27 上海界龙艺术印刷有限公司 A kind of automatic batching system
CN110414820A (en) * 2019-07-20 2019-11-05 中图数字科技(北京)有限公司 It is a kind of for printing the system and method for scheduled production
CN110428180A (en) * 2019-08-06 2019-11-08 罗玉清 ERP System
CN110782202A (en) * 2019-09-25 2020-02-11 广州花都宝井汽车钢材部件有限公司 EDS management system
CN111242477A (en) * 2020-01-13 2020-06-05 湖州朗讯信息科技有限公司 ERP commodity management system and method
CN111861633A (en) * 2020-06-08 2020-10-30 青岛奥利普自动化控制系统有限公司 Resource scheduling method, device, equipment and storage medium
CN112949993A (en) * 2021-02-03 2021-06-11 浙江富安莱科技有限公司 Sharing collaboration platform and method for one-wire-flow intelligent production line
CN113159652A (en) * 2021-05-24 2021-07-23 汇信软投(佛山)软件科技发展有限公司 Method and device for down-regulating inventory rate of heat-insulating rubber strips

Similar Documents

Publication Publication Date Title
CN101833711A (en) Method for planning enterprise resources
Gunasekaran et al. A framework for supply chain performance measurement
Bhatnagar et al. Role of logistics in enhancing competitive advantage: A value chain framework for global supply chains
Singh et al. Just-in-time manufacturing: literature review and directions
Portioli-Staudacher et al. Lean implementation in non-repetitive companies: a survey and analysis
Knolmayer et al. Supply chain management based on SAP systems: Architecture and planning processes
Lage Junior et al. Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies
Atan et al. Setting planned leadtimes in customer-order-driven assembly systems
Nicoletti Agile Procurement: Volume I: Adding Value with Lean Processes
Verma Business process management: profiting from process
Ervolina et al. Managing product availability in an assemble-to-order supply chain with multiple customer segments
Kugeler Supply Chain Management and Customer Relationship Management− Process Modeling for Extended Enterprises
Wang et al. Using value stream mapping to analyze an upholstery furniture engineering process
Makarova et al. Supplier management improvement in aviation industry: A case study of Beriev aircraft company
Santin et al. MRP implementation on supply management process: a Brazilian furniture industry case study
Huang Supply chain management for engineers
CN107506860A (en) System and implementation method are realized in lean production plan
Brandl Business to manufacturing (B2M) collaboration between business and manufacturing using ISA-95
Sohal et al. Trends in materials management
Yücesan Impact of Information Technology on Supply Chain Management
Luo et al. Value analysis framework for RFID technology adoption in retailers in China
Myerson Lean and Technology: Working Hand in Hand to Enable and Energize Your Global Supply Chain
Rizzi Representation of the supply chain through the business functions
Lebreton et al. Architecture of selected APS
Huang et al. Management information system applied in the logistics

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHEJIANG HUALONG JUSHUI TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: ZHEJIANG HUALONG VALVE CO., LTD.

Effective date: 20120210

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 317605 TAIZHOU, ZHEJIANG PROVINCE TO: 317606 TAIZHOU, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20120210

Address after: 317606 Zhejiang province Yuhuan County Town Industrial Park

Applicant after: Zhejiang Valogin Technology Co., Ltd.

Address before: Truman Town Industrial Zone Yuhuan County Pu Tian Taizhou city in Zhejiang province 317605

Applicant before: Zhejiang Hualong Valves Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100915