CN101725101A - Construction method of waste tyre earth roadbed - Google Patents

Construction method of waste tyre earth roadbed Download PDF

Info

Publication number
CN101725101A
CN101725101A CN200810201033A CN200810201033A CN101725101A CN 101725101 A CN101725101 A CN 101725101A CN 200810201033 A CN200810201033 A CN 200810201033A CN 200810201033 A CN200810201033 A CN 200810201033A CN 101725101 A CN101725101 A CN 101725101A
Authority
CN
China
Prior art keywords
tire
roadbed
job practices
layer
junked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810201033A
Other languages
Chinese (zh)
Inventor
王瑜
李彤
高德宪
胡立昌
孙丽
王殿涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA MCC20 CONSTRUCTION Co Ltd
Original Assignee
CHINA MCC20 CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA MCC20 CONSTRUCTION Co Ltd filed Critical CHINA MCC20 CONSTRUCTION Co Ltd
Priority to CN200810201033A priority Critical patent/CN101725101A/en
Publication of CN101725101A publication Critical patent/CN101725101A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to highway construction, in particular to a roadbed construction method. A construction method of waste tyre earth roadbed comprises the following steps: a. selecting basement processing area; b. preparing materials and construction equipments (waste tyres and stainless steel bolt connecting pieces); c. adding auxiliary reinforcing layers at edges of each layer of the basement and non high filling square tyre earth, which mainly comprises geogrid and geotextile pavement; d. installing bottom layer waste tyre to connected into an integral; e. transporting to location and filling filler materials; f. continuing to construct the waste tyre earth structure of the second layer and the third layer according to steps d and e until reaching the designed height; and g. paving geogrids and reinforcing on the top of the uppermost layer of waste tyre earth.

Description

Waste tyre earth roadbed job practices
Technical field
The present invention relates to the highway construction construction, relate in particular to a kind of roadbed construction method.
Background technology
In recent years, along with the development of highway construction, increasing newly-built road is dispersed throughout urban and urual areas of whole country everywhere.But with regard to its structure, most of road structure layers of determining have adopted comparatively traditional form of structure often, and promptly the selected material of each deck mainly is delay slag, plain soil, lime, cement, stone, industrial residue etc.; Though use these materials to build the road to draw materials conveniently, work progress is easy to grasp and multiple advantages such as control, but, also brought simultaneously to guaranteeing the stable of road structure layer, the thickness that must increase deck causes deadweight to cause roadbed subsidence, enlarges floor space, also consumes shortcomings such as ample resources simultaneously.Therefore, be badly in need of seeking a kind of method at present and solve this problem.
Summary of the invention
The present invention is intended to solve the above-mentioned defective of prior art, and a kind of waste tyre earth roadbed job practices is provided.The present invention is the effective thickness of control structure layer not only, reduces floor space, utilizes junked tire can reduce the use of various resources, strengthens roadbed toughness, and sought this outlet of YITIAOGEN for the processing of junked tire.
The present invention is achieved in that
A kind of job practices of junked tire roadbed, it comprises the following steps:
A. basement processing area is selected;
B. material and construction equipment are prepared; It comprises the preparation of junked tire and stainless steel bolt connector;
C. substrate and each layer of Fei Gao embankment tyre earth edge add auxiliary back-up coat, mainly comprise geo-grid and geotextile laying;
D. the installing bottom layer junked tire makes it be linked to be integral body;
E. have bad luck and fill packing material;
F. d and e continue the construction second layer, three-ply tire soil structure set by step, until design height;
G. the geo-grid reinforcement is spread at the superiors' tyre earth top.
The job practices of described junked tire roadbed, described step a comprises: as requested road bases is pushed away, evens out whole, grinding compacting; Change and fill out when requiring, change on request and fill out, and it is real that substrate is pushed away concora crush.
The job practices of described junked tire roadbed, described step b comprises: it is complete to choose external form, and the waste tire of automobile of specification unanimity is as reinforcing road bed reinforcement material.
The job practices of described junked tire roadbed, described step b comprises: the specification of described junked tire is advisable with φ 1100-20.
The job practices of described junked tire roadbed, described steps d comprises: described tire is tiled in intends reinforcing road bed position, the vertical, horizontal marshalling in the circumscribed contacting points position boring of each adjacent tire, connects this tire with stainless steel bolt afterwards.
The job practices of described junked tire roadbed, described step e comprises:
E1. after the connection of bottom tire finishes, adopt digging machine to be aided with and manually have bad luck packing material to connecting on the tire that finishes, artificial cooperation overturning is to tire and in the slit between tire, filling should be full of the space as much as possible, and exceed tire tread 100mm and be advisable, adopting dry fine sand to fill out filling than small gap between tire expires, manually rams packing material with vertical rammer machine then;
E2. fill for the first time, ram finish after, carry out filling the second time packing material immediately; That is, have bad luck packing material to tire layer, and exceed the about 150mm of tire, slowly roll with the iron tandem type road rollers then; Roll the order of pressing and carry out, must all be pressed onto, do not have to leak and press, all be full of space in the tire and the space between tire until inserts by shaking behind the first static pressure; Unnecessary inserts artificially collects, and stock pile stacked is in intending putting the upper strata tire location.
The job practices of described junked tire roadbed, among the described step f, during repeating step d, the levels tire staggers and puts, and along with the increase of structure level number, successively reduces certain size.
The job practices of described junked tire roadbed in the described step g, when roadbed substrate soil property is bad, adopts geotextiles and geo-grid to be overlapped into to assist the back-up coat substrate surface that is laid in reinforcing road bed, to satisfy requirement for bearing capacity; Simultaneously, in order to stablize each layer edge tire inner filling material, need to add auxiliary back-up coat (being geo-grid and geotextiles) at tire bottom, each layer edge 1.0m wide region.
And geo-grid and geotextiles are pricked with nylon and are linked with geo-grid and geotextiles that together colligation is firm with the form of overlap joint; Colligation is detained at the overlap joint edge entirely, and midfeather is not more than 100mm; Other position is pricked button bit and is put interlaced arrangement, at interval 500mm~600mm.
The job practices of described junked tire roadbed, in step c, f, construct for high-fill roadbed, when adopting tyre earth reinforcing road bed, can by 1: 0.3~1: 0.4 slope than (that is: height change 1.0m, horizontal range changes 0.3~0.4m) control width of subgrade, with effective minimizing highway floor space, promptly increase with structure level number, the levels tire staggers apart from being reduced to 90mm.
The present invention introduces junked tire in roadbed, because:
Tyre earth has the light advantage of dead load, can obviously reduce the subgrade settlement that causes because of dead load, and is favourable stable;
Tyre earth has the good mechanical performance.Mainly between soil (or other packing material) and the tire rely on mutual anchoring and work.Tire is made up of rubber, has an extremely strong anti-tensile strength, and certain toughness is arranged, even the mechanics of materials index of Tian Chonging is bad, also can obviously improve the supporting capacity of roadbed therebetween;
From job practices of the present invention, easy construction of the present invention is easy to operate, does not need the special work post labour, can save labor cost;
The construction machinery less investment only needs conventional machinery to get final product, and saves the input quantity of machinery;
Can shorten the inter process interval, it is short to take effective time duration;
Reduce construction costs, waste tire of automobile can be purchased by low price, and engineering earth can be gathered materials on the spot, and the engineering economy input obviously reduces; Applying in similar engineering project from now on has broad prospects.
The used waste tire of automobile of engineering is a trade waste, and application of the present invention can be the reasonable utilization of waste tire of automobile and sought this outlet of YITIAOGEN; Environmental protection had positive facilitation.
The specific embodiment
A kind of job practices of junked tire roadbed, it comprises the following steps:
A. basement processing area is selected; As requested road bases is pushed away, evens out whole, grinding compacting.Change and fill out when requiring, change on request and fill out, and it is real that substrate is pushed away concora crush;
B. material and construction equipment are prepared; It comprises the preparation of junked tire: it is complete to choose external form, and the waste tire of automobile of specification unanimity is as reinforcing road bed reinforcement material.The tire that with the specification is φ 1100-20 is good, according to filling roadbed width difference, the tire collocation of different-diameter can be used;
C. substrate making back-up coat is laid, and mainly comprises geo-grid and geotextile laying;
D. the installing bottom layer junked tire makes it be linked to be integral body; Tire tiling (in length and breadth to marshalling) in intending reinforcing road bed position, in the circumscribed contacting points position boring of adjacent tires, is connected tire with stainless steel bolt afterwards;
E. have bad luck and fill packing material;
E1. the bottom tire connect finish after, adopt digging machine to be aided with and manually have bad luck packing material (soil, sand, two ash or two dirt) to connecting on the tire that finishes, manually cooperate overturning to reach to the tire in the slit between tire.Fill for the first time and should be full of the space as much as possible, and exceed tire tread 100mm and be advisable, it is full to fill out filling with the fine sand of drying than small gap between tire, manually rams packing material with vertical rammer machine then.
E2. fill for the first time, ram finish after, should carry out filling the second time packing material immediately.That is, have bad luck packing material to tire layer, and exceed the about 150mm of tire, slowly roll with the iron tandem type road rollers then.Roll by the order of pressing of shaking behind the first static pressure and undertaken, require all to be pressed onto, must not leak pressure.All be full of space in the tire and the space between tire until inserts.Unnecessary inserts artificially collects, and stock pile stacked is in intending putting the upper strata tire location.
F. d and e continue the construction second layer, three-ply tire soil structure set by step, until design height;
G. the geo-grid reinforcement is spread at the superiors' tyre earth top;
Roadbed substrate soil property is bad, and bearing capacity does not reach when requiring, and it is reinforcing road bed to adopt geotextiles and geo-grid to be overlapped into the auxiliary back-up coat substrate surface that is laid in.Simultaneously, in order to stablize each layer edge tire inner filling material, need to add auxiliary back-up coat (being geo-grid and geotextiles) at tire bottom, each layer edge 1.0m wide region.When geo-grid and geotextiles connect, prick with nylon and to link that together colligation is firm with the form of overlap joint with geo-grid and geotextiles.Colligation is detained at the overlap joint edge entirely, and midfeather is advisable to be not more than 100mm.Other position is pricked button bit and is put interlaced arrangement, is advisable with 500mm~600mm at interval.
High-fill roadbed construction, when adopting tyre earth reinforcing road bed, can be by 1: 0.3~1: 0.4 slope than (that is: height change 1.0m, horizontal range changes 0.3~0.4m) control width of subgrade, effectively reduces the highway floor space.

Claims (9)

1. the job practices of a junked tire roadbed is characterized in that, it comprises the following steps:
A. basement processing area is selected;
B. material and construction equipment are prepared; It comprises the preparation of junked tire and stainless steel bolt connector;
C. substrate and each layer of Fei Gao embankment tyre earth edge add auxiliary back-up coat, mainly comprise geo-grid and geotextile laying;
D. the installing bottom layer junked tire makes it be linked to be integral body;
E. have bad luck and fill packing material;
F. d and e continue the construction second layer, three-ply tire soil structure set by step, until design height;
G. the geo-grid reinforcement is spread at the superiors' tyre earth top.
2. the job practices of junked tire roadbed according to claim 1 is characterized in that, described step a comprises: as requested road bases is pushed away, evens out whole, grinding compacting; Change and fill out when requiring, change on request and fill out, and it is real that substrate is pushed away concora crush.
3. the job practices of junked tire roadbed according to claim 1 is characterized in that, described step b comprises: it is complete to choose external form, and the waste tire of automobile of specification unanimity is as reinforcing road bed reinforcement material.
4. according to the job practices of claim 1 or 3 described junked tire roadbeds, it is characterized in that described step b comprises: the specification of described junked tire is φ 1100-20.
5. the job practices of junked tire roadbed according to claim 1, it is characterized in that, described steps d comprises: described tire is tiled in intends reinforcing road bed position, the vertical, horizontal marshalling, in the circumscribed contacting points position boring of each adjacent tire, with stainless steel bolt this tire is connected afterwards.
6. the job practices of junked tire roadbed according to claim 1 is characterized in that, described step e comprises:
E1. after the connection of bottom tire finishes, adopt digging machine to be aided with and manually have bad luck packing material to connecting on the tire that finishes, artificial cooperation overturning is to tire and in the slit between tire, filling should be full of the space as much as possible, and exceed tire tread 100mm and be advisable, adopting dry fine sand to fill out filling than small gap between tire expires, manually rams packing material with vertical rammer machine then;
E2. fill for the first time, ram finish after, carry out filling the second time packing material immediately; That is, have bad luck packing material to tire layer, and exceed the about 150mm of tire, slowly roll with the iron tandem type road rollers then; Roll the order of pressing and carry out, must all be pressed onto, do not have to leak and press, until inserts all being full of space in the tire and the space between tire by shaking behind the first static pressure; Unnecessary inserts artificially collects, and stock pile stacked is in intending putting the upper strata tire location.
7. the job practices of junked tire roadbed according to claim 1 is characterized in that, among the described step f, during repeating step d, the levels tire staggers and puts, and along with the increase of structure level number, successively reduces certain size.
8. the job practices of junked tire roadbed according to claim 1, it is characterized in that, in the described step g, when roadbed substrate soil property is bad, adopt geotextiles and geo-grid to be overlapped into to assist the back-up coat substrate surface that is laid in reinforcing road bed, to satisfy requirement for bearing capacity; Simultaneously, in order to stablize each layer edge tire inner filling material, need in the interpolation of tire bottom, each layer edge auxiliary back-up coat, i.e. geo-grid and geotextiles.
And geo-grid and geotextiles are pricked with nylon and are linked with geo-grid and geotextiles that together colligation is firm with the form of overlap joint; Colligation is detained at the overlap joint edge entirely, and midfeather is not more than 100mm; Other position is pricked button bit and is put interlaced arrangement, at interval 500mm~600mm.
9. according to the job practices of claim 1 or 7 described junked tire roadbeds, it is characterized in that, at step c, f, for the high-fill roadbed construction, when adopting tyre earth reinforcing road bed, slope ratio by 1: 0.3~1: 0.4, that is: height change 1.0m, horizontal range changes 0.3~0.4m control width of subgrade, with effective minimizing highway floor space, promptly increase with structure level number, the levels tire staggers apart from being reduced to 90mm.
CN200810201033A 2008-10-10 2008-10-10 Construction method of waste tyre earth roadbed Pending CN101725101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810201033A CN101725101A (en) 2008-10-10 2008-10-10 Construction method of waste tyre earth roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810201033A CN101725101A (en) 2008-10-10 2008-10-10 Construction method of waste tyre earth roadbed

Publications (1)

Publication Number Publication Date
CN101725101A true CN101725101A (en) 2010-06-09

Family

ID=42446601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810201033A Pending CN101725101A (en) 2008-10-10 2008-10-10 Construction method of waste tyre earth roadbed

Country Status (1)

