CN101745748A - Method for welding pile leg and pile shoe of drill platform - Google Patents

Method for welding pile leg and pile shoe of drill platform Download PDF

Info

Publication number
CN101745748A
CN101745748A CN201010042685A CN201010042685A CN101745748A CN 101745748 A CN101745748 A CN 101745748A CN 201010042685 A CN201010042685 A CN 201010042685A CN 201010042685 A CN201010042685 A CN 201010042685A CN 101745748 A CN101745748 A CN 101745748A
Authority
CN
China
Prior art keywords
shoe
riser
spud leg
welding
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010042685A
Other languages
Chinese (zh)
Other versions
CN101745748B (en
Inventor
刘建成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Heavy Industry Jiangsu Co Ltd
China Merchants Heavy Industry Shenzhen Co Ltd
Original Assignee
China Merchants Heavy Industry Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Heavy Industry Shenzhen Co Ltd filed Critical China Merchants Heavy Industry Shenzhen Co Ltd
Priority to CN2010100426858A priority Critical patent/CN101745748B/en
Publication of CN101745748A publication Critical patent/CN101745748A/en
Application granted granted Critical
Publication of CN101745748B publication Critical patent/CN101745748B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for welding a pile leg and a pile shoe of a drill platform. The pile shoe comprises a pile shoe main body and an upright plate component. The method comprises the following steps of: a) welding the upright plate component on the pile leg; b) inserting the upright plate component connected with the pile leg into the pile shoe main body, and c) welding the upright plate component inside the pile shoe main body. The method of the invention solves the problem that the exterior of the pile shoe is difficult to weld because the working station space is narrow. The welding quality is ensured, the welding cost is saved and the construction period is shortened.

Description

The spud leg of drilling platforms and the welding method of shoe
Technical field
The present invention relates to offshore rig, particularly relate to a kind of spud leg of drilling platforms and the welding method of shoe.
Background technology
For some offshore oil drilling platforms, the CJ series platform of for example Dutch Gusto MSC company design, its spud leg root is to be welded in the shoe outside, and 18 weld seams will bear the weight (about 20950 tons of maximum weight) that platform rises fully, and its importance is well imagined.According to this class platform structure, weld seam between spud leg and the shoe has particularity, the space of welding post is narrow especially, as shown in Figure 1, about the about 135mm in gap between spud leg 2 and glide path 3 and the shoe 1, very narrow and small, so the engineering staff at all can't be from the outside welding of spud leg and shoe integral body.At present, for the CJ series platform of Gusto MSC company, each big shipyard has following three kinds of ways in the welding of handling spud leg root and shoe.
First kind of scheme is with more than pier 6 promotions to 3.5 of main hull meter, outside this weld seam is exposed to fully, and just can be with this weld seam welding.This scheme as shown in Figure 2.
Second kind of scheme is that to keep the pier height of main hull be 1.7 meters, and the residing position of shoe is digged pit 2.2 meters, outside equally this weld seam being exposed to fully, and just can be with this weld seam welding.This scheme as shown in Figure 3.
The third scheme is with the lifting tower structure of whole spud leg as a whole, shoe and spud leg is welded in advance finish, and then the lifting tower structural entity is installed from top to bottom.
Three kinds of above-mentioned schemes all have more defective and restriction, are analyzed as follows:
For first kind of scheme, the pier height of main hull will be established De Taigao, cause the materials demand amount of pier very greatly, and ship's bottom paint and other fitting operation all need to take very high scaffold, this will waste a lot of labor costs, and bring very large trouble for follow-up work.
For second kind of scheme, can weld by digging pit in principle, but same cost of idleness, and it almost is infeasible digging pit on those had carried out module place that pressure-bearing handles.
For the third scheme, according to common size, if first section spud leg height is 25.76 meters, the lifting tower height is 17.86 meters, adds that the lifting tower bottom is 1.7 meters to the distance on ground, and height overall has just reached 45.32 meters, add shackle, length of steel wire rope, height overall will because the loop wheel machine lifting altitude on the module place is limited, down be installed from the top of spud leg so be difficult to that whole lifting tower structure is entangled spud leg as a whole above 50 meters.And, because self-elevating drilling platform is the precision size by the lifting tower structure to be retrained spud leg keep linear state on the lifting tower structure, be not the precision of controlling the lifting tower structure by the linearity of spud leg, so this scheme is very unfavorable for the triangle location of lifting tower in the future.
Summary of the invention
Main purpose of the present invention is exactly at the deficiencies in the prior art, a kind of spud leg of drilling platforms and the welding method of shoe are provided, little former in shoe outside weldings station space thereby the problem that is difficult to weld solved owing to can be saved cost, the reduction of erection time on the basis that guarantees welding quality.
For achieving the above object, the present invention is by the following technical solutions:
A kind of spud leg of drilling platforms and the welding method of shoe, described shoe comprise shoe body and riser member, said method comprising the steps of:
A. described riser member is welded on the described spud leg;
B. will connect the described riser member of described spud leg inserts described shoe body from the top inside; With
C. in the inside of described shoe body described riser member is welded on the described shoe body.
Preferably, described riser member comprises rectangular first riser and has second riser of arc notch, and described method also is included in before the step a, and the minor face of described first riser is docked with the non-arc limit of described second riser becomes a plate.
Preferably, described riser member comprises two groups of described first risers and described second riser, among the described step a, will dock the formed two boards in back separately by two groups of described first risers and described second riser and be welded on vertically on the described spud leg.
Preferably, described two boards forms the angle of 60 degree.
Beneficial technical effects of the present invention is:
The method according to this invention, script is positioned at the intrinsic riser member of shoe to weld together with spud leg outside shoe earlier, and then will carry out the shoe interior welds in the riser member insertion shoe body, like this, because the intrinsic riser member of shoe and spud leg have been to weld to have got well, also just need not be again weld and be connected shoe and spud leg at the outside opposition of shoe board member and weld seam between spud leg, thereby solved because little former in shoe outside weldings station space thereby the problem that is difficult to weld, particularly, the present invention has following advantage:
1. because the outside weld seam that joins with spud leg of shoe can weld on other stations, be not subjected to the constraint of member on every side, thereby improve the welding quality at this place;
2. with respect to first kind of known scheme, can reduce the height of main hull pier, as remain on 1.7 meters, waste of material is avoided in easy construction simultaneously, thereby saves cost;
3. with respect to the third known scheme, can before spud leg does not insert shoe, carry out the precision control of lifting tower structure, make that the precision control of lifting tower structure is more accurate;
4. the construction environment that can facilitate for follow-up work better, thus improve the quality of products;
5. the height of spud leg butt joint will not be subjected to the influence of loop wheel machine sling height.
Generally speaking, the spud leg of drilling platforms of the present invention and the welding method of shoe can be saved cost, the reduction of erection time on the basis that guarantees welding quality.
Description of drawings
Fig. 1 is the vertical view of spud leg and shoe assembly structure;
The side view of spud leg and shoe when Fig. 2 welds for adopting first kind of known scheme;
The side view of spud leg and shoe when Fig. 3 welds for adopting second kind of known scheme;
Fig. 4 a-4d is the schematic diagram of a kind of embodiment of welding method of the present invention;
Fig. 5 is the flow chart of a kind of embodiment of welding method of the present invention.
The specific embodiment
In conjunction with the accompanying drawings the present invention is further described in detail by the following examples.
Please refer to Fig. 4 a-4d, in one embodiment, drilling platforms comprises shoe and spud leg 2, shoe comprises shoe body 1 and riser member, the position opening that shoe body 1 and spud leg 2 are relative, the riser member has two groups of (not illustrating respectively) first riser 4 (model can be EQ63-Z) and second risers 5 (model can be EH36-Z), and first riser 4 is a rectangle, and described second riser 5 is for having the shape of big arc notch on the rectangle profile.
Please refer to Fig. 4 a-Fig. 5, in a kind of preferred embodiment, the welding method of shoe and spud leg may further comprise the steps:
Step S1. docks the minor face of first riser 4 in two groups respectively with the non-arc limit of second riser 5 become a plate.
Step S2. is welded on formed two boards on the spud leg 2 vertically at weld seam 7 places.More preferably, two boards forms the angle of 60 degree.The first segment that the welding position of spud leg 2 is generally spud leg is its part bottom.
Step S3. will connect the inside that the riser member of spud leg 2 inserts shoe body 1 from top to bottom.,
Step S4. welds together riser member and shoe body 1 in the inside of shoe body 1.Shown in Fig. 4 d, the inside of shoe body 1 is represented on the left side of straight line ab, and the outside of shoe body 1 is represented on the right of straight line ab.
Because riser member 1 is to have welded in advance to insert in the shoe body 1 with spud leg 2 again, need not be again weld and be connected shoe and spud leg at the outside opposition of shoe board member 1 and weld seam between the spud leg 2, this with regard to having solved because little former in shoe outside weldings station space thereby the problem that is difficult to weld, guaranteed welding quality, save welding cost, shortened the duration.
Above content be in conjunction with concrete preferred implementation to further describing that the present invention did, can not assert that concrete enforcement of the present invention is confined to these explanations.For the general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to protection scope of the present invention.

Claims (4)

1. the welding method of the spud leg of a drilling platforms and shoe, described shoe comprises shoe body and riser member, it is characterized in that, said method comprising the steps of:
A. described riser member is welded on the described spud leg;
B. will connect the described riser member of described spud leg inserts described shoe body from the top inside; With
C. in the inside of described shoe body described riser member is welded on the described shoe body.
2. welding method as claimed in claim 1, it is characterized in that, described riser member comprises rectangular first riser and has second riser of arc notch, described method also is included in before the step a, and the minor face of described first riser is docked with the non-arc limit of described second riser becomes a plate.
3. welding method as claimed in claim 2, it is characterized in that, described riser member comprises two groups of described first risers and described second riser, among the described step a, will dock the formed two boards in back separately by two groups of described first risers and described second riser and be welded on vertically on the described spud leg.
4. welding method as claimed in claim 3 is characterized in that, described two boards forms the angle of 60 degree.
CN2010100426858A 2010-01-07 2010-01-07 Method for welding pile leg and pile shoe of drill platform Active CN101745748B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010100426858A CN101745748B (en) 2010-01-07 2010-01-07 Method for welding pile leg and pile shoe of drill platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010100426858A CN101745748B (en) 2010-01-07 2010-01-07 Method for welding pile leg and pile shoe of drill platform

Publications (2)

Publication Number Publication Date
CN101745748A true CN101745748A (en) 2010-06-23
CN101745748B CN101745748B (en) 2011-09-21

Family

ID=42473710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010100426858A Active CN101745748B (en) 2010-01-07 2010-01-07 Method for welding pile leg and pile shoe of drill platform

Country Status (1)

Country Link
CN (1) CN101745748B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704453A (en) * 2012-07-05 2012-10-03 南通中远船务工程有限公司 Connecting method of spud leg and pile shoe of windmill mounting ship
CN102704455A (en) * 2012-07-05 2012-10-03 南通中远船务工程有限公司 Method for connecting pile leg and pile shoe of windmill installation vehicle
CN103924566A (en) * 2014-05-06 2014-07-16 太重(天津)滨海重型机械有限公司 Self-elevating type drilling platform with one pile leg
CN104759770A (en) * 2014-10-10 2015-07-08 南通振华重型装备制造有限公司 Self-elevating drilling platform pile leg manufacturing method
CN105178274A (en) * 2015-08-21 2015-12-23 上海外高桥造船有限公司 Constructing method for self-elevating platform
CN106223302A (en) * 2016-07-22 2016-12-14 上海外高桥造船有限公司 The method of construction of self-elevating drilling platform
CN106638525A (en) * 2016-10-20 2017-05-10 南通振华重型装备制造有限公司 Mounting technology for pile legs and pile shoes of JU2000E type self-elevating drilling platform
CN112267460A (en) * 2020-09-03 2021-01-26 中海油能源发展股份有限公司 Active puncturing pile shoe structure of self-elevating drilling platform and operation method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4761096A (en) * 1987-02-24 1988-08-02 Lin Sheng S Universal footing with jetting system
CN2294996Y (en) * 1997-06-03 1998-10-21 第三航务工程局第五工程公司 Steel-pile-boot fixed at head of engineering pile
KR100519120B1 (en) * 2003-01-21 2005-10-04 주식회사 동우 이앤씨 건축사사무소 Cross shaped Shoe for increasing effective friction area of open-ended pipe pile
US7534072B1 (en) * 2004-11-08 2009-05-19 Christopher Scott Spud can surface washing apparatus

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704455A (en) * 2012-07-05 2012-10-03 南通中远船务工程有限公司 Method for connecting pile leg and pile shoe of windmill installation vehicle
CN102704453B (en) * 2012-07-05 2014-09-17 南通中远船务工程有限公司 Connecting method of spud leg and pile shoe of windmill mounting ship
CN102704455B (en) * 2012-07-05 2014-11-26 南通中远船务工程有限公司 Method for connecting pile leg and pile shoe of windmill installation vehicle
CN102704453A (en) * 2012-07-05 2012-10-03 南通中远船务工程有限公司 Connecting method of spud leg and pile shoe of windmill mounting ship
CN103924566A (en) * 2014-05-06 2014-07-16 太重(天津)滨海重型机械有限公司 Self-elevating type drilling platform with one pile leg
CN103924566B (en) * 2014-05-06 2015-12-30 太重(天津)滨海重型机械有限公司 A kind of Single Pile self-elevating drilling platform
CN104759770B (en) * 2014-10-10 2016-08-17 南通振华重型装备制造有限公司 A kind of manufacture method of pile legs of self-elevating drilling platform
CN104759770A (en) * 2014-10-10 2015-07-08 南通振华重型装备制造有限公司 Self-elevating drilling platform pile leg manufacturing method
CN105178274A (en) * 2015-08-21 2015-12-23 上海外高桥造船有限公司 Constructing method for self-elevating platform
CN106223302A (en) * 2016-07-22 2016-12-14 上海外高桥造船有限公司 The method of construction of self-elevating drilling platform
CN106223302B (en) * 2016-07-22 2018-11-09 上海外高桥造船有限公司 The method of construction of self-elevating drilling platform
CN106638525A (en) * 2016-10-20 2017-05-10 南通振华重型装备制造有限公司 Mounting technology for pile legs and pile shoes of JU2000E type self-elevating drilling platform
CN112267460A (en) * 2020-09-03 2021-01-26 中海油能源发展股份有限公司 Active puncturing pile shoe structure of self-elevating drilling platform and operation method thereof

Also Published As

Publication number Publication date
CN101745748B (en) 2011-09-21

Similar Documents

Publication Publication Date Title
CN101745748B (en) Method for welding pile leg and pile shoe of drill platform
CN102433841B (en) Method for installing abnormal-shape curve steel box girder
CN102975817A (en) Integral installation technology method of folding hatch cover and hatch coaming
CN107100309B (en) A kind of construction method for the large-scale multi-angular cantilever frame of integral hoisting
CN102357783B (en) Manufacturing process of pile shoe of wind power installation vessel
CN105401732A (en) Assembling method of large steel structure module of nuclear power plant
CN104389268A (en) Steel tower column with positioning structure and hoisting construction method thereof
CN104494784A (en) Manufacturing and mounting method of container ship guide frame
CN104801836A (en) Offshore wind power generation jacket foundation flange installation method
CN112144408A (en) Construction method for building assembled trestle
CN202577305U (en) Steel column positioner
CN102936899A (en) Method for installing steel cofferdam by the aid of pier supporting frame
CN102720371B (en) Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN104594317B (en) Working platform, single pile foundation, offshore working platform and installing method of offshore working platform
KR20140050186A (en) Offshore wind generator and rapid installing method thereof
CN101811555B (en) Section assembly control method of bulk freighter body in floating dock
CN109967975B (en) Method for building large floating access door
CN104018682B (en) Based on the method that realizes reinforced concrete column splicing on building site
CN207436897U (en) A kind of detachable offshore wind turbine foundation cat ladder
CN207092045U (en) The stage apparatus of marine pile connection construction
CN207452955U (en) A kind of measurement in a closed series Tower System
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN102528306B (en) Manufacturing method of offshore oil drilling derrick
CN205501971U (en) Attached component of special integrated form of marine wind power

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA MERCHANTS HEAVY INDUSTRY (JIANGSU) CO., LTD.

Free format text: FORMER OWNER: MERCHANTS GROUP HEAVY INDUSTRY (SHENZHEN) CO., LTD.

Effective date: 20131209

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518000 SHENZHEN, GUANGDONG PROVINCE TO: 226116 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131209

Address after: 226116 Haimen, Haimen, Binjiang Avenue, Xin'An River Road, No. 1, Jiangsu

Patentee after: China Merchants heavy industry (Jiangsu) Co., Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Qianhai margin island base

Patentee before: China Merchants Heavy Industry (Shenzhen) Co., Ltd.

ASS Succession or assignment of patent right

Owner name: MERCHANTS GROUP HEAVY INDUSTRY (SHENZHEN) CO., LTD

Effective date: 20140808

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140808

Address after: 226116 Haimen, Haimen, Binjiang Avenue, Xin'An River Road, No. 1, Jiangsu

Patentee after: China Merchants heavy industry (Jiangsu) Co., Ltd.

Patentee after: China Merchants Heavy Industry (Shenzhen) Co., Ltd.

Address before: 226116 Haimen, Haimen, Binjiang Avenue, Xin'An River Road, No. 1, Jiangsu

Patentee before: China Merchants heavy industry (Jiangsu) Co., Ltd.