CN101713191A - Device and method used for excavating foundation pit deep earthwork - Google Patents

Device and method used for excavating foundation pit deep earthwork Download PDF

Info

Publication number
CN101713191A
CN101713191A CN200910193233A CN200910193233A CN101713191A CN 101713191 A CN101713191 A CN 101713191A CN 200910193233 A CN200910193233 A CN 200910193233A CN 200910193233 A CN200910193233 A CN 200910193233A CN 101713191 A CN101713191 A CN 101713191A
Authority
CN
China
Prior art keywords
steel platform
temporary steel
excavator
earthwork
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910193233A
Other languages
Chinese (zh)
Other versions
CN101713191B (en
Inventor
谢永生
吴健
陶聿君
刘智
陈伟仁
张明德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co., Ltd of Guangdong Province
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN2009101932337A priority Critical patent/CN101713191B/en
Publication of CN101713191A publication Critical patent/CN101713191A/en
Application granted granted Critical
Publication of CN101713191B publication Critical patent/CN101713191B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention provides a device for excavating foundation pit deep earthwork, which is characterized by comprising a temporary steel platform which is arranged in the middle part of the foundation pit and an excavator which is used for excavating earthwork, wherein the temporary steel platform is manufactured by steel plates with the thickness being 6-10mm; the four angular positions of the temporary steel platform are respectively coated by steel wire ropes, and a chain block is adopted to hang the steel wire ropes bound on a top beam; an adhesive tape is padded at the contact point between the steel wire rope and the concrete top beam; the lifting of the chain block is utilized to adjust the vertical position and stability of the temporary steel platform; the temporary steel platform hung in the foundation pit substitutes the footsteps of sloping step method and is taken as a transfer station of earthwork excavation, which is also convenient for vertically excavating the earthwork in the temporary steel platform when standing on the excavator on the top of the foundation pit; and the excavator which stands on the top of the foundation pit and the following layer of earthwork excavation steps can select the arm length of the excavator according to the depth of the earthwork excavation depth. The invention provides a deep earthwork excavation device with high efficiency, economy, flexibility and easy operation and a method thereof.

Description

A kind of device and method that is used for foundation ditch deep layer soil excavation
Technical field
The present invention relates to a kind of device and method that is used for foundation ditch deep layer soil excavation.
Background technology
Along with underground foundation depth more and more comes deeply, the soil excavation difficulty is increasing, particularly the excavation of the deep layer earthwork.The method that foundation ditch deep layer soil excavation is commonly used has at present: one, put sloping benching tunnelling method excavation; Two, high-front shovel (hydraulic grab) excavation method; Three, excavator excavation+crane lifting method.But these methods are in the shortcoming that all has self in varying degrees: one, put sloping benching tunnelling method excavation, soil layer is put the slope difficulty, and is subjected to weather effect bigger, if cutting depth is darker, the step of putting the slope is more, in the length limited system of the foundation ditch of putting sloping direction; Two, high-front shovel (hydraulic grab) excavation method, on the market exhibition arm after excavator (hydraulic grab) brachium the longest be 11.5 meters, high-front shovel (hydraulic grab) bucket is less, each shoveling is consuming time back and forth longer, efficient is lower, and is restricted aspect cutting depth, is obstructed at hard soil layer excavation, efficient is not high, and 1 machine-team is opened the about 500m of amount of excavation 3, One-Shift Costs is than higher, and 1 4500 yuan of machine-team (market price) is uneconomical; Three, excavator excavation+crane lifting method, excavation+lifting speed is too slow, and 1 machine-team is opened the about 300m of amount of excavation 3, be not suitable for generous amount excavation and overwork.
Summary of the invention
The objective of the invention is to solve the problem that above-mentioned several method self exists, a kind of high efficiency, economy are provided, maneuverability is operated easy deep layer earthwork excavating device and method thereof.
The objective of the invention is to be achieved through the following technical solutions:
A kind of device that is used for foundation ditch deep layer soil excavation, its characteristics are to comprise temporary steel platform that is arranged on the foundation ditch middle part and the excavator that is used for soil excavation, wherein the temporary steel platform is made by 6~10mm steel plate, length is 3~5m, width is 1.5~3.0m, highly be 0.5~1.5m, wherein the temporary steel platform advances native side direction and turns up 45 °~75 °, highly be 0.3~0.5m, draw the anglec of rotation of digging cubic metre of earth bucket in the temporary steel platform to adapt to excavator, same so that in the foundation ditch excavator earthwork is transported in the temporary steel platform, position, four angles of temporary steel platform is wrapped up in bag and is adopted Chain block to hang the wire rope of tying up on Guan Liang by wire rope respectively, at wire rope and concrete Guan Liang contact position pad adhesive tape, utilize the vertical position of Chain block lift adjustment temporary steel platform to reach steadily, the temporary steel platform that hangs in the foundation ditch replaces the step of putting sloping benching tunnelling method, terminal as soil excavation, also be convenient to stand in foundation ditch top excavator and vertically draw the earthwork of digging in the temporary steel platform, stand in the excavator of foundation ditch top and alternating floor soil excavation step, select the brachium of excavator according to the soil excavation degree of depth.
The method that is used for foundation ditch deep layer soil excavation of the present invention may further comprise the steps:
(1) foundation pit enclosure structure, operations such as first floor soil excavation and first and second road support construction are finished the about 6.5m of first floor earthwork thickness;
(2) hang the temporary steel platform, 2 groups of wire rope that are bundled on the Guan Liang are installed earlier, one group 3, every group of wire rope hangs 2 10t Chain blocks, according to the floor height of the earthwork, determine 2 groups of rope capacities of binding temporary steel platform, 4 suspension centres are hung on the hook of 4 Chain blocks, and 4 hoisting point positions are all set up wire rope, as the suspension centre of lifting, dismounting temporary steel platform, wherein the temporary steel platform advances native side direction and turns up 60 °, so that soil excavation and transhipment;
(3) the temporary steel platform hangs Guan Liang, calculate according to the brachium of first excavator that stands in the foundation ditch limit and to wrap up in bag temporary steel platform length of steel wire rope, and the vertical position that utilizes Chain block lift adjustment temporary steel platform reaches steadily, be fixed on waist rail position, second road, second excavator stands in the earthwork of the second layer soil end face excavation second layer, and be transported on the temporary steel platform, go on the transport vehicle by first excavator that stands in the foundation ditch limit and transport outward, wherein the thick 5.1m of the second layer earthwork;
(4) second layer earthwork is all finished or is excavated soil layer and forms step, three layers of native end face of the second excavator dive to the excavate the 3rd layer of earthwork, and transhipment is used to the temporary steel platform, go on the car by first excavator that stands in the foundation ditch limit and to transport outward, the 3rd layer of thick 4.9m of the earthwork wherein, the about 16.5m of cutting depth;
For accelerating construction progress, the second layer earthwork propelling that goes ahead, the 3rd layer of earthwork end face increases by 1 second excavator and excavates the 3rd layer of earthwork, increases temporary steel platform quantity simultaneously and gets final product.
Equally, can also hang the temporary steel platform in waist rail position, the 4th road, the 4th layer of earthwork is gone to the temporary steel platform, second excavator that stands in the 3rd layer of native end face will go on the second road waist rail temporary steel platform in the earthwork of waist rail position, the 4th road temporary steel platform, the rest may be inferred, hangs the temporary steel platform every one waist rail.
In order to accelerate soil excavation speed, in next waist rail position, excavation section second road one temporary steel platform is installed again, finish at last excavation section excavation, be convenient to form continuous productive process, and the temporary steel platform that will go up an excavation section moves to next excavation section.
The temporary steel platform replaces the rank, earthen platform, solves to put the sloping difficulty of putting of sloping benching tunnelling method, and is subjected to weather effect bigger, if cutting depth is darker, the step of putting the slope is more, is putting the problems such as foundation ditch length limited system of sloping direction; Excavation transhipment by excavator is cubic metre of earth to the temporary steel platform and draw to dig in the temporary steel platform and cubic metre of earth combine, it is less to solve high-front shovel (hydraulic grab) excavation method high-front shovel (hydraulic grab) grab bucket, each shoveling is consuming time back and forth longer, efficient is lower, restricted aspect cutting depth, be obstructed at hard soil layer excavation, efficient is not high, and 1 machine-team is opened the about 500m of amount of excavation 3, One-Shift Costs is than higher, 1 4500 yuan of machine-team (market price), problem such as uneconomical; Excavator excavation and transhipment solve excavator excavation+crane lifting method, and crane lifting speed waits problem too slowly.
The present invention is the continuity of putting sloping benching tunnelling method owing to adopt excavator and be arranged on the interior interim temporary steel platform of foundation ditch, is again the simplification that vertically goes out local method.Both continued and put sloping benching tunnelling method and the vertical advantage that goes out local method, solved the problem that self exists again.The present invention adopts the temporary steel platform in two excavators+be hung in foundation ditch, excavation pit degree of depth 16.5m, and 1 machine-team is opened amount of excavation 1000m 3More than, be not subjected to weather, put the influence of slope difficulty, simple to operate, effective, economic advantage fast.
The present invention is further illustrated below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is the structural representation of temporary steel platform of the present invention.
Fig. 2 is a temporary steel platform scheme of installation of the present invention.
Fig. 3 is a foundation ditch deep layer soil excavation schematic diagram.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of device that is used for foundation ditch deep layer soil excavation of the present invention, its characteristics are to comprise temporary steel platform that is arranged on the foundation ditch middle part and the excavator that is used for soil excavation, wherein the temporary steel platform is made by 6~10mm steel plate, length is 3~5m, width is 1.5~3.0m, highly be 0.5~1.5m, wherein the temporary steel platform advances native side direction and turns up 45 °~75 °, highly be 0.3~0.5m, draw the anglec of rotation of digging cubic metre of earth bucket in the temporary steel platform to adapt to excavator, same so that in the foundation ditch excavator earthwork is transported in the temporary steel platform, position, four angles of temporary steel platform is wrapped up in bag and is adopted Chain block to hang the wire rope of tying up on Guan Liang by wire rope respectively, at wire rope and concrete Guan Liang contact position pad adhesive tape, utilize the vertical position of Chain block lift adjustment temporary steel platform to reach steadily, the temporary steel platform that hangs in the foundation ditch replaces the step of putting sloping benching tunnelling method, terminal as soil excavation, also be convenient to stand in foundation ditch top excavator and vertically draw the earthwork of digging in the temporary steel platform, stand in the excavator of foundation ditch top and alternating floor soil excavation step, select the brachium of excavator according to the soil excavation degree of depth.
Wherein, above-mentioned excavator 2 adopts HD1250 type excavator, and it stands on the foundation ditch limit earthwork in the temporary steel platform 1 is gone to directly outward transport on the transport vehicle 4; Above-mentioned excavator 2 adopts HD1250 type excavator, and it stands on the foundation ditch limit earthwork in the temporary steel platform 1 is gone to directly outward transport on the transport vehicle 4; Above-mentioned excavator 3 adopts HD820 type excavator, it stands on the earthwork of the second layer soil end face excavation second layer, and but three layers of native end face of dive to the excavate the 3rd layer of earthwork, and transhipment uses to the temporary steel platform, go to outward transport on the transport vehicle 4 by the excavator 2 that stands in the foundation ditch limit; Above-mentioned transport vehicle 4 is drawn the earthwork outward transport of digging, 20~30m with excavator 2 from temporary steel platform 1 3/ car, and roof has covering, meets town road operation requirement.
The job practices that is used for foundation ditch deep layer soil excavation of the present invention comprises the steps:
(1) foundation pit enclosure structure, operations such as first floor soil excavation and first and second road support construction are finished the about 6.5m of first floor earthwork thickness;
(2) hang the temporary steel platform, 2 groups of wire rope that are bundled on the Guan Liang are installed earlier, one group 3, every group of wire rope hangs 2 10t Chain blocks, according to the floor height of the earthwork, determine 2 groups of rope capacities of binding temporary steel platform, 4 suspension centres are hung on the hook of 4 Chain blocks, and 4 hoisting point positions are all set up wire rope, as the suspension centre of lifting, dismounting temporary steel platform, wherein the temporary steel platform advances native side direction and turns up 60 °, so that soil excavation and transhipment;
(3) the temporary steel platform hangs Guan Liang, calculate according to the brachium of first excavator that stands in the foundation ditch limit and to wrap up in bag temporary steel platform length of steel wire rope, and the vertical position that utilizes Chain block lift adjustment temporary steel platform reaches steadily, be fixed on waist rail position, second road, second excavator stands in the earthwork of the second layer soil end face excavation second layer, and be transported on the temporary steel platform, go on the transport vehicle by first excavator that stands in the foundation ditch limit and transport outward, wherein the thick 5.1m of the second layer earthwork;
(4) second layer earthwork is all finished or is excavated soil layer and forms step, three layers of native end face of the second excavator dive to the excavate the 3rd layer of earthwork, and transhipment is used to the temporary steel platform, go on the car by first excavator that stands in the foundation ditch limit and to transport outward, the 3rd layer of thick 4.9m of the earthwork wherein, the about 16.5m of cutting depth;
For accelerating construction progress, the second layer earthwork propelling that goes ahead, the 3rd layer of earthwork end face increases by 1 second excavator and excavates the 3rd layer of earthwork, increases temporary steel platform quantity simultaneously and gets final product.
Equally, can also hang the temporary steel platform in waist rail position, the 4th road, the 4th layer of earthwork is gone to the temporary steel platform, second excavator that stands in the 3rd layer of native end face will go on the second road waist rail temporary steel platform in the earthwork of waist rail position, the 4th road temporary steel platform, the rest may be inferred, hangs the temporary steel platform every one waist rail.
In order to accelerate soil excavation speed, in next waist rail position, excavation section second road one temporary steel platform is installed again, finish at last excavation section excavation, be convenient to form continuous productive process, and the temporary steel platform that will go up an excavation section moves to next excavation section.
The temporary steel platform replaces the rank, earthen platform, solves to put the sloping difficulty of putting of sloping benching tunnelling method, and is subjected to weather effect bigger, if cutting depth is darker, the step of putting the slope is more, is putting the problems such as foundation ditch length limited system of sloping direction; Excavation transhipment by excavator is cubic metre of earth to the temporary steel platform and draw to dig in the temporary steel platform and cubic metre of earth combine, it is less to solve high-front shovel (hydraulic grab) excavation method high-front shovel (hydraulic grab) grab bucket, each shoveling is consuming time back and forth longer, efficient is lower, restricted aspect cutting depth, be obstructed at hard soil layer excavation, efficient is not high, and 1 machine-team is opened the about 500m of amount of excavation 3, One-Shift Costs is than higher, 1 4500 yuan of machine-team (market price), problem such as uneconomical; Excavator excavation and transhipment solve excavator excavation+crane lifting method, and crane lifting speed waits problem too slowly.
The present invention is the continuity of putting sloping benching tunnelling method owing to adopt excavator and be arranged on the interior temporary steel platform of foundation ditch, is again the simplification that vertically goes out local method.Both continued and put sloping benching tunnelling method and the vertical advantage that goes out local method, solved the problem that self exists again.The present invention adopts the temporary steel platform in two excavators+be hung in foundation ditch, excavation pit degree of depth 16.5m, and 1 machine-team is opened amount of excavation 1000m 3More than, be not subjected to weather, put the influence of slope difficulty, simple to operate, effective, economic advantage fast.
A specific embodiment of the present invention is: present embodiment comprises temporary steel platform 1 that is arranged on the foundation ditch middle part and excavator 2,3 and the transport vehicle 4 that is used for earth excavation.Described temporary steel platform 1 is made by the 8mm steel plate, length is 3.8m, width is 2.0m, highly be 0.8m, wherein the temporary steel platform advances native side direction and turns up 60 °, highly be 0.4m, the rotation of bucket when adapting to the earthwork in the excavator transhipment temporary steel platform, same so that in the foundation ditch excavator earthwork is transported in the temporary steel platform, 2 groups of wire rope 4 that are bundled on the Guan Liang are installed earlier, one group 3, every group of wire rope hangs 2 10t Chain blocks 3, floor height according to the earthwork, determine 2 groups of wire rope 2 length of binding temporary steel platform 1,4 suspension centres are hung on the hook of 4 Chain blocks 3,4 hoisting point positions are all set up wire rope 5, as lifting, remove the suspension centre of temporary steel platform, wherein temporary steel platform 1 advances native side direction and turns up 60 °, so that soil excavation and transhipment, described excavator 2 adopts HD1250 type excavators, stand in the foundation ditch limit earthwork in the temporary steel platform 1 is gone to outward transport on the transport vehicle 4, described excavator 3 adopts HD820 type excavator, stand in the earthwork of the second layer soil end face excavation second layer, and three layers of native end face of dive to the excavates the 3rd layer of earthwork, and transport and use to the temporary steel platform, go to outward transport on the transport vehicle 4 by the excavator 2 that stands in the foundation ditch limit.If the 3rd layer of native end is exactly substrate, suggestion adds 1 PC120 type excavator at the 3rd layer of native end, with the finishing substrate, and also can be with earthwork transmission excavator 3 excavations of substrate.

Claims (6)

1. device that is used for foundation ditch deep layer soil excavation, it is characterized in that comprising temporary steel platform that is arranged on the foundation ditch middle part and the excavator that is used for soil excavation, wherein the temporary steel platform is made by 6~10mm steel plate, length is 3~5m, width is 1.5~3.0m, highly be 0.5~1.5m, wherein the temporary steel platform advances native side direction and turns up 45 °~75 °, highly be 0.3~0.5m, draw the anglec of rotation of digging cubic metre of earth bucket in the temporary steel platform to adapt to excavator, same so that in the foundation ditch excavator earthwork is transported in the temporary steel platform, position, four angles of temporary steel platform is wrapped up in bag and is adopted Chain block to hang the wire rope of tying up on Guan Liang by wire rope respectively, at wire rope and concrete Guan Liang contact position pad adhesive tape, utilize the vertical position of Chain block lift adjustment temporary steel platform to reach steadily, the temporary steel platform that hangs in the foundation ditch replaces the step of putting sloping benching tunnelling method, terminal as soil excavation, also be convenient to stand in foundation ditch top excavator and vertically draw the earthwork of digging in the temporary steel platform, stand in the excavator of foundation ditch top and alternating floor soil excavation step, select the brachium of excavator according to the soil excavation degree of depth.
2. according to the described device that is used for foundation ditch deep layer soil excavation of claim 1, it is characterized in that comprising temporary steel platform (1) that is arranged on the foundation ditch middle part and excavator (2), (3) and the transport vehicle (4) that is used for earth excavation, described temporary steel platform (1) is hung on the Guan Liang by wire rope, calculate according to the brachium of the excavator that stands in the foundation ditch limit and to wrap up in bag temporary steel platform length of steel wire rope, and utilize the vertical position of Chain block lift adjustment temporary steel platform and steadily.
3. according to the described device that is used for foundation ditch deep layer soil excavation of claim 2, it is characterized in that above-mentioned excavator (2) adopts HD1250 type excavator, it stands on the foundation ditch limit earthwork in the temporary steel platform (1) is gone to upward directly outward transport of transport vehicle (4).
4. according to the described device that is used for foundation ditch deep layer soil excavation of claim 2, it is characterized in that above-mentioned excavator (3) adopts HD820 type excavator, it stands on the earthwork of the second layer soil end face excavation second layer, and but three layers of native end face of dive to the excavate the 3rd layer of earthwork, and transport and use to the temporary steel platform, go to transport vehicle (4) by the excavator that stands in the foundation ditch limit (2) and go up outward transport.
5. according to claim 2 or the 3 or 4 described devices that are used for foundation ditch deep layer soil excavation, it is characterized in that above-mentioned transport vehicle (4) draws the earthwork outward transport of digging, 20~30m with excavator (2) from temporary steel platform (1) 3/ car, and roof has covering, meets town road operation requirement.
6. a method that is used for foundation ditch deep layer soil excavation is characterized in that comprising the steps:
(1) foundation pit enclosure structure, operations such as first floor soil excavation and first and second road support construction are finished the about 6.5m of first floor earthwork thickness;
(2) hang the temporary steel platform, 2 groups of wire rope that are bundled on the Guan Liang are installed earlier, one group 3, every group of wire rope hangs 2 10t Chain blocks, according to the floor height of the earthwork, determine 2 groups of rope capacities of binding temporary steel platform, 4 suspension centres are hung on the hook of 4 Chain blocks, and 4 hoisting point positions are all set up wire rope, as the suspension centre of lifting, dismounting temporary steel platform, wherein the temporary steel platform advances native side direction and turns up 60 °, so that soil excavation and transhipment;
(3) the temporary steel platform hangs Guan Liang, calculate according to the brachium of the excavator that stands in the foundation ditch limit (2) and to wrap up in bag temporary steel platform length of steel wire rope, and the vertical position that utilizes Chain block lift adjustment temporary steel platform reaches steadily, be fixed on waist rail position, second road, excavator (3) stands in the earthwork of the second layer soil end face excavation second layer, and be transported on the temporary steel platform, go on the transport vehicle by the excavator that stands in the foundation ditch limit (2) and transport outward, wherein the thick 5.1m of the second layer earthwork;
(4) second layer earthwork is all finished or is excavated soil layer and forms step, three layers of native end face of excavator (3) dive to the excavate the 3rd layer of earthwork, and transhipment is used to the temporary steel platform, go on the car by the excavator that stands in the foundation ditch limit (2) and to transport outward, the 3rd layer of thick 4.9m of the earthwork wherein, the about 16.5m of cutting depth;
For accelerating construction progress, the second layer earthwork propelling that goes ahead, the 3rd layer of earthwork end face increases the 3rd layer of earthwork of 1 excavator (3) excavation, increases temporary steel platform quantity simultaneously and gets final product.
CN2009101932337A 2009-10-23 2009-10-23 Device and method used for excavating foundation pit deep earthwork Expired - Fee Related CN101713191B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101932337A CN101713191B (en) 2009-10-23 2009-10-23 Device and method used for excavating foundation pit deep earthwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101932337A CN101713191B (en) 2009-10-23 2009-10-23 Device and method used for excavating foundation pit deep earthwork

Publications (2)

Publication Number Publication Date
CN101713191A true CN101713191A (en) 2010-05-26
CN101713191B CN101713191B (en) 2011-05-18

Family

ID=42417153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101932337A Expired - Fee Related CN101713191B (en) 2009-10-23 2009-10-23 Device and method used for excavating foundation pit deep earthwork

Country Status (1)

Country Link
CN (1) CN101713191B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892668A (en) * 2010-07-30 2010-11-24 中铁四局集团第六工程有限公司 Combined support-excavated geologically solutional deep foundation pit and construction method thereof
CN102296615A (en) * 2010-06-25 2011-12-28 中国二十冶集团有限公司 Complex deep foundation pit stepped combined supporting method of under condition of soft soil foundation
CN102758442A (en) * 2011-04-28 2012-10-31 成都中铁隆工程集团有限公司 Earth excavation method and open-cut tunnel construction method
CN102758441A (en) * 2011-04-23 2012-10-31 中国建筑第四工程局有限公司 Relay unearthing method and structure for deep foundation pit platform under reverse construction condition
CN104695445A (en) * 2015-01-21 2015-06-10 中国建筑第八工程局有限公司 Basement earth excavation method adopting reverse construction method
CN105401582A (en) * 2015-12-03 2016-03-16 上海建工一建集团有限公司 Hanging type unearthing device for bidirectional synchronous reversed construction and construction method
CN105926632A (en) * 2016-05-10 2016-09-07 东通岩土科技(杭州)有限公司 Detachable soil discharging platform
CN106013165A (en) * 2016-06-23 2016-10-12 程华清 Container combined type foundation pit unearthing method
CN106968271A (en) * 2017-03-09 2017-07-21 中国建筑第八工程局有限公司 The construction method that underground pipe gallery is excavated and supported

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691300B (en) * 2012-04-18 2014-08-13 浙江省建工集团有限责任公司 Construction method of foundation pit earthwork

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296615A (en) * 2010-06-25 2011-12-28 中国二十冶集团有限公司 Complex deep foundation pit stepped combined supporting method of under condition of soft soil foundation
CN102296615B (en) * 2010-06-25 2013-09-25 中国二十冶集团有限公司 Complex deep foundation pit stepped combined supporting method of under condition of soft soil foundation
CN101892668A (en) * 2010-07-30 2010-11-24 中铁四局集团第六工程有限公司 Combined support-excavated geologically solutional deep foundation pit and construction method thereof
CN101892668B (en) * 2010-07-30 2012-07-25 中铁上海工程局第一工程有限公司 Combined support-excavated geological erosion deep foundation pit and construction method thereof
CN102758441A (en) * 2011-04-23 2012-10-31 中国建筑第四工程局有限公司 Relay unearthing method and structure for deep foundation pit platform under reverse construction condition
CN102758442A (en) * 2011-04-28 2012-10-31 成都中铁隆工程集团有限公司 Earth excavation method and open-cut tunnel construction method
CN104695445A (en) * 2015-01-21 2015-06-10 中国建筑第八工程局有限公司 Basement earth excavation method adopting reverse construction method
CN105401582A (en) * 2015-12-03 2016-03-16 上海建工一建集团有限公司 Hanging type unearthing device for bidirectional synchronous reversed construction and construction method
CN105401582B (en) * 2015-12-03 2017-07-14 上海建工一建集团有限公司 Suspension type excavation device and construction method for bi-directional synchronization adverse construction method
CN105926632A (en) * 2016-05-10 2016-09-07 东通岩土科技(杭州)有限公司 Detachable soil discharging platform
CN106013165A (en) * 2016-06-23 2016-10-12 程华清 Container combined type foundation pit unearthing method
CN106968271A (en) * 2017-03-09 2017-07-21 中国建筑第八工程局有限公司 The construction method that underground pipe gallery is excavated and supported
CN106968271B (en) * 2017-03-09 2019-05-10 中国建筑第八工程局有限公司 Underground pipe gallery excavates and the construction method of support

Also Published As

Publication number Publication date
CN101713191B (en) 2011-05-18

Similar Documents

Publication Publication Date Title
CN101713191B (en) Device and method used for excavating foundation pit deep earthwork
CN101838993B (en) Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction
CN101775821B (en) Device and method for vertically transporting earthwork by reverse construction method
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
RU2396394C1 (en) Stripping aggregate
CN101434358A (en) Elevator for deep foundation pit excavation by inverse construction method, and excavation system and method
CN105908625A (en) Construction method for adding frame bridge under existing railway line based on dragging method
CN102758441A (en) Relay unearthing method and structure for deep foundation pit platform under reverse construction condition
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN109339096A (en) A kind of construction integrated constructing device of pipe gallery open cut precast assembly and its construction method
CN107606305A (en) A kind of underground water abundance of water area gas pipeline erection method
CN201339209Y (en) Top-down construction earth excavation earth-moving device
CN106245652B (en) A kind of construction method of deep foundation pit earthwork digging near a river
CN203284084U (en) Suspension type transporter at cave top
CN102926388B (en) Earth moving method for deep foundation pit excavation
CN201432842Y (en) Non-drainage undisturbed soil transfer device
CN106869165A (en) City integrated prefabricated piping lane open cut formula is from construction of prevention work method and self-propelled laydown machine
CN108118728B (en) Efficient soil excavating device and method for special-shaped deep foundation pit
CN201495571U (en) Special soil lifting device for topdown construction method underground excavation engineering
CN105672354B (en) Cast-in-place ground-connecting-wall and cast-in-place metro station construction integral method
CN112253848B (en) Sand geology water network swamp area pipeline construction method
CN104762951A (en) Construction method of new hydraulic fill muck reclamation by twice straight-line vacuum prepressing treatment
CN209384267U (en) A kind of assembled suspension device of prefabricated piping lane construction
CN103154434A (en) Closed trench tunnels
CN204356779U (en) Support the deep foundation ditch vertical cut equipment of support form

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

CP01 Change in the name or title of a patent holder

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee after: Foundation Design Group Co., Ltd of Guangdong Province

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Prov. Foundation Engineering Co.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110518

Termination date: 20181023