Country Link
CN (1) CN101725101A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535301A (en) * 2011-12-26 2012-07-04 华北水利水电学院 Desert road paved by waste tires
CN103174126A (en) * 2013-03-22 2013-06-26 中冶集团武汉勘察研究院有限公司 Rubber strip reinforced soil technology
CN103498396A (en) * 2013-10-21 2014-01-08 山东大学 Method for processing roadbed by means of matching of waste tire piece bodies and reinforced soil
CN103572680A (en) * 2012-08-02 2014-02-12 五冶集团上海有限公司 Road roadbed filling construction method of coal mine gob
CN103711053A (en) * 2014-01-16 2014-04-09 山东大学 Composite reinforced roadbed and construction method
CN103741566A (en) * 2014-01-16 2014-04-23 山东大学 Compound tire-broken stone anti-skid draining roadbed structure and construction method thereof
CN105064167A (en) * 2015-08-14 2015-11-18 福州皇家地坪有限公司 Method for handling cracking of plastic track
CN110820431A (en) * 2019-11-25 2020-02-21 湖北工业大学 Railway foundation bed construction method
CN114277632A (en) * 2021-11-29 2022-04-05 中铁第六勘察设计院集团有限公司 Environment-friendly roadbed structure based on waste plastic barrels and construction method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535301A (en) * 2011-12-26 2012-07-04 华北水利水电学院 Desert road paved by waste tires
CN102535301B (en) * 2011-12-26 2015-04-15 华北水利水电学院 Desert road paved by waste tires
CN103572680A (en) * 2012-08-02 2014-02-12 五冶集团上海有限公司 Road roadbed filling construction method of coal mine gob
CN103572680B (en) * 2012-08-02 2016-01-20 五冶集团上海有限公司 The roadbed filling construction method of coal mine gob
CN103174126A (en) * 2013-03-22 2013-06-26 中冶集团武汉勘察研究院有限公司 Rubber strip reinforced soil technology
CN103498396A (en) * 2013-10-21 2014-01-08 山东大学 Method for processing roadbed by means of matching of waste tire piece bodies and reinforced soil
CN103498396B (en) * 2013-10-21 2015-09-16 山东大学 Junked tire lamellar body is utilized to coordinate the method for reinforcement process roadbed
CN103711053A (en) * 2014-01-16 2014-04-09 山东大学 Composite reinforced roadbed and construction method
CN103741566A (en) * 2014-01-16 2014-04-23 山东大学 Compound tire-broken stone anti-skid draining roadbed structure and construction method thereof
CN103741566B (en) * 2014-01-16 2016-08-17 山东大学 A kind of composite tyre-rubble anti-skid draining subgrade structure and construction method
CN105064167A (en) * 2015-08-14 2015-11-18 福州皇家地坪有限公司 Method for handling cracking of plastic track
CN110820431A (en) * 2019-11-25 2020-02-21 湖北工业大学 Railway foundation bed construction method
CN114277632A (en) * 2021-11-29 2022-04-05 中铁第六勘察设计院集团有限公司 Environment-friendly roadbed structure based on waste plastic barrels and construction method
CN114277632B (en) * 2021-11-29 2022-12-20 中铁第六勘察设计院集团有限公司 Roadbed structure based on waste plastic bucket and construction method

Similar Documents

Publication Publication Date Title
CN101725101A (en) Construction method of waste tyre earth roadbed
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN201095717Y (en) Red beds filled high-speed railway roadbed
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN106283944B (en) The method for pressing washer stone and/or block stone to reinforce shallow layer soft ground
CN110644324A (en) Splicing construction method for reconstructing and expanding new road and old road
CN112726310A (en) Reinforced roadbed with concrete building rubbish mixed soil as roadbed filler and construction method thereof
CN108589737A (en) Underground speedy way hands over the construction method that section is built jointly with rail under a kind of major urban arterial highway
CN109958018A (en) A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
CN110080051B (en) Geotextile bag bridge type embankment structure and construction method thereof
CN104452510B (en) Immediate construction method of rural road
CN103510504B (en) High saturated uneven reclaimed ground processing method
CN106592608A (en) Differential settlement control method for new foundation and old roadbed of utility tunnel
CN113445396A (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN214271530U (en) Soft basic district road structure based on building rubbish is laid
CN111576487B (en) Underground engineering foundation bottom plate structure and construction method thereof
CN109024123A (en) A kind of roadbed construction method
CN210529400U (en) Solidified building residue soil road structure
CN109797730B (en) Comprehensive compaction filling method for filling and land building in loess hilly gully region
CN112030643A (en) Construction method of red mud-based assembled roadbed for expressway
CN111441331A (en) High-water-content clay dynamic compaction replacement filling foundation and construction method thereof
CN102296506A (en) Geotechnical bag back subgrade and application method
CN210238174U (en) Old way transformation deep disease combined type micro pile reinforced structure
CN211142675U (en) Roadbed structure of expressway filled with muck type construction waste
CN113322734A (en) Construction method of aeolian sand roadbed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100609