CN101739799A - Device and method for using internet to copying and controlling gauge table - Google Patents

Device and method for using internet to copying and controlling gauge table Download PDF

Info

Publication number
CN101739799A
CN101739799A CN200910202014A CN200910202014A CN101739799A CN 101739799 A CN101739799 A CN 101739799A CN 200910202014 A CN200910202014 A CN 200910202014A CN 200910202014 A CN200910202014 A CN 200910202014A CN 101739799 A CN101739799 A CN 101739799A
Authority
CN
China
Prior art keywords
concentrator
gprs
internet
gauge table
copying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910202014A
Other languages
Chinese (zh)
Inventor
聂光义
毛加兴
魏建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SUNRAY TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI SUNRAY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRAY TECHNOLOGY Co Ltd filed Critical SHANGHAI SUNRAY TECHNOLOGY Co Ltd
Priority to CN200910202014A priority Critical patent/CN101739799A/en
Publication of CN101739799A publication Critical patent/CN101739799A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a device and a method for using internet to copying and controlling a gauge table. The device comprises a building concentrator and a wireless transmission gauge table featuring wireless communication; a GPS concentrator comprises a CPU with a GPRS network interface, a wireless transmission module and a memorizer connected with the CPU; wherein the building concentrator is connected with the GPRS concentrator by wireless communication, the GPRS concentrator is connected to the internet by a GPRS data terminal unit. The device and the method of the invention solve the problems of high cost and low automation degree of a wireless meter reading system, confinement of communication range to a community and inability to realize ex-situ control.

