CN101827348A - Control method and equipment for user credit in prepayment service and service support system - Google Patents

Control method and equipment for user credit in prepayment service and service support system Download PDF

Info

Publication number
CN101827348A
CN101827348A CN200910047258A CN200910047258A CN101827348A CN 101827348 A CN101827348 A CN 101827348A CN 200910047258 A CN200910047258 A CN 200910047258A CN 200910047258 A CN200910047258 A CN 200910047258A CN 101827348 A CN101827348 A CN 101827348A
Authority
CN
China
Prior art keywords
user
business
remaining sum
advance deposit
deposit remaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910047258A
Other languages
Chinese (zh)
Inventor
沈尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Shanghai Co Ltd
Original Assignee
China Mobile Group Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Shanghai Co Ltd filed Critical China Mobile Group Shanghai Co Ltd
Priority to CN200910047258A priority Critical patent/CN101827348A/en
Publication of CN101827348A publication Critical patent/CN101827348A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a control method and equipment for user credit in a prepayment service and a service support system. The method comprises the following steps: comparing total expense of a first type of service used by the user in the current charging cycle with the current prepayment balance of the user, wherein the first type of service does not contain specified amount of prepayment and the service of specified amount of pre-allocated resources; determining the first type of service and a second type of service the amount of the prepayment balance or rest pre-allocated resources of which is zero as service of users required to halt when the total expense is higher than the prepayment balance; and carrying out the halt operation on the halt services required by the user and determined by a credit control system. The invention avoids the defects that all services of the user are halted after the prepayment is overdrawn, realizes more accurate control on the user credit and improves the use experience of the user.

Description

The control method of user credit in prepayment service, equipment and business support system
Technical field
The present invention relates to mobile communication system, relate in particular to a kind of control method, equipment and business support system of user credit in prepayment service.
Background technology
In existing communication supporting network, when prepaid user's arrearage, common carrier makes the user can not re-use any business, after the user pays up arrearage, can answer a pager's call to the user, makes it can reuse every business.
Shown in Figure 1 is that prior art realizes the method flow that the user shuts down in the communication supporting network.In the existing communication supporting network; acquisition system is gathered from end office (EO); Short Message Center; charging gateway (Charging Gateway; the charging bill of all kinds of business platforms such as CG); and each charging bill that will collect; send to letter control system; carry out user's total cost accumulative total by letter control system; if Sorry, your ticket has not enough value to find the current expense of prepaid user; so by worker's single system; to home location register (Home Location Register; HLR) and Service Provisioning Administration Core Environment (Data Service Management Platform, DSMP) etc. the authentication network element is initiated operation that this user is shut down, the authentication network element is put this user and is stopped status.When the user used business for example to call, this state of user of switch query authentication network element if this user of authentication network element record is a stopped status, did not so then allow this user to use business.
Shown in Figure 2 is that prior art realizes the method flow that the user answers a pager's call in the communication supporting network; after the shutdown user supplements with money; the amount of money that charging system is supplemented the user with money is notified to letter control system; system adds up to user's advance payment by the letter control; if the user prepayment remaining sum is more than or equal to zero; then by worker's single system, to the operation that all kinds of authentication network elements initiations such as HLR and DSMP are answered a pager's call to this user, putting this authentication NE User is normal condition.After this, when the user used business for example to call, this state of user of switch query authentication network element when inquiring this user for normal condition, then allowed this user to use business.
Prior art realizes that in the communication supporting network there is following point in the method that the user is stopped answering a pager's call; whether existing letter control system only calculates user's current advance payment remaining sum and overdraws; after the current advance payment remaining sum overdraw of this user; just stop all professional uses of this user immediately; in the business marketing process of reality; the user is by comprising some coin free service resources in the employed service package of prepayment mode; the free the number of minutes that for example comprises voice call; the free bar number of note; free flow of GPRS or the like; and in order to reduce the risk of subscriber arrearage; the set meal expense of most of pre-payment is all collected in advance at the beginning of the month; therefore; when the user is shut down, tend to occur the situation that the free resource of its pre-payment does not use as yet fully, in case use advance deposit the situation of overdraw to occur; promptly the user credit control mode that all business of user are all shut down has influenced the experience of user to business.
Summary of the invention
The embodiment of the invention provides a kind of user credit in prepayment service control method, equipment and business support system, realizes the control to the more accurate credit of prepaid user.
The control method of a kind of user credit in prepayment service that the embodiment of the invention provides comprises:
Use the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The described first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource;
When described total cost is higher than described advance deposit remaining sum, determine that the first kind is professional and the advance deposit remaining sum that comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class;
To the business that the described user who determines need shut down, initiate shutdown operation.
The control method of the user credit in prepayment service that the embodiment of the invention provides, the total cost of described first kind business is determined by following manner:
Periodically gather the charging bill that each business platform produces;
According to described charging bill, calculate the total cost that the interior described user of current metering period uses first kind business.
The quantity of the advance deposit remaining sum of described user's advance deposit remaining sum, the second class business or residue pre-allocation resource obtains by following manner:
The record of inquiring user expense center obtains the advance deposit remaining sum that the current advance deposit remaining sum of described user, the described user second class business comprise or the quantity of residue pre-allocation resource.
The control method of the user credit in prepayment service that the embodiment of the invention provides also comprises:
According to the number that the user supplements with money, upgrade this user's advance deposit remaining sum;
When judging that this user has business to shut down, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; When being not less than described user and shutting down, the advance deposit remaining sum after the described renewal during total cost of first kind business, determines that this user need answer a pager's call, and the operation that the business that this user has shut down is answered a pager's call.
The embodiment of the invention also provides a kind of control appliance of user credit in prepayment service, comprising:
Comparing unit is used for using the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The described first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource;
Determining unit is used for when described total cost is higher than described advance deposit remaining sum, determines that the first kind is professional and the advance deposit remaining sum that comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class; Described second class is professional for comprising the business of advance deposit or pre-allocation resource;
Notification unit, the service announcements of the required shutdown of this user that is used for described determining unit is determined is given worker's single system.
Described determining unit also is used for the record of inquiring user expense center, obtains the advance deposit remaining sum that the current advance deposit remaining sum of described user, the second class business comprise or the quantity of residue pre-allocation resource.
Described determining unit, also be used to receive the advance deposit remaining sum after the user who notifies at the customer charge center upgrades, when judging that this user has business to shut down, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; When the advance deposit remaining sum after the described renewal is not less than described user and shuts down, during the total cost of first kind business, determine that this user need answer a pager's call, and be notified to the operation of answering a pager's call of business that described worker's single system shut down to this user.
The embodiment of the invention also provides a kind of business support system, comprising:
Letter control system is used for using the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource; When described total cost is higher than described advance deposit remaining sum, determines that the first kind is professional and the advance deposit remaining sum that comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class, and be notified to worker's single system;
Worker's single system is used for the business that need shut down the described user that described letter control system determines, initiates shutdown operation.
The business support system that the embodiment of the invention provides also comprises:
Acquisition system is used for periodically gathering the charging bill that each business platform produces, and described charging bill is sent to described letter control system;
Described letter control system also is used for the described charging bill that receives according to from described acquisition system, calculates the total cost that described user in the current metering period uses first kind business.
Further, the business support system that the embodiment of the invention provides also comprises: the customer charge center is used for the advance deposit remaining sum that the current advance deposit remaining sum of recording user, the described user second class business comprise or the quantity of residue pre-allocation resource;
Described letter control system also is used for the record of inquiring user expense center, obtains the advance deposit remaining sum that the current advance deposit remaining sum of described user, the described user second class business comprise or the quantity of residue pre-allocation resource.
Described customer charge center also is used for the number of supplementing with money according to the user, upgrades this user's advance deposit remaining sum, and is notified to described letter control system;
Described letter control system also is used to receive the notice at described customer charge center, and when judging that this user has business to shut down, the advance deposit remaining sum when this user is shut down after the total cost of first kind business and this user renewal compares; When the advance deposit remaining sum after the described renewal is not less than described user and shuts down, during the total cost of first kind business, determine that this user need answer a pager's call, and be notified to described worker's single system;
Described worker's single system also is used for the notice according to described letter control system, the business that this user has been shut down the operation of answering a pager's call.
The beneficial effect of the embodiment of the invention comprises:
The control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system, letter control system uses the total cost of first kind business (do not comprise the advance deposit of designated amounts and do not comprise the business of specified quantity pre-allocation resource) and current this user's advance deposit remaining sum to compare the user; When the user uses the total cost of first kind business to be higher than current this user's advance deposit remaining sum, advance deposit remaining sum of determining that the first kind is professional and being comprised or residue pre-allocation resource quantity are the business that the zero second class business (business that comprises the advance deposit or the specified quantity pre-allocation resource of designated amounts) need be shut down for this user, and are notified to worker's single system; Worker's single system is initiated the shutdown operation to correspondence according to the business of the required shutdown of this user.The control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system; the current advance deposit remaining sum that can be implemented in this user is lower than the total cost that the user uses first kind business; advance deposit remaining sum that but this user is a certain or some second class business is comprised or residue pre-allocation resource quantity are but greater than under zero the situation; still keep this user for advance deposit remaining sum or residue pre-allocation resource use right greater than zero the second class business, and in addition all professional shutdown operations of carrying out.The control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system; remedied in the prior art; after the overdraw of user's advance deposit, can only all shut down the deficiency of being brought to all business of user; realized more accurately user credit being controlled, improved user's experience simultaneously.
In addition, the control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system, after can working as the user and supplementing operation with money, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; When the advance deposit remaining sum after this user upgrades was not less than this total cost, the business that can shut down this user was timely and accurately answered a pager's call.
Description of drawings
Fig. 1 is the schematic flow sheet of in the existing communication supporting network user being shut down;
The schematic flow sheet of Fig. 2 in the existing communication supporting network user being answered a pager's call;
One of flow chart of the control method of the user credit in prepayment service that Fig. 3 provides for the embodiment of the invention;
One of flow chart of the control method of the user credit in prepayment service that Fig. 4 provides for the embodiment of the invention;
The structural representation of the control appliance of the user credit in prepayment service that Fig. 5 provides for the embodiment of the invention;
The structural representation of the business support system that Fig. 6 provides for the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing, a kind of user credit in prepayment service control method provided by the invention, equipment and business support system are described in detail with specific embodiment.
The control method of the user credit in prepayment service that the embodiment of the invention provides, the function of each network element of existing communication supporting network is improved and optimized, in order to be illustrated more clearly in the control method of the user credit in prepayment service that the embodiment of the invention provides, at first each network element is simply introduced in the related business support network of the user credit in prepayment service control method that the embodiment of the invention is provided.The business support network that the control method of the user credit in prepayment service that the embodiment of the invention provides is related includes but not limited to: letter control system, worker's single system, acquisition system and customer charge center etc.Letter control system is connected with acquisition system, worker's single system and customer charge center respectively.
Fig. 3 is the flow chart of the control method of the user credit in prepayment service that provides of the embodiment of the invention, specifically may further comprise the steps:
Step S301, letter control system use total cost that first kind business produced and current this user's remaining sum to compare user in the current period; The first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource; When the user uses the total cost of first kind business to be higher than this user's advance deposit remaining sum, then carry out following step S302 in current period.
Step S302, letter control system determine first kind business and advance deposit remaining sum be zero or the residue pre-allocation resource be the professional business that need shut down for the user of zero second class, for advance deposit remaining sum or residue pre-allocation resource rights of using greater than zero the professional reservation of second class user.
The business that this user that step S303, letter control system will determine need shut down is notified to worker's single system;
Letter control system can be by the type of service sign of initiating professional control requirement, carry in professional control request to need the user ID of shutting down and need to shut down, the business of notifying this user to shut down.
Step S304, worker's single system initiate the corresponding professional shutdown operation to this user according to the business of the required shutdown of this user in the notice.
In the control method of the user credit in prepayment service that the embodiment of the invention provides; letter control system in the above steps and worker's single system; also can adopt the form of the network entity of other titles to realize; as long as can realize function corresponding; do not break away from protection scope of the present invention, the embodiment of the invention does not limit this.
In embodiments of the present invention, the expense that the user uses first business to be produced, can calculate according to the charging bill that acquisition system sends to letter control system, acquisition system is periodically gathered the charging bill of each business platform according to user's professional service recorder generation, and charging bill is sent to letter control system.Concrete charging way is identical with charging way in the prior art.
In the embodiment of the invention in actual applications, the business that the user uses can be divided into two classes usually, first kind business is the general service that the advance deposit that neither comprises designated amounts does not comprise the specified quantity pre-allocation resource again, this class business for user's actual usage quantity or duration etc. without limits, operator is according to the actual usage quantity of user or use duration etc. to charge.
The second class business is the business that comprises designated amounts advance deposit or specified quantity pre-allocation resource.This class business is service package form or comprise specified amount pre-payment form and offer the user for example usually, freely selects customization by the user.For instance, adopt the second class business of service package form, the service of voice, note or the GPRS flow etc. of the specific quantity that in service package, can comprise and distribute, for example comprise the short message service set meal of 200 notes, 200 minutes duration of call set meal etc., this preallocated resource also claims " free resource ", in other words, to the use of the resource in this set meal, operator reduces according to the quantity of the actual use of user, and does not adopt the mode of charging to settle accounts; Employing comprises the second class business of pre-payment form, can comprise the fund of some prepayment, for example comprises the caller talk business of 50 yuan of funds etc.For this class business, carry out the clearing of expense usually separately.Identical in concrete account form and the prior art.
Letter control system can be by the respective record of inquiring user expense center, obtains the current advance deposit remaining sum of the user expense that is produced of any first kind business (this advance deposit can deduct).Letter control system can also obtain the remaining amount of money or the remaining quantity of appointment pre-allocation resource of appointment advance deposit that this user's second class business is comprised by the respective record of inquiring user expense center.
The total cost that current this user's advance deposit remaining sum that letter control system will inquire and this user use first kind business to be produced compares; if the advance deposit remaining sum is lower than the total cost that first kind business is produced; determine all first kind service needed shutdown so; and whether advance deposit or pre-allocation resource that the second class business that letter control system further judges the user and customized is comprised have used; with the advance deposit remaining sum that is comprised be zero or the residue pre-allocation resource is that the second zero class business is defined as the business that the user need shut down; otherwise; if advance deposit that a certain second class business is comprised or pre-allocation resource are greater than zero; keep the authority that this user continues to use this business so, not the operation that this business of user is shut down.
Describe with an example below; certain user uses the note set meal; the note that comprises in this note set meal adds up to 100 (pre-allocation resources); the current advance deposit remaining sum of this user for example is 30 yuan; and the cost of use of this user speech business (belonging to first kind business) has reached 35 yuan in the current metering period; at this moment; though letter control system judges that the total cost of this user's first kind business is higher than this user's advance deposit remaining sum; if but only 20 of notes that this user accumulative total sends; be lower than the note sum that the user uses the note set meal to send; in other words also have residual resource not use in this user's the note set meal; believe that so the control system is for this business of note; keep the authority that this user uses, and determine this user use except that note first kind business (for example above-mentioned voice service) and other to comprise the advance deposit remaining sum or remain pre-allocation resource be the business that zero second class business need be shut down for this user.
Worker's single system is connected with each communication network element (as authentication network element HLR or DSMP etc.); store the mapping relations of different business and corresponding communication network element in its this locality of worker's single system; business according to the shutdown of user's needs; worker's single system sends the communication network element of corresponding halt instruction to correspondence; indicate this communication network element that this business of user is shut down, for example user's voice business, short message service or gprs service are shut down etc.
After the user shut down by business, if this user has carried out supplementing with money operation, as shown in Figure 4, the control method of the user credit in prepayment service that the embodiment of the invention provides, further comprising the steps of:
This user's advance deposit remaining sum is upgraded according to the number that the user supplements with money in step S401, customer charge center, and gives letter control system with the advance deposit balance notification after this user's renewal.
Step S402, letter control system receive the notice at customer charge center, and judge whether this user has business to shut down, when judged result when being, execution in step S403; When judged result for not the time, execution in step S406, process ends.
Step S403, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compare; During the total cost of first kind business that the advance deposit remaining sum after upgrading is not less than this user when shutting down, execution in step S404;
Step S404, letter control system determine that this user need answer a pager's call, and are notified to worker's single system;
Step S405, worker's single system are according to the notice of believing the control system, the operation that all business of having shut down are answered a pager's call to the user.
The business that worker's single system is answered a pager's call according to user's needs sends the instruction of answering a pager's call accordingly to each communication network element of correspondence, and the indication communication network element is answered a pager's call to this business of user.
The control method of the user credit in prepayment service that provides according to the embodiment of the invention; the embodiment of the invention also provides a kind of control appliance of user credit in prepayment service; this equipment for example can be the letter control system in the communication supporting network when practical application; certainly; also can adopt the form of the network entity of other titles to realize; as long as can realize the controlled function of the user credit that the embodiment of the invention provides; do not break away from protection scope of the present invention, the embodiment of the invention does not limit this.
