CN101748744A - 大型桥梁基础分离式钢围堰异步下沉施工方法 - Google Patents
大型桥梁基础分离式钢围堰异步下沉施工方法 Download PDFInfo
- Publication number
- CN101748744A CN101748744A CN200810147924A CN200810147924A CN101748744A CN 101748744 A CN101748744 A CN 101748744A CN 200810147924 A CN200810147924 A CN 200810147924A CN 200810147924 A CN200810147924 A CN 200810147924A CN 101748744 A CN101748744 A CN 101748744A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel cofferdam
- cofferdam
- asynchronous
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 180
- 239000010959 steel Substances 0.000 title claims abstract description 180
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 238000000926 separation method Methods 0.000 title abstract description 4
- 238000005553 drilling Methods 0.000 claims description 31
- 238000011144 upstream manufacturing Methods 0.000 claims description 29
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 25
- 229910052742 iron Inorganic materials 0.000 claims description 12
- 238000002513 implantation Methods 0.000 claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 230000002093 peripheral effect Effects 0.000 claims description 6
- 239000000725 suspension Substances 0.000 claims description 6
- 239000011230 binding agent Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101479249A CN101748744B (zh) | 2008-12-19 | 2008-12-19 | 大型桥梁基础分离式钢围堰异步下沉施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101479249A CN101748744B (zh) | 2008-12-19 | 2008-12-19 | 大型桥梁基础分离式钢围堰异步下沉施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101748744A true CN101748744A (zh) | 2010-06-23 |
CN101748744B CN101748744B (zh) | 2011-06-01 |
Family
ID=42476320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101479249A Active CN101748744B (zh) | 2008-12-19 | 2008-12-19 | 大型桥梁基础分离式钢围堰异步下沉施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101748744B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101974913A (zh) * | 2010-10-15 | 2011-02-16 | 中铁三局集团有限公司 | 桥梁深水基础钻孔桩与围堰平行施工的方法 |
CN104895083A (zh) * | 2015-06-24 | 2015-09-09 | 江苏省建筑科学研究院有限公司 | 一种水中承台基坑导向架及其围堰支护施工方法 |
CN105586977A (zh) * | 2016-02-03 | 2016-05-18 | 中交第三航务工程局有限公司宁波分公司 | 一种下插法外海无掩护钢围堰龙口导流施工方法 |
CN105604072A (zh) * | 2016-01-18 | 2016-05-25 | 中国铁建大桥工程局集团有限公司 | 一种钢护筒围堰及应用钢护筒围堰的钢护筒沉放就位方法 |
CN105696614A (zh) * | 2016-01-27 | 2016-06-22 | 中国十七冶集团有限公司 | 一种采用上拉下顶解决沉井超沉复位装置及其施工方法 |
CN105714837A (zh) * | 2016-02-03 | 2016-06-29 | 中交第三航务工程局有限公司宁波分公司 | 一种上拔法外海无掩护钢围堰龙口导流施工方法 |
CN108677978A (zh) * | 2018-05-04 | 2018-10-19 | 中国建筑第四工程局有限公司 | 一种桥梁无粘结预应力拼接双壁钢围堰下沉施工工法 |
CN108867672A (zh) * | 2018-08-24 | 2018-11-23 | 中国建筑第四工程局有限公司 | 一种双壁钢围堰拼接方法 |
CN113774936A (zh) * | 2021-09-23 | 2021-12-10 | 中铁十一局集团第一工程有限公司 | 一种先桩基后围堰的双壁钢围堰浮运定位下沉施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3849996A (en) * | 1974-01-02 | 1974-11-26 | Us Navy | Method and apparatus for positioning a cofferdam |
CN2276051Y (zh) * | 1996-06-10 | 1998-03-11 | 倪晓庚 | 一种新型钢筋网片围堰及其导向架 |
CN100469974C (zh) * | 2004-04-02 | 2009-03-18 | 上海市基础工程公司 | 海上大口径超深钻孔桩施工工艺 |
CN101200898A (zh) * | 2007-12-04 | 2008-06-18 | 中铁大桥局股份有限公司 | 光板岩和浅覆盖层钻孔桩基础的施工方法 |
-
2008
- 2008-12-19 CN CN2008101479249A patent/CN101748744B/zh active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101974913A (zh) * | 2010-10-15 | 2011-02-16 | 中铁三局集团有限公司 | 桥梁深水基础钻孔桩与围堰平行施工的方法 |
CN101974913B (zh) * | 2010-10-15 | 2012-07-04 | 中铁三局集团有限公司 | 桥梁深水基础钻孔桩与围堰平行施工的方法 |
CN104895083A (zh) * | 2015-06-24 | 2015-09-09 | 江苏省建筑科学研究院有限公司 | 一种水中承台基坑导向架及其围堰支护施工方法 |
CN105604072A (zh) * | 2016-01-18 | 2016-05-25 | 中国铁建大桥工程局集团有限公司 | 一种钢护筒围堰及应用钢护筒围堰的钢护筒沉放就位方法 |
CN105696614A (zh) * | 2016-01-27 | 2016-06-22 | 中国十七冶集团有限公司 | 一种采用上拉下顶解决沉井超沉复位装置及其施工方法 |
CN105696614B (zh) * | 2016-01-27 | 2018-02-02 | 中国十七冶集团有限公司 | 一种采用上拉下顶解决沉井超沉复位装置 |
CN105586977A (zh) * | 2016-02-03 | 2016-05-18 | 中交第三航务工程局有限公司宁波分公司 | 一种下插法外海无掩护钢围堰龙口导流施工方法 |
CN105714837A (zh) * | 2016-02-03 | 2016-06-29 | 中交第三航务工程局有限公司宁波分公司 | 一种上拔法外海无掩护钢围堰龙口导流施工方法 |
CN108677978A (zh) * | 2018-05-04 | 2018-10-19 | 中国建筑第四工程局有限公司 | 一种桥梁无粘结预应力拼接双壁钢围堰下沉施工工法 |
CN108677978B (zh) * | 2018-05-04 | 2021-06-15 | 中国建筑第四工程局有限公司 | 一种桥梁无粘结预应力拼接双壁钢围堰下沉施工工法 |
CN108867672A (zh) * | 2018-08-24 | 2018-11-23 | 中国建筑第四工程局有限公司 | 一种双壁钢围堰拼接方法 |
CN113774936A (zh) * | 2021-09-23 | 2021-12-10 | 中铁十一局集团第一工程有限公司 | 一种先桩基后围堰的双壁钢围堰浮运定位下沉施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101748744B (zh) | 2011-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101748744B (zh) | 大型桥梁基础分离式钢围堰异步下沉施工方法 | |
CN102561404B (zh) | 一种型钢混凝土柱式接头及采用该接头的地下连续墙的施工方法 | |
CN104805854B (zh) | 一种潮汐环境下深水超长钢板桩围堰施工方法 | |
CN210086275U (zh) | 一种双壁中空沉井基础 | |
CN103225304B (zh) | 一种海上基础支撑结构及其施工方法 | |
CN106939595A (zh) | 一种旋挖扩底灌注桩施工工艺 | |
CN108035337B (zh) | 一种地下连续墙的施工方法和应用于该方法中的接头 | |
CN104695380A (zh) | 一种塑钢板桩与混凝土组合的护岸结构 | |
CN202466644U (zh) | 一种型钢混凝土柱式接头 | |
CN204311435U (zh) | 一种旋挖咬合钢筋混凝土防渗墙 | |
CN108824471A (zh) | 一种深水裸岩群桩基础及其施工方法 | |
CN205776157U (zh) | 装配式地下连续墙 | |
CN103088820A (zh) | 水力自激振荡射流振动沉桩装置及沉桩工艺 | |
CN106758759A (zh) | 一种用于深水裸岩河床的栈桥桩基及其锚固方法 | |
CN203977417U (zh) | 一种深水桩基础用加强肋嵌入式钢护筒 | |
CN210013191U (zh) | 坝肩冲击钻造槽薄防渗墙与浆砌石坝体的连接结构 | |
CN103015459A (zh) | 强涌潮河口水下承台钢套箱施工工法 | |
CN105401564B (zh) | 将潮流能发电装置固定于水底的施工方法和潮流发电装置 | |
CN101705668B (zh) | 可在动水中修建的壅水水工建筑物结构及其施工方法 | |
CN206477240U (zh) | 一种用于深水裸岩河床的栈桥桩基 | |
CN110258643A (zh) | 一种利用钢缆索定位的水下反拱形悬浮双隧道及建造方法 | |
CN205276273U (zh) | 一种土木工程施工用空心桩体 | |
CN106522253B (zh) | 一种大水深趾板上精确钻孔及灌浆的施工方法 | |
CN204690772U (zh) | 一种深水桩基定位、导向结构 | |
CN104047273A (zh) | 水电站消能防冲墙及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: SICHUAN SHENGDA TRANSPORTATION RESEARCH + DESIGN CO., LTD. |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20110808 Address after: 610041 nine Xing Xing Road 12, hi tech Zone, Sichuan, Chengdu Patentee after: Sichuan Road and Bridge (Group) Co., Ltd. Address before: 610041 nine Xing Xing Road 12, hi tech Zone, Sichuan, Chengdu Co-patentee before: SICHUAN SHENGDA COMM SCIENCE RES AND DESIGN Co.,Ltd. Patentee before: Sichuan Road and Bridge (Group) Co., Ltd. |