Description

A kind of internet to copying and devices and methods therefor of controlling gauge table of utilizing
Technical field
The present invention relates to a kind of internet to copying and devices and methods therefor of controlling gauge table of utilizing.
Background technology
The meter reading method of the civilian gauge table of current domestic public utilities is got for manually manually copying to the doorstep mostly, radio meter register mode in the one-way communication mode has appearred in recent years, promptly on the table tool, a unidirectional micropower wireless data transmission module is installed, table tool terminal timed sending measurement data constantly is to concentrator, and concentrator is transferred to control center again by M-BUS.Such system also has several limitations: 1, system cost height, automaticity is low.2, communication context is confined to the sub-district, and numer centre is its characteristics, but has also limited its range of operation by the mode of a M-BUS and a building concentrator contact.
Summary of the invention
Technical matters to be solved by this invention is: at the defective that exists in the above-mentioned prior art, provide a kind of devices and methods therefor that utilizes internet to copying and control gauge table of realizing place remote.
A kind of technical scheme of the present invention:
A kind of internet to copying and device of controlling gauge table of utilizing, comprise by a wireless continuous building concentrator and wireless transmission gauge table, the GPRS concentrator comprises the CPU that has the GPRS network interface, and the wireless transport module and the storer that link to each other with described CPU; A described building concentrator links to each other with the GPRS concentrator by radio communication, and described GPRS concentrator is connected to the internet by the GPRS data terminal unit.
Be provided with repeater between a described building concentrator and the wireless transmission gauge table by wireless connections.
Another kind of technical scheme of the present invention:
A kind of internet to copying and method of controlling gauge table utilized comprises the steps:
1) communication service program starts with Web server, and in real time and the GPRS concentrator connect, and corresponding GPRS concentrator connection status is updated to database;
2) after user's login, set up archive information by the Web mode;
3) generate the Long-distance Control task by the Web mode, the task operating data storage is to database;
4) communication service program detects user's Long-distance Control task, generates the protocol data bag of corresponding control task command format, by communicating with being connected of GPRS concentrator foundation;
5) after the GPRS concentrator receives the control task order that the communication service program issues, carry out the corresponding communication operation, and receive the operation response data of a building concentrator, wireless table tool with a corresponding building concentrator, wireless table tool;
6) after communication service program is come out the operation response data parsing of uploading, and be updated in the database.
Described communication service program is used the C# language exploitation C/S of .Net2.0 Framework and above version thereof, and the real-time Communication for Power link of accepting the GPRS concentrator in the thread mode connects on the one hand, and will connect online, off-line state and be updated in the database; On the other hand with thread mode real-time inspection database medium-long range control signal, and carry out corresponding communication and handle, the data after handling are written in the database.
After described GPRS concentrator powers on, wait for long-range control signal in real time, after receiving control signal corresponding, communication data is issued a corresponding building concentrator with the wireless signal of 433MHz/470MHz frequency range, and the operation response data of a building concentrator are issued Web server.
According to authority, the operation response data that are written in the database are carried out accounting processing, be provided with according to charge information and generate pay the fees data and bill.
According to authority, charge and handle and decision analysis being written to operation response data in the database.
The invention has the beneficial effects as follows:
A kind of internet to copying and devices and methods therefor of controlling gauge table of utilizing of the present invention, wherein a building concentrator to from the data of table tool terminal wireless transmission (433MHz/470MHz frequency range) as regularly freezing to show the tool continuous data, copying and get table tool continuous data and satisfy ladder calculation and valuation etc. and handle in real time, data are after treatment still sent to corresponding GPRS concentrator with the wireless mode of 433MHz/470MHz frequency range, copy and accept through GPRS internet realization place remote by it; Equally, the GPRS concentrator can be waited for long-range control signal through the GPRS internet in real time, after receiving control signal corresponding, instruction is issued a corresponding building concentrator with the wireless mode biography of 433MHz/470MHz frequency range, realization is to the instruction issuing of a place remote building concentrator, specifies the operation of a certain civilian gauge table and copies and accepts thereby finish control.
The present invention gives building concentrator and GPRS concentrator through wireless mode with information transmission with civilian gauge table, by the remote transmission of internet internet, has realized the connection to place remote then.
The invention will be further described below in conjunction with drawings and Examples.
Description of drawings
Fig. 1 utilizes internet to copying and the system chart of controlling gauge table for the present invention is a kind of.
Fig. 2 is the structure principle chart of GPRS concentrator among Fig. 1.
Fig. 3 utilizes internet to copying and the system flowchart of controlling gauge table for the present invention is a kind of.
Embodiment
According to Fig. 1 and 2, a kind of internet to copying and device of controlling gauge table of utilizing of the present invention mainly comprises wireless transmission gauge table, a building concentrator, GPRS concentrator, GPRS data terminal unit and Web server.Wherein, the GPRS concentrator is made up of the wireless transport module that links to each other with cpu controller, storer and GRPS network interface, and cpu controller is that the built-in Flash reduced instruction set computer of the enhancement mode of Atmel company high speed machine Atmegal16L, wireless communication module are that SRWF-1028 wireless data transmission module, the GPRS network interface of Shanghai Tangray Information Technology Co., Ltd. is the grand electric H7118D data terminal in Shenzhen.
According to Fig. 3, the user carries out remote meter reading by the WEB mode according to operating right at computer terminal, and long-range to specifying instrument control such as to open, close, all operations data all can write database---the SQL Server of Microsoft 2005.The executing state of computer terminal real-time inspection corresponding operating, and give the user with interface display.
The communication management program of installing and moving on the server promptly uses the C# language of .Net2.0 Framework and above version thereof to develop C/S.The communication service program connects with the real-time Communication for Power link that the thread mode is accepted the GPRS concentrator on the one hand, and will connect online, off-line state and be updated in the database.The telecommunication service routine is checked meter, is opened valve, closes control operations such as valve with thread mode real-time inspection database medium-long range on the other hand, and control corresponding is carried out corresponding communication handle, and the data of traffic operation are written in the database.
After the GPRS concentrator was installed and to be powered on, the GPRS part initiatively was connected with communication service program in the server.After the success to be connected, wait for remote meter reading in real time, drive valve, close control operations such as valve.After receiving the control corresponding operation, initiatively communication data is issued a corresponding building concentrator with the wireless signal of 433MHz/470MHz frequency range, and the data of a building concentrator response are issued communication management program again.
The user can be according to authority, and the meter reading data that the communication service program is written in the database carries out accounting processing, is provided with according to charge information and generates pay the fees data and bill;
It is business hall payment, network payment, bank paying etc. that this device can provide multiple charge processing mode; Owing to gather mass data, be convenient to customer analysis, user's decision-making.
The present invention can produce by using for reference this paper disclosure all combinations and method open and that disclose, although combination of the present invention and method are described by detailed implementation process, but those skilled in the art obviously can be spliced the described method and apparatus of the application in not breaking away from content of the present invention, spirit and scope or change, or increase and decrease some parts, more particularly, the replacement that all are similar and change apparent to those skilled in the artly, they are regarded as being included among spirit of the present invention, scope and the content.

Claims (7)

1. one kind is utilized internet to copying and the device of controlling gauge table, comprise by a wireless continuous building concentrator and wireless transmission gauge table, it is characterized in that: the GPRS concentrator comprises the CPU that has the GPRS network interface, and the wireless transport module and the storer that link to each other with described CPU; A described building concentrator links to each other with the GPRS concentrator by radio communication, and described GPRS concentrator is connected to the internet by the GPRS data terminal unit.
2. according to described internet to copying and the device of controlling gauge table of utilizing of claim 1, it is characterized in that: be provided with repeater between a described building concentrator and the wireless transmission gauge table by wireless connections.
3. one kind is utilized internet to copying and the method for controlling gauge table, comprises the steps:
1) communication service program starts with Web server, and in real time and the GPRS concentrator connect, and corresponding GPRS concentrator connection status is updated to database;
2) after user's login, set up archive information by the Web mode;
3) generate the Long-distance Control task by the Web mode, the task operating data storage is to database;
4) communication service program detects user's Long-distance Control task, generates the protocol data bag of corresponding control task command format, by communicating with being connected of GPRS concentrator foundation;
5) after the GPRS concentrator receives the control task order that the communication service program issues, carry out the corresponding communication operation, and receive the operation response data of a building concentrator, wireless table tool with a corresponding building concentrator, wireless table tool;
6) after communication service program is come out the operation response data parsing of uploading, and be updated in the database.
4. according to described internet to copying and the method for controlling gauge table utilized of claim 3, it is characterized in that: described communication service program is used the C# language exploitation C/S of .Net2.0 Framework and above version thereof, on the one hand the real-time Communication for Power link of accepting the GPRS concentrator in the thread mode connects, and will connect online, off-line state and be updated in the database; On the other hand with thread mode real-time inspection database medium-long range control signal, and carry out corresponding communication and handle, the data after handling are written in the database.
5. according to described internet to copying and the method for controlling gauge table utilized of claim 3, it is characterized in that: after described GPRS concentrator powers on, wait for long-range control signal in real time, after receiving control signal corresponding, communication data is issued a corresponding building concentrator with the wireless signal of 433MHz/470MHz frequency range, and the operation response data of a building concentrator are issued Web server.
6. according to described internet to copying and the method for controlling gauge table utilized of claim 3, it is characterized in that: according to authority, the operation response data that are written in the database are carried out accounting processing, be provided with according to charge information and generate pay the fees data and bill.
7. according to the described method of utilizing internet to copying and control gauge table of claim 3, it is characterized in that:, charge and handle and decision analysis being written to operation response data in the database according to authority.
CN200910202014A 2009-12-21 2009-12-21 Device and method for using internet to copying and controlling gauge table Pending CN101739799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910202014A CN101739799A (en) 2009-12-21 2009-12-21 Device and method for using internet to copying and controlling gauge table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910202014A CN101739799A (en) 2009-12-21 2009-12-21 Device and method for using internet to copying and controlling gauge table

Publications (1)

Publication Number Publication Date
CN101739799A true CN101739799A (en) 2010-06-16

Family

ID=42463228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910202014A Pending CN101739799A (en) 2009-12-21 2009-12-21 Device and method for using internet to copying and controlling gauge table

Country Status (1)

Country Link
CN (1) CN101739799A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103874227A (en) * 2012-12-10 2014-06-18 华为终端有限公司 Method, device and system for setting up connection
CN104764970A (en) * 2015-04-22 2015-07-08 国家电网公司 Power distribution fault judgment method based on real-time topology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103874227A (en) * 2012-12-10 2014-06-18 华为终端有限公司 Method, device and system for setting up connection
CN104764970A (en) * 2015-04-22 2015-07-08 国家电网公司 Power distribution fault judgment method based on real-time topology

Similar Documents

Publication Publication Date Title
CN204102247U (en) A kind of intellectual water meter control device based on 3G wireless communication technology
WO2012100686A1 (en) Internet of things intelligent gas meter and control system thereof
CN201757929U (en) Fully wireless networked power consumer power consumption information acquisition system
CN108877176A (en) Internet of Things gas is wireless automatic remote transmission kilowatt meter reading-out system
JP7378388B2 (en) Voice activated energy management system
CN105550952A (en) Intelligent property management system based on internet of things
CN101840234A (en) Embedded automobile fault diagnosis equipment and updating method thereof
CN105260885A (en) Internet of things mobile phone APP self-service prepayment and cloud management system
CN105303727A (en) Method and system for billing and charging of charging pile
CN110444000A (en) A kind of multilist measurement data acquisition method and system based on technology of Internet of things
CN103439463A (en) Real-time online monitoring system for carbon emission of building
CN103914919A (en) Gas metering device and gas metering information reporting method
CN110634240A (en) Control method and device of Bluetooth gas meter
CN102855745A (en) Handheld wireless meter reader and remote data synchronous inquiring method thereof
CN202816025U (en) Power charge intelligent system
CN104424714A (en) Intelligent water meter based in Internet of Things and control system thereof
CN102999355B (en) A kind of client application software system managed by terminal management system
CN101212299A (en) Mineral resource yield tax monitoring method
CN101739799A (en) Device and method for using internet to copying and controlling gauge table
CN101673434B (en) Secret key management method of IC card terminal
CN102930706A (en) Remote concentration measurement multi-protocol data acquisition system and method
CN201331812Y (en) Urban and rural micro-payment system
CN107172613A (en) The remote maintenance system and method for a kind of car wireless terminal
CN109962973A (en) Water, gas and electricity synthesization intelligent management system
WO2015049515A1 (en) Improvements relating to distributed resource management in real-time systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100616