The control appliance of the user credit in prepayment service that the embodiment of the invention provides as shown in Figure 5, specifically comprises: comparing unit 501, determining unit 502 and notification unit 503; Wherein:
Comparing unit 501 is used for using the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource;
Determining unit 502, be used for when the user uses the total cost of first kind business to be higher than active user's advance deposit remaining sum, determine that first kind business and the advance deposit remaining sum that is comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class;
In the embodiment of the invention, second class is professional for comprising the business of designated amounts advance deposit or specified quantity pre-allocation resource;
Notification unit 503, the service announcements of the required shutdown of this user that is used for determining unit 502 is determined is given worker's single system.
Further, really order unit 502 in the control appliance of the user credit in prepayment service that the embodiment of the invention provides, the record that also is used for the inquiring user expense center obtains the advance deposit remaining sum that the current advance deposit remaining sum of this user, the second class business comprise or the quantity of residue pre-allocation resource.
Further, order unit 502 really in the control appliance of the user credit in prepayment service that the embodiment of the invention provides when also being used for the advance deposit remaining sum after the customer charge center notifies the user to upgrade, judges whether this user has business to shut down; If the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; During the total cost of first kind business that the advance deposit remaining sum after the user upgrades is not less than this user when shutting down, determine that this user need answer a pager's call, and the operation of answering a pager's call of the business of notifying worker's single system that this user has been shut down.
The control method of the user credit in prepayment service that provides according to the embodiment of the invention, the embodiment of the invention also provides a kind of business support system, as shown in Figure 6, comprising: letter control system 601 and worker's single system 602; Wherein:
Letter control system 601 is used for using the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource; When this user uses the total cost of first kind business to be higher than the current advance deposit remaining sum of this user, advance deposit remaining sum of determining that the first kind is professional and being comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class, and are notified to worker's single system 602;
Worker's single system 602 is used for the business that need shut down the user that letter control system 601 determines, initiates shutdown operation.
Worker's single system 602 needs in advance in the mapping relations of local storage service with corresponding communication network element, indicates to the corresponding communication network element by the transmission halt instruction user's business is shut down.
The business support system that the embodiment of the invention provides as shown in Figure 6, can also comprise: acquisition system 603; Acquisition system 603 links to each other with each business platform, can periodically gather the charging bill that each business platform produces according to user record, and possess the function that the charging bill that will collect is sent to letter control system 601.
Letter control system 601 also is used for calculating the total cost that the user uses first kind business to be produced in the current metering period according to the charging bill from acquisition system 603 receptions.
The business support system that the embodiment of the invention provides as shown in Figure 6, can also comprise: customer charge center 604 is used for the advance deposit remaining sum that the current advance deposit remaining sum of recording user, user's second class business comprise or the quantity of residue pre-allocation resource.
Preferably, the data in the customer charge center 604 can adopt the mode of memory database to store, and this mode can have higher reading efficiency.
Customer charge center 604 also is used for the number of supplementing with money according to the user, upgrades this user's advance deposit remaining sum, and is notified to letter control system 601.Customer charge center 604 has the interface of supplementing with money that is connected with external system, when the user finish supplement operation with money after, customer charge center 604 can upgrade in time the user the advance deposit remaining sum and be notified to letter control system 601.
Accordingly, believe control system 601, also be used to receive the notice at customer charge center 604, when judging that this user has business to shut down, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; During the total cost of first kind business that the advance deposit remaining sum after this user upgrades is not less than this user when shutting down, determine that this user need answer a pager's call, and be notified to worker's single system 602;
Worker's single system 602 also is used for the notice according to letter control system 601, the operation that the business that this user has been shut down is answered a pager's call.
The control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system, letter control system uses the total cost of first kind business and current this user's advance deposit remaining sum to compare the user; When the user uses the total cost of first kind business to be higher than current this user's advance deposit remaining sum, advance deposit remaining sum of determining that the first kind is professional and being comprised or residue pre-allocation resource quantity are the business that zero second class business need be shut down for this user, and are notified to worker's single system; Worker's single system is initiated the shutdown operation to correspondence according to the business of the required shutdown of this user.The control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system; the current advance deposit remaining sum that can be implemented in this user is lower than the total cost that the user uses first kind business; the quantity of advance deposit remaining sum that but this user is a certain or some second class business is comprised or residue pre-allocation resource is but greater than under zero the situation; still keep this user for advance deposit remaining sum or residue pre-allocation resource use right greater than zero the second class business, and in addition all professional shutdown operations of carrying out.The control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system; remedied in the prior art; after the overdraw of user's advance deposit, can only all shut down the deficiency of being brought to all business of user; realized more accurately user credit being controlled, improved user's experience simultaneously.
In addition, the control method of the user credit in prepayment service that the embodiment of the invention provides, equipment and business support system, after can working as the user and supplementing operation with money, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; When the advance deposit remaining sum after this user upgrades was not less than this total cost, the business that can shut down this user was timely and accurately answered a pager's call.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (11)

1. the control method of a user credit in prepayment service is characterized in that, comprising:
Use the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The described first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource;
When described total cost is higher than described advance deposit remaining sum, determine that the first kind is professional and the advance deposit remaining sum that comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class;
To the business that the described user who determines need shut down, initiate shutdown operation.
2. the method for claim 1 is characterized in that, the total cost of described first kind business is determined by following manner:
Periodically gather the charging bill that each business platform produces;
According to described charging bill, calculate the total cost that the interior described user of current metering period uses first kind business.
3. the method for claim 1 is characterized in that, the quantity of the advance deposit remaining sum of described user's advance deposit remaining sum, the second class business or residue pre-allocation resource obtains by following manner:
The record of inquiring user expense center obtains the advance deposit remaining sum that the current advance deposit remaining sum of described user, the described user second class business comprise or the quantity of residue pre-allocation resource.
4. method as claimed in claim 3 is characterized in that, also comprises:
According to the number that the user supplements with money, upgrade this user's advance deposit remaining sum;
When judging that this user has business to shut down, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; When being not less than described user and shutting down, the advance deposit remaining sum after the described renewal during total cost of first kind business, determines that this user need answer a pager's call, and the operation that the business that this user has shut down is answered a pager's call.
5. the control appliance of a user credit in prepayment service is characterized in that, comprising:
Comparing unit is used for using the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The described first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource;
Determining unit is used for when described total cost is higher than described advance deposit remaining sum, determines that the first kind is professional and the advance deposit remaining sum that comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class;
Notification unit, the service announcements of the required shutdown of this user that is used for described determining unit is determined is given worker's single system.
6. equipment as claimed in claim 5 is characterized in that, described determining unit also is used for the record of inquiring user expense center, obtains the advance deposit remaining sum that the current advance deposit remaining sum of described user, the second class business comprise or the quantity of residue pre-allocation resource.
7. equipment as claimed in claim 6, it is characterized in that, described determining unit, also be used to receive the advance deposit remaining sum after the user who notifies at the customer charge center upgrades, when judging that this user has business to shut down, the advance deposit remaining sum after the total cost of first kind business and this user upgraded when this user was shut down compares; When the advance deposit remaining sum after the described renewal is not less than described user and shuts down, during the total cost of first kind business, determine that this user need answer a pager's call, and be notified to the operation of answering a pager's call of business that described worker's single system shut down to this user.
8. a business support system is characterized in that, comprising:
Letter control system is used for using the total cost of first kind business and current this user's advance deposit remaining sum to compare user in the current metering period; The first kind is professional to be the business that does not comprise the advance deposit of designated amounts and do not comprise the specified quantity pre-allocation resource; When described total cost is higher than described advance deposit remaining sum, determines that the first kind is professional and the advance deposit remaining sum that comprised or residue pre-allocation resource quantity are zero the professional business that need shut down for described user of second class, and be notified to worker's single system;
Worker's single system is used for the business that need shut down the described user that described letter control system determines, initiates shutdown operation.
9. system as claimed in claim 8 is characterized in that, also comprises:
Acquisition system is used for periodically gathering the charging bill that each business platform produces, and described charging bill is sent to described letter control system;
Described letter control system also is used for the described charging bill that receives according to from described acquisition system, calculates the total cost that described user in the current metering period uses first kind business.
10. system as claimed in claim 8 is characterized in that, also comprises: the customer charge center is used for the advance deposit remaining sum that the current advance deposit remaining sum of recording user, the described user second class business comprise or the quantity of residue pre-allocation resource;
Described letter control system also is used for the record of inquiring user expense center, obtains the advance deposit remaining sum that the current advance deposit remaining sum of described user, the described user second class business comprise or the quantity of residue pre-allocation resource.
11. system as claimed in claim 10 is characterized in that, described customer charge center also is used for the number of supplementing with money according to the user, upgrades this user's advance deposit remaining sum, and is notified to described letter control system;
Described letter control system also is used to receive the notice at described customer charge center, and when judging that this user has business to shut down, the advance deposit remaining sum when this user is shut down after the total cost of first kind business and this user renewal compares; When the advance deposit remaining sum after the described renewal is not less than described user and shuts down, during the total cost of first kind business, determine that this user need answer a pager's call, and be notified to described worker's single system;
Described worker's single system also is used for the notice according to described letter control system, the business that this user has been shut down the operation of answering a pager's call.
CN200910047258A 2009-03-04 2009-03-04 Control method and equipment for user credit in prepayment service and service support system Pending CN101827348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910047258A CN101827348A (en) 2009-03-04 2009-03-04 Control method and equipment for user credit in prepayment service and service support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910047258A CN101827348A (en) 2009-03-04 2009-03-04 Control method and equipment for user credit in prepayment service and service support system

