CN105714081A - Heat treatment process for drill pipe bodies - Google Patents

Heat treatment process for drill pipe bodies Download PDF

Info

Publication number
CN105714081A
CN105714081A CN201410740342.7A CN201410740342A CN105714081A CN 105714081 A CN105714081 A CN 105714081A CN 201410740342 A CN201410740342 A CN 201410740342A CN 105714081 A CN105714081 A CN 105714081A
Authority
CN
China
Prior art keywords
drill pipe
pipe body
quenching
pipe bodies
heat treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410740342.7A
Other languages
Chinese (zh)
Inventor
秦海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO TAIWEI MACHINE TOOL CO Ltd
Original Assignee
QINGDAO TAIWEI MACHINE TOOL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO TAIWEI MACHINE TOOL CO Ltd filed Critical QINGDAO TAIWEI MACHINE TOOL CO Ltd
Priority to CN201410740342.7A priority Critical patent/CN105714081A/en
Publication of CN105714081A publication Critical patent/CN105714081A/en
Pending legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a heat treatment process for drill pipe bodies. The heat treatment process for the drill pipe bodies involves quenching and tempering heat treatment operated according to the steps and technological parameters as follows: (1), quenching is conducted, specifically, a, the drill pipe bodies are conveyed into a walking-beam quenching furnace heated to 880-930 DEG C, and heat preservation is conducted for 40-60 minutes; and b, after being discharged out of the furnace, the drill pipe bodies enter quenching liquid at the temperature of 10-30 DEG C within 15 seconds, and the quenching time is not shorter than 30 seconds; and (2) tempering is conducted, specifically, the drill pipe bodies are conveyed into a walking-beam tempering furnace heated to 560-590 DEG C, heat preservation is conducted for 60-85 minutes, and then the drill pipe bodies are discharged out of the furnace and naturally cooled to the room temperature. By the adoption of the heat treatment process for the drill pipe bodies, the impact performance of drill pipes is good and is 30% or above higher than the standard value of the V150 steel grade; the strength, elongation percentage and other mechanical properties of the drill pipe bodies subjected to heat treatment meet the requirements of the V150 steel grade, and the percent of pass of the drill pipe bodies reaches 98% or above; and in addition, the operation steps and technological parameters for heat treatment are reasonable.

