CN101761069A - Construction method of three-in-one underground diaphragm wall - Google Patents

Construction method of three-in-one underground diaphragm wall Download PDF

Info

Publication number
CN101761069A
CN101761069A CN 200810044179 CN200810044179A CN101761069A CN 101761069 A CN101761069 A CN 101761069A CN 200810044179 CN200810044179 CN 200810044179 CN 200810044179 A CN200810044179 A CN 200810044179A CN 101761069 A CN101761069 A CN 101761069A
Authority
CN
China
Prior art keywords
wall
grooving
construction method
slot
underground diaphragm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200810044179
Other languages
Chinese (zh)
Other versions
CN101761069B (en
Inventor
余力
李闵
李耀良
吴远忠
郑江
袁芬
余振栋
张哲彬
漏家俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
SHANGHAI FOUNDATION ENGINEERING Co Ltd
Original Assignee
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION ENGINEERING Co OF SHANGHAI CITY, SHANGHAI FOUNDATION ENGINEERING Co Ltd filed Critical FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority to CN 200810044179 priority Critical patent/CN101761069B/en
Publication of CN101761069A publication Critical patent/CN101761069A/en
Application granted granted Critical
Publication of CN101761069B publication Critical patent/CN101761069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a construction method of a three-in-one underground diaphragm wall, which comprises the following steps of employing a full-rotation drilling machine to backfill and strengthen a retention wall after removing obstacles before forming a slot, and employing a three-shaft stirring pile to strengthen both sides of the retention wall and to stop water at the outer side of the retention wall; when forming the slot, slurry proportion is as follows: specific gravity is of 1.08 - 1.2, viscosity is of 22 - 30'', pH = 8 - 10, sand rate is less than 4%, and mud cover is of 1 - 1.5mm; the selection of a slot-forming device is as follows: during forming the retention wall, in order to prevent the impact of slot wall collapsing on a flood prevention wall, employing a masa-serial slot-forming machine with less soil disturbance. The construction method can realize the combination of an enclosure wall, a structural exterior wall and a permanent flood prevention wall. The invention can achieve landscape protection, environment protection and energy saving, increase energy utilization efficiency and land utilization in prime locations, and restore more sky to residents and the tourists; and meanwhile the three-in-one underground diaphragm wall brings convenience for the future use function distribution and site construction.

Description

Construction method of three-in-one underground diaphragm wall
Technical field
The present invention relates to a kind of diaphragm wall and analyse construction technology, particularly relate to a kind of construction method of three-in-one underground diaphragm wall that has.
Background technology
Certain project plot, 16 shop is positioned on the south the foreigner beach, Shanghai, and to the East Zhongshan Road, Huangpu River is faced in east, reaches the east gate road in the south, and north is to the Xinkai River road, and always land area is 30,400 square metres, 66,399 square metres of overall floorages.Above ground portion is three small and exquisite buildings, intersperses in large-area view leisure platform, the floating wharf of going on board for water balcony and visit Pujiang is then fallen in the Binjiang zone layer by layer, has demonstrated fully the design aim in " city allow life finer ".In addition, in the design of Binjiang platform, take into full account hommization, designed can keep out wind and rain, the view glass ceiling of shielding of ultraviolet.The underground building is established 3 layers altogether, wherein underground 1 layer based on waiting room, the passage of going on board, supporting commercial function; Underground 2 layers based on equipment with room, parking lot, supporting commercial function; Underground 3 layers based on parking lot, equipment with room, tourism office function.For making ground surface platform more smooth and easy, ground surface platform and underground 1 layer underground interlayer is set, based on functions such as VIP waiting room, supporting commerce, the passages of going on board to the peripheral path traffic.
For realizing the protection view; the purpose of environmental protection and energy saving and raising comprehensive utilization of energy efficient; improve the land use rate of this prime location; allow more sky reduce to citizen and visitor; make improved view and facility grace and safety more; arranging with site operation for simultaneously function of use in the future brings convenience; in the project development ﹠ construction process; to build sustainable development society; the state basic policy of energy-conservation saving resource is for instructing; use for reference international forward position exploitation theory; geographical position that integration project is specific and natural conditions; fully proving engineering; on the feasible basis of technology and economical rationality; introduce the scheme of " three-in-one underground diaphragm wall ", be about to the enclosure wall of constructing; structure outer integrates with permanent flood-control wall three walls.Therefore, need a kind of job practices that can implement " multi-functional diaphragm wall ".
Summary of the invention
The present invention will provide a kind of construction method of three-in-one underground diaphragm wall, and this job practices can realize that enclosure wall, structure outer and permanent flood-control wall three walls integrate.
For achieving the above object, technical scheme of the present invention is: a kind of construction method of three-in-one underground diaphragm wall, specifically comprise: before grooving, adopt the backfill after the ground wall displacement is removed obstacles of full circle swinging rig to reinforce, Di Qiang both sides cell wall is reinforced and outside sealing adopts three agitation piles to reinforce; During grooving, mud proportioning: proportion 1.08~1.2, viscosity 22~30 ", PH=8~10, sand factor<4%, mud skin 1~1.5mm; Select grooving equipment: for preventing that the cell wall landslide from impacting flood-control wall, adopt the true sand series groover less in the ground wall grooving process to soil disturbance.
Mud was deposited more than 24 hours, used after making the abundant aquation of swell soil.
With digging, guarantee grooving verticality 1/400 during grooving with surveying with entangling.
The invention has the beneficial effects as follows: job practices of the present invention can realize that enclosure wall, structure outer and permanent flood-control wall three walls integrate.Can realize protection view, environmental protection and energy saving and improve comprehensive utilization of energy efficient, improve the land use rate of prime location, allow more sky reduce, arrange with site operation for simultaneously function of use in the future and bring convenience to citizen and visitor.
Description of drawings
Fig. 1 revolves to dig the schematic diagram of removing obstacles;
Fig. 2 is a cement-soil backfill schematic diagram;
Fig. 3 is three agitation pile schematic diagrames;
Fig. 4 is the grooving schematic diagram.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the present invention.Should be understood that these embodiment only to be used to the present invention is described and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
Wall is as space enclosing structure, agent structure, flood-control wall structure " unification of three walls ", wall chase wall planeness, cell wall stable type, joint waterproofing, concrete self antiseepage waterproof, verticality require 1/400 over the ground, aspects such as control ground wall sedimentation require highly, and wall construction technology " unification of three walls " has been proposed higher requirement.
" unification of three walls " of the present invention construction method of underground continuous wall, concrete construction sequence is: as shown in table 1: before grooving, adopt the backfill after the ground wall displacement is removed obstacles (Fig. 1) of full circle swinging rig to reinforce (Fig. 2), Di Qiang both sides cell wall is reinforced and outside sealing adopts three agitation piles (Fig. 3) to reinforce.Optimize the mud proportioning during grooving (Fig. 4), select suitable grooving equipment.
Strengthen management in addition, rationally arrange flow process, shorten unit groove section construction period, take measures, satisfy the antiseepage requirement.
Table 1
Figure G2008100441795D0000031
The optimization of mud match ratio:
From the mechanics index of physics of control mud when guaranteeing the stable grooving of the groove section soil body, select for use viscosity big, fluid loss is little, forming retaining wall mud skin approaches and the strong premium mud of toughness, guarantee that groove section Tu Bi in grooving machinery moves up and down process repeatedly is stable, calculate to determine and control every index of mud by theory.
When determining grooving, can satisfy retaining wall requirement (shown in the table 2) when mud reaches following index in the groove.
Table 2
Proportion Viscosity ??PH Sand factor The mud skin
??1.08~1.2 ??22~30″ ??8~10 ??<4% ??1~1.5mm
Mud should be deposited more than 24 hours, can use after making the abundant aquation of swell soil.During side ground wall grooving near a river, suitably strengthen mud balance and viscosity, guarantee the stable and ground wall concrete quality of cell wall.
Select suitable grooving equipment:
Because existing flood-control wall needs to protect in ground wall work progress, to prevent in the ground wall grooving process that the cell wall landslide from impacting flood-control wall, adopt the true sand series groover less to soil disturbance.
Take measures, satisfy the antiseepage requirement
(1), during grooving with digging with surveying with entangling, guarantee the grooving verticality.
(2), the rigidity of reinforcing steel bar cage, prevent the reinforcement cage hoisting distortion.Place the topping billet on the reinforcing cage, stop to reveal the muscle phenomenon.
(3), improve terminal bruss, butt joint is brushed wall repeatedly and is handled until no mud.
(4), optimize the concrete grating, improve concrete self water resistance.
(5), during concreting, the strict control conduit spacing and the buried depth degree of depth are guaranteed concrete pouring quality.
(6), concrete returns slurry and highly suitably improves, and guarantees wall wall top, ground concrete quality.Emergency measure:
(1), existing flood-control wall protection and emergency measure
For prevent that damaging from appearring in flood-control wall in work progress, need to formulate special emergency preplan before the construction.Sedimentation, displacement to flood-control wall in work progress are monitored, gap observation, and the instant analysis monitored data dangerous situation occurs and takes measures early.The configure dedicated flood fighting materials, as near flood-control wall, prepare dress mud snakeskin bag several, dangerous situation occurs and can form interim cofferdam at once.The heavy duty on strict control ground in the work progress, do not make Tu Bi be subjected to constructing near load action influence and cause the Tu Bi landslide, and then influence flood-control wall safety.
(2), the emergency measure of cell wall landslide
After the ground wall becomes trough end the groove section is carried out ultrasonic test,, take measure, prevent the loss of concrete slurry in ground wall reinforcing cage outside parcel waterproof geotextiles as finding to have the phenomenon of cell wall landslide.

Claims (3)

1. construction method of three-in-one underground diaphragm wall, it is characterized in that: concrete steps are: before grooving, adopt the full circle swinging rig to reinforce in the back backfill of removing obstacles of ground wall displacement, Di Qiang both sides cell wall is reinforced and outside sealing adopts three agitation piles to reinforce; During grooving, mud proportioning: proportion 1.08~1.2, viscosity 22~30 ", PH=8~10, sand factor<4%, mud skin 1~1.5mm; Select grooving equipment: for preventing that the cell wall landslide from impacting flood-control wall, adopt the true sand series groover less in the ground wall grooving process to soil disturbance.
2. construction method of three-in-one underground diaphragm wall according to claim 1 is characterized in that: the mud of described preparation was deposited more than 24 hours, used after making the abundant aquation of swell soil.
3. construction method of three-in-one underground diaphragm wall according to claim 1 is characterized in that: with digging with surveying with entangling, guarantee grooving verticality 1/400 during described grooving.
CN 200810044179 2008-12-24 2008-12-24 Construction method of three-in-one underground diaphragm wall Active CN101761069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810044179 CN101761069B (en) 2008-12-24 2008-12-24 Construction method of three-in-one underground diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810044179 CN101761069B (en) 2008-12-24 2008-12-24 Construction method of three-in-one underground diaphragm wall

Publications (2)

Publication Number Publication Date
CN101761069A true CN101761069A (en) 2010-06-30
CN101761069B CN101761069B (en) 2011-07-20

Family

ID=42492438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810044179 Active CN101761069B (en) 2008-12-24 2008-12-24 Construction method of three-in-one underground diaphragm wall

Country Status (1)

