CN101758151A CN200910102903A CN200910102903A CN101758151A CN 101758151 A CN101758151 A CN 101758151A CN 200910102903 A CN200910102903 A CN 200910102903A CN 200910102903 A CN200910102903 A CN 200910102903A CN 101758151 A CN101758151 A CN 101758151A
Authority
CN
China
Prior art keywords
rolling
titanium alloy
speed
solid disk
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910102903A
Other languages
Chinese (zh)
Other versions
CN101758151B (en
Inventor
夏欲民
苏春民
郑永灵
杜正荣
顾莉莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC Guizhou Anda Aviation Forging Co Ltd
Original Assignee
Guizhou Anda Aviation Forging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Anda Aviation Forging Co Ltd filed Critical Guizhou Anda Aviation Forging Co Ltd
Priority to CN200910102903XA priority Critical patent/CN101758151B/en
Publication of CN101758151A publication Critical patent/CN101758151A/en
Application granted granted Critical
Publication of CN101758151B publication Critical patent/CN101758151B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention discloses a rolling formation method of a large and medium titanium alloy solid disc-shaped forge piece , which comprises the following steps of: upsetting, compressing and punching a titanium alloy rod material into a solid disc blank; putting the disc blank into a rolling machine to roll; rolling the disc blank for 20s and axially rolling the hollow disc blank under an axial rolling force of 4000-4900KN at an axial feeding speed of 1.8mm/s to widen the hollow disc blank at a speed of 10-12mm/s; rolling the disc blank for 20-40s and axially rolling the hollow disc blank under an axial rolling force of 3000-3500KN at an axial feeding speed of 0.8mm/s to widen the hollow disc blank at a speed of 8-10mm/s; rolling the disc blank for 40-70s and axially rolling the solid disc blank under an axial rolling force of 2500-3000KN at an axial feeding speed of 0.5mm/s to widen the hollow disc blank at a speed of 5-8mm/s; and carrying out fire rolling to prepare the solid disc-shaped forge piece. The method is mainly used for rolling disc-shaped forge pieces with excellent shapes, sizes, textures and performances.

Description

The roll-forming method of big-and-middle-sized titanium alloy solid disc-shaped forging
Technical field
The present invention relates to the roll-forming method of a kind of roll-forming method of forging, particularly big-and-middle-sized titanium alloy solid disc-shaped forging.
Background technology
Big-and-middle-sized solid disk forging, forging such as the compressor disc of using as heavy ground gas turbine and the turbine disk, because work under bad environment, stressed complexity requires forging will have excellent tissue and performance.
On June 13rd, 2007, disclosed Chinese invention patent specification CN1978125A disclosed a kind of roll-forming method of big-and-middle-sized solid disk forging, this method is metal bar material heating after jumping-up, die mould become solid disk, solid disk heating afterloading unit location, axially rolled one-tenth solid disk forging.This method has only solved the roll forming technical problem of big-and-middle-sized solid disk forging.When adopting the rolling big-and-middle-sized stainless steel solid disk forge piece of this method, when the epicone roller of elongator is made the rolling dish base of axial feed motion towards the dish base, if its feed speed is excessive, will cause coiling base temperature when rolling and raise, be easy to generate defectives such as overheated, burning and tissue variation; If its feed speed is too small, it is too fast that the dish base dispel the heat when rolling, cause rolling motionless, or increase rolling time and rolling number of times, reduce rolling efficiency, and can cause on the disk forge piece card and fill defectives such as discontented near the peripheral position of the ring wedge angle of outer ring surface.And when adopting the rolling disk forge piece of this method, need reach requirement through changeing the rolling shape and size of disk forge piece that just can make repeatedly more, so not only increase production cost, reduced productivity ratio, and rolling technology and the quality control increase difficulty of also can giving of repeated multiple times.
Summary of the invention
The technical problem to be solved in the present invention provides the roll-forming method that a kind of axial feed velocity that uses variation is realized big-and-middle-sized titanium alloy solid disc-shaped forging, the variation that this method axial feed velocity when rolling is descending is also adjusted roll-force thereupon, makes the solid disk forging of roll forming possess excellent tissue and performance.
For solving the problems of the technologies described above, the roll-forming method of the big-and-middle-sized titanium alloy solid disc-shaped forging of the present invention is realized by the following technical solutions:
Be heated to deformation temperature after jumping-up, die mould obtain titanium alloy solid dish base by the titanium alloy bar of specification blanking, put into the elongator location after more described solid disk being heated to deformation temperature;
Start elongator, handle its epicone roller and make axial feed motion with the speed of 1.8mm/s towards described solid disk direction, thereby the epicone roller of described elongator and down the awl roller along described solid disk axially with rolling its card of the roll-force of 4000KN~4900KN and outside its radial level, move the axially rolled of realization dish base, described solid disk is with the speed broadening of 10mm/s~12mm/s;
When the operation of rolling proceeds to 20s, the feed speed of adjusting described epicone roller makes its rolling solid disk of speed axial feed with 0.8mm/s, the axial rolling force that described solid disk is subjected to upper and lower awl roller at this moment is 3000KN~3500KN, described solid disk under the effect of axial rolling force with the speed broadening of 8mm/s~10mm/s;
When the operation of rolling proceeds to 40s, the feed speed of adjusting described epicone roller makes the rolling described solid disk of its speed axial feed with 0.5mm/s, at this moment, the roll-force that described solid disk is subjected to upper and lower awl roller is 2500KN~3000KN, described solid disk is with the speed broadening of 5mm/s~8mm/s, finish when the operation of rolling proceeds to 70s, heating once and rolling becomes titanium alloy solid disc-shaped forging.。
Carry out annealing in process after described titanium alloy solid disc-shaped forging rolls, described annealing be described solid disk forging be heated to 650 ℃~850 ℃ the insulation laggard line spaces cold.
Compared with prior art, beneficial effect of the present invention is as follows:
The present invention makes its speed broadening with 10mm/s~12mm/s with axial feed velocity axial rolling solid disk under the roll-force of 4000KN~4900KN of 1.8mm/s in the rolling 20s of beginning; In rolling 20s~40s, make its speed broadening with 8mm/s~10mm/s with axial feed velocity axial rolling solid disk under the axial rolling force of 3000KN~3500KN of 0.8mm/s; In rolling 40s~70s, make its speed broadening at the following axial rolling solid disk of the axial rolling force of 2500KN~3000KN with 5mm/s~8mm/s with the axial feed velocity of 0.5mm/s; Heating once and rolling is configured as solid disk forging.
Adopt such process route, can avoid coiling base temperature when rolling and raise, produce defectives such as overheated, burning and tissue variation; Can also avoid coiling base when rolling, dispel the heat too fast, cause rolling motionless, reduce rolling efficiency and on the disk forge piece card ring wedge angle periphery position near outer ring surface fill defectives such as discontented.And adopt this method to realize the heating once and rolling shaping, and reduced rolling time and rolling number of times, be easy to technology and quality are controlled, reduced production cost, improved productivity ratio.
The size and dimension of this titanium alloy solid disc-shaped forging has reached the design drawing requirement after testing.
The titanium alloy material that with the trade mark is TC4 is an example:
The macrostructure of this titanium alloy solid disc-shaped forging finds no any defective after testing.
The mirco structure of this titanium alloy solid disc-shaped forging (microscopically amplifies 500 times) has obtained even tiny tissue after testing.
After testing, the performance of this titanium alloy solid disc-shaped forging is as follows:
The room temperature tensile performance: tensile strength is 970MPa~980MPa (greater than the 895MPa of instructions for use), its percentage elongation is that 0.2% o'clock yield strength is 920MPa~935MPa (greater than the 825MPa of instructions for use), elongation after fracture be 14.5% (greater than instructions for use 10%), the contraction percentage of area be 37.5% (greater than instructions for use 20%).
400 ℃ of high temperature tensile properties: tensile strength is 680MPa~705MPa (greater than the 615MPa of instructions for use), elongation after fracture is 14.5%~16.5% (greater than the 12MPa of instructions for use), the contraction percentage of area be 61%~65.5% (greater than instructions for use 40%).
400 ℃ of high temperature endurance performances: stress is 570MPa, and rupture time 〉=100 hour have reached instructions for use.
Description of drawings
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
Fig. 1 is the low power metallographic structure figure that adopts the titanium alloy disk forge piece of the method for the invention roll forming.
Fig. 2 is the high power metallographic structure figure that adopts the titanium alloy disk forge piece of the method for the invention roll forming.
The specific embodiment
The titanium alloy material that with the trade mark is TC4 below is that example illustrates concrete processing step of the present invention:
Step 1: the titanium alloy bar by the TC4 of specification blanking is heated to 1030 ℃~1050 ℃ deformation temperature after jumping-up, die mould obtain titanium alloy solid dish base;
Step 2: described solid disk is heated to puts into elongator and location after the above-mentioned deformation temperature;
Step 3: start elongator, handle its epicone roller and make axial feed motion with the speed of 1.8mm/s towards described solid disk direction, thus the epicone roller of described elongator and down the awl roller along described solid disk axially with rolling its card of the roll-force of 4000KN~4900KN and outside its radial level, move the axially rolled of realization dish base; Described solid disk is with the speed broadening of 10mm/s~12mm/s.
Step 4: when the operation of rolling proceeds to 20s, the feed speed of adjusting described epicone roller makes its rolling solid disk of speed axial feed with 0.8mm/s, the axial rolling force that described solid disk is subjected to upper and lower awl roller at this moment is 3000KN~3500KN, described solid disk under the effect of axial rolling force with the speed broadening of 8mm/s~10mm/s.
Step 5: when the operation of rolling proceeds to 40s, the feed speed of adjusting described epicone roller makes the rolling described solid disk of its speed axial feed with 0.5mm/s, at this moment, the roll-force that described solid disk is subjected to upper and lower awl roller is 2500KN~3000KN, described solid disk is with the speed broadening of 5mm/s~8mm/s, finish when the operation of rolling proceeds to 70s, heating once and rolling becomes titanium alloy solid disc-shaped forging.
The finish-forging of above-mentioned TC4 titanium alloy material or finishing temperature are greater than 950 ℃
Step 6: carry out annealing in process after described titanium alloy solid disc-shaped forging rolls, described annealing be described solid disk forging be heated to 650 ℃~850 ℃ the insulation laggard line spaces cold.
The size and dimension of this titanium alloy solid disc-shaped forging has reached the design drawing requirement after testing.
The macrostructure of this titanium alloy solid disc-shaped forging as shown in Figure 1, finds no any defective after testing.
The mirco structure of this titanium alloy solid disc-shaped forging (microscopically amplifies 500 times) as shown in Figure 2, has obtained even tiny tissue after testing.
After testing, the performance of this titanium alloy solid disc-shaped forging is as follows:
The room temperature tensile performance: tensile strength is 970MPa~980MPa, and its percentage elongation is that 0.2% o'clock yield strength is 920MPa~935MPa, and elongation after fracture is 14.5%, and the contraction percentage of area is 37.5%.
400 ℃ of high temperature tensile properties: tensile strength is 680MPa~705MPa, and elongation after fracture is 14.5%~16.5%, and the contraction percentage of area is 61%~65.5%.
400 ℃ of high temperature endurance performances: stress is 570MPa, rupture time 〉=100 hour.

Claims (2)

1. the roll-forming method of a big-and-middle-sized titanium alloy solid disc-shaped forging, comprise being heated to deformation temperature after jumping-up, die mould obtain titanium alloy solid dish base, put into the elongator localization step after more described solid disk being heated to deformation temperature by the titanium alloy bar of specification blanking; It is characterized in that this method is further comprising the steps of:
Start elongator, handle its epicone roller and make axial feed motion with the speed of 1.8mm/s towards described solid disk direction, thereby the epicone roller of described elongator and down the awl roller along described solid disk axially with rolling its card of the roll-force of 4000KN~4900KN and outside its radial level, move the axially rolled of realization dish base, described solid disk is with the speed broadening of 10mm/s~12mm/s;
When the operation of rolling proceeds to 20s, the feed speed of adjusting described epicone roller makes its rolling solid disk of speed axial feed with 0.8mm/s, the axial rolling force that described solid disk is subjected to upper and lower awl roller at this moment is 3000KN~3500KN, described solid disk under the effect of axial rolling force with the speed broadening of 8mm/s~10mm/s;
When the operation of rolling proceeds to 40s, the feed speed of adjusting described epicone roller makes the rolling described solid disk of its speed axial feed with 0.5mm/s, at this moment, the roll-force that described solid disk is subjected to upper and lower awl roller is 2500KN~3000KN, described solid disk is with the speed broadening of 5mm/s~8mm/s, finish when the operation of rolling proceeds to 70s, heating once and rolling becomes titanium alloy solid disc-shaped forging.
2. the roll-forming method of big-and-middle-sized titanium alloy solid disc-shaped forging according to claim 1, it is characterized in that: carry out annealing in process after described titanium alloy solid disc-shaped forging rolls, described annealing be described solid disk forging be heated to 650 ℃~850 ℃ the insulation laggard line spaces cold.
CN200910102903XA 2009-11-27 2009-11-27 Rolling formation method of large and medium titanium alloy solid disc-shaped forge piece Expired - Fee Related CN101758151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910102903XA CN101758151B (en) 2009-11-27 2009-11-27 Rolling formation method of large and medium titanium alloy solid disc-shaped forge piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910102903XA CN101758151B (en) 2009-11-27 2009-11-27 Rolling formation method of large and medium titanium alloy solid disc-shaped forge piece

Publications (2)

Publication Number Publication Date
CN101758151A true CN101758151A (en) 2010-06-30
CN101758151B CN101758151B (en) 2011-07-20

Family

ID=42489624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910102903XA Expired - Fee Related CN101758151B (en) 2009-11-27 2009-11-27 Rolling formation method of large and medium titanium alloy solid disc-shaped forge piece

Country Status (1)

Country Link
CN (1) CN101758151B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580768A (en) * 2018-04-10 2018-09-28 张家港中环海陆特锻股份有限公司 The manufacturing process of the pure titanium sheath forging of ocean engineering
CN108672622A (en) * 2018-04-02 2018-10-19 张家港中环海陆特锻股份有限公司 The high pure titanacycle part stable rolling technique of cylindrical thin wall
CN109127975A (en) * 2018-10-17 2019-01-04 重庆文理学院 A kind of titanium alloy rotation part and preparation method thereof
CN109518108A (en) * 2018-12-24 2019-03-26 洛阳双瑞精铸钛业有限公司 A kind of TA5 titanium alloy sheet and the preparation method and application thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2216438Y (en) * 1994-12-23 1996-01-03 冶金工业部钢铁研究总院 Conical roll core rod compound extender
CN100486754C (en) * 2006-12-06 2009-05-13 贵州安大航空锻造有限责任公司 Rolling forming process for large hollow disc forging
CN100484696C (en) * 2007-03-06 2009-05-06 马鞍山钢铁股份有限公司 Forging and rolling technology and hot rolling and forging apparatus for making large pulley

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108672622A (en) * 2018-04-02 2018-10-19 张家港中环海陆特锻股份有限公司 The high pure titanacycle part stable rolling technique of cylindrical thin wall
CN108672622B (en) * 2018-04-02 2019-12-03 张家港中环海陆高端装备股份有限公司 The high pure titanacycle part stable rolling technique of cylindrical thin wall
CN108580768A (en) * 2018-04-10 2018-09-28 张家港中环海陆特锻股份有限公司 The manufacturing process of the pure titanium sheath forging of ocean engineering
CN108580768B (en) * 2018-04-10 2019-12-03 张家港中环海陆高端装备股份有限公司 The manufacturing process of the pure titanium sheath forging of ocean engineering
CN109127975A (en) * 2018-10-17 2019-01-04 重庆文理学院 A kind of titanium alloy rotation part and preparation method thereof
CN109127975B (en) * 2018-10-17 2020-05-08 重庆文理学院 Titanium alloy rotating member and preparation method thereof
CN109518108A (en) * 2018-12-24 2019-03-26 洛阳双瑞精铸钛业有限公司 A kind of TA5 titanium alloy sheet and the preparation method and application thereof
CN109518108B (en) * 2018-12-24 2020-09-29 洛阳双瑞精铸钛业有限公司 TA5 titanium alloy plate and preparation method and application thereof

Also Published As

Publication number Publication date
CN101758151B (en) 2011-07-20

Similar Documents

Publication Publication Date Title
CN100584482C (en) Method for rolling and shaping titanium alloy special-shaped ring forging
CN101439350B (en) Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle
CN101758150B (en) Rolling formation method of large and medium high-temperature alloy hollow disc-shaped forge piece
CN1919530A (en) Manufacturing technique of heavy caliber alloy seamless steel pipe
CN102513799A (en) Ring rolling method for flange of megawatt wind generation set tower
CN103522007A (en) Method for manufacturing TC25 titanium alloy ring piece
CN101758151B (en) Rolling formation method of large and medium titanium alloy solid disc-shaped forge piece
CN102554114A (en) Ring forging and rolling processing method of bearing ring parts used for large-scale wind turbine unit
CN103736734A (en) Process of preparing high-chromium alloy supper 13-Cr seamless steel tubes through CPE (cross-roll piercing and elongation) hot rolling mill
CN105397000A (en) Rolling method of titanium alloy plate-shaped forgings
CN109434397A (en) A kind of preparation method of superalloy annular forging expanding die
CN110773686A (en) Preparation method of TB3 titanium alloy wire for fastener
CN101758152B (en) Rolling formation method of large and medium hollow titanium alloy disc-shaped forge piece
CN108237197B (en) A kind of forging method improving the flaw detection of structural steel large-sized ring part
CN101773963A (en) New process for shaping large disk-shaped forging
JP5387797B1 (en) Seamless steel pipe manufacturing method
CN109822021A (en) Rolloff forming method of C-shaped section forging
CN101758153B (en) Rolling formation method of large and medium stainless steel hollow disc-shaped forge piece
CN101632998A (en) Target plasticity deformation method
CN101804438B (en) Roll forming method of large and medium-size aluminum alloy hollow disk-shaped forgings
CN105397417A (en) Rolling method of high-temperature alloy plate shaped forging
CN101428291A (en) Production process for large weight soldering-free molybdenum wire pole stock
CN108746440B (en) A kind of high cylindrical forged piece segmentation milling method of large-sized high-temperature alloy
CN101791669B (en) Roll forming method of large and medium structural steel solid disk forging
CN101791667B (en) Roll forming method of large and medium high-temperature alloy solid disk forging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720