CN101781702A - Process for heat treatment of tube body of drill rod - Google Patents

Process for heat treatment of tube body of drill rod Download PDF

Info

Publication number
CN101781702A
CN101781702A CN 201010124652 CN201010124652A CN101781702A CN 101781702 A CN101781702 A CN 101781702A CN 201010124652 CN201010124652 CN 201010124652 CN 201010124652 A CN201010124652 A CN 201010124652A CN 101781702 A CN101781702 A CN 101781702A
Authority
CN
China
Prior art keywords
drill pipe
pipe body
tempering
heat treatment
drill rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010124652
Other languages
Chinese (zh)
Other versions
CN101781702B (en
Inventor
钱强
刘聪
姜荣凯
周秋芬
刘荣
王青林
王建民
李竹滨
张树田
伍国巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HG (HEBEI) PETROLEUM SPECIAL TUBE CO Ltd
CNPC Bohai Equipment Manufacturing Co Ltd
Original Assignee
HG (HEBEI) PETROLEUM SPECIAL TUBE CO Ltd
CNPC Bohai Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HG (HEBEI) PETROLEUM SPECIAL TUBE CO Ltd, CNPC Bohai Equipment Manufacturing Co Ltd filed Critical HG (HEBEI) PETROLEUM SPECIAL TUBE CO Ltd
Priority to CN2010101246528A priority Critical patent/CN101781702B/en
Publication of CN101781702A publication Critical patent/CN101781702A/en
Application granted granted Critical
Publication of CN101781702B publication Critical patent/CN101781702B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a process for heat treatment of the tube body of a drill rod, which comprises quenching and tempering heat treatment. The process comprises the following steps with the following process parameters: (1) quenching: a, conveying the tube body of the drill rod to a stepping quenching furnace with the temperature rising to be 880-930 DEG C, and keeping the temperature for 40-60 minutes; b, taking the tube body of the drill rod out of the furnace and placing the tube body of the drill rod into quenching solution with the temperature being 10-30 DEG C within 15 seconds, wherein the quenching time is no less than 30 seconds; and (2) tempering: conveying the tube body of the drill rod to a stepping tempering furnace with the temperature rising to be 560-590 DEG C, keeping the temperature for 60-85 minutes, taking the tube body of the drill rod out of the furnace, and naturally cooling the tube body of the drill rod to the room temperature. When the invention is applied, the impact performance of the drill rod is good and is 30 percent above the V150 steel grade standard; the strength, elongation rate and other mechanical indicators of the tube body of the drill rod after heat treatment meet the V150 steel grade requirements, and the qualification rate is higher than 98 percent; and the operating steps and process parameters of the heat treatment of the invention are reasonable.

Description

The thermal treatment process of drill pipe body
Technical field
The present invention relates to a kind of thermal treatment process of body, especially a kind of manufacturing has quenching, the tempering process than the drill pipe body of high-mechanical property, makes it can reach the standard of V150 grade of steel.
Background technology
Oil drill rocker is the main tool of oil drilling, comprises the drill pipe sub at drill pipe body and drill pipe body two ends in the structure.In the exploitation and extractive process of oil gas, require drill pipe body must be able to bear huge interior external pressure, distortion, bending and vibration.
Along with the continuous development of petroleum industry, increasing deep-well, ultra deep well are developed, and this has just proposed more and more higher requirement to drilling rod.At present in the API series drilling rod intensity the highest be the S135 grade of steel, but along with the increase of drilling depth, also in continuous increase, the drilling rod of S135 grade of steel can't satisfy the requirement of part deep-well to the requirement of strength of drilling rod.
External drilling rod industry has proposed the standard of the new grade of steel of this drilling rod industry of V150 grade of steel.The V150 steel grade drill pipe is all had higher requirement to starting material and heat treatment capacity.Domestic disclosed thermal treatment process is difficult to reach the technical requirements of V150 steel grade drill pipe at present, and especially the tensile property of the drill pipe body after the thermal treatment can not meet the demands, and relevant thermal treatment process is not abroad appeared in the newspapers yet.
Summary of the invention
The technical problem to be solved in the present invention provides the thermal treatment process that a kind of manufacturing of reliably, being convenient to operate meets the drill pipe body of V150 grade of steel.
For solving the problems of the technologies described above, the technical solution used in the present invention comprises quenching, tempering, and the steel grades and the content that are used for thermal treatment process are, C:0.24-0.30, Cr:0.85-1.20, Mo:0.50-0.75, V:0-0.05, Si:0.10-0.40, Mn:0.60-1.00, Cu:0-0.05, S :≤0.015, P :≤0.020, surplus is Fe, unit is a mass percent, operates with processing parameter as follows:
1. quench
A, drill pipe body is transported in the stepped start-stop system quenching furnance that is warming up to 880 ℃-930 ℃, is incubated 40-60 minute,
After b, drill pipe body are come out of the stove, enter 10 ℃-30 ℃ hardening liquid in 15 seconds, the cool time is no less than 30 seconds,
2. tempering
Drill pipe body is transported in the stepped start-stop system tempering stove that is warming up to 560 ℃-590 ℃, is incubated 60-85 minute, again drill pipe body is come out of the stove, naturally cool to room temperature.
Further improve and be:
Drill pipe body after the quenching carried out tempering in four hours.
Described hardening liquid is a tap water, and the temperature of hardening liquid is regulated by cooling tower.
The drill pipe body of quenching step described in 1. carries out rotation in hardening liquid, autorotation speed is 70-100 rev/min.
1. after 2. handling no more than 200 of drill pipe body with step according to step, do the mechanicl test of 1 upset end and drill pipe body, test subject is tensile strength and ballistic work, qualified after, warehouse-in.This step is in order to strengthen quality monitoring.
Described ballistic work test underproof drill pipe body again according to step 1. and 2. quench, tempering heat treatment, quench again, the number of times of tempering heat treatment is no more than three times.
During described ballistic work stand the test, 2. the higher drill pipe body of tensile strength carries out tempering according to step again, times of tempering is no more than three times, the drill pipe body that tensile strength is on the low side again according to step 1. and 2. quench, tempering heat treatment, quench again, the tempering heat treatment number of times is no more than three times.
After adopting the present invention that the drill pipe body of above-mentioned steel grade is heat-treated, the ballistic work performance of drill pipe body is good, compares with the 54J of V150 grade of steel standard value, exceeds more than 30%; And mechanical index such as intensity of the drill pipe body after the thermal treatment, unit elongation all reaches the requirement of V150 grade of steel, filled up blank both domestic and external; The heat treatment step that the present invention is provided with is simple, and processing parameter is reasonable, handles qualification rate and reaches more than 98%.
Embodiment
Below by embodiment invention is described in further detail.
Embodiment 1
Adopt the drill pipe body of certain company, its chemical ingredients is, C:0.26, and Cr:0.98, Mo:0.64, V:0.005, Si:0.22, Mn:0.75, Cu:0.03, S:0.001, P:0.008, surplus is Fe, unit is a mass percent.Heat-treat according to the following step:
1. quench
A, drill pipe body is transported in the stepped start-stop system quenching furnance that is warming up to 910 ℃, is incubated 60 minutes;
After b, drill pipe body are come out of the stove, enter 23 ℃ hardening liquid in 15 seconds, hardening liquid is a tap water, and carry out rotation with 88 rev/mins speed, 40 seconds cool times, wherein the temperature of hardening liquid is regulated by cooling tower, and drill pipe body is for quick, uniform hardening with the given pace rotation, forms tiny, uniform grain structure.