Country Link
CN (1) CN101761069B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556641A (en) * 2013-10-09 2014-02-05 中铁十三局集团有限公司 Grooving assisting method for in-pit underground diaphragm wall of existing basement
CN104612179A (en) * 2014-12-31 2015-05-13 上海市机械施工集团有限公司 Construction method for underground diaphragm wall penetrating through super-thick silt layer
CN105386458A (en) * 2015-11-26 2016-03-09 中铁十一局集团第四工程有限公司 Method for constructing slot wall of underground diaphragm wall reinforced through embedded type plastic mixing piles
CN105696550A (en) * 2014-11-27 2016-06-22 五冶集团上海有限公司 Three axes agitating pile construction method capable of assisting in grooving of reinforced underground diaphragm wall
CN106869110A (en) * 2016-12-29 2017-06-20 上海市基础工程集团有限公司 The construction method of underground continuous wall of existing underground structure
CN114855818A (en) * 2022-05-23 2022-08-05 中铁二十局集团第一工程有限公司 High-pressure rotary spraying reinforcement method for double-row narrow-distance ground wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064424C (en) * 1996-08-02 2001-04-11 北京乾坤基础工程有限公司 3 in 1 underground continuous wall and construction method thereof
CN1279319A (en) * 1999-06-29 2001-01-10 陈星� Full-reverse construction technology for basement
FR2879632B1 (en) * 2004-12-17 2007-04-20 Cie Du Sol Soc Civ Ile PROCESS FOR MAKING MOLDED WALLS
NL1029709C1 (en) * 2005-07-05 2007-01-08 Bam Civiel B V Method for manufacturing a deep wall, as well as spacer.
CN101289853A (en) * 2008-05-20 2008-10-22 上海市第二建筑有限公司 Construction method of continuous wall trench underground on soft soil region

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556641A (en) * 2013-10-09 2014-02-05 中铁十三局集团有限公司 Grooving assisting method for in-pit underground diaphragm wall of existing basement
CN105696550A (en) * 2014-11-27 2016-06-22 五冶集团上海有限公司 Three axes agitating pile construction method capable of assisting in grooving of reinforced underground diaphragm wall
CN105696550B (en) * 2014-11-27 2017-08-25 五冶集团上海有限公司 A kind of three axes agitating pile construction method of additional reinforcement continuous wall trench underground
CN104612179A (en) * 2014-12-31 2015-05-13 上海市机械施工集团有限公司 Construction method for underground diaphragm wall penetrating through super-thick silt layer
CN105386458A (en) * 2015-11-26 2016-03-09 中铁十一局集团第四工程有限公司 Method for constructing slot wall of underground diaphragm wall reinforced through embedded type plastic mixing piles
CN105386458B (en) * 2015-11-26 2017-04-05 中铁十一局集团第四工程有限公司 A kind of embedded plasticity cement mixing method groove inside of continuous underground wall construction method
CN106869110A (en) * 2016-12-29 2017-06-20 上海市基础工程集团有限公司 The construction method of underground continuous wall of existing underground structure
CN114855818A (en) * 2022-05-23 2022-08-05 中铁二十局集团第一工程有限公司 High-pressure rotary spraying reinforcement method for double-row narrow-distance ground wall
CN114855818B (en) * 2022-05-23 2023-09-12 中铁二十局集团第一工程有限公司 Double-row narrow-distance ground wall high-pressure rotary spraying reinforcement method

Also Published As

Publication number Publication date
CN101761069B (en) 2011-07-20

Similar Documents

Publication Publication Date Title
CN102454167B (en) The construction method of especially big & deep open caisson
CN101761069B (en) Construction method of three-in-one underground diaphragm wall
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN102312445A (en) Diaphragm wall and construction method thereof
CN102345300A (en) Construction method of underground structures of seacoasts and artificial islands
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN103334452B (en) A kind of underground construction mixed construction method
CN106869110A (en) The construction method of underground continuous wall of existing underground structure
CN103924602A (en) Deep soft soil foundation pit construction method
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN104264663A (en) Hard cutting construction technology for secant piles
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN202519695U (en) Ultra-deep T-shaped slot wall pile used for soil layer with soft top and hard bottom and slot structure thereof
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN108457289A (en) A kind of open caisson construction method of complex condition
CN105239573B (en) The interplantation tube anchor rock construction method of shaped steel trestle
CN110939150A (en) Emergency rescue method for rapidly constructing large-hydraulic-slope-drop-ratio thin-wall structure in confined water inrush accident state
CN202706049U (en) Reinforced concrete basin open caisson
CN107268536A (en) A kind of fill encloses sea, draining, does not fill to make somebody a mere figurehead and make ground construction process
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
CN211547830U (en) Structure for preventing ground from being wetted
CN208023600U (en) A kind of caisson structure suitable for complex environment
CN209508998U (en) A kind of unearthed system of open caisson flushing cinder formula
CN106522251A (en) Geological drill hole confined water spewing water head balanced construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant