CN101787703B - 饱和水条件下地质为砂石、卵石层的沉井下沉施工方法 - Google Patents
饱和水条件下地质为砂石、卵石层的沉井下沉施工方法 Download PDFInfo
- Publication number
- CN101787703B CN101787703B CN2010101275643A CN201010127564A CN101787703B CN 101787703 B CN101787703 B CN 101787703B CN 2010101275643 A CN2010101275643 A CN 2010101275643A CN 201010127564 A CN201010127564 A CN 201010127564A CN 101787703 B CN101787703 B CN 101787703B
- Authority
- CN
- China
- Prior art keywords
- sinking
- open caisson
- excavation
- gravel
- center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明涉及沉井下沉施工方法,尤其涉及一种饱和水条件下地质为砂石、卵石层的沉井下沉施工方法,该方法是沉井结构下沉至饱和水条件下且地质为砂石、卵石层时,采用挖砂船对其中心处下部进行挖方,根据沉井下沉情况在逐渐向四周开挖,同时沉井外侧两台吊车配合吊出土方。施工过程中挖砂船顺时针移动,调整挖掘位置,保证沉井内部对称、均匀挖方,以破坏卵石层的内摩擦角度,使韧角处均匀向中心塌陷,沉井自重下沉。本发明效果是:在饱和水条件下且存在砂石、卵石层,挖砂船使用上更加灵活方便,效率高于抓斗且成本低。此法可用于类似地质条件下的结构施工中。
Description
技术领域
本发明涉及沉井下沉施工方法,尤其涉及一种饱和水条件下地质为砂石、卵石层的沉井下沉施工方法。
背景技术
目前,沉井下沉到饱和水条件下且地质情况为砂石、卵石层,多采用长臂抓斗或液压抓斗施工。长臂抓斗受沉井池壁影响大,施工过程中根据沉井下沉情况,设备需不断移动位置,来满足沉井均匀平稳下沉,沉井周围需有足够的场地,且抓斗操作不灵活对沉井纠偏不利,挖方量一般为抓斗容积1/5-2/5,施工效率低。
发明内容
本发明目的旨在解决现有沉井下沉施工方法存在的上述问题,而提供一种采用挖砂船施工的饱和水条件下地质为砂石、卵石层的沉井下沉施工方法。
本发明采用的技术方案是:一种饱和水条件下地质为砂石、卵石层的沉井下沉施工方法,按如下步骤进行:
a、将挖砂船吊入沉井内,同时沉井外侧使用两台吊车配合施工;
b、调整挖砂船至沉井中心位置,将船体定位绳索固定在池壁对拉螺栓杆上;
c、操作挖斗控制轨道,使轨道前端锚杆锚入沉井中心处下部土方开挖处;
d、开动挖砂设备,再次调整前端定位绳索,保证挖砂船位置不动;
e、由沉井中心处下部进行挖方,根据沉井下沉情况再逐渐向四周开挖;
f、根据每个挖斗挖方量,不断调整挖斗控制轨道,待吊斗满后由吊车吊出沉井;
g、根据沉井下沉情况,挖砂船按照顺时针移动,保证沉井内部对称、均匀挖方,以破坏卵石层的内摩擦角度,使韧角处均匀向中心塌陷,保证沉井自重均匀下沉。
与现有技术相比,本发明的有益效果是:在饱和水条件下且存在砂石、卵石层,挖砂船使用上更加灵活方便,效率高于抓斗且成本低。此法可用于类似地质条件下的结构施工中。
附图说明
图1是饱和水条件下不排水挖砂船施工平面示意图。
图2是饱和水条件下不排水挖砂船施工剖面示意图。
图中:沉井1;吊车2;挖砂船3;定位绳索4;挖斗控制轨道5;土方开挖处6;吊斗7。
具体实施方式
以下结合附图及实施例详述本发明。
如图1、图2所示,本发明所述饱和水条件下地质为砂石、卵石层的沉井下沉施工方法,具体操作步骤如下:
1、挖砂船3吊入沉井1内,同时沉井1外侧使用两台吊车2配合施工;
2、调整挖砂船3位置,将船体定位绳索4固定在池壁对拉螺栓杆上;
3、操作挖斗控制轨道5,使轨道前端锚杆锚入沉井1中心处下部土方开挖处6;
4、开动挖砂设备,再次调整前端定位绳索4,保证挖砂船3位置不动;
5、由沉井1中心处下部进行挖方,根据沉井1下沉情况再逐渐向四周开挖;
6、根据每个挖斗挖方量,不断调整挖斗控制轨道5,待吊斗7满后由吊车2吊出沉井1;
7、根据沉井1下沉情况,挖砂船3按照顺时针移动,保证沉井1内部对称、均匀挖方,以破坏卵石层的内摩擦角度,使韧角处均匀向中心塌陷,保证沉井1自重均匀下沉。
Claims (1)
1.一种饱和水条件下地质为砂石、卵石层的沉井下沉施工方法,按如下步骤进行:
a、将挖砂船吊入沉井内,同时沉井外侧使用两台吊车配合施工;
b、调整挖砂船至沉井中心位置,将船体定位绳索固定在沉井池壁对拉螺栓杆上;
c、操作挖砂船挖斗控制轨道,使轨道前端锚杆锚入沉井中心处下部土方开挖处;
d、开动挖砂设备,再次调整前端定位绳索,保证挖砂船位置不动;
e、由沉井中心处下部进行挖方,根据沉井下沉情况再逐渐向四周开挖;
f、根据每个挖斗挖方量,不断调整挖斗控制轨道,待吊斗满后由吊车吊出沉井;
g、根据沉井下沉情况,挖砂船按照顺时针移动,保证沉井内部对称、均匀挖方,以破坏卵石层的内摩擦角度,使韧角处均匀向中心塌陷,保证沉井自重均匀下沉。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101275643A CN101787703B (zh) | 2010-03-17 | 2010-03-17 | 饱和水条件下地质为砂石、卵石层的沉井下沉施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101275643A CN101787703B (zh) | 2010-03-17 | 2010-03-17 | 饱和水条件下地质为砂石、卵石层的沉井下沉施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101787703A CN101787703A (zh) | 2010-07-28 |
CN101787703B true CN101787703B (zh) | 2011-06-15 |
Family
ID=42531070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101275643A Active CN101787703B (zh) | 2010-03-17 | 2010-03-17 | 饱和水条件下地质为砂石、卵石层的沉井下沉施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101787703B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485358B (zh) * | 2013-08-28 | 2016-02-24 | 中建七局第二建筑有限公司 | 地下结构降水沉井的构筑方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1245559C (zh) * | 2003-04-09 | 2006-03-15 | 王民寿 | 快速沉井的井架结构装置及其成井施工方法 |
JP2006070469A (ja) * | 2004-08-31 | 2006-03-16 | Kato Construction Co Ltd | 井筒工法 |
CN101418573B (zh) * | 2008-01-24 | 2012-09-05 | 丁慈鑫 | 沉井结构及将沉井结构平稳准确沉入地面的方法 |
CN100585095C (zh) * | 2008-05-13 | 2010-01-27 | 交通部广州打捞局 | 在水下进行钢沉井的定位下沉方法 |
CN101666097B (zh) * | 2009-08-04 | 2011-10-26 | 中交第二航务工程局有限公司 | 大型钢吊箱定位方法 |
-
2010
- 2010-03-17 CN CN2010101275643A patent/CN101787703B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101787703A (zh) | 2010-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210562236U (zh) | 水下坚硬岩层破碎取土系统 | |
CN206721958U (zh) | 一种大直径全自动沉井挖掘系统 | |
CN106759442A (zh) | 一种单桩高位承台与锚索塔吊基础结构及其施工方法 | |
CN102644290A (zh) | 一种适用于浅海地区深淤泥层桥梁施工的钢围堰施工工法 | |
CN111058458A (zh) | 基于绞吸式地连墙局部替代排桩支护的施工方法及结构 | |
CN203066134U (zh) | 一种挖泥船的同步挖泥装置 | |
CN102888847B (zh) | 电梯井局部深基坑免降水施工方法 | |
CN109797759A (zh) | 一种海上岩面仿生套箱围堰及其施工方法 | |
CN207176723U (zh) | 一种海上风电嵌岩单桩及其施工系统 | |
CN104711991A (zh) | 一种临近基坑边坡的地基及其加固方法 | |
CN103758132B (zh) | 一种结合放坡的悬臂排桩支护结构的施工工艺 | |
CN209923935U (zh) | 一种上软下硬地层中同位组合桩墙支护结构 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN203654309U (zh) | 一种桩箱水工结构物 | |
CN101787703B (zh) | 饱和水条件下地质为砂石、卵石层的沉井下沉施工方法 | |
CN102767187A (zh) | 卵石地基漩流井逆作施工方法 | |
CN114960715B (zh) | 地下工程突涌处理装置及控制方法 | |
CN108118728B (zh) | 异形深基坑高效挖土装置及挖土方法 | |
CN113356179B (zh) | 一种水工构筑物地基的处理方法 | |
CN217325391U (zh) | 一种临高铁线路深基坑咬合桩的施工工装 | |
CN207143965U (zh) | 钢板混凝土组合式抗浮止水结构 | |
CN202430762U (zh) | 振动液压挖掘斗 | |
CN206157758U (zh) | 一种可拖航的桁架‑重力式组合的海上风机基础结构 | |
CN114482070A (zh) | 一种临高铁线路深基坑咬合桩的施工工装及其施工方法 | |
CN210031871U (zh) | 一种不良地质便携式反滤装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |