CN101745748A - Method for welding pile leg and pile shoe of drill platform - Google Patents
Method for welding pile leg and pile shoe of drill platform Download PDFInfo
- Publication number
- CN101745748A CN101745748A CN201010042685A CN201010042685A CN101745748A CN 101745748 A CN101745748 A CN 101745748A CN 201010042685 A CN201010042685 A CN 201010042685A CN 201010042685 A CN201010042685 A CN 201010042685A CN 101745748 A CN101745748 A CN 101745748A
- Authority
- CN
- China
- Prior art keywords
- shoe
- riser
- spud leg
- welding
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010100426858A CN101745748B (en) | 2010-01-07 | 2010-01-07 | Method for welding pile leg and pile shoe of drill platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010100426858A CN101745748B (en) | 2010-01-07 | 2010-01-07 | Method for welding pile leg and pile shoe of drill platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101745748A true CN101745748A (en) | 2010-06-23 |
CN101745748B CN101745748B (en) | 2011-09-21 |
Family
ID=42473710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010100426858A Active CN101745748B (en) | 2010-01-07 | 2010-01-07 | Method for welding pile leg and pile shoe of drill platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101745748B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704453A (en) * | 2012-07-05 | 2012-10-03 | 南通中远船务工程有限公司 | Connecting method of spud leg and pile shoe of windmill mounting ship |
CN102704455A (en) * | 2012-07-05 | 2012-10-03 | 南通中远船务工程有限公司 | Method for connecting pile leg and pile shoe of windmill installation vehicle |
CN103924566A (en) * | 2014-05-06 | 2014-07-16 | 太重(天津)滨海重型机械有限公司 | Self-elevating type drilling platform with one pile leg |
CN104759770A (en) * | 2014-10-10 | 2015-07-08 | 南通振华重型装备制造有限公司 | Self-elevating drilling platform pile leg manufacturing method |
CN105178274A (en) * | 2015-08-21 | 2015-12-23 | 上海外高桥造船有限公司 | Constructing method for self-elevating platform |
CN106223302A (en) * | 2016-07-22 | 2016-12-14 | 上海外高桥造船有限公司 | The method of construction of self-elevating drilling platform |
CN106638525A (en) * | 2016-10-20 | 2017-05-10 | 南通振华重型装备制造有限公司 | Mounting technology for pile legs and pile shoes of JU2000E type self-elevating drilling platform |
CN112267460A (en) * | 2020-09-03 | 2021-01-26 | 中海油能源发展股份有限公司 | Active puncturing pile shoe structure of self-elevating drilling platform and operation method thereof |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4761096A (en) * | 1987-02-24 | 1988-08-02 | Lin Sheng S | Universal footing with jetting system |
CN2294996Y (en) * | 1997-06-03 | 1998-10-21 | 第三航务工程局第五工程公司 | Steel-pile-boot fixed at head of engineering pile |
KR100519120B1 (en) * | 2003-01-21 | 2005-10-04 | 주식회사 동우 이앤씨 건축사사무소 | Cross shaped Shoe for increasing effective friction area of open-ended pipe pile |
US7534072B1 (en) * | 2004-11-08 | 2009-05-19 | Christopher Scott | Spud can surface washing apparatus |
-
2010
- 2010-01-07 CN CN2010100426858A patent/CN101745748B/en active Active
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704455A (en) * | 2012-07-05 | 2012-10-03 | 南通中远船务工程有限公司 | Method for connecting pile leg and pile shoe of windmill installation vehicle |
CN102704453B (en) * | 2012-07-05 | 2014-09-17 | 南通中远船务工程有限公司 | Connecting method of spud leg and pile shoe of windmill mounting ship |
CN102704455B (en) * | 2012-07-05 | 2014-11-26 | 南通中远船务工程有限公司 | Method for connecting pile leg and pile shoe of windmill installation vehicle |
CN102704453A (en) * | 2012-07-05 | 2012-10-03 | 南通中远船务工程有限公司 | Connecting method of spud leg and pile shoe of windmill mounting ship |
CN103924566A (en) * | 2014-05-06 | 2014-07-16 | 太重(天津)滨海重型机械有限公司 | Self-elevating type drilling platform with one pile leg |
CN103924566B (en) * | 2014-05-06 | 2015-12-30 | 太重(天津)滨海重型机械有限公司 | A kind of Single Pile self-elevating drilling platform |
CN104759770B (en) * | 2014-10-10 | 2016-08-17 | 南通振华重型装备制造有限公司 | A kind of manufacture method of pile legs of self-elevating drilling platform |
CN104759770A (en) * | 2014-10-10 | 2015-07-08 | 南通振华重型装备制造有限公司 | Self-elevating drilling platform pile leg manufacturing method |
CN105178274A (en) * | 2015-08-21 | 2015-12-23 | 上海外高桥造船有限公司 | Constructing method for self-elevating platform |
