CN101787704A - 一种带传力环的预应力筒型基础结构体系 - Google Patents
一种带传力环的预应力筒型基础结构体系 Download PDFInfo
- Publication number
- CN101787704A CN101787704A CN 201010116382 CN201010116382A CN101787704A CN 101787704 A CN101787704 A CN 101787704A CN 201010116382 CN201010116382 CN 201010116382 CN 201010116382 A CN201010116382 A CN 201010116382A CN 101787704 A CN101787704 A CN 101787704A
- Authority
- CN
- China
- Prior art keywords
- cylinder
- force transmission
- prestressed
- transmission ring
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 34
- 239000011513 prestressed concrete Substances 0.000 claims abstract description 8
- 239000004567 concrete Substances 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 11
- 239000002436 steel type Substances 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 8
- 239000000463 material Substances 0.000 abstract description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 3
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000007789 sealing Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000012141 concentrate Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101163826A CN101787704B (zh) | 2010-03-03 | 2010-03-03 | 一种带传力环的预应力筒型基础结构体系 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101163826A CN101787704B (zh) | 2010-03-03 | 2010-03-03 | 一种带传力环的预应力筒型基础结构体系 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101787704A true CN101787704A (zh) | 2010-07-28 |
CN101787704B CN101787704B (zh) | 2012-03-28 |
Family
ID=42531071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101163826A Active CN101787704B (zh) | 2010-03-03 | 2010-03-03 | 一种带传力环的预应力筒型基础结构体系 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101787704B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102162256A (zh) * | 2010-08-06 | 2011-08-24 | 天津道达渤海新能源开发有限公司 | 海上地基基础 |
CN103243735A (zh) * | 2013-05-11 | 2013-08-14 | 天津大学 | 一种带斜支撑的预应力混凝土筒型基础 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19949246A1 (de) * | 1999-10-13 | 2001-04-19 | Heinz Zimmermann | Verfahren zur Abfangung und Stabilisierung eines Kreisfundamentes mittels Pfahlgründung in Verbindung mit einem Torsions-Fundamentring |
DE10117109A1 (de) * | 2001-04-06 | 2002-12-05 | Joachim Falkenhagen | Wellschutzring |
CN1651661A (zh) * | 2005-02-24 | 2005-08-10 | 天津大学 | 箱或筒型基础上的圆筒排构件挡土挡水结构 |
CN1776120A (zh) * | 2005-11-28 | 2006-05-24 | 天津大学 | 横跨并保护海底管线的筒型基础海堤结构及安装方法 |
-
2010
- 2010-03-03 CN CN2010101163826A patent/CN101787704B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19949246A1 (de) * | 1999-10-13 | 2001-04-19 | Heinz Zimmermann | Verfahren zur Abfangung und Stabilisierung eines Kreisfundamentes mittels Pfahlgründung in Verbindung mit einem Torsions-Fundamentring |
DE10117109A1 (de) * | 2001-04-06 | 2002-12-05 | Joachim Falkenhagen | Wellschutzring |
CN1651661A (zh) * | 2005-02-24 | 2005-08-10 | 天津大学 | 箱或筒型基础上的圆筒排构件挡土挡水结构 |
CN1776120A (zh) * | 2005-11-28 | 2006-05-24 | 天津大学 | 横跨并保护海底管线的筒型基础海堤结构及安装方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102162256A (zh) * | 2010-08-06 | 2011-08-24 | 天津道达渤海新能源开发有限公司 | 海上地基基础 |
CN102162256B (zh) * | 2010-08-06 | 2015-07-08 | 江苏道达海上风电工程科技有限公司 | 海上地基基础 |
CN103243735A (zh) * | 2013-05-11 | 2013-08-14 | 天津大学 | 一种带斜支撑的预应力混凝土筒型基础 |
Also Published As
Publication number | Publication date |
---|---|
CN101787704B (zh) | 2012-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422B (zh) | 一种桥梁预制空心墩柱后浇连接结构及施工方法 | |
CN103243961B (zh) | 火力发电厂烟囱钛板钢内筒倒装施工装置 | |
CN203755778U (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
CN103867019A (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
CN103243735A (zh) | 一种带斜支撑的预应力混凝土筒型基础 | |
JP2006299631A (ja) | プレキャスト工法による変断面塔状構造物 | |
CN111910673A (zh) | 一种装配式海上风电筒型基础 | |
CN101787704B (zh) | 一种带传力环的预应力筒型基础结构体系 | |
CN201794087U (zh) | 筒型基础构件 | |
CN201850702U (zh) | 空心钢管活性粉末混凝土组合构件 | |
CN108086135B (zh) | 一种装配式钢管约束钢筋混凝土排架桥墩 | |
CN213358588U (zh) | 一种光伏支架基础灌注桩 | |
CN203373735U (zh) | 外置纵向腹板的混凝土预制管桩 | |
CN111910674A (zh) | 一种六边形海上风电筒型基础结构 | |
CN201943186U (zh) | Frp管-活性粉末混凝土-钢管组合构件 | |
CN110953125A (zh) | 一种预制式多边形预应力钢混塔筒及其筒节的制造模具 | |
CN210004859U (zh) | 一种自然通风冷却塔及其加强型钢管混凝土x支柱 | |
CN102041785B (zh) | 桥墩钢-混凝土组合结构抱柱梁 | |
CN203256765U (zh) | 一种带斜支撑的预应力混凝土筒型基础 | |
CN102537515A (zh) | 防沉降型预应力顶管 | |
CN202039455U (zh) | 中空夹层钢管活性粉末混凝土组合构件 | |
CN201826322U (zh) | 筒型基础构件 | |
CN218542488U (zh) | 一种分片带肋薄壁中空夹层复合钢管混凝土风电塔架 | |
CN201785779U (zh) | 火力发电厂汽机基座梁的加固装置 | |
CN205088676U (zh) | 型钢-混凝土组合预应力管桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: DAODA (SHANGHAI) WIND POWER INVESTMENT CO., LTD. Free format text: FORMER OWNER: TIANJIN UNIVERSITY Effective date: 20100916 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 300072 NO.92, WEIJIN ROAD, NANKAI DISTRICT, TIANJIN CITY TO: 200129 ROOM 210, NO.212, LINGHE ROAD, PUDONG NEW DISTRICT, SHANGHAI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20100916 Address after: 200129 Shanghai city Pudong New Area Linghe Road No. 212 room 210 Applicant after: Daoda (Shanghai) Wind Power Investment Co., Ltd. Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92 Applicant before: Tianjin University |
|
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd. Assignor: Daoda (Shanghai) Wind Power Investment Co., Ltd. Contract record no.: 2011320000097 Denomination of invention: Prestressed cylinder-shaped foundation structure system provided with force transmission ring License type: Exclusive License Open date: 20100728 Record date: 20110225 |
|
ASS | Succession or assignment of patent right |
Owner name: JIANGSU DAODA MARINE WIND POWER ENGINEERING TECHNO Free format text: FORMER OWNER: DAODA (SHANGHAI) WIND POWER INVESTMENT CO., LTD. Effective date: 20110331 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200129 ROOM 210, NO. 212, LINGHE ROAD, PUDONG NEW DISTRICT, SHANGHAI TO: 226259 KAIXUAN ROAD, ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE, QIDONG CITY, JIANGSU PROVINCE, CHINA |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20110331 Address after: 226259 triumph Road, Qidong economic and Technological Development Zone, Jiangsu, China Applicant after: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd. Address before: 200129 Shanghai city Pudong New Area Linghe Road No. 212 room 210 Applicant before: Daoda (Shanghai) Wind Power Investment Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160224 Address after: 226333 No. 8, the Yellow River Road, Binhai Park, Jiangsu, Nantong Patentee after: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd. Address before: Triumph Road, Qidong economic and Technological Development Zone, Jiangsu, China Patentee before: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20181102 Address after: 226000 Jianghai Road 159, Nantong economic and Technological Development Zone, Jiangsu Patentee after: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd. Address before: 226333 8 the Yellow River Road, Binhai Park, Nantong, Jiangsu Patentee before: Jiangsu Dolda Wind Power Equipment Technology Co., Ltd |
|
TR01 | Transfer of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20190716 Granted publication date: 20120328 |
|
PP01 | Preservation of patent right | ||
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20201028 Granted publication date: 20120328 |