Publications (1)

Publication Number Publication Date
CN101827348A true CN101827348A (en) 2010-09-08

Family

ID=42691002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910047258A Pending CN101827348A (en) 2009-03-04 2009-03-04 Control method and equipment for user credit in prepayment service and service support system

Country Status (1)

Country Link
CN (1) CN101827348A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102281522A (en) * 2011-07-27 2011-12-14 华为技术有限公司 Credit control method and credit control device
CN105992183A (en) * 2015-02-13 2016-10-05 中国移动通信集团安徽有限公司 Method, apparatus and equipment for rapid starting up for fee payment
CN107909453A (en) * 2017-12-18 2018-04-13 南京理工大学 One kind, which is paid in advance, supplements intelligent analysis system and method with money
CN108207006A (en) * 2016-12-20 2018-06-26 中国移动通信有限公司研究院 Data field shuts down policy control method and communication system
CN110381222A (en) * 2019-05-31 2019-10-25 中国联合网络通信集团有限公司 The determination method and apparatus of Information Mobile Service state

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102281522A (en) * 2011-07-27 2011-12-14 华为技术有限公司 Credit control method and credit control device
CN105992183A (en) * 2015-02-13 2016-10-05 中国移动通信集团安徽有限公司 Method, apparatus and equipment for rapid starting up for fee payment
CN108207006A (en) * 2016-12-20 2018-06-26 中国移动通信有限公司研究院 Data field shuts down policy control method and communication system
CN107909453A (en) * 2017-12-18 2018-04-13 南京理工大学 One kind, which is paid in advance, supplements intelligent analysis system and method with money
CN110381222A (en) * 2019-05-31 2019-10-25 中国联合网络通信集团有限公司 The determination method and apparatus of Information Mobile Service state
CN110381222B (en) * 2019-05-31 2021-02-09 中国联合网络通信集团有限公司 Method and device for determining mobile service state

Similar Documents

Publication Publication Date Title
RU2310229C2 (en) Multiple virtual wallets in wireless devices
CN102348185B (en) Computer-implemented method, system, and computer program product for telecommunication rating
US6332579B1 (en) Identification card billing method using an identification card
US7123703B2 (en) Differentiated threshold value behavior in prepaid services
US20020101966A1 (en) Prepaid phone service for both wired and wireless telecommunication devices
CN101370060B (en) A kind of multiple channel automated refill system, method and apparatus
CN101438325A (en) System and method for prepay account management system of utility usage charges
CN101601273A (en) The control of prepaid balance status notification
CN106372886A (en) Distributed payment system, method and device based on payment routing
CN101005384A (en) Processing method, system and device in charging process
CN101827348A (en) Control method and equipment for user credit in prepayment service and service support system
US20090186598A1 (en) Automatic Step-Down of Prepaid Accounts for Communication Services
CN101022488B (en) Charge metering method, system and account period switching module
CN101345634A (en) Charging method, device and system
CN101286859A (en) Family billing plan for sharing the balance in on-line charging system of wireless communication system
CN101106756A (en) Method for loaning and loan-returning call fee and credit control platform
KR20020022534A (en) Access contract changing method and server of a communication service provider
KR20020020773A (en) Auto Recharging System of Advance payments
CN101895402B (en) Charging data management method and device of communication users
CN101765053A (en) Client guiding and shunting method, device and system
CN1964410A (en) Charging system and its recharging method
CN102461145B (en) Utilize the network communication services of multiple payment mode
CN115150764B (en) Tariff configuration method, tariff configuration device, tariff configuration equipment and tariff configuration medium
JP5354433B1 (en) Notification system
CN101267586A (en) A method for paying communication fee via fund transfer between customer accounts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100908