CN106223302A (en) * | 2016-07-22 | 2016-12-14 | 上海外高桥造船有限公司 | The method of construction of self-elevating drilling platform |
CN106223302B (en) * | 2016-07-22 | 2018-11-09 | 上海外高桥造船有限公司 | The method of construction of self-elevating drilling platform |
CN106638525A (en) * | 2016-10-20 | 2017-05-10 | 南通振华重型装备制造有限公司 | Mounting technology for pile legs and pile shoes of JU2000E type self-elevating drilling platform |
CN112267460A (en) * | 2020-09-03 | 2021-01-26 | 中海油能源发展股份有限公司 | Active puncturing pile shoe structure of self-elevating drilling platform and operation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN101745748B (en) | 2011-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101745748B (en) | Method for welding pile leg and pile shoe of drill platform | |
CN102433841B (en) | Method for installing abnormal-shape curve steel box girder | |
CN102975817A (en) | Integral installation technology method of folding hatch cover and hatch coaming | |
CN107100309B (en) | A kind of construction method for the large-scale multi-angular cantilever frame of integral hoisting | |
CN102357783B (en) | Manufacturing process of pile shoe of wind power installation vessel | |
CN105401732A (en) | Assembling method of large steel structure module of nuclear power plant | |
CN104389268A (en) | Steel tower column with positioning structure and hoisting construction method thereof | |
CN104494784A (en) | Manufacturing and mounting method of container ship guide frame | |
CN104801836A (en) | Offshore wind power generation jacket foundation flange installation method | |
CN112144408A (en) | Construction method for building assembled trestle | |
CN202577305U (en) | Steel column positioner | |
CN102936899A (en) | Method for installing steel cofferdam by the aid of pier supporting frame | |
CN102720371B (en) | Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device | |
CN101838986B (en) | Disassembling tool type lattice column and construction method thereof | |
CN104594317B (en) | Working platform, single pile foundation, offshore working platform and installing method of offshore working platform | |
KR20140050186A (en) | Offshore wind generator and rapid installing method thereof | |
CN101811555B (en) | Section assembly control method of bulk freighter body in floating dock | |
CN109967975B (en) | Method for building large floating access door | |
CN104018682B (en) | Based on the method that realizes reinforced concrete column splicing on building site | |
CN207436897U (en) | A kind of detachable offshore wind turbine foundation cat ladder | |
CN207092045U (en) | The stage apparatus of marine pile connection construction | |
CN207452955U (en) | A kind of measurement in a closed series Tower System | |
CN107881914B (en) | Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method | |
CN102528306B (en) | Manufacturing method of offshore oil drilling derrick | |
CN205501971U (en) | Attached component of special integrated form of marine wind power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA MERCHANTS HEAVY INDUSTRY (JIANGSU) CO., LTD. Free format text: FORMER OWNER: MERCHANTS GROUP HEAVY INDUSTRY (SHENZHEN) CO., LTD. Effective date: 20131209 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 518000 SHENZHEN, GUANGDONG PROVINCE TO: 226116 NANTONG, JIANGSU PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20131209 Address after: 226116 Haimen, Haimen, Binjiang Avenue, Xin'An River Road, No. 1, Jiangsu Patentee after: China Merchants heavy industry (Jiangsu) Co., Ltd. Address before: 518000 Guangdong city of Shenzhen province Nanshan District Qianhai margin island base Patentee before: China Merchants Heavy Industry (Shenzhen) Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: MERCHANTS GROUP HEAVY INDUSTRY (SHENZHEN) CO., LTD Effective date: 20140808 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20140808 Address after: 226116 Haimen, Haimen, Binjiang Avenue, Xin'An River Road, No. 1, Jiangsu Patentee after: China Merchants heavy industry (Jiangsu) Co., Ltd. Patentee after: China Merchants Heavy Industry (Shenzhen) Co., Ltd. Address before: 226116 Haimen, Haimen, Binjiang Avenue, Xin'An River Road, No. 1, Jiangsu Patentee before: China Merchants heavy industry (Jiangsu) Co., Ltd. |