2. tempering
Quenched 1 hour in, drill pipe body is transported in the stepped start-stop system tempering stove that is warming up to 575 ℃, be incubated 70 minutes; Again drill pipe body is come out of the stove, naturally cool to room temperature.
Through above heat treatment step, the mechanical property of drill pipe body is as follows:
Yield strength 1090MPa
Tensile strength 1180MPa
Unit elongation 22.0%
Charpy-V impact power (21 ℃) is 99J vertically.
The mechanical property of above-mentioned drill pipe body meets the technical requirements of following V150 grade of steel:
Yield strength 1034-1138MPa
Tensile strength 〉=1103MPa
Unit elongation 〉=13.0%
Charpy-V impact power (21 ℃) vertically 〉=54J.
The metallographic structure of the body after the thermal treatment process of drill pipe body of the present invention is handled, crystal grain is tiny, and evenly the upset end inside and outside wall is 10 grades, and 9 grades of inboard wall of tube body, 9.5 grades of outer walls are for the performance of aspects such as the tension of drill pipe body, antifatigue provides assurance.
According to above-mentioned steps quench, behind 100 of the tempering heat treatment drill pipe bodies, the mechanicl test of doing 1 upset end and drill pipe body is as quality monitoring, test subject is tensile strength and ballistic work.Two test-results all meet the technical requirements of V150 grade of steel, with 100 drill pipe body warehouse-ins of above-mentioned processing.
If ballistic work test underproof drill pipe body again according to step 1. and 2. quench, tempering heat treatment, quench again, the number of times of tempering heat treatment is no more than three times.
When the ballistic work stand the test, 2. the higher drill pipe body of tensile strength carries out tempering according to step again, times of tempering is no more than three times, the drill pipe body that tensile strength is on the low side again according to step 1. and 2. quench, tempering heat treatment, quench again, the tempering heat treatment number of times is no more than three times.
Embodiment 2
Adopt the drill pipe body of certain company, its chemical ingredients is: C:0.26, and Cr:0.97, Mo:0.70, V:0.004, Si:0.21, Mn:0.74, Cu:0.03, S:0.001, P:0.008, surplus is Fe, unit is a mass percent.
1. quench
A, drill pipe body is transported in the stepped start-stop system quenching furnance that is warming up to 930 ℃, is incubated 50 minutes;
Enter 30 ℃ hardening liquid in 15 seconds after b, drill pipe body are come out of the stove, hardening liquid is a water, and carries out rotation with 100 rev/mins speed, 35 seconds cool times.
2. tempering
Quenched 3 hours in, drill pipe body is transported in the stepped start-stop system tempering stove that is warming up to 590 ℃, be incubated 60 minutes; Drill pipe body is come out of the stove, air cooling is to room temperature again.
Through above heat treatment step, the mechanical property of drill pipe body is as follows:
Yield strength 1040MPa
Tensile strength 1110MPa
Unit elongation 19.0%
Charpy-V impact power (21 ℃) vertically single group 103J, 106J, 101J, average out to 103J.
The mechanical property of above-mentioned drill pipe body meets the technical requirements of following V150 grade of steel.
The metallographic structure of the body after the thermal treatment process of drill pipe body of the present invention is handled, the upset end inside and outside wall is 9.5 grades, and the body inside and outside wall is 9 grades.
After 200 of above-mentioned quenchings, tempering heat treatment drill pipe body, the mechanicl test of doing 1 upset end and drill pipe body is as quality monitoring, and test subject is tensile strength and ballistic work.Two test-results all meet the technical requirements of V150 grade of steel, with 200 drill pipe body warehouse-ins of above-mentioned processing.
Embodiment 3
Adopt the drill pipe body of certain company, its chemical ingredients is: C:0.26, and Cr:0.94, Mo:0.60, V:0.004, Si:0.22, Mn:0.75, Cu:0.03, S:0.001, P:0.008, all the other are Fe,
Unit is a mass percent.
1. quench
A, drill pipe body is transported in the stepped start-stop system quenching furnance that is warming up to 880 ℃, is incubated 40 minutes;
Enter 12 ℃ hardening liquid in 15 seconds after b, drill pipe body are come out of the stove, hardening liquid is a tap water, and carries out rotation with 70 rev/mins speed, 60 seconds cool times.
2. tempering
Quenched 4 hours in, drill pipe body is transported in the stepped start-stop system tempering stove that is warming up to 560 ℃, be incubated 85 minutes; Drill pipe body is come out of the stove, air cooling is to room temperature again.
Through above heat treatment step, the mechanical property of drill pipe body is as follows:
Yield strength 1060MPa
Tensile strength 1130MPa
Unit elongation 22.0%
Charpy-V impact power (21 ℃) vertically single group 107J, 108J, 120J, average out to 112J.
The mechanical property of above-mentioned drill pipe body meets the technical requirements of following V150 grade of steel.
The metallographic structure of the body after the thermal treatment process of drill pipe body of the present invention is handled, the upset end inside and outside wall is 9.5 grades, and the body inside and outside wall is 9 grades.

