CN101769688B - Colored metallurgical industrial furnace decoking technology method - Google Patents

Colored metallurgical industrial furnace decoking technology method Download PDF

Info

Publication number
CN101769688B
CN101769688B CN2009100604161A CN200910060416A CN101769688B CN 101769688 B CN101769688 B CN 101769688B CN 2009100604161 A CN2009100604161 A CN 2009100604161A CN 200910060416 A CN200910060416 A CN 200910060416A CN 101769688 B CN101769688 B CN 101769688B
Authority
CN
China
Prior art keywords
spray
traditional chinese
chinese medicines
furnace
flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100604161A
Other languages
Chinese (zh)
Other versions
CN101769688A (en
Inventor
简洪生
李荣庭
刘朝辉
朱燃
张生祥
石育才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daye Nonferrous Metals Group Holdings Co., Ltd.
Daye Nonferrous Metals Co Ltd
Daye Nonferrous Design and Research Institute Co Ltd
Original Assignee
DAYE NONFERROUS METALS GROUP HOLDINGS Co Ltd
Daye Nonferrous Metals Co Ltd
Daye Nonferrous Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAYE NONFERROUS METALS GROUP HOLDINGS Co Ltd, Daye Nonferrous Metals Co Ltd, Daye Nonferrous Design and Research Institute Co Ltd filed Critical DAYE NONFERROUS METALS GROUP HOLDINGS Co Ltd
Priority to CN2009100604161A priority Critical patent/CN101769688B/en
Publication of CN101769688A publication Critical patent/CN101769688A/en
Application granted granted Critical
Publication of CN101769688B publication Critical patent/CN101769688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The invention relates to a colored metallurgical industrial furnace decoking technology method which is characterized in that: the method comprises the following steps: 1. chemicals spraying points are distributed: a. four chemicals spraying points are distributed at the top part of the inner wall of the furnace body and at the position that the tail part of the furnace body is 3-5m far away from the flue combination part; 2. chemicals are sprayed at regular time: decoking agents are sprayed in the furnace and the flue by compression air through six chemicals spraying points, 3-6 times are carried out each day, and spraying is carried out at intervals of 4-8 hours, and 15-30min are used each time; 3. decoking: compression air is used for blowing loosened coke pieces in the furnace and the flue, so as to lead the coke pieces to fall off to a refuse vessel for removal every 3-5 days; the colored metallurgical industrial furnace decoking technology method solves the problems that the existing decoking technology lags behind, the removal effect is poor, and removal work is carried out by shutting down the furnace, the metallurgical furnace operation rate is affected, the working condition is poor and the cost is high, and is particularly suitable removal and maintenance of the colored metallurgical furnace flues.

Description

A kind of colored metallurgical industrial furnace decoking technology method
(1) technical field:
The present invention relates to metallurgical industrial furnace flue slagging scorification clearance technique, particularly a kind of colored metallurgical industrial furnace decoking technology method.
(2) background technology:
In heavy coloured pyrometallurgy production process, with a large amount of molten flue dust, these flue dust are after getting into flue usually for high-temperature flue gas; Along with reducing, temperature is bonded in walling of flue; Reduce the flue breathing area, influence the flue gas proper flow, cause the metallurgical furnace voltage rise high; What harm was produced normally carries out, for addressing this problem the following method of common employing: 1. increase the mechanical vibrator device on the walling of flue; 2. all kinds deashing device is installed, like ultrasonic wave deashing, high steam deashing etc. on the flue; 3. the artificial deashing of blowing out contains the explosion cleaning.There is shortcoming in said method: 1. mechanical vibrator ash removal method weak effect, and applicable surface is narrow, and the harm device security, reduces flue shelf life; 2. various soot blowers are better for the granular material effect, but for the stronger coking of caking property, remove weak effect; 3. blowing out is artificial removes, and influence the metallurgical furnace operating rate, and working condition is poor, and cost is high.
(3) summary of the invention:
It is backward in technique that the object of the invention will solve above-mentioned existing flue coke cleaning exactly, removes weak effect, needs blowing out to remove, and influences the metallurgical furnace operating rate, and working condition is poor, and problems such as cost height provide a kind of brand-new colored metallurgical industrial furnace decoking technology method.
Design principle of the present invention is: adopts the combination of chemical method and physical method,, changes the slagging scorification structure, let slagging scorification become loose through the little chemical substances of at first in flue gas, jetting, and auxilliary again simple physics method, thus thoroughly remove slagging scorification.
Concrete scheme of the present invention is: a kind of colored metallurgical industrial furnace decoking technology method; It is characterized in that: may further comprise the steps: 1. the spray snack made with traditional Chinese medicines is arranged: a. at the body of heater afterbody apart from 3-5m place, flue joint portion; And being positioned at the inboard wall of furnace body top layout has four spray snack made with traditional Chinese medicines, and b. respectively arranges a spray snack made with traditional Chinese medicines on the observation door of flue both sides; 2. regularly spray medicine: adopt compressed air in stove, to reach flue through above-mentioned six spray snack made with traditional Chinese medicines and spray into coke cleaning agent, every day 3-6 time, 4-8 hour once, each 15-30 minute; 3. coke cleaning: every 3-5 days, adopt the coke button that pneumatics wind is aimed in the stove and flue is loose to purge, coke button is come off and fall to dirt-excluding bucket and get rid of.
Four of the top of inboard wall of furnace body described in the present invention spray snack made with traditional Chinese medicines are for side by side or the circular arc arranged; Two spray snack made with traditional Chinese medicines are at a distance of the separation of 2-2.5m wherein; Two of both sides spray snack made with traditional Chinese medicines arrange at a distance of 1-1.5m with the body of heater two side, and four spray snack made with traditional Chinese medicines and furnace roof be the 200-300mm layout apart.
The dose that regularly sprays medicine among the present invention is designed to: two each 10-20kg of spray snack made with traditional Chinese medicines of inboard wall of furnace body crown center, all the other four the each 5-10kg of spray snack made with traditional Chinese medicines.
The present invention compares with traditional clinker removal method and has the following advantages:
1. can reduce the furnace outage time that causes because of the flue coking significantly, improve equipment operation rate, and reduce cause therefrom stop, the blow-on expense;
2. simple to operate, operating environment is good, and labour intensity reduces greatly;
3. slag cleaning is thorough, and flue is easy to maintenance, can prolong flue service life;
4. can better improve the waste heat boiler heat-transfer effect, energy consumption is low;
5. small investment, cost is low.
(4) description of drawings:
Fig. 1 is metallurgical industrial furnace and flue structure master sketch map;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the schematic top plan view of metallurgical industrial furnace and flue structure.
Among the figure: the 1-body of heater, 2-flue joint portion, the 3-flue, 4-sees window, and 5-sprays snack made with traditional Chinese medicines, 6-dirt-excluding bucket, 7,8,9,10,11-sprays snack made with traditional Chinese medicines.
(5) specific embodiment:
The process of certain factory's reverberatory furnace being carried out flue coke cleaning (the body of heater span is 9m) is: may further comprise the steps:
1. the spray snack made with traditional Chinese medicines is arranged:
A. at the 3-5m place of body of heater 1 afterbody apart from flue joint portion 2; And be positioned at body of heater 1 inwall top layout four spray snack made with traditional Chinese medicines 7,8,9,10 are arranged; Said four spray snack made with traditional Chinese medicines 7,8,9,10 are be arranged side by side (be circular arc certainly, or suitably interlaced arrangement also being feasible), and wherein middle two spray snack made with traditional Chinese medicines 8,9 are at a distance of the separation of 2-2.5m; Two of both sides spray snack made with traditional Chinese medicines 7 arrange at a distance of 1-1.5m with body of heater 1 two side with 10, and four spray snack made with traditional Chinese medicines 7,8,9,10 and furnace roof be the 200-300mm layout apart; B. on the observation door 4 of flue 3 both sides, respectively arrange a spray snack made with traditional Chinese medicines 5 and 11.
Above-mentioned six spray snack made with traditional Chinese medicines respectively include a stainless steel tube shower nozzle and an external drug bucket.
2. regularly spray medicine: adopt compressed air in stove, to reach flue through above-mentioned six spray snack made with traditional Chinese medicines 5,7,8,9,10,11 and spray into coke cleaning agent (being to adopt the special-purpose coke cleaning agent of DREW11-GFMFST type), every day 3-6 time, 4-8 hour once, each 15-30 minute; The dose that regularly sprays medicine is: two spray snack made with traditional Chinese medicines 8,9 each 10-20kg of inboard wall of furnace body crown center, all the other four spray snack made with traditional Chinese medicines 5,7,10,11 each 5-10kg.
3. coke cleaning: every 3-5 days, adopt the coke button that pneumatics wind is aimed in the stove and flue is loose to purge, coke button is come off and fall to dirt-excluding bucket 6 and get rid of.

