CN101705691B - 基坑内基础底板下降水井的施工方法 - Google Patents

基坑内基础底板下降水井的施工方法 Download PDF

Info

Publication number
CN101705691B
CN101705691B CN2009102128371A CN200910212837A CN101705691B CN 101705691 B CN101705691 B CN 101705691B CN 2009102128371 A CN2009102128371 A CN 2009102128371A CN 200910212837 A CN200910212837 A CN 200910212837A CN 101705691 B CN101705691 B CN 101705691B
Authority
CN
China
Prior art keywords
foundation
well
foundation pit
precipitation
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009102128371A
Other languages
English (en)
Other versions
CN101705691A (zh
Inventor
张向阳
易兴中
刘旭
张喜一
王金峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NANTONG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN2009102128371A priority Critical patent/CN101705691B/zh
Publication of CN101705691A publication Critical patent/CN101705691A/zh
Application granted granted Critical
Publication of CN101705691B publication Critical patent/CN101705691B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种基坑内基础底板下降水井的施工方法,在基坑内布置降水井;基坑土方开挖过程中,不损坏降水井,保证降水井的有效性;基坑土方开挖至基底后,沿降水井的中心线,开挖纵横交错的沟槽,沟槽内铺滤水型土工布;然后将降水井的排水管及电缆线铺设于沟槽内,并接至坑外,检查降水井井深、抽水泵及其管线,保证其完好可靠;然后在沟槽内铺设颗粒状碎石或卵石,上覆油毡,形成盲沟;盲沟引接至基坑边侧集水坑,基坑周边布置排水明沟;施工基础底板下垫层及防水层,在地下结构及其上部结构施工过程中,逐步调减基坑内降水井使用数量及降水速度,辅助采用基坑边集水坑辅助排水,直至可停止基坑内降水作业。本发明施工方便、安全可靠、基坑降水费用小。

Description

基坑内基础底板下降水井的施工方法
技术领域:
本发明涉及一种基坑内基础底板下降水井的施工方法。
背景技术:
随着开发利用地下空间的迅猛发展,超深、超宽基坑工程不断涌现,在富含地下水、特别是有地下承压水影响的超大深基坑内的降排水措施及其可靠效果是保证深基坑作业安全及保证工程质量的重要施工措施之一。一般的降水方法是在基坑内布置多个降水井,降水管及其电缆线路通过套管及其它相应的防水处理措施穿过基础结构,排至基坑外,在满足停止降水要求后,对降水井所通过的基础结构套管进行防水处理并刚性封闭;此种降水施工方法,虽然满足深基坑作业降水要求,但影响基础结构的防水施工质量,既使套管处防水效果能够保证,但其防水效果的保证依赖的仅是单一的基础结构混凝土本身的防水效果,基础结构下的卷材或涂料防水层已被破坏,从严格的意义上来说,此种降水井封堵防水处理方法不满足相应的地下工程防水标准或规范要求。有的深基坑施工时,为避免上述基础结构上降水井处的防水节点处理,将降水井布置在基坑周边上,这大大增加了降水井的布置深度、降水时间与降水范围,增加了降水费用,同时对基坑外周边环境的不利影响大大增加。
发明内容:
本发明的目的在于提供一种施工方便、安全可靠、基坑降水费用小的基坑内基础底板下降水井的施工方法。
本发明的技术解决方案是:
一种基坑内基础底板下降水井的施工方法,其特征是:包括下列步骤:
1)在基坑内布置降水井;
2)基坑土方开挖过程中,不损坏降水井,保证降水井的有效性;
3)基坑土方开挖至基底后,沿降水井的中心线,开挖纵横交错的沟槽,沟槽内铺滤水型土工布;然后将降水井的排水管及电缆线铺设于沟槽内,并接至坑外,检查降水井井深、抽水泵及其管线,保证其完好可靠;然后在沟槽内铺设颗粒状碎石或卵石,上覆油毡,形成盲沟;盲沟引接至基坑边侧集水坑,基坑周边布置排水明沟;
4)施工基础底板下垫层及防水层,在地下结构及其上部结构施工过程中,逐步调减基坑内降水井使用数量及降水速度,辅助采用基坑边集水坑辅助排水,直至可停止基坑内降水作业。
步骤3)中沟槽的宽为500~900mm、深为300~500mm。在盲沟与集水坑间设置滤水格栅。
本发明施工方便、安全可靠、基坑降水费用小。其主要优点:1)通过布置纵横交错的盲沟,将基础底板下降水井并联于一体,基础底板下降水井排水管及其电缆线由盲沟接出,降水井管网布置简便。一般基坑内的布置的降水井,降水管及其电缆线路通过采用套管及其它相应的防水处理措施穿过基础结构,排至基坑外,在满足停止降水要求后,对降水井所通过的基础结构套管进行防水处理并刚性封闭;此种降水施工方法,虽然满足深基坑作业降水要求,但影响基础结构的防水施工质量,既使套管处防水效果能够保证,但其防水效果的保证依赖的仅是单一的基础结构混凝土本身的防水效果,基础结构下的卷材或涂料防水层已被破坏,从严格的意义上来说,此种降水井封口处理方法不满足相应的地下工程防水标准或规范要求。有的深基坑施工过程中,为避免上述基础结构上降水井处的防水节点处理,将降水井布置在基坑周边上,这大大增加了降水井的布置深度、降水时间与降水范围,增加了降水费用,同时对基坑外周边环境的不利影响大大增加。本发明,综合了上述两种降水井施工方法的优点,有效克服了上述两种深基坑降水井施工方法的不足之处,在基坑土方挖至基底后,沿降水井的中心线布置纵横交错的盲沟,将基坑内降水井通过盲沟串并联与一体,降水井内排水管及电缆线通过盲沟内接出并排至坑外。
2)本发明有效提高了基坑内降排水效果,降低了降水费用。在地下室基础结构下防水层及地下室基础结构完成后,在降水井内形成相对密封空腔,随降水井的降水及其水位的降低,降水井腔内形成相对负压,这种负压随地下室上部结构向上进行,负压逐步增大,从而增大了降水井的渗水量,保证了降水井的降水效果,因而在地下结构及其上部结构施工过程中,根据降水速率、出水量、基坑水位监测数据,以及基坑施工及结构抗浮设计要求,逐步调减基坑内降水井使用数量及降水速度,这不仅保证了基坑降水效果,同时减少了降水过程中降水井的使用数量,降低降水费用。
3)本发明能够有效克服降水井正常故障对基坑降水效果的影响。当可能出现降水井泵损坏时,该井内水可由盲沟流入相邻其它降水井内,形成降水井的串并联,不影响基坑降排水效果,不影响基坑抗浮设计功能;大部分情况之下,即使出现大部分基础底板下降水井的潜水泵损坏或全部损坏,基础底板下的水可由盲沟自然流入基坑周边集水坑,基坑内水可由集水坑内潜水泵排出,不会出现基底地下水压力对基础结构抗浮设计要求构成不利影响。因而本发明,保证了基坑降排水效果安全可靠,不影响地下工程施工过程中抗浮设计要求。
4)本发明特别适用于基坑下有承压水的降排水施工。降水井布置时,根据控制承压水位要求,布置成疏干井与降压井组合降水井形式,在地下室基础结构下防水层及地下室基础结构完成后,在降水井内形成相对密封空腔,随降水井的降水及其水位的降低,降水井腔内形成相对负压,这种负压随地下室上部结构向上进行,负压逐步增大,从而增大了降水井的渗水量,保证了降水井的降水效果,避免了承压水在基础底板封闭降水井口时,对基础结构防水功能及防水施工质量的影响,因而可有效降低承压水位,保证基坑施工安全。
附图说明:
下面结合附图和实施例对本发明作进一步说明。
图1是本发明一个实施例的基坑内基础底板下降水井布置平面示图。
图2是基坑内降排水系统剖面示图。
图3是基础底板下降水井与盲沟节点示图。
图4是盲沟剖面示图。
图5是集水坑与盲沟关系示图。
具体实施方式:
一种基坑内基础底板下降水井的施工方法,包括下列步骤:
1)在基坑1内布置降水井2;
2)基坑土方开挖过程中,不损坏降水井,保证降水井的有效性;
3)基坑土方开挖至基底后,沿降水井的中心线,开挖纵横交错的沟槽3,沟槽内铺滤水型土工布4;然后将降水井的排水管5及电缆线6铺设于沟槽内,并接至坑外,检查降水井井深、抽水泵及其管线,保证其完好可靠;然后在沟槽内铺设颗粒状碎石或卵石7,上覆油毡8,形成盲沟9;盲沟引接至基坑边侧集水坑10,基坑周边布置排水明沟11;
4)施工基础底板下垫层及防水层,在地下结构及其上部结构施工过程中,根据降水速率、出水量、基坑水位监测数据,以及基坑施工及结构抗浮设计要求,逐步调减基坑内降水井使用数量及降水速度,辅助采用基坑边集水坑辅助排水,直至可停止基坑内降水作业。
步骤3)中沟槽的宽为500~900mm、深为300~500mm。在盲沟与集水坑间设置滤水格栅12。
图中还有基坑边坡(支护结构)13、基础底板外框线14、坡顶排水沟或集水井15、集水坑内潜水泵16、基础垫层砼17、降水井上口封板18、降水井管壁设施19、降水井侧滤料填料20。

Claims (3)

1.一种基坑内基础底板下降水井的施工方法,其特征是:包括下列步骤:
1)在基坑内布置降水井;
2)基坑土方开挖过程中,不损坏降水井,保证降水井的有效性;
3)基坑土方开挖至基底后,沿降水井的中心线,开挖纵横交错的沟槽,沟槽内铺滤水型土工布;然后将降水井的排水管及电缆线铺设于沟槽内,并接至坑外,检查降水井井深、抽水泵及其管线,保证其完好可靠;然后在沟槽内铺设颗粒状碎石或卵石,上覆油毡,形成盲沟;盲沟引接至基坑边侧集水坑,基坑周边布置排水明沟;
4)施工基础底板下垫层及防水层,在地下结构及其上部结构施工过程中,逐步调减基坑内降水井使用数量及降水速度,辅助采用基坑边集水坑辅助排水,直至可停止基坑内降水作业。
2.根据权利要求1所述的基坑内基础底板下降水井的施工方法,其特征是:步骤3)中沟槽的宽为500~900mm、深为300~500mm。
3.根据权利要求1或2所述的基坑内基础底板下降水井的施工方法,其特征是:在盲沟与集水坑间设置滤水格栅。
CN2009102128371A 2009-10-30 2009-10-30 基坑内基础底板下降水井的施工方法 Active CN101705691B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102128371A CN101705691B (zh) 2009-10-30 2009-10-30 基坑内基础底板下降水井的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102128371A CN101705691B (zh) 2009-10-30 2009-10-30 基坑内基础底板下降水井的施工方法

Publications (2)

Publication Number Publication Date
CN101705691A CN101705691A (zh) 2010-05-12
CN101705691B true CN101705691B (zh) 2011-07-20

Family

ID=42375940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102128371A Active CN101705691B (zh) 2009-10-30 2009-10-30 基坑内基础底板下降水井的施工方法

Country Status (1)

Country Link
CN (1) CN101705691B (zh)

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182198B (zh) * 2011-04-12 2012-07-04 中国十九冶集团有限公司 矿浆管道在季节性湿地沼泽地段的降水敷设方法
CN102561306A (zh) * 2011-12-30 2012-07-11 上海广联建设发展有限公司 深层真空高效疏干加固土体的方法
CN102561373A (zh) * 2012-02-14 2012-07-11 江苏江中集团有限公司 一种坑井降水装置
CN102733403B (zh) * 2012-02-24 2015-05-13 中国科学院寒区旱区环境与工程研究所 一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法
CN102747739A (zh) * 2012-08-01 2012-10-24 中天建设集团有限公司 一种用于底板抗浮的盲沟结构
CN103898920B (zh) * 2012-12-27 2016-05-04 上海建工七建集团有限公司 基坑降、排水方法
CN103114605B (zh) * 2013-03-12 2015-12-09 中国建筑第八工程局有限公司 防渗疏水层结构及施工方法
CN103469799B (zh) * 2013-09-24 2015-09-09 中国建筑第二工程局有限公司 寒冷地区地下水位以下红泥岩土质电梯基坑的开挖工法
CN103628491B (zh) * 2013-11-15 2015-07-08 南京振高建设有限公司 一种深基坑预降承压水施工装置及其方法
CN103669424B (zh) * 2013-12-20 2015-12-09 江苏省华建建设股份有限公司 建筑物地下室防水结构
CN103912009B (zh) * 2014-04-18 2016-01-27 二十二冶集团第一建设有限公司 流砂地质的高层住宅基础集水坑施工方法
CN103938639B (zh) * 2014-05-12 2016-02-17 中国二十二冶集团有限公司 底板导墙处渗水状况下的隔水导流防渗施工方法
CN104762982B (zh) * 2015-03-06 2016-06-29 中建三局第一建设工程有限责任公司 一种富水红砂岩地质地下水位控制的施工方法
CN104863168A (zh) * 2015-04-30 2015-08-26 中冶天工上海十三冶建设有限公司 一种基础底板下部的疏水装置及其使用方法
CN105804105A (zh) * 2016-04-11 2016-07-27 任江涛 降水井、降水井的封井结构及降水井的盖埋封井方法
CN106088124A (zh) * 2016-07-28 2016-11-09 中国建筑第四工程局有限公司 一种深基坑底板外墙盲沟排水二次利用方法及结构
CN106759364B (zh) * 2016-11-28 2018-09-04 中冶建工集团有限公司 深基坑底板分步施工方法
CN106836252A (zh) * 2017-03-14 2017-06-13 中国十七冶集团有限公司 塔吊基础结合降水管井形成自然排水及再利用的施工方法
CN107419739B (zh) * 2017-06-23 2019-04-19 中建八局第二建设有限公司 一种建筑底板降水施工方法
CN107354950A (zh) * 2017-07-13 2017-11-17 中国建筑第七工程局有限公司 一种经济快速的集水坑局部降水方法
CN107386307B (zh) * 2017-07-24 2020-06-09 中国建筑第八工程局有限公司 基坑内结构抗浮系统及其施工方法
CN109577337A (zh) * 2017-09-29 2019-04-05 中国石油天然气股份有限公司 排水管线的深基坑施工方法
CN109056765A (zh) * 2018-07-20 2018-12-21 广东建邦兴业集团有限公司 一种防塌方防淹泡的基坑施工方法
CN108999219A (zh) * 2018-08-03 2018-12-14 成都市建筑设计研究院 一种新型地下室减压排水抗浮结构
CN109440775B (zh) * 2018-12-27 2020-11-24 云南省建设投资控股集团有限公司 一种下沉式基坑降排水系统、施工方法及使用方法
CN110080259A (zh) * 2019-03-19 2019-08-02 上海三彩科技发展有限公司 在地下工程底板面上切割引水槽做中空地坪的方法
CN109898533B (zh) * 2019-03-27 2024-01-23 中建一局集团第二建筑有限公司 筏板内置式降水结构、降水井的封井结构及封井方法
CN110761291A (zh) * 2019-11-15 2020-02-07 中铁一局集团第二工程有限公司 一种应用于岩溶富水区深基坑的抗浮防水系统及方法
CN111945759B (zh) * 2020-08-13 2022-01-11 大地巨人(北京)工程科技有限公司 一种用于明盲结合降水强夯地基加固方法的降水处理装置
CN112627212B (zh) * 2021-01-08 2022-04-01 安徽省公路桥梁工程有限公司 一种临水围堰内管井降水法干挖施工方法
CN112982459A (zh) * 2021-03-11 2021-06-18 中国二十二冶集团有限公司 富含低承压裂隙水的强风化岩基底大面积排水施工方法
CN113089681B (zh) * 2021-04-23 2023-03-24 中建八局第一建设有限公司 一种深基坑基底混凝土垫层防水侵害结构及施工方法
CN114439027A (zh) * 2022-02-24 2022-05-06 中国水利水电建设工程咨询渤海有限公司 水电工程深厚强透水地基上混凝土建筑物基础的施工方法
CN114737586A (zh) * 2022-04-21 2022-07-12 中国十七冶集团有限公司 一种富水沙土区大型地下室多井点联动降水施工方法
CN114809050A (zh) * 2022-05-13 2022-07-29 济南轨道交通集团有限公司 一种用于岩溶裂隙水丰富基坑排水系统及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1141991A (zh) * 1996-02-14 1997-02-05 孙五奇 软质地基立体疏干加固法
CN1657712A (zh) * 2005-03-22 2005-08-24 无锡市建筑设计研究院有限责任公司 地下建筑物的排水抗浮方法及其所用的装置
CN101148885A (zh) * 2007-11-07 2008-03-26 中冶长天国际工程有限责任公司 填埋场地下水的立体式疏排系统结构
JP2009179945A (ja) * 2008-01-29 2009-08-13 Yoshitaka Igawa 道路用井戸暗渠及びその施行方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1141991A (zh) * 1996-02-14 1997-02-05 孙五奇 软质地基立体疏干加固法
CN1657712A (zh) * 2005-03-22 2005-08-24 无锡市建筑设计研究院有限责任公司 地下建筑物的排水抗浮方法及其所用的装置
CN101148885A (zh) * 2007-11-07 2008-03-26 中冶长天国际工程有限责任公司 填埋场地下水的立体式疏排系统结构
JP2009179945A (ja) * 2008-01-29 2009-08-13 Yoshitaka Igawa 道路用井戸暗渠及びその施行方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
傅仲萼.垃圾填埋场网状盲沟防渗漏排水技术.《施工技术》.2007,第36卷(第6期),第84-85页. *
董利华等.复杂地质条件下深大基坑的综合降水技术.《施工技术》.2006,第35卷(第6期),第73-75、80页. *

Also Published As

Publication number Publication date
CN101705691A (zh) 2010-05-12

Similar Documents

Publication Publication Date Title
CN101705691B (zh) 基坑内基础底板下降水井的施工方法
CN110219313B (zh) 一种地下施工盲井排水系统及施工方法
CN104032760A (zh) 一种基坑施工管井降水方法
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN203530996U (zh) 多井点组合降水设施
CN104314090A (zh) 深基坑基岩排水暗沟及其排水系统和排水施工方法
CN110055972A (zh) 干船坞基坑施工方法及干船坞基坑结构
CN111691425B (zh) 一种水利工程基坑管井结合轻型井点降排水方法
CN103967015B (zh) 一种深基坑止水开挖方法及其结构
CN210341957U (zh) 一种适用于沉箱的降水结构
CN218148458U (zh) 一种裂隙发育岩层深水深基坑降排水系统
CN110185051A (zh) 深窄基坑开挖施工排水方法
CN203320576U (zh) 超限高层建筑地下室外墙防排水系统
CN113585311B (zh) 一种设置贯穿深基坑降水井的真空降水方法
CN112854268B (zh) 岩溶地区框架桥顶进降水施工方法及地质勘察与治理方法
CN204435321U (zh) 一种火力发电厂取水明渠
CN111549807B (zh) 水利工程基坑管井结合轻型井点降排水方法
CN103774698B (zh) 土工免排水施工方法
CN103306299A (zh) 超限高层建筑地下室外墙防排水综合施工方法
KR100645324B1 (ko) 대심도용 케이슨 지지구조
CN110761308A (zh) 一种局部基坑施工方法
CN111206624A (zh) 一种用于地下建/构筑物减压抗浮结构及施工方法
CN104947699A (zh) 深基坑排水结构
CN108867542A (zh) 一种尾矿回水清淤系统及其清淤方法
CN217233586U (zh) 一种暗挖掌子面超前降水系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20100512

Assignee: Nantong Academy of Building Research Co., Ltd.

Assignor: Nantong Construction Engineering Group Co., Ltd.

Contract record no.: 2014320000393

Denomination of invention: Construction method of dewatering well under foundation slab in foundation pit

Granted publication date: 20110720

License type: Exclusive License

Record date: 20140508

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model