Claims (7)

1. the thermal treatment process of a drill pipe body comprises quenching, tempering, and the steel grades and the content that are used for thermal treatment process are, C:0.24-0.30, Cr:0.85-1.20, Mo:0.50-0.75, V:0-0.05, Si:0.10-0.40, Mn:0.60-1.00, Cu:0-0.05, S :≤0.015, P :≤0.020, surplus is Fe, unit is a mass percent, it is characterized in that, operates with processing parameter as follows:
1. quench
A, drill pipe body is transported in the stepped start-stop system quenching furnance that is warming up to 880 ℃-930 ℃, is incubated 40-60 minute,
After b, drill pipe body are come out of the stove, enter 10 ℃-30 ℃ hardening liquid in 15 seconds, the cool time is no less than 30 seconds,
2. tempering
Drill pipe body is transported in the stepped start-stop system tempering stove that is warming up to 560 ℃-590 ℃, is incubated 60-85 minute, again drill pipe body is come out of the stove, naturally cool to room temperature.
2. the thermal treatment process of drill pipe body according to claim 1, the drill pipe body after it is characterized in that quenching carried out tempering in four hours.
3. the thermal treatment process of drill pipe body according to claim 1 is characterized in that described hardening liquid is a tap water, and the temperature of hardening liquid is regulated by cooling tower.
4. the thermal treatment process of drill pipe body according to claim 1, the drill pipe body of step described in 1. that it is characterized in that quenching carries out rotation in hardening liquid, and autorotation speed is 70-100 rev/min.
5. the thermal treatment process of drill pipe body according to claim 1, after it is characterized in that 1. 2. handling no more than 200 of drill pipe body with step according to step, do the mechanicl test of 1 upset end and drill pipe body, test subject is tensile strength and ballistic work, after qualified, warehouse-in.
6. the thermal treatment process of drill pipe body according to claim 5, it is characterized in that described ballistic work test underproof drill pipe body again according to step 1. and 2. quench, tempering heat treatment, quench again, the number of times of tempering heat treatment is no more than three times.
7. the thermal treatment process of drill pipe body according to claim 5, when it is characterized in that described ballistic work stand the test, 2. the higher drill pipe body of tensile strength carries out tempering according to step again, times of tempering is no more than three times, the drill pipe body that tensile strength is on the low side again according to step 1. and 2. quench, tempering heat treatment, quench again, the tempering heat treatment number of times is no more than three times.
CN2010101246528A 2010-03-16 2010-03-16 Process for heat treatment of tube body of drill rod Expired - Fee Related CN101781702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101246528A CN101781702B (en) 2010-03-16 2010-03-16 Process for heat treatment of tube body of drill rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101246528A CN101781702B (en) 2010-03-16 2010-03-16 Process for heat treatment of tube body of drill rod

Publications (2)

Publication Number Publication Date
CN101781702A true CN101781702A (en) 2010-07-21
CN101781702B CN101781702B (en) 2012-05-02

Family

ID=42521855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101246528A Expired - Fee Related CN101781702B (en) 2010-03-16 2010-03-16 Process for heat treatment of tube body of drill rod

Country Status (1)

Country Link
CN (1) CN101781702B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102399970A (en) * 2011-11-18 2012-04-04 中国石油集团渤海石油装备制造有限公司 Heat treatment method for V150 steel grade drill rod welded seam
CN103266217A (en) * 2013-05-10 2013-08-28 中国石油天然气集团公司 Reinforcing thermal treatment technology for pipe end of petroleum steel pipe in quenching and tempering condition
CN103266216A (en) * 2013-05-10 2013-08-28 中国石油天然气集团公司 Strength mismatching heat treatment process for petroleum steel tube in hardened and tempered state
CN103320697A (en) * 2013-06-17 2013-09-25 中国石油集团渤海石油装备制造有限公司 Drill rod pipe body applied to ultra-deep well working condition and manufacturing method thereof
CN103898304A (en) * 2014-03-25 2014-07-02 江苏和信石油机械有限公司 Heat treatment process of novel drill pipe body for mine exploration
CN107151761A (en) * 2016-10-28 2017-09-12 中国石油集团渤海石油装备制造有限公司 A kind of high toughness petroleum drilling rod and its manufacture method
CN107604258A (en) * 2017-08-09 2018-01-19 包头钢铁(集团)有限责任公司 Drill pipe body seamless steel pipe and its production method
CN109702443A (en) * 2019-01-03 2019-05-03 六安煜晟电子科技有限公司 A kind of production technology of anti-oxidant pcb board drill point steel handle
JP2020117790A (en) * 2019-01-25 2020-08-06 古河ロックドリル株式会社 Drill tool and method of manufacturing the same
CN112226694A (en) * 2020-10-12 2021-01-15 江阴雷特斯钻具有限公司 Trenchless drill rod and heat treatment process thereof
CN112280963A (en) * 2020-10-27 2021-01-29 山东威玛装备科技股份有限公司 Heat treatment method for ultrahigh-strength drill pipe body

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003166037A (en) * 2001-11-28 2003-06-13 Japan Marine Sci & Technol Center Drill pipe and manufacturing method therefor
CN1603429A (en) * 2004-11-01 2005-04-06 江苏曙光石油钻具有限公司 Heat treatment process for petroleum drill rod joint
CN1619005A (en) * 2003-11-21 2005-05-25 天津钢管有限责任公司 Deep well, ultra deep well petroleum sleev in petroleum natural extraction gas and its production method
CN101581200A (en) * 2009-05-31 2009-11-18 盘锦辽河油田派普钻具制造有限公司 120 steel grade drill pipe and manufacturing process method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003166037A (en) * 2001-11-28 2003-06-13 Japan Marine Sci & Technol Center Drill pipe and manufacturing method therefor
CN1619005A (en) * 2003-11-21 2005-05-25 天津钢管有限责任公司 Deep well, ultra deep well petroleum sleev in petroleum natural extraction gas and its production method
CN1603429A (en) * 2004-11-01 2005-04-06 江苏曙光石油钻具有限公司 Heat treatment process for petroleum drill rod joint
CN101581200A (en) * 2009-05-31 2009-11-18 盘锦辽河油田派普钻具制造有限公司 120 steel grade drill pipe and manufacturing process method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《金属材料与冶金工程》 20070331 曹建军等 26CrMoNbTiB(S135) 钻杆管热处理工艺的研究 28-32 1-7 第35卷, 第2期 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102399970A (en) * 2011-11-18 2012-04-04 中国石油集团渤海石油装备制造有限公司 Heat treatment method for V150 steel grade drill rod welded seam
CN102399970B (en) * 2011-11-18 2014-02-05 中国石油集团渤海石油装备制造有限公司 Heat treatment method for V150 steel grade drill rod welded seam
CN103266216B (en) * 2013-05-10 2015-01-21 中国石油天然气集团公司 Strength mismatching heat treatment process for petroleum steel tube in hardened and tempered state
CN103266217A (en) * 2013-05-10 2013-08-28 中国石油天然气集团公司 Reinforcing thermal treatment technology for pipe end of petroleum steel pipe in quenching and tempering condition
CN103266216A (en) * 2013-05-10 2013-08-28 中国石油天然气集团公司 Strength mismatching heat treatment process for petroleum steel tube in hardened and tempered state
CN103266217B (en) * 2013-05-10 2015-01-21 中国石油天然气集团公司 Reinforcing thermal treatment technology for pipe end of petroleum steel pipe in quenching and tempering condition
CN103320697B (en) * 2013-06-17 2015-11-18 中国石油集团渤海石油装备制造有限公司 A kind of drill pipe body and manufacture method thereof being applied to ultra deep well operating mode
CN103320697A (en) * 2013-06-17 2013-09-25 中国石油集团渤海石油装备制造有限公司 Drill rod pipe body applied to ultra-deep well working condition and manufacturing method thereof
CN103898304A (en) * 2014-03-25 2014-07-02 江苏和信石油机械有限公司 Heat treatment process of novel drill pipe body for mine exploration
CN103898304B (en) * 2014-03-25 2016-08-17 江苏和信石油机械有限公司 The Technology for Heating Processing of Prospection drill rod body
CN107151761A (en) * 2016-10-28 2017-09-12 中国石油集团渤海石油装备制造有限公司 A kind of high toughness petroleum drilling rod and its manufacture method
CN107604258A (en) * 2017-08-09 2018-01-19 包头钢铁(集团)有限责任公司 Drill pipe body seamless steel pipe and its production method
CN109702443A (en) * 2019-01-03 2019-05-03 六安煜晟电子科技有限公司 A kind of production technology of anti-oxidant pcb board drill point steel handle
JP2020117790A (en) * 2019-01-25 2020-08-06 古河ロックドリル株式会社 Drill tool and method of manufacturing the same
CN112226694A (en) * 2020-10-12 2021-01-15 江阴雷特斯钻具有限公司 Trenchless drill rod and heat treatment process thereof
CN112280963A (en) * 2020-10-27 2021-01-29 山东威玛装备科技股份有限公司 Heat treatment method for ultrahigh-strength drill pipe body

Also Published As

Publication number Publication date
CN101781702B (en) 2012-05-02

Similar Documents

Publication Publication Date Title
CN101781702B (en) Process for heat treatment of tube body of drill rod
CN105112774B (en) The air-cooled hardening spring steel of the low middle carbon microalloy of high-strength tenacity and its shaping and Technology for Heating Processing
CN103305672B (en) Heat treatment process for ultra-large type tube plate forge piece of pressure container
CN101413088B (en) Sulfurated hydrogen stress etching-resisting petroleum casing pipe and manufacturing method thereof
CN101660036B (en) Heat treating method of high strength and high ductility steel tube
CN101956055A (en) Heat treatment method of large-diameter thick-walled heat-resistant steel pipe
CN109536691A (en) A kind of preparation method of low-temperature impact-resistant CrMo alloy steel forging circle
CN103305777A (en) Large-caliber extra-thick-walled seamless steel pipe and manufacturing method thereof
CN103397293A (en) Carburization process for heavy machinery part
CN102796965A (en) Rolling mill support roll steel and heat treatment technology thereof
CN102337387A (en) Heat treatment process of sulfur-resistant petroleum drill rod joint
CN102409241A (en) Steel for oil casing pipe, oil casing pipe and manufacturing methods thereof
CN107245555A (en) Improve the double tempering method of 30CrNi2MoV steel forgings low-temperature impact toughness
CN105714081A (en) Heat treatment process for drill pipe bodies
CN107297450B (en) A kind of upset method of high-strength tenacity titanium alloy drilling rod material
CN106119511B (en) 9Cr2Mo smoothing roll heat treatment methods based on exhaust quenching technical
CN110055470B (en) Container corner fitting and heat treatment process thereof
CN105483528B (en) The shale gas anti-H of 80ksi2S corrodes casing steel and its manufacture method
CN112941279A (en) Heat treatment process for improving hardenability hardness of 20MnCr5+ HH steel tail end
CN106755902A (en) The Technology for Heating Processing of drill pipe body
CN107685129B (en) A kind of forging preparation method of heavy type electric arbor
CN111154954A (en) Heat treatment method of rare earth-containing high-strength high-toughness seamless steel tube for deep well shale gas
CN111979498B (en) Sulfide stress corrosion resistant oil sleeve material and preparation method thereof
CN106755903A (en) The Technology for Heating Processing of drill pipe body
CN105755252A (en) Process for heat treatment of tube body of drilling rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120502

Termination date: 20180316