Claims (2)

1. colored metallurgical industrial furnace decoking technology method; It is characterized in that: may further comprise the steps: 1. the spray snack made with traditional Chinese medicines is arranged: a. at the body of heater afterbody apart from 3-5m place, flue joint portion; And being positioned at the inboard wall of furnace body top layout has four spray snack made with traditional Chinese medicines, and these four spray snack made with traditional Chinese medicines are for being arranged side by side, and wherein middle two spray snack made with traditional Chinese medicines are at a distance of the separation of 2-2.5m; Two of both sides spray snack made with traditional Chinese medicines arrange at a distance of 1-1.5m with the body of heater two side, and four spray snack made with traditional Chinese medicines and furnace roof be the 200-300mm layout apart; B. on the observation door of flue both sides, respectively arrange a spray snack made with traditional Chinese medicines; 2. regularly spray medicine: adopt compressed air in stove, to reach flue through above-mentioned six spray snack made with traditional Chinese medicines and spray into coke cleaning agent, every day 3-6 time, 4-8 hour once, each 15-30 minute; 3. coke cleaning: every 3-5 days, adopt the coke button that pneumatics wind is aimed in the stove and flue is loose to purge, coke button is come off and fall to dirt-excluding bucket and get rid of.
2. a kind of colored metallurgical industrial furnace decoking technology method according to claim 1 is characterized in that: the dose that regularly sprays medicine is: two each 10-20kg of spray snack made with traditional Chinese medicines of inboard wall of furnace body crown center, all the other four the each 5-10kg of spray snack made with traditional Chinese medicines.
CN2009100604161A 2009-01-05 2009-01-05 Colored metallurgical industrial furnace decoking technology method Active CN101769688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100604161A CN101769688B (en) 2009-01-05 2009-01-05 Colored metallurgical industrial furnace decoking technology method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100604161A CN101769688B (en) 2009-01-05 2009-01-05 Colored metallurgical industrial furnace decoking technology method

Publications (2)

Publication Number Publication Date
CN101769688A CN101769688A (en) 2010-07-07
CN101769688B true CN101769688B (en) 2012-07-04

Family

ID=42502695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100604161A Active CN101769688B (en) 2009-01-05 2009-01-05 Colored metallurgical industrial furnace decoking technology method

Country Status (1)

Country Link
CN (1) CN101769688B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105135901B (en) * 2015-07-31 2017-05-17 江西稀有稀土金属钨业集团有限公司 Cleaning device and method for feeding end of rotary furnace
CN111351370A (en) * 2018-12-20 2020-06-30 汉能新材料科技有限公司 Method for cleaning furnace slag
CN114705044A (en) * 2022-03-24 2022-07-05 中国神华煤制油化工有限公司 Heating furnace

