CN102296506A - Geotechnical bag back subgrade and application method - Google Patents
Geotechnical bag back subgrade and application method Download PDFInfo
- Publication number
- CN102296506A CN102296506A CN2010102070960A CN201010207096A CN102296506A CN 102296506 A CN102296506 A CN 102296506A CN 2010102070960 A CN2010102070960 A CN 2010102070960A CN 201010207096 A CN201010207096 A CN 201010207096A CN 102296506 A CN102296506 A CN 102296506A
- Authority
- CN
- China
- Prior art keywords
- bag
- geotechnique
- subgrade
- foundation ditch
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a geotechnical bag back subgrade and application method. The geotechnical bag back subgrade consists of geotechnical bags (1), a bridge culvert passage (2), a back subgrade foundation pit (3) and a road surface (4), wherein the geotechnical bags (1) are vertically and horizontally laminated layer by layer in a staggering way from the back subgrade foundation pit (3) of the bridge culvert passage (2) and are closely combined with asphalt or concrete which is laid on the road surface (4). The geotechnical bag back subgrade is simple, practical and economical and has obvious social benefit and economic benefit.
Description
Technical field
The present invention relates to the improvement of a kind of back of the body roadbed and method, the improvement of particularly a kind of geotechnique's bag platform back of the body roadbed and method.
Background technology
Between the roadbed that bridges and culverts, passage etc. crosses the structure of highway and the structure platform back of the body bankets, often produce stepped differential settlement because of the rigidity great disparity, cause that " bumping at bridge-head " phenomenon takes place.Though adopting the roadbed of the geonet reinforcement structure platform back of the body to banket at present produces effect to the differential settlement that reduces between structure and the roadbed, but because structure platform back of the body construction space is narrow, backfill is difficult to grinding compacting, therefore, even adopt the geonet reinforcement, the sedimentation that enough bearing capacities can not be provided and reduce backfill effectively, have only the ground of working as to have enough bearing capacities, banketing under the synergy of heavy load and traffic loading, unlikely destruction and when producing big sedimentation, the geosynthetics reinforcement just can bring about tangible results.
Summary of the invention
The present invention has overcome deficiency of the prior art, and the improvement of a kind of geotechnique's bag platform back of the body roadbed and method is provided, and platform back of the body subgrade rating is improved, and sedimentation is even, reduces vibration.
The present invention solves by the following technical programs:
Hold the power situation according to bridges and culverts, channel board back of the body subgrade soil, platform is carried on the back the rubble, the original soil that excavate in the roadbed foundation ditch pack into and form geotechnique's bag behind the geotechnological woven bag tying, it is stand-by to be deposited in the foundation ditch limit; Treat that foundation ditch is by crisscross successively the stacking to the road surface of geotechnique's bag that after the standard arrangement foundation ditch limit is filled; Slit between geotechnique's bag is filled and led up with the place hack; Every layer of geotechnique's bag machinery or hand compaction; The road surface is by standard asphalt or concrete; Geotechnique's bag and bridges and culverts, passage etc. are combined closely,, reach the raising subgrade rating, eliminate differential settlement, reduce the road vibration to strengthen its globality; Dissolve the bumping at bridge-head phenomenon.
The invention has the beneficial effects as follows: simple, practicality, saving, economy.
1. simple.Geotechnique's woven bag is directly packed the original soil at bridges and culverts, passage scene into and is formed geotechnique's bag in the bag and be used for platform back of the body roadbed, and crisscross successively stacking to the road surface gets final product after filling and leading up the compacting road surfacing.
2. practical.Geotechnique's bag platform back of the body roadbed not only improves subgrade rating, eliminates differential settlement, and reduces the road vibration; Dissolve the bumping at bridge-head phenomenon.
3. save.The original soil at bridges and culverts, passage scene is directly used, gather materials on the spot, become useless and be usefulness, economize on resources, reduce discharging.
4. economical.Owing to gather materials on the spot, reduce discharging, can significantly save construction fund.
Description of drawings
Accompanying drawing is a sectional structural map of the present invention.
Among the figure: 1. geotechnique bag, 2. bridges and culverts passage, 3. a back of the body roadbed foundation ditch, 4. road surface.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is described in further detail.
In the drawings, rubble, the original soil of excavation in 2 back of the body roadbeds of bridges and culverts passage foundation ditch 3 packed into forms geotechnique's bag 1 behind the geotechnological woven bag tying, and it is stand-by to be deposited in platform back of the body roadbed foundation ditch 3 limits; Treat after platform back of the body roadbed foundation ditch 3 is by the standard arrangement platform carried on the back that geotechnique's bag that roadbed foundation ditch 3 limits fill 1 is crisscross successively stacks to the road surface 4; Slit between geotechnique's bag 1 is filled and led up with the place hack; Every layer of geotechnique's bag machinery or hand compaction; Road surface 4 is by standard asphalt or concrete.
Claims (1)
1. geotechnique's bag platform is carried on the back roadbed and application process, form by geotechnique's bag (1), bridges and culverts passage (2), platform back of the body roadbed foundation ditch (3), road surface (4), it is characterized in that: rubble, the original soil of excavation in bridges and culverts passage (2) the platform back of the body roadbed foundation ditch (3) are packed into forms geotechnique's bag (1) behind the geotechnological woven bag tying, and it is stand-by to be deposited in platform back of the body roadbed foundation ditch (3) limit; Treat after platform back of the body roadbed foundation ditch (3) is by the standard arrangement platform carried on the back that geotechnique's bag (1) that roadbed foundation ditch (3) limit fills is crisscross successively stacks to the road surface (4); Slit between geotechnique's bag (1) is filled and led up with the place hack; Every layer of geotechnique's bag machinery or hand compaction; Road surface (4) is by standard asphalt or concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102070960A CN102296506A (en) | 2010-06-23 | 2010-06-23 | Geotechnical bag back subgrade and application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102070960A CN102296506A (en) | 2010-06-23 | 2010-06-23 | Geotechnical bag back subgrade and application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102296506A true CN102296506A (en) | 2011-12-28 |
Family
ID=45357170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102070960A Pending CN102296506A (en) | 2010-06-23 | 2010-06-23 | Geotechnical bag back subgrade and application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102296506A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107012803A (en) * | 2017-06-01 | 2017-08-04 | 湖北工业大学 | High roadbed culvert off-load and the control method and structure for preventing creep |
CN108643199A (en) * | 2018-06-04 | 2018-10-12 | 中冶沈勘工程技术有限公司 | A kind of soil engineering bag consolidated subsoil simultaneously safeguards underground piping basis and its construction method |
CN113186768A (en) * | 2021-04-21 | 2021-07-30 | 中铁六局集团太原铁路建设有限公司 | Construction method for improving roadbed backfill quality after existing line demolition of frame structure |
CN114635373A (en) * | 2021-12-23 | 2022-06-17 | 安徽省交通规划设计研究总院股份有限公司 | Self-stabilizing bearing channel without internal supporting structure |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1328190A (en) * | 2000-06-14 | 2001-12-26 | 荆学松 | Method for preventing car jump between high road bed and bridge |
-
2010
- 2010-06-23 CN CN2010102070960A patent/CN102296506A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1328190A (en) * | 2000-06-14 | 2001-12-26 | 荆学松 | Method for preventing car jump between high road bed and bridge |
Non-Patent Citations (3)
Title |
---|
王波,李天斌: "公路桥涵台背回填及处治技术研究", 《地质灾害与环境保护》, vol. 19, no. 4, 30 December 2008 (2008-12-30) * |
裴畅茂: "如何防治高填土路基桥头跳车的探讨", 《山西建筑》, vol. 30, no. 11, 30 June 2004 (2004-06-30) * |
邵介贤等: "土工编织袋在路基工程中应用的研究", 《公路》, no. 7, 30 July 2005 (2005-07-30) * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107012803A (en) * | 2017-06-01 | 2017-08-04 | 湖北工业大学 | High roadbed culvert off-load and the control method and structure for preventing creep |
CN107012803B (en) * | 2017-06-01 | 2022-07-29 | 湖北工业大学 | Control method and structure for load shedding and creep prevention of high-fill culvert |
CN108643199A (en) * | 2018-06-04 | 2018-10-12 | 中冶沈勘工程技术有限公司 | A kind of soil engineering bag consolidated subsoil simultaneously safeguards underground piping basis and its construction method |
CN113186768A (en) * | 2021-04-21 | 2021-07-30 | 中铁六局集团太原铁路建设有限公司 | Construction method for improving roadbed backfill quality after existing line demolition of frame structure |
CN114635373A (en) * | 2021-12-23 | 2022-06-17 | 安徽省交通规划设计研究总院股份有限公司 | Self-stabilizing bearing channel without internal supporting structure |
CN114635373B (en) * | 2021-12-23 | 2023-11-14 | 安徽省交通规划设计研究总院股份有限公司 | Self-stabilizing bearing channel without internal supporting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704364B (en) | Clay serging tailings subgrade structure and construction method thereof | |
CN201495468U (en) | Structure of highway subgrade on wet soft foundation | |
CN104631254A (en) | Construction method of geogrid reinforced clay edge-covered tailing subgrade | |
CN105297571B (en) | A kind of mud stone filled-up ground structure and its construction method | |
CN107419630A (en) | A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction | |
CN102900001A (en) | Construction method for road foundation | |
CN108468325A (en) | A kind of large area borders on the sea beach ooze rapid curing construction method | |
CN204849508U (en) | Roadbed structure of soft soil foundation highway road bridge changeover portion | |
CN110080051B (en) | Geotextile bag bridge type embankment structure and construction method thereof | |
CN104358196B (en) | Highway open to traffic Embankment Subsidence disposes the construction method of structure | |
CN101725102A (en) | Construction method for filling roadbed with coal gangues | |
CN207295358U (en) | A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure | |
CN101701442B (en) | Method for building road by pressing and silting large-scale silt sand in large powder and soil filled bag | |
CN111041916A (en) | Roadbed construction method by solidifying earthwork | |
CN102296506A (en) | Geotechnical bag back subgrade and application method | |
CN101831851A (en) | Construction method of red sandstone roadbed | |
CN104863031A (en) | Karst region ductile anti-collapse roadbed structure and construction method of Karst region ductile anti-sag roadbed structure | |
CN102465481A (en) | Soilbag roadbed and method | |
CN103993533B (en) | For the comprehensive debulking methods of Canal in Loess Area high-filled embankment | |
CN203383116U (en) | Road-bridge connecting section variable rigidity roadbed | |
CN201801794U (en) | Soilbag back roadbed | |
JP6445572B2 (en) | Construction, reinforcement, widening, and raising methods for embankments for passing vehicles | |
CN217500288U (en) | High-energy-level dynamic compaction and replacement and tubular pile combined foundation structure for deep soil filling field | |
CN205223768U (en) | Road subgrade sedimentation preventing facility | |
CN201485765U (en) | Novel low liquid limit silty soil subgrade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |