CN101831901A - Shallow poor subsoil composite foundation stabilization treatment method - Google Patents
Shallow poor subsoil composite foundation stabilization treatment method Download PDFInfo
- Publication number
- CN101831901A CN101831901A CN201010177410A CN201010177410A CN101831901A CN 101831901 A CN101831901 A CN 101831901A CN 201010177410 A CN201010177410 A CN 201010177410A CN 201010177410 A CN201010177410 A CN 201010177410A CN 101831901 A CN101831901 A CN 101831901A
- Authority
- CN
- China
- Prior art keywords
- lime
- compacting
- clay
- pile
- shallow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101774105A CN101831901B (en) | 2010-05-13 | 2010-05-13 | Shallow poor subsoil composite foundation stabilization treatment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101774105A CN101831901B (en) | 2010-05-13 | 2010-05-13 | Shallow poor subsoil composite foundation stabilization treatment method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101831901A true CN101831901A (en) | 2010-09-15 |
CN101831901B CN101831901B (en) | 2012-04-25 |
Family
ID=42716100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101774105A Expired - Fee Related CN101831901B (en) | 2010-05-13 | 2010-05-13 | Shallow poor subsoil composite foundation stabilization treatment method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101831901B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102155009A (en) * | 2011-05-23 | 2011-08-17 | 中铁二院工程集团有限责任公司 | Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof |
CN102465524A (en) * | 2010-11-11 | 2012-05-23 | 上海市政工程设计研究总院 | Double radial mesh-cage sand-gravel pile and construction process thereof |
CN102817353A (en) * | 2012-08-03 | 2012-12-12 | 华侨大学 | Composite soft clay foundation |
CN104196004A (en) * | 2014-08-22 | 2014-12-10 | 中国建筑西南勘察设计研究院有限公司 | Overall length core pouring prestress pipe pile composite foundation |
CN105780753A (en) * | 2016-03-28 | 2016-07-20 | 北京中岩大地科技股份有限公司 | Construction method for stabilized soil piles |
CN105834206A (en) * | 2016-03-28 | 2016-08-10 | 北京中岩大地科技股份有限公司 | Treatment method of contaminated soil |
CN105862861A (en) * | 2016-06-13 | 2016-08-17 | 上海强劲地基工程股份有限公司 | Rigid-pile embedding device and construction method |
CN107326765A (en) * | 2017-08-25 | 2017-11-07 | 中铁西北科学研究院有限公司 | Handle segregated frozen ground ground lime pile and its construction method |
CN108560345A (en) * | 2018-05-04 | 2018-09-21 | 刘刚 | Road construction pretreatment unit and its construction method |
CN110130313A (en) * | 2019-05-30 | 2019-08-16 | 合肥建设装饰(集团)有限责任公司 | Method foundation stabilization tamping unit and its working method are rushed in a kind of shake |
CN113073639A (en) * | 2021-04-13 | 2021-07-06 | 兰州大学 | Stepped loess foundation reinforcing method and built variable-rigidity combined pile composite foundation |
CN114991112A (en) * | 2022-06-23 | 2022-09-02 | 河南城建学院 | Foundation construction method for eliminating loess collapsibility |
CN115492087A (en) * | 2022-09-28 | 2022-12-20 | 中铁二院昆明勘察设计研究院有限责任公司 | Construction method of high-speed railway stone-sandwiched soft plastic soil foundation reinforcing pile |
-
2010
- 2010-05-13 CN CN2010101774105A patent/CN101831901B/en not_active Expired - Fee Related
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102465524A (en) * | 2010-11-11 | 2012-05-23 | 上海市政工程设计研究总院 | Double radial mesh-cage sand-gravel pile and construction process thereof |
CN102465524B (en) * | 2010-11-11 | 2016-05-25 | 上海市政工程设计研究总院 | Double radial mesh-cage sand-gravel pile and construction technology thereof |
CN102155009A (en) * | 2011-05-23 | 2011-08-17 | 中铁二院工程集团有限责任公司 | Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof |
CN102817353A (en) * | 2012-08-03 | 2012-12-12 | 华侨大学 | Composite soft clay foundation |
CN104196004A (en) * | 2014-08-22 | 2014-12-10 | 中国建筑西南勘察设计研究院有限公司 | Overall length core pouring prestress pipe pile composite foundation |
CN105780753A (en) * | 2016-03-28 | 2016-07-20 | 北京中岩大地科技股份有限公司 | Construction method for stabilized soil piles |
CN105834206A (en) * | 2016-03-28 | 2016-08-10 | 北京中岩大地科技股份有限公司 | Treatment method of contaminated soil |
CN105862861B (en) * | 2016-06-13 | 2018-03-23 | 上海强劲地基工程股份有限公司 | A plant pile construction method |
CN105862861A (en) * | 2016-06-13 | 2016-08-17 | 上海强劲地基工程股份有限公司 | Rigid-pile embedding device and construction method |
CN107326765A (en) * | 2017-08-25 | 2017-11-07 | 中铁西北科学研究院有限公司 | Handle segregated frozen ground ground lime pile and its construction method |
CN108560345A (en) * | 2018-05-04 | 2018-09-21 | 刘刚 | Road construction pretreatment unit and its construction method |
CN108560345B (en) * | 2018-05-04 | 2020-08-07 | 绍兴市尊铖自动化设备有限公司 | Road construction pretreatment device and construction method thereof |
CN110130313A (en) * | 2019-05-30 | 2019-08-16 | 合肥建设装饰(集团)有限责任公司 | Method foundation stabilization tamping unit and its working method are rushed in a kind of shake |
CN110130313B (en) * | 2019-05-30 | 2020-12-01 | 合肥建设装饰(集团)有限责任公司 | Seismic impact method foundation stabilization tamping device and working method thereof |
CN113073639A (en) * | 2021-04-13 | 2021-07-06 | 兰州大学 | Stepped loess foundation reinforcing method and built variable-rigidity combined pile composite foundation |
CN114991112A (en) * | 2022-06-23 | 2022-09-02 | 河南城建学院 | Foundation construction method for eliminating loess collapsibility |
CN114991112B (en) * | 2022-06-23 | 2024-03-22 | 中化地质河南局集团有限公司 | Foundation construction method for eliminating loess collapsibility |
CN115492087A (en) * | 2022-09-28 | 2022-12-20 | 中铁二院昆明勘察设计研究院有限责任公司 | Construction method of high-speed railway stone-sandwiched soft plastic soil foundation reinforcing pile |
Also Published As
Publication number | Publication date |
---|---|
CN101831901B (en) | 2012-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101831901B (en) | Shallow poor subsoil composite foundation stabilization treatment method | |
CN105887837B (en) | A kind of construction method of field ground stirring concrete earth pile | |
CN101899828B (en) | Construction method of bagged rammed small-diameter soil-cement pile composite foundation | |
CN101858077B (en) | Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile | |
AU2020376449B2 (en) | Construction method of pressurized grouting pile based on reinforcing fiber and metakaolin | |
CN110512589B (en) | Vacuum drainage-reducing and magnesium oxide carbonization combined shallow ultra-soft foundation curing method | |
CN101899838B (en) | Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method | |
CN103074882A (en) | Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles | |
CN107246000A (en) | A kind of method that high polymer reinforces reclaimed ground | |
CN104404838A (en) | Collapsed loess subgrade base treatment method for railway with speed more than 200km | |
CN104746505A (en) | Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting | |
CN104762957B (en) | A kind of spiral pore-forming rams the construction method that expands CFG stake | |
CN101634139B (en) | Dynamic compaction method for backfill foundation with drainage layer | |
CN110241695A (en) | A kind of gravelly soil superelevation fill foundation reinforcement means | |
CN103061224A (en) | Method for thawing and strengthening permafrost foundations by quicklime-sand piles | |
CN102839683A (en) | Discrete pile-water permeability concrete pile novel binary composite foundation and treatment method of composite foundation | |
CN110512592B (en) | Vacuum preloading and guide pipe pile gas injection carbonization ultra-soft foundation reinforcement processing system | |
CN107326765A (en) | Handle segregated frozen ground ground lime pile and its construction method | |
CN110512591A (en) | A kind of reinforcement means of vacuum preloading benefit conduit stake gas injection carbonization ultra-soft foundation | |
CN110172980A (en) | A kind of coarse grain block stone superelevation fill foundation ruggedized construction and its construction method | |
CN101892665A (en) | Construction method for grouting and vibro-replacement stone pile composite foundation | |
CN108570979A (en) | A kind of construction method for building antiseepage composite foundation on dolomite stratigraph | |
CN103015438A (en) | Collapsible loess subgrade landslide treatment method | |
CN105603961A (en) | Pre-perforated lateral restraint pile and construction method thereof | |
CN110526733A (en) | A kind of preparation method, the construction method of the light ceramic for backfill technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Lin Caikui Inventor after: Xu Yiming Inventor after: Fang Jianqin Inventor after: Yang Hongjun Inventor after: Wu Zhanghua Inventor after: Xia Jian Inventor before: Fang Jianqin |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: FANG JIANQIN TO: LIN CAIKUI XU YIMING FANG JIANQIN YANG HONGJUN WU ZHANGHUA XIA JIAN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120425 Termination date: 20160513 |
|
CF01 | Termination of patent right due to non-payment of annual fee |