CN101739502A - 4阶龙格-库塔母线负荷预报方法 - Google Patents

4阶龙格-库塔母线负荷预报方法 Download PDF

Info

Publication number
CN101739502A
CN101739502A CN200810203042A CN200810203042A CN101739502A CN 101739502 A CN101739502 A CN 101739502A CN 200810203042 A CN200810203042 A CN 200810203042A CN 200810203042 A CN200810203042 A CN 200810203042A CN 101739502 A CN101739502 A CN 101739502A
Authority
CN
China
Prior art keywords
bus load
kutta
bus
forecast
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810203042A
Other languages
English (en)
Other versions
CN101739502B (zh
Inventor
李昌
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Saiyun Amperex Technology Limited
Original Assignee
SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER AUTOMATION CO Ltd filed Critical SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority to CN200810203042XA priority Critical patent/CN101739502B/zh
Publication of CN101739502A publication Critical patent/CN101739502A/zh
Application granted granted Critical
Publication of CN101739502B publication Critical patent/CN101739502B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开一种4阶龙格-库塔母线负荷预报方法,涉及数据预报技术领域;所要解决的是数据预报中减少误差、提高精确度的技术问题;该母线负荷预报方法的步骤为:1)取厂站母线负荷;2)对母线负荷,按照等时间间隔取得连续的采样数据;3)对相邻的数据取微分,得到微分值;4)根据4阶龙格-库塔方法要求实时计算加权值;5)根据前一时刻的加权计算值,计算下一时刻的母线预报负荷;6)反复步骤1)至5),能进行母线负荷预报。本发明的母线负荷预报方法具有能在不同时间段上存在较小误差的,高精确度的特点。

Description

4阶龙格-库塔母线负荷预报方法
技术领域
本发明涉及数据预报技术,特别是涉及一种用于电力系统的母线负荷预报数据处理方法的技术。
背景技术
电力系统母线负荷预报作用是:1)为安全预警提供未来几分钟的负荷数据;2)为状态估计提供一个检测数据突变的数据源;3)提供超短期负荷预报基础数据。
目前,国内外对母线负荷预报基本采用全网负荷预测加上分配系数的方式。这种处理方式并没有考虑到每个母线的负荷特性,并且使用不变的分配系数,导致在不同时间段上存在较大的不确定性误差。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种能在不同时间段上存在较小误差的,高精确度的4阶龙格-库塔母线负荷预报方法。
为了解决上述技术问题,本发明所提供的一种4阶龙格-库塔母线负荷预报方法,其特征在于,本发明所采用的方法如下:
1)取厂站母线负荷,对每个厂站按照电压等级计算母线负荷Pmea
2)对母线负荷,按照等时间间隔取得连续的(若干)采样数据;例如:对每个母线负荷Pmea,按照等时间间隔h=ΔT,连续得到N(N为自然数)个数据P(Pmea0,Pmea1,Pmea2,Pmea3,Pmea4……PmeaN);
3)对相邻的数据取微分,得到(若干)微分值;对同一个母线的M组数据,求一阶微分得到M(M=N-1)个微分数据Km(M=1,2,3,4),Km=(Pmea m,-/Pmea m-1)ΔT;
4)根据4阶龙格一库塔方法要求实时计算加权值;取加权平均值Kiper=(K1+2×K2+2×K3+K4)/6;
5)根据前一时刻的加权计算值,计算下一时刻的母线预报负荷;即预报下一个ΔT时刻的母线负荷Pest=Pmea4+KiperΔT;
6)反复步骤1)至5),能进行母线负荷预报;即可以连续的预测下个时刻的母线Pest
进一步的,所述的步骤4)中得到的斜率K2,K3,K4能作为下一个时刻的斜率K1,K2,K3;无需反复求解。
利用本发明提供的4阶龙格-库塔母线负荷预报方法,由于采用工程上更为精确的微分算法,进行母线负荷预报,即采用4阶龙格-库塔法,对数据进行预测,使母线负荷预报不再依赖全网负荷预测,避免了以往导致在不同时间段上存在较大的不确定性的误差,从而提高了母线预报的精确度。
本发明提供的基于龙格-库塔的母线预报方法,预测中得到的微分值,可以作为下一个时刻的部分微分计算值,无需从头开始反复求解,所以能快速的预报出下一个时刻的预报值。
附图说明
图1是本发明实施例4阶龙格-库塔方法的母线负荷预报流程图。
(SCADA:数据采集与监视控制系统)
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围。
龙格-库塔(Runge-Kutta)方法是一种在工程上应用广泛的高精度单步算法,该算法精度高,采取措施对误差进行抑制,其实现原理也较复杂,算法是构建在数学支持的基础之上的。
如果y在数据样本区间[xi,xi+1]内存在m个点上的斜率值K1,K2,……,Km,并取他们的加权平均数作为平均斜率Kiper的近似值,构造出具有很高精度的高阶计算公式。经数学推导、求解,可以得出四阶龙格-库塔公式,也就是在工程中应用广泛的经典龙格-库塔算法:
yi+1=yi+h×(K1+2×K2+2×K3+K4)/6
K1=f(xi,yi)
K2=f(xi+h/2,yi+h/2*K1)
K3=f(xi+h/2,yi+h/2*K2)
K4=f(xi+h,yi+h*K3)
采用4阶龙格-库塔法能精确求解区间[xi,xi+1]的微分值,从而得到区间的数学期望值,这个数学期望值可以用作下个区间估计值。
本发明实施例所提供的一种4阶龙格-库塔母线负荷预报方法,其特征在于,具体步骤如下:
1)采用4阶龙格-库塔方法;
2)上个时刻的微分值部分可以作为下个时空微分计算值,无需从头开始计算;
3)母线负荷预报中的母线是按照变电站划分,物理上可能是同一个电压等级下的多个母线组成。
如图1所示,本发明实施例所提供的4阶龙格-库塔母线负荷预报的实现流程如下:
1)对每个厂站按照电压等级计算母线负荷Pmea
2)对每个母线负荷Pmea,按照等时间间隔h=ΔT,连续得到N(N=5)个数据P(Pmea0,Pmea1,Pmea2,Pmea3,Pmea4);
3)对同一个母线的M组数据,求一阶微分得到M(M=4)个微分数据Km(M=1,2,3,4),Km=(Pmea m,-/Pmea m-1)ΔT;
4)取加权平均值Kiper=(K1+2×K2+2×K3+K4)/6;
5)预报下一个ΔT时刻的母线负荷Pest=Pmea4+KiperΔT;
6)反复1)-5),可以连续的预测下个时刻的母线Pest
本发明提供的基于龙格-库塔的母线预报方法,预测中得到的斜率K2,K3,K4可以作为下一个时刻的K1,K2,K3,无需从头开始反复求解,快速的预报出下一个时刻的预报值。

Claims (2)

1.一种4阶龙格-库塔母线负荷预报方法,其特征在于,方法的步骤为:
1)取厂站母线负荷;
2)对母线负荷,按照等时间间隔取得连续的采样数据;
3)对相邻的数据取微分,得到微分值;
4)根据4阶龙格-库塔方法要求实时计算加权值;
5)根据前一时刻的加权计算值,计算下一时刻的母线预报负荷;
6)反复步骤1)至5),能进行母线负荷预报。
2.根据权利要求1所述的4阶龙格-库塔母线负荷预报方法,其特征在于,所述的步骤4)中得到的斜率能作为下一个时刻的斜率;无需反复求解。
CN200810203042XA 2008-11-20 2008-11-20 4阶龙格-库塔母线负荷预报方法 Active CN101739502B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810203042XA CN101739502B (zh) 2008-11-20 2008-11-20 4阶龙格-库塔母线负荷预报方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810203042XA CN101739502B (zh) 2008-11-20 2008-11-20 4阶龙格-库塔母线负荷预报方法

Publications (2)

Publication Number Publication Date
CN101739502A true CN101739502A (zh) 2010-06-16
CN101739502B CN101739502B (zh) 2012-11-28

Family

ID=42462978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810203042XA Active CN101739502B (zh) 2008-11-20 2008-11-20 4阶龙格-库塔母线负荷预报方法

Country Status (1)

Country Link
CN (1) CN101739502B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930344A (zh) * 2012-10-09 2013-02-13 中国电力科学研究院 一种基于负荷趋势变化的超短期母线负荷预测方法
CN103793041A (zh) * 2014-02-21 2014-05-14 珠海全志科技股份有限公司 多核对称多处理系统的电源管理方法及装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100428276C (zh) * 2005-09-09 2008-10-22 清华大学 基于最小信息损失的综合负荷预测方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930344A (zh) * 2012-10-09 2013-02-13 中国电力科学研究院 一种基于负荷趋势变化的超短期母线负荷预测方法
CN102930344B (zh) * 2012-10-09 2016-08-31 中国电力科学研究院 一种基于负荷趋势变化的超短期母线负荷预测方法
CN103793041A (zh) * 2014-02-21 2014-05-14 珠海全志科技股份有限公司 多核对称多处理系统的电源管理方法及装置

Also Published As

Publication number Publication date
CN101739502B (zh) 2012-11-28

Similar Documents

Publication Publication Date Title
Sun et al. Research on ultra-short-term wind power prediction considering source relevance
CN102946253B (zh) 数据采样方法与系统及其在参数辨识中的应用方法与系统
CN103020743B (zh) 风电场超短期风速预测方法
CN103995162B (zh) 基于高级量测体系的配电网大用户实时防窃电方法
CN102789447A (zh) 基于灰多元线性回归的覆冰与气象关系的分析方法
CN108574300B (zh) 一种基于相似性聚合的分布式光伏发电功率状态估计方法
CN104700151A (zh) 一种基于三次样条插值曲线拟合的风电功率考核方法
CN101872975A (zh) 电力系统暂态功角稳定在线分析的自适应动态等值方法
CN105699849A (zh) 一种基于量子行为粒子群优化算法的电压暂降估计方法
CN102331548A (zh) 一种配网电缆单相接地故障的故障定位方法
CN105048508B (zh) 一种t型三电平单相并网逆变器的控制方法及系统
CN104537233B (zh) 一种基于核密度估计的配电网伪量测生成方法
CN101739502B (zh) 4阶龙格-库塔母线负荷预报方法
CN102590686B (zh) 一种双极直流输电线路无线电干扰确定方法
CN106410862B (zh) 基于有功恢复斜率校正的风电场单机等值方法
CN105654189B (zh) 基于时间序列分析与卡尔曼滤波算法的覆冰短期预测方法
CN105046349A (zh) 一种计及尾流效应的风电功率预测方法
CN105939014A (zh) 一种风电场站相关性指标获取方法
Zhicun et al. Evaluating the effect of sample length on forecasting validity of FGM (1, 1)
Ding et al. Forecast of pv power generation based on residual correction of markov chain
CN102142682B (zh) 一种基于直流潮流模型的支路开断灵敏度计算方法
CN117200223A (zh) 日前电力负荷预测方法和装置
CN112052985A (zh) 一种基于lightgbm的中短期低电压预测方法
CN102539823A (zh) 一种wtg风速分布的预测方法
CN116973683A (zh) 一种风电场集电线路单相接地故障区段定位方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD

Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD.

Effective date: 20130227

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130227

Address after: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building

Patentee after: Shanghai Sunrise Power Technology Co., Ltd.

Address before: 200233 Shanghai City, Xuhui District Road No. 159 15 Tianzhou room unit 1301

Patentee before: Shanghai Sunrise Power Automation Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180211

Address after: Room 2409, building No. 2, Jiaxing Software Park, No. 599, Jiaxing, subzhong Road, Nanhu District, Jiaxing, Zhejiang

Patentee after: Jiaxing Saiyun Amperex Technology Limited

Address before: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building

Patentee before: Shanghai Sunrise Power Technology Co., Ltd.