CN201801794U - Soilbag back roadbed - Google Patents
Soilbag back roadbed Download PDFInfo
- Publication number
- CN201801794U CN201801794U CN2010202342034U CN201020234203U CN201801794U CN 201801794 U CN201801794 U CN 201801794U CN 2010202342034 U CN2010202342034 U CN 2010202342034U CN 201020234203 U CN201020234203 U CN 201020234203U CN 201801794 U CN201801794 U CN 201801794U
- Authority
- CN
- China
- Prior art keywords
- roadbed
- bag
- geotechnique
- foundation ditch
- soilbag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
A soilbag back roadbed is composed of soilbags (1), a bridge/culvert tunnel (2), a back roadbed foundation ditch (3) and a pavement (4) and is characterized in that the soilbags (1) are stacked up layer by layer in a criss-cross manner in the back roadbed foundation ditch (3) of the bridge/culvert tunnel (2) and are tightly combined with asphalt or concrete paved on the pavement (4). The soilbag back roadbed is simple, practical and economical, and has remarkable social and economic benefits.
Description
Technical field
The utility model relates to a kind of back of the body roadbed, particularly a kind of geotechnique's bag platform back of the body roadbed.
Background technology
Between the roadbed that bridges and culverts, passage etc. crosses the structure of highway and the structure platform back of the body bankets, often produce stepped differential settlement because of the rigidity great disparity, cause that " bumping at bridge-head " phenomenon takes place.Though adopting the roadbed of the geonet reinforcement structure platform back of the body to banket at present produces effect to the differential settlement that reduces between structure and the roadbed, but because structure platform back of the body construction space is narrow, backfill is difficult to grinding compacting, therefore, even adopt the geonet reinforcement, the sedimentation that enough bearing capacities can not be provided and reduce backfill effectively, have only the ground of working as to have enough bearing capacities, banketing under the synergy of heavy load and traffic loading, unlikely destruction and when producing big sedimentation, the geosynthetics reinforcement just can bring about tangible results.
Summary of the invention
The utility model has overcome deficiency of the prior art, and a kind of geotechnique's bag platform back of the body roadbed is provided, and platform back of the body subgrade rating is improved, and sedimentation is even, reduces vibration.
The utility model solves by the following technical programs:
Hold the power situation according to bridges and culverts, channel board back of the body subgrade soil, platform is carried on the back the rubble, the original soil that excavate in the roadbed foundation ditch pack into and form geotechnique's bag behind the geotechnological woven bag tying, it is stand-by to be deposited in the foundation ditch limit; Treat that foundation ditch is by crisscross successively the stacking to the road surface of geotechnique's bag that after the standard arrangement foundation ditch limit is filled; Slit between geotechnique's bag is filled and led up with the place hack; Every layer of geotechnique's bag machinery or hand compaction; The road surface is by standard asphalt or concrete; Geotechnique's bag and bridges and culverts, passage etc. are combined closely,, combine, reach the raising subgrade rating, eliminate differential settlement, reduce the road vibration, dissolve the bumping at bridge-head phenomenon by geotechnique's bag, bridges and culverts passage, platform back of the body roadbed foundation ditch, road surface to strengthen its globality.
The beneficial effects of the utility model are: simple, practicality, saving, economy.
1. simple.Geotechnique's woven bag is directly packed the original soil at bridges and culverts, passage scene into and is formed geotechnique's bag in the bag and be used for platform back of the body roadbed, and crisscross successively stacking to the road surface gets final product after filling and leading up the compacting road surfacing.
2. practical.Geotechnique's bag platform back of the body roadbed not only improves subgrade rating, eliminates differential settlement, and reduces the road vibration; Dissolve the bumping at bridge-head phenomenon.
3. save.The original soil at bridges and culverts, passage scene is directly used, gather materials on the spot, become useless and be usefulness, economize on resources, reduce discharging.
4. economical.Owing to gather materials on the spot, reduce discharging, can significantly save construction fund.
Description of drawings
Accompanying drawing is a sectional structural map of the present utility model.
Among the figure: 1. geotechnique bag, 2. bridges and culverts passage, 3. a back of the body roadbed foundation ditch, 4. road surface.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is described in further detail.
In the drawings, rubble, the original soil of excavation in 2 back of the body roadbeds of bridges and culverts passage foundation ditch 3 packed into forms geotechnique's bag 1 behind the geotechnological woven bag tying, and it is stand-by to be deposited in platform back of the body roadbed foundation ditch 3 limits; Treat after platform back of the body roadbed foundation ditch 3 is by the standard arrangement platform carried on the back that geotechnique's bag that roadbed foundation ditch 3 limits fill 1 is crisscross successively stacks to the road surface 4; Slit between geotechnique's bag 1 is filled and led up with the place hack; Every layer of geotechnique's bag machinery or hand compaction; Road surface 4 is by standard asphalt or concrete.Combine by geotechnique's bag 1, bridges and culverts passage 2, platform back of the body roadbed foundation ditch 3, road surface 4, reach the raising subgrade rating, eliminate differential settlement, reduce the road vibration, dissolve the bumping at bridge-head phenomenon.
Claims (1)
1. geotechnique's bag platform back of the body roadbed is characterized in that: combined by geotechnique's bag (1), bridges and culverts passage (2), platform back of the body roadbed foundation ditch (3), road surface (4), form geotechnique's bag platform back of the body roadbed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202342034U CN201801794U (en) | 2010-06-23 | 2010-06-23 | Soilbag back roadbed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202342034U CN201801794U (en) | 2010-06-23 | 2010-06-23 | Soilbag back roadbed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201801794U true CN201801794U (en) | 2011-04-20 |
Family
ID=43871304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202342034U Expired - Fee Related CN201801794U (en) | 2010-06-23 | 2010-06-23 | Soilbag back roadbed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201801794U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821164A (en) * | 2014-01-28 | 2014-05-28 | 中铁二院工程集团有限责任公司 | Mountainous area valley backfill tunnel structure |
-
2010
- 2010-06-23 CN CN2010202342034U patent/CN201801794U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821164A (en) * | 2014-01-28 | 2014-05-28 | 中铁二院工程集团有限责任公司 | Mountainous area valley backfill tunnel structure |
CN103821164B (en) * | 2014-01-28 | 2016-08-17 | 中铁二院工程集团有限责任公司 | Mountain area cheuch backfill tunnel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704364B (en) | Clay serging tailings subgrade structure and construction method thereof | |
CN201495468U (en) | Structure of highway subgrade on wet soft foundation | |
CN105297571B (en) | A kind of mud stone filled-up ground structure and its construction method | |
CN108978623B (en) | Composite reinforced gravel cushion layer doped with construction waste and waste tires and construction method | |
CN110080051B (en) | Geotextile bag bridge type embankment structure and construction method thereof | |
CN101831851B (en) | Construction method of red sandstone roadbed | |
CN101725102A (en) | Construction method for filling roadbed with coal gangues | |
CN206438358U (en) | A kind of highway soft soil widening of subgrade ruggedized construction | |
CN111041916A (en) | Roadbed construction method by solidifying earthwork | |
CN207295358U (en) | A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure | |
CN101701442B (en) | Method for building road by pressing and silting large-scale silt sand in large powder and soil filled bag | |
CN102296506A (en) | Geotechnical bag back subgrade and application method | |
CN102465481A (en) | Soilbag roadbed and method | |
CN104863031A (en) | Karst region ductile anti-collapse roadbed structure and construction method of Karst region ductile anti-sag roadbed structure | |
CN108589454B (en) | Composite reinforced damping roadbed doped with construction waste and construction technical method | |
CN202509359U (en) | Concrete block assembled type road structure | |
CN201801794U (en) | Soilbag back roadbed | |
CN109137659A (en) | The construction method of dregs class building castoff Filling Expressway Subgrade | |
CN203383116U (en) | Road-bridge connecting section variable rigidity roadbed | |
CN206448125U (en) | A kind of express highway roadbed ruggedized construction | |
CN203625741U (en) | Roadbed filled with tailing sand | |
CN205223768U (en) | Road subgrade sedimentation preventing facility | |
CN201865018U (en) | Soil engineering bag road bed for road | |
CN201485765U (en) | Novel low liquid limit silty soil subgrade | |
CN213173170U (en) | Highway gangue roadbed structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110420 Termination date: 20150623 |
|
EXPY | Termination of patent right or utility model |