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5980816A (en) * 1996-11-05 1999-11-09 Nippon Mining And Metals Co., Ltd. Method and apparatus for removing deposit in non-ferrous smelting furnace
CN1487262A (en) * 2003-06-27 2004-04-07 琦 戴 Boiler coke eliminating agent
CN1507551A (en) * 2001-06-26 2004-06-23 ���Ͽع����޹�˾ Multiple hearth furnace

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5980816A (en) * 1996-11-05 1999-11-09 Nippon Mining And Metals Co., Ltd. Method and apparatus for removing deposit in non-ferrous smelting furnace
CN1507551A (en) * 2001-06-26 2004-06-23 ���Ͽع����޹�˾ Multiple hearth furnace
CN1487262A (en) * 2003-06-27 2004-04-07 琦 戴 Boiler coke eliminating agent

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2007-85561A 2007.04.05
徐生荣.锅炉除焦剂使用效果分析.《南京师范大学学报(工程技术版)》.2007,第7卷(第3期),44-46. *

Also Published As

Publication number Publication date
CN101769688A (en) 2010-07-07

Similar Documents

Publication Publication Date Title
CN202024338U (en) Garbage incinerator and flue-gas purification treatment device allowing zero dioxin discharge
CN101769688B (en) Colored metallurgical industrial furnace decoking technology method
CN106244242B (en) Novel medical waste plasma gasification treatment system
CN212293640U (en) Innocent treatment system of steelmaking converter flue gas
CN203099873U (en) Quench tower device
CN110848705A (en) Domestic waste limit for oxygen formula pyrolysis oven
CN214619569U (en) Sulfur-containing solid waste pre-incineration device
CN204121928U (en) A kind of dedusting, catalyzing integrated gasifying device
CN103820158B (en) Cyclonic powder coal gasification furnace
CN203323138U (en) Incinerator recycling precious metals from carbon carrier catalyst containing precious metals
CN102230627A (en) High-temperature tail gas quenching reaction tower of refuse combustion furnace
CN203700295U (en) Cyclone type powdered coal gasifier
CN103571505B (en) Desulfurized waste liquid pyrolyzer on top of carbonization chamber
CN104324602B (en) A kind of smoke exhaust pollution sources control device and process
CN203904422U (en) Top blowing type round smelting furnace
CN207412761U (en) A kind of ammonium hydroxide vaporising device for SCR denitration system
CN205065769U (en) Flue gas quench tower structure
CN207980820U (en) A kind of kiln desulfurization and dedusting cooling system
CN208340376U (en) A kind of high temperature dust waste gas purification recycling environmental protecting device
CN209866336U (en) Cathode hanging single-column device of wet electrostatic dust collector
CN202322723U (en) 125t/h dry quenching barricade-free one-time dust removing device
CN201971784U (en) Primary dust remover
CN201684541U (en) Spray washing tower
CN104006377A (en) Treatment method for realizing zero release of fuel coal smoke dust in atmosphere
CN202061510U (en) High-temperature tail gas cooling reaction tower for garbage incinerator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: DAYE NONFERROUS METALS CO., LTD.

Free format text: FORMER OWNER: DAYE NON-FERROUS METALS CO., LTD.

Effective date: 20101223

Owner name: DAYE NONFERROUS METALS GROUP HOLDINGS CO., LTD. DA

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 435505 DESIGN INSTITUTE OF DAYE CO., LTD., XINXIALU, HUANGSHI CITY, HUBEI PROVINCE TO: 435005 NO.65, YELIAN ROAD, XINXIA ROAD, HUANGSHI CITY, HUBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20101223

Address after: 435005 Hubei city of Huangshi Province under new smelting Road No. 65

Applicant after: Daye Nonferrous Metals Co., Ltd.

Co-applicant after: Daye Nonferrous Metals Group Holdings Co., Ltd.

Co-applicant after: Daye Nonferrous Metals Design Institute Co., Ltd.

Address before: 435505 Hubei city of Huangshi province Daye new land company Research Institute

Applicant before: Daye Non-ferrous Metals Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant