CN101728801A - Lead unfolding process - Google Patents

Lead unfolding process Download PDF

Info

Publication number
CN101728801A
CN101728801A CN200910273273A CN200910273273A CN101728801A CN 101728801 A CN101728801 A CN 101728801A CN 200910273273 A CN200910273273 A CN 200910273273A CN 200910273273 A CN200910273273 A CN 200910273273A CN 101728801 A CN101728801 A CN 101728801A
Authority
CN
China
Prior art keywords
rope
mentioned
unfolding
lead
unfolding process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910273273A
Other languages
Chinese (zh)
Other versions
CN101728801B (en
Inventor
余秋安
汤祖澎
杨力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
Hubei Electric Transmission & Transformation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Electric Transmission & Transformation Engineering Co filed Critical Hubei Electric Transmission & Transformation Engineering Co
Priority to CN2009102732732A priority Critical patent/CN101728801B/en
Publication of CN101728801A publication Critical patent/CN101728801A/en
Application granted granted Critical
Publication of CN101728801B publication Critical patent/CN101728801B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ropes Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention relates to a lead unfolding process which comprises the following steps of: unfolding a middle-phase pulling rope, and utilizing the middle-phase pulling rope to unfold two ground leads, two lead guide ropes and a middle-phase pulling rope by once pulling. The two ground leads, the two lead guide pulling ropes and the middle-phase pulling rope are unfolded through once pulling, therefore, the process can reduce the number of times of flights of a paramotor, improves the working efficiency, saves the energy and the cost, and increases the safety.

Description

Lead unfolding process
[technical field]
The present invention relates to unfolding process, relate in particular to a kind of technology with traction limp spreading conducting wire.
[background technology]
At present, for ultra-high-tension power transmission line, owing to improving constantly of electric pressure and transmission capacity, the cross-sectional area of lead and division number also constantly increase.In order to finish the unfolding of lead, for a phase multiple fission conductor, must adopt gradation to unfold step by step pull rope.For example, the exhibition of power transmission sequence stringing engineering single loop iron tower guiding rope is put in the construction, what generally adopt is to utilize the propeller-parachuting exhibition to put 2 φ, 3.5 high-strength caprone cables, utilizes φ 3.5 high-strength caprone cables to adopt " one leads two " construction technologies again, and progressively 5 guidings of unwrapping wire section being restricted, it is logical to put.
In order to increase work efficiency, gradation is opened up the number of times of putting step by step and should be reduced as far as possible.
[summary of the invention]
In view of this, be necessary to provide a kind of lead unfolding process that exhibition is put number of times, increased work efficiency that reduces.
A kind of lead unfolding process may further comprise the steps: traction rope in the unfolding; And utilize above-mentioned middle traction rope once to tract two ground wires, two wire guide ropes and a middle traction rope.
Preferably, above-mentioned middle traction rope connects above-mentioned two ground wires, two wire guide ropes and a middle traction rope by limp.
Preferably, described lead unfolding process further may further comprise the steps: when every basic iron tower, will above-mentioned two ground wires and after two sideline guide ropes pass coaster, again be connected limp and connect, thereby continue to draw.
Preferably, described lead unfolding process further may further comprise the steps: phase preliminary leading rope in the unfolding; Utilize above-mentioned middle phase preliminary leading rope to unfold secondary guide rope; Utilize again level guide rope of above-mentioned secondary guide rope unfolding; And utilize above-mentioned again level guide rope to unfold above-mentioned middle traction rope.
Preferably, the phase preliminary leading rope adopts propeller-parachuting or dirigible unfolding or manpower unfolding in the described unfolding.
Preferably, described utilize above-mentioned in the phase preliminary leading rope unfold secondary guide rope and adopt the manpower unfolding, described utilize above-mentioned secondary guide rope unfolding again the level guide rope and utilize above-mentioned again level guide rope unfolding above-mentioned in traction rope unfold for machinery.
Preferably, above-mentioned middle phase preliminary leading rope is Ф 3.5 high-strength caprone cables, and above-mentioned secondary guide rope is Ф 10 enlightening Nima ropes, and a level guide rope is the 15 anti-steel wire ropes of turning round again, and above-mentioned middle traction rope is the 24 anti-steel wire ropes of turning round.
Preferably, above-mentioned ground wire is the GJ-80 cable.
By once unfolding two ground wires, two wire guide ropes and a middle traction rope, this technology can reduce the number of times of the flight of propeller-parachuting, increases work efficiency, energy savings, saving cost, increases security.
[description of drawings]
Fig. 1 is the schematic diagram of phase preliminary leading rope in the unfolding in the preferred embodiment of lead unfolding process of the present invention.
Fig. 2 unfolds the schematic diagram of secondary guide rope for phase preliminary leading rope in utilizing in the preferred embodiment of lead unfolding process of the present invention.
Fig. 3 is for utilizing the again schematic diagram of level guide rope of secondary guide rope unfolding in the preferred embodiment of lead unfolding process of the present invention.
Fig. 4 is for utilizing again the schematic diagram of traction rope in the level guide rope unfolding in the preferred embodiment of lead unfolding process of the present invention.
Fig. 5 once unfolds two ground wires and the again schematic diagram of level guide rope of three-phase conducting wire for traction rope in utilizing in the preferred embodiment of lead unfolding process of the present invention.
[embodiment]
Below in conjunction with accompanying drawing, specific embodiments of the invention are elaborated.
Put efficient for the exhibition that improves lead effectively, the invention provides a kind of lead unfolding process, this technology comprises the steps:
A) phase preliminary leading rope 1 (as shown in fig. 1) during exhibition is put.In the present embodiment, middle phase preliminary leading rope 1 is Ф 3.5 high-strength caprone cables.General technology is propeller-parachuting (or dirigible) unfolding, and the manpower unfolding also can be adopted in the level land that condition is good.Before adopting propeller-parachuting (or dirigible) unfolding process, mainly adopt the manpower unfolding.
B) phase preliminary leading rope 1 unfolding secondary guide rope 2 (as shown in Figure 2) in the utilization.In the present embodiment, secondary guide rope 2 is Ф 10 enlightening Nima ropes, and phase preliminary leading rope 1 manpower unfolds secondary guide rope 2 in the utilization.In between phase preliminary leading rope 1 and the secondary guiding rope 2 the employing rotary connector be connected.
C) utilize again level guide rope 3 (as shown in Figure 3) of secondary guide rope 2 unfoldings.In the present embodiment, level guide rope 3 utilizes the secondary guide rope 3 of secondary guide rope 2 machinery unfoldings for 15 prevents turning round steel wire rope again.Secondary guide rope 2 is connected with again adopting rotary connector between grade guide rope 3.
D) utilize again traction rope 4 (as shown in Figure 4) in level guide rope 3 unfoldings.In the present embodiment, middle traction rope 4 is utilized again traction rope 4 in the level guide rope 3 machinery unfoldings for the 24 anti-steel wire ropes of turning round.The employing rotary connector is connected between level guide rope 3 and the middle traction rope 4 again
E) traction rope 4 once tracts left ground wire 5, right ground wire 6, left wire guide rope 7, right wire guide rope 8 and middle traction rope 9 (as shown in Figure 5) in the utilization.In the present embodiment, wire guide rope 7,8 is the 15 anti-steel wire ropes of turning round, and middle phase pull rope 9 is prevented turning round steel wire rope for 24, and ground wire is the GJ-80 cable.
In brief, above-mentioned construction technology is exactly to open up in the phase coaster to put a guiding rope (preliminary leading rope 1, secondary guiding rope 2,3) in lead, the guiding rope (middle phase pull rope 4) of phase in utilizing then, adopt " one leads five " towing plate (to call limp in the following text, as shown in Figure 5), with two ground wires (ground wire 5,6) and three-phase conducting wire with guiding rope (left wire guide rope 7, right wire guide rope 8 and in pull rope 9) mutually disposable put logical.Divide rope at tower during the every basic iron tower of " one leads five " limp process, with 2 ground wires (ground wire 5,6) with are connected a sideline guide rope (left wire guide rope 7, right wire guide rope 8) pass behind the coaster again be connected lead five " limp connects, continue then traction, guide rope is put logical by base.The advantage of this construction technology is to reduce the number of times of the flight of propeller-parachuting, energy savings, saving cost, increase security.
Adopt the construction of above-mentioned unfolding process to have the following advantages: on the one hand, can reduce the powered paragliding number of times, thus energy savings, the security risk that reduces; On the other hand, can reduce the payingoff construction personnel amount, reduce the human cost of engineering.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to claim of the present invention.Should be pointed out that for the person of ordinary skill of the art without departing from the inventive concept of the premise, can also make some distortion and improvement to enforcement of the present invention, these all belong to protection scope of the present invention.Therefore, the protection range of patent of the present invention should be as the criterion with claims.

Claims (8)

1. lead unfolding process may further comprise the steps:
Zhan Fangzhong phase pull rope; And
Utilize above-mentioned middle traction rope once to tract two ground wires, two wire guide ropes and a middle traction rope.
2. lead unfolding process according to claim 1 is characterized in that: traction rope connects above-mentioned two ground wires, two wire guide ropes and a middle traction rope by limp in above-mentioned.
3. lead unfolding process according to claim 2 is characterized in that: described lead unfolding process further may further comprise the steps:
When every basic iron tower, will above-mentioned two ground wires and after two sideline guide ropes pass coaster, again be connected limp and connect, thereby continue to draw.
4. lead unfolding process according to claim 3 is characterized in that: described lead unfolding process further may further comprise the steps:
Phase preliminary leading rope in the unfolding;
Utilize above-mentioned middle phase preliminary leading rope exhibition to put secondary guiding rope;
Utilize above-mentioned secondary guiding rope exhibition to put level guiding rope once more; And
Utilize the above-mentioned middle traction rope of above-mentioned again level guide rope unfolding.
5. lead unfolding process according to claim 4 is characterized in that: phase preliminary leading rope employing propeller-parachuting or dirigible unfolding or manpower unfolding in the described unfolding.
6. lead unfolding process according to claim 5 is characterized in that: described utilize above-mentioned in the phase preliminary leading rope unfold secondary guide rope and adopt the manpower unfolding, described utilize above-mentioned secondary guide rope unfolding above-mentioned in traction rope unfold for machinery.
7. lead unfolding process according to claim 4, it is characterized in that: the phase preliminary leading rope is Φ 3.5 high-strength caprone cables in above-mentioned, above-mentioned secondary guiding rope is Φ 10 enlightening Nima ropes, and above-mentioned grade guiding rope once more is the 15 anti-steel wire ropes of turning round, and above-mentioned middle phase pull rope is the 24 anti-steel wire ropes of turning round.
8. according to the lead unfolding process described in the claim 7, it is characterized in that: above-mentioned ground wire is the GJ-80 cable.
CN2009102732732A 2009-12-15 2009-12-15 Lead unfolding process Active CN101728801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102732732A CN101728801B (en) 2009-12-15 2009-12-15 Lead unfolding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102732732A CN101728801B (en) 2009-12-15 2009-12-15 Lead unfolding process

Publications (2)

Publication Number Publication Date
CN101728801A true CN101728801A (en) 2010-06-09
CN101728801B CN101728801B (en) 2012-06-27

Family

ID=42449248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102732732A Active CN101728801B (en) 2009-12-15 2009-12-15 Lead unfolding process

Country Status (1)

Country Link
CN (1) CN101728801B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038367A (en) * 2018-08-22 2018-12-18 国网山东省电力公司安丘市供电公司 Construction of line leaping over obstacles bracket
CN110165602A (en) * 2019-04-24 2019-08-23 河南送变电建设有限公司 A kind of high pressure stringing system and method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101442194A (en) * 2008-09-11 2009-05-27 山西省电力公司送变电工程公司 Spanning method for ultra, extra high voltage line construction without crossover frame
CN101459321B (en) * 2008-12-31 2011-08-31 程永忠 Long distance bundling paying-out method and apparatus for slope tower over hanging power transmission line
CN101510677B (en) * 2009-01-15 2011-01-05 国网直流工程建设有限公司 Method and system for unfolding conductor
CN101582572B (en) * 2009-06-23 2011-02-02 湖南省送变电建设公司 Method of extra-high voltage tension stringing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038367A (en) * 2018-08-22 2018-12-18 国网山东省电力公司安丘市供电公司 Construction of line leaping over obstacles bracket
CN110165602A (en) * 2019-04-24 2019-08-23 河南送变电建设有限公司 A kind of high pressure stringing system and method

Also Published As

Publication number Publication date
CN101728801B (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN101582572B (en) Method of extra-high voltage tension stringing
CN102290742B (en) Tension stringing construction technology
CN102545103B (en) Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method
CN204131006U (en) Novel traction pulley
CN101728801B (en) Lead unfolding process
CN106099771B (en) Cable guide device
CN202444206U (en) Wire clamp for grounding wire
CN209217586U (en) A kind of power line construction cable safety hitch
CN206908188U (en) A kind of split conductor is changed leads a stringing walking plate with four
CN211769863U (en) Crane cable pulley group
CN205960528U (en) Cable wire formula hydraulic pressure tension device for transmission line
CN106253143A (en) A kind of cable type hydraulic line tightening device and method used for transmission line
CN204992433U (en) Cable carrier
CN113027840A (en) Remote walking hydraulic system and walking power station of electric drilling machine
CN202444204U (en) Traction lifting device for high-altitude circuit tools and appliances
CN204835429U (en) Continuous tying to built on stilts phase line of carbon fiber optoelectrical composite constructs
CN202495705U (en) Wire clamping device for charged disconnected lead
CN207765887U (en) One kind four leads six hinge type bivector traction limps
CN218386682U (en) Power cable convenient to installation
CN209497003U (en) A kind of grounding wire device
CN203361151U (en) Light and portable ground anchor
CN214698555U (en) Remote walking hydraulic system and walking power station of electric drilling machine
CN202736554U (en) Extensible straight elevator traveling cable
CN207312874U (en) A kind of taking-up frame anti-off device
CN208315254U (en) A kind of composite high-strength cable that current-carrying capacity is high

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121211

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20121211

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Patentee after: State Grid Corporation of China

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.