Description

The Technology for Heating Processing of drill pipe body
Technical field
The present invention relates to the Technology for Heating Processing of a kind of body, especially a kind of manufacture has the relatively quenching of the drill pipe body of high-mechanical property, tempering process so that it is can reach the standard of V150 grade of steel.
Background technology
Oil drill rocker is the main tool of oil drilling, and structure includes drill pipe body and the tool joint at drill pipe body two ends.In the exploitation and extractive process of oil gas, it is desirable to drill pipe body allows for bearing huge interior external pressure, distortion, bending and vibration.
Along with the development of petroleum industry, increasing deep-well, ultradeep well are developed, and drilling rod is just proposed increasingly higher requirement by this.What in current API series drilling rod, intensity was the highest is S135 grade of steel, but along with the increase of drilling depth, the requirement of strength of drilling rod is also being continuously increased, and the drilling rod of S135 grade of steel cannot meet the requirement of part deep-well.
External drilling rod industry proposes the standard of this new grade of steel of drilling rod industry of V150 grade of steel.Raw material and heat treatment capacity are all had higher requirement by V150 steel grade drill pipe.Current domestic disclosed Technology for Heating Processing, is extremely difficult to the technology requirement of V150 steel grade drill pipe, and especially the tensile property of the drill pipe body after heat treatment can not meet requirement, and relevant Technology for Heating Processing abroad also has no report.
Summary of the invention
The technical problem to be solved in the present invention is to provide the Technology for Heating Processing that a kind of manufacture reliable, that be easy to operate meets the drill pipe body of V150 grade of steel.
For solving above-mentioned technical problem, the technical solution used in the present invention includes quenching, tempering, and steel grades and content for Technology for Heating Processing are, C:0.24-0.30, Cr:0.85-1.20, Mo:0.50-0.75, V:0-0.05, Si:0.10-0.40, Mn:0.60-1.00, Cu:0-0.05, S :≤0.015, P :≤0.020, surplus is Fe, unit is mass percent, is operated with technological parameter as follows:
1. quench
A, drill pipe body is transported in the step-by-step movement glowing furnace being warming up to 880 DEG C-930 DEG C, is incubated 40-60 minute,
After b, drill pipe body are come out of the stove, entering the quenching liquid of 10 DEG C-30 DEG C in 15 seconds, the cool time was no less than 30 seconds;
2. tempering
Drill pipe body is transported in the step-by-step movement tempering furnace being warming up to 560 DEG C-590 DEG C, is incubated 60-85 minute, then drill pipe body is come out of the stove, naturally cool to room temperature.
Further it is improved by:
Drill pipe body after quenching carried out tempering in four hours.
Described quenching liquid is tap water, and the temperature of quenching liquid is regulated by cooling tower.
Quenching Step 1. described in drill pipe body in quenching liquid, carry out rotation, autorotation speed is 70-100 rev/min.
1. after 2. processing no more than 200 of drill pipe body with step according to step, doing the mechanical test of 1 upset end and drill pipe body, pilot project is tensile strength and ballistic work, after qualified, and warehouse-in.This step is to strengthen quality monitoring.Described ballistic work test underproof drill pipe body again according to step 1. and 2. carry out quenching, tempering heat treatment, quenching again, tempering heat treatment number of times less than three times.
During described ballistic work pass the test, 2. the higher drill pipe body of tensile strength carries out tempering again according to step, times of tempering is less than three times, the drill pipe body of low cross-intensity again according to step 1. and 2. carry out quenching, tempering heat treatment, quenching again, tempering heat treatment number of times are less than three times.
After adopting the present invention that the drill pipe body of above-mentioned steel grade is carried out heat treatment, the ballistic work performance of drill pipe body is good, compared with the 54J of V150 grade of steel standard value, beyond more than 30%;And the mechanical index such as the intensity of the drill pipe body after heat treatment, elongation percentage all reach the requirement of V150 grade of steel, have filled up blank both domestic and external;The heat treatment step that the present invention is arranged is simple, and technological parameter is reasonable, processes qualification rate and reaches more than 98%.
Detailed description of the invention
Below by detailed description of the invention, invention is described in further detail.
Adopting the drill pipe body of certain company, its chemical composition is, C:0.26, Cr:0.98, Mo:0.64, V:0.005, Si:0.22, Mn:0.75, Cu:0.03, S:0.001, P:0.008, and surplus is Fe, and unit is mass percent.Heat treatment is carried out according to the following step:
1. quench
A, drill pipe body is transported in the step-by-step movement glowing furnace being warming up to 910 DEG C, is incubated 60 minutes;
After b, drill pipe body are come out of the stove, the quenching liquid of 23 DEG C is entered in 15 seconds, quenching liquid is tap water, and carry out rotation with the speed of 88 revs/min, 40 seconds cool times, wherein the temperature of quenching liquid is regulated by cooling tower, and drill pipe body is for quick, uniform hardening with given pace rotation, forms grain structure tiny, uniform.
2. tempering
In quenching 1 hour, drill pipe body is transported in the step-by-step movement tempering furnace being warming up to 575 DEG C, is incubated 70 minutes;Again drill pipe body is come out of the stove, naturally cool to room temperature.Through above heat treatment step, the mechanical performance of drill pipe body is as follows:
Yield strength 1090MPa
Tensile strength 1180MPa
Elongation percentage 22.0%
The longitudinal 99J of Charpy-V impact power (21 DEG C).
The mechanical performance of above-mentioned drill pipe body meets following V150 grade of steel technology and requires:
Yield strength 1034-1138MPa
Tensile strength >=1103MPa
Elongation percentage >=13.0%
Charpy-V impact power (21 DEG C) longitudinal direction >=54J.
The metallographic structure of the body after the Technology for Heating Processing of the drill pipe body of the present invention processes, uniform small grains, upset end inside and outside wall is 10 grades, and inboard wall of tube body 9 grades, outer wall 9.5 grades, the performance for aspects such as the tension of drill pipe body, resisting fatigue provides guarantee.
After above-mentioned steps quenching, tempering heat treatment drill pipe body 100, doing the mechanical test of 1 upset end and drill pipe body as quality monitoring, pilot project is tensile strength and ballistic work.Two result of the tests all meet the technology requirement of V150 grade of steel, are put in storage by the 100 of above-mentioned process drill pipe bodies.
If ballistic work test underproof drill pipe body again according to step 1. and 2. carry out quenching, tempering heat treatment, quenching again, tempering heat treatment number of times less than three times.
When ballistic work pass the test, 2. the higher drill pipe body of tensile strength carries out tempering again according to step, times of tempering less than three times, the drill pipe body of low cross-intensity again according to step 1. and 2. carry out quenching, tempering heat treatment, quenching again, tempering heat treatment number of times are less than three times.

Claims (3)

1. a Technology for Heating Processing for drill pipe body, including quenching, tempering, steel grades and content for Technology for Heating Processing are, C:0.24-0.30, Cr:0.85-1.20, Mo:0.50-0.75, V:0-0.05, Si:0.10-0.40, Mn:0.60-1.00, Cu:0-0.05, S :≤0.015, P :≤0.020, surplus is Fe, unit is mass percent, it is characterised in that be operated with technological parameter as follows:
1. quench
A, drill pipe body is transported in the step-by-step movement glowing furnace being warming up to 880 DEG C-930 DEG C, it is incubated 40-60 minute, after b, drill pipe body are come out of the stove, entering the quenching liquid of 10 DEG C-30 DEG C in 15 seconds, the cool time, described drill pipe body carried out rotation in quenching liquid no less than 30 seconds, autorotation speed is 70-100 rev/min, described quenching liquid is tap water, and the temperature of quenching liquid is regulated by cooling tower
2. tempering
Drill pipe body is transported in the step-by-step movement tempering furnace being warming up to 560 DEG C-590 DEG C, is incubated 60-85 minute, then drill pipe body is come out of the stove, naturally cool to room temperature.
2. the Technology for Heating Processing of drill pipe body according to claim 1, it is characterised in that the drill pipe body after quenching carried out tempering in four hours.
3. the Technology for Heating Processing of drill pipe body according to claim 1, it is characterized in that, after 1. 2. processing no more than 200 of drill pipe body with step according to step, do the mechanical test of 1 upset end and drill pipe body, pilot project is tensile strength and ballistic work, warehousing after passing.
CN201410740342.7A 2014-12-05 2014-12-05 Heat treatment process for drill pipe bodies Pending CN105714081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410740342.7A CN105714081A (en) 2014-12-05 2014-12-05 Heat treatment process for drill pipe bodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410740342.7A CN105714081A (en) 2014-12-05 2014-12-05 Heat treatment process for drill pipe bodies

Publications (1)

Publication Number Publication Date
CN105714081A true CN105714081A (en) 2016-06-29

Family

ID=56144516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410740342.7A Pending CN105714081A (en) 2014-12-05 2014-12-05 Heat treatment process for drill pipe bodies

Country Status (1)

Country Link
CN (1) CN105714081A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106319353A (en) * 2016-09-26 2017-01-11 山西风雷钻具有限公司 Geological drill rod and manufacturing method thereof
CN107151761A (en) * 2016-10-28 2017-09-12 中国石油集团渤海石油装备制造有限公司 A kind of high toughness petroleum drilling rod and its manufacture method
CN107604258A (en) * 2017-08-09 2018-01-19 包头钢铁(集团)有限责任公司 Drill pipe body seamless steel pipe and its production method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106319353A (en) * 2016-09-26 2017-01-11 山西风雷钻具有限公司 Geological drill rod and manufacturing method thereof
CN106319353B (en) * 2016-09-26 2019-02-01 山西风雷钻具有限公司 Geologic drilling rod and its manufacturing method
CN107151761A (en) * 2016-10-28 2017-09-12 中国石油集团渤海石油装备制造有限公司 A kind of high toughness petroleum drilling rod and its manufacture method
CN107604258A (en) * 2017-08-09 2018-01-19 包头钢铁(集团)有限责任公司 Drill pipe body seamless steel pipe and its production method

Similar Documents

Publication Publication Date Title
CN101781702B (en) Process for heat treatment of tube body of drill rod
CN109261869B (en) Forging and heat treatment process of conversion flange forging
CN109622836B (en) Forging and heat treatment process of shell forging
US9340847B2 (en) Methods of manufacturing steel tubes for drilling rods with improved mechanical properties, and rods made by the same
CN101899624A (en) High-carbon low-alloy large size wearable forged mining steel ball and manufacture method thereof
CN101831595B (en) Rapid cooling thermal treatment method of 21/4Cr-1Mo-1/4V steel forging and automatic temperature-control inflation three-dimensional circulating water
CN105886710B (en) A kind of R6 grades of mooring cable Technology for Heating Processing
CN101660036B (en) Heat treating method of high strength and high ductility steel tube
CN109536691A (en) A kind of preparation method of low-temperature impact-resistant CrMo alloy steel forging circle
CN106319353A (en) Geological drill rod and manufacturing method thereof
CN101608282A (en) Anti--40 ℃~-60 ℃ low temperature drill rod material steel pipes and manufacture method thereof
CN103305777A (en) Large-caliber extra-thick-walled seamless steel pipe and manufacturing method thereof
CN105714081A (en) Heat treatment process for drill pipe bodies
CN102399970B (en) Heat treatment method for V150 steel grade drill rod welded seam
CN102409241A (en) Steel for oil casing pipe, oil casing pipe and manufacturing methods thereof
CN104988407B (en) Oil drilling sulfur resistant drill pipe and preparation method thereof
CN109161788B (en) High-temperature-resistant petroleum casing pipe for thermal recovery well of hot steam injection thickened oil and manufacturing method thereof
CN107151761A (en) A kind of high toughness petroleum drilling rod and its manufacture method
CN106755902A (en) The Technology for Heating Processing of drill pipe body
CN105483528B (en) The shale gas anti-H of 80ksi2S corrodes casing steel and its manufacture method
CN109182896B (en) 175MPa movable elbow material and heat treatment process
CN104562050B (en) A kind of preparation method of heavy-duty gear
CN105755252A (en) Process for heat treatment of tube body of drilling rod
CN106755903A (en) The Technology for Heating Processing of drill pipe body
CN106801197A (en) The Technology for Heating Processing of drill pipe body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160629