CN102733403B - 一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法 - Google Patents
一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法 Download PDFInfo
- Publication number
- CN102733403B CN102733403B CN201210042646.7A CN201210042646A CN102733403B CN 102733403 B CN102733403 B CN 102733403B CN 201210042646 A CN201210042646 A CN 201210042646A CN 102733403 B CN102733403 B CN 102733403B
- Authority
- CN
- China
- Prior art keywords
- water
- pit
- excavated
- excavation
- permafrost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
本发明涉及一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法,其特征是在距拟基坑周边开挖沟槽,沟槽深度至地下多年冻土上限以下0-100cm的深度;坑槽的底部铺设一层1~30mm厚的膨润土、或粘土,然后,在开挖的坑槽内布设隔水膜,隔水膜布满开挖坑槽的底部,然后再沿坑壁抵达地表,形成L型,用填土回填并夯实;L型隔水膜的沿坑壁垂直部分为靠近拟开挖基坑边缘的间距为0.5-5m。本发明有效避免地下水对工程施工过程和冻土基础的影响,通过充分考虑冻土结构特点、地下水土质和水文结构特点,通过在拟开挖基坑周边布设一种特殊结构的隔水薄膜,有效阻水。同时,在工程施工完成后可以继续调控原开挖基坑内部水分,从而达到长期维护冻土基础稳定的目的。
Description
技术领域
本发明涉及多年冻土区寒冷季节工程建筑基坑开挖过程中,利用隔水膜阻止冻结层上水向开挖基坑涌水的方法
背景技术
我国分布大面积的高海拔多年冻土和高纬度多年冻土,在广袤的多年冻土区进行了青藏公路、青藏铁路、青藏输电线路、东北哈大高速、中俄输油管道等国家重大项目的建设。在进行这些工程建设过程中,特别是于2010年至2011年在青藏高原进行的青藏直流联网工程输电线路重大工程的建设,不可避免的要进行了大量的基坑开挖工作,并由此导致一些重要的工程问题亟待解决。
在多年冻土区,由于冻土的存在导致了地下水空间分布特征与一般地区存在根本性的差异。多年冻土长年的冻结及其对水分的阻隔作用,夏季降水、或地表的径流的下渗水分,即地下水只能到达地下一定深度,即多年冻土层的顶板(在冻土学中被称为“多年冻土上限”,其深度一般为距离地表约2m),并在冻结层以上大量汇集,在冻土学中被称为“冻结层上水”,而无法再继续下渗。因此,基坑开挖后,极易导致周边大量冻结层上水向基坑内部的涌水,在导致地下冰的不断融化,基坑内部大量积水、软化坑壁和基底的同时,冻结层上水的流动过程导致基坑坑壁的大量坍塌,以致失稳,对施工安全性、建设周期、建设成本,特别是施工质量和施工人员安全造成重大影响。同时,在建设完成后由于涌水所携带的热量对冻土的热扰动,对基础周围多年冻土的热稳定性也会受到重要影响。因此,如何有效避免冻结层上水对冻土基坑施工过程的不利影响是冻土基坑施工的重要难题。
在一般常规地区进行基础基坑开挖施工时,常采用的止水措施包括:1、在开挖基坑附近打孔并进行排水,降低开挖处的地下水位,如真空井点、管井法等;2、在基坑内修建集水井,再用水泵将水抽走排走,即井点排水法;3、打孔后用高压泥浆泵,向周围土体注入固化浆液,凝固后便在土体中形成具有一定性能和形状的固结体,由多个高压喷射注浆固结体形成帷幕,以达到止水效果,此法为高压喷射注浆法。上述这些方法在常规地区对地下水涌入基坑发挥了良好的作用,但是多年冻土区,由于地下水空间分布特殊的特性,使得这些方法难以发挥有效作用。其原因在于,这些方法主要通过排水孔的大量抽水,大幅降低周围水位,而避免地下水向开挖基坑内部的汇集。但在多年冻土区,由于冻土隔水作用的存在,地下水难以穿过冻土层、其水位难以发生大的改变,难以向排水孔汇集,由此造成常规方法的失效。其次,高压喷射注浆法凝固过程产生的大量的热量而导致冻土表层顶板下部冻土的融化,会对冻土产生严重的热扰动,使其在基坑开挖施工中也难以发挥有效作用。因此,如何有效解决多年冻土区施工过程中,基坑的涌水问题的输电线路施工过程中亟待解决的难题。
发明内容
针对冻土区基坑开挖过程中常规方法难以解决的突出工程难题,本发明的目的在于提供一种利用隔水膜阻止冻结层上水向开挖基坑涌水的方法。本发明充分结合多年冻土区冻结层上水的埋藏和结构特点,以及与冻土的相互关系,而提出一种隔绝地下水、保证施工过程正常进行的方法。
本发明的目的是这样实现的:
一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法,在距拟开挖基坑周边、一定间距开挖沟槽,沟槽深度至地下多年冻土上限以下0-100cm的深度;坑槽的底部铺设一层1~30mm厚的膨润土、或粘土,然后,在开挖的坑槽内布设隔水膜,隔水膜布满开挖坑槽的底部,然后再沿坑壁抵达地表,形成L型,用填土回填并夯实;L型隔水膜的沿坑壁垂直部分为靠近拟开挖基坑边缘的间距为0.5-5m。
上述隔水膜为PVC薄膜,或为土工布,或为彩条布。
本发明的优点和产生的有益效果是:
1、本发明充分结合多年冻土区冻结层上水的埋藏和结构特点,以及与冻土的相互关系,通过多年冻土隔水特性的充分利用,并与隔水膜的充分结合,有效切断了冻结层上水向开挖基坑流动的水利通道,有效解决冻结层上水向开挖基坑涌水难题,解决了冻土区基坑开挖过程中常规方法难以解决的突出工程难题,有效保证了工程施工的顺利进行和施工工期的完成。
2、本发明中隔水膜在工程施工中有效阻止冻结层上水向开挖基坑涌水的基础上,在工程完工后,可进一步发挥其对工程稳定性的促进作用。隔水膜底部的铺设有类似单向阀门的作用,在工程施工完成后,当基坑周边外部水分向基坑内部方向渗漏的时候,由于水分迁移过程对隔水膜的推挤重力作用,使得底部隔水膜的隔水作用进一步增强,而阻挡周围水分向原基坑位置的汇集和热影响;而当基坑内部地下水位高于四周水位的时候,由于内部地下水对隔水膜的推挤作用,可以打开与外界相通的通道,而向外渗漏,以及保证塔基的稳定。
3、本发明在阻止地下水向基坑汇水的同时,避免汇水造成基坑坑壁坍塌,确保了基坑内部施工人员的安全性。保证基坑处于干燥状态,同时保证了浇筑混凝土质量。
4、本发明有效避免了冻结层上水向基坑内部大量汇水过程导致的对基础周边和下部冻土的热扰动,进一步增强了周边冻土的稳定性。
5、本发明保证了冻土热稳定性,免除冻土受到强烈扰动。通过本发明在多年冻土工程实施,很大程度上减小了对周围生态环境的破坏。
7、本发明工程结构简单、施工简便快捷、工程造价十分低廉,效果明显,便于在工程实际中大量推广,具有重要的工程实际应用价值。
附图说明
图1为本发明断面结构示意图。
具体实施方式
下面,结合附图对本发明的技术方案再作进一步的说明:
为验证本发明的有效性,2010年9月20日在青藏直流线路工程建设工地进行了现场实地试验。实验场地选择在青藏高原清水河段,该段多年冻土、地下冰发育且不稳定。通过测定,多年冻土上限在2.1m左右,是青藏高原常见的典型的类型。在此段区域,输电线路塔基开挖后多年冻土层上水丰富,尽管施工人员采用了水泵等排水措施,仍无法及时将基坑中的水排尽,严重影响施工进度,而被迫推迟施工工期。
为了解决在现场施工过程出现多年冻土上限层向开挖基坑涌水这一现象,本发明在设定开挖坑槽1的位置,采用挖掘机挖掘一个3m×3m×2m的坑槽1,先在坑槽1铺设一层20mm厚膨润土5。然后在坑槽1顶部、侧面和底部四周布设PVC薄膜,并至地下多年冻土上限4以下50cm的深度;然后再沿坑壁抵达地表,形成L型,用填土3回填并夯实;PVC薄膜沿坑壁垂直部分为靠近拟开挖基坑的边缘的间距为5m。
整个工作流程可以连续进行,即一边开挖、一边向坑槽1布设PVC薄膜、一边快速进行土体的回填。在填土3回填过程中,可将PVC薄膜全部埋置于土体中。
在PVC薄膜铺设后第二天,在现场铺设PVC薄膜的试验中心部位进行排水测试,测试结果表明,在最初5小时中心部位有一定水量的情况下,在后续连续3天的时间里,中心部位基本没有水量。根据现场条件分析,最初5小时的水量应为试坑内部原有水量,而后续基本没有水量说明该种方法的隔水效果。试验结果证明本发明完全阻止了冻结层上水向坑槽内部的渗入。然后再在进行设计基坑的开挖,保证了工程施工的顺利进行和施工工期完成。
为保证底部冻土的稳定和良好的隔水效果,可以在土体回填坑槽几天后再进行基坑的开挖,使基坑处于干湿状态,同时保证了基坑浇筑混凝土质量。
Claims (1)
1.一种利用隔水膜阻止冻土层上水向开挖基坑涌水的方法,其特征是在距拟开挖基坑周边开挖一个3m×3m×2m的坑槽(1),坑槽深度至地下多年冻土层上限(4)以下0-100cm的深度;坑槽(1)的底部,铺设一层1~30mm厚的膨润土、或粘土(5),然后,在开挖的坑槽(1)顶部、侧面和底部四周布设隔水膜(2),并至地下多年冻土层上限(4)以下50cm的深度;隔水膜(2)为PVC薄膜,隔水膜(2)布满开挖坑槽(1)的底部,然后再沿坑壁抵达地表,形成L型,用填土(3)回填并夯实;L型隔水膜的沿坑壁垂直部分靠近拟开挖基坑的边缘,与该边缘的间距为0.5-5m;整个工作流程连续进行,即一边开挖、一边向坑槽1布设PVC薄膜、一边快速进行土体的回填。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210042646.7A CN102733403B (zh) | 2012-02-24 | 2012-02-24 | 一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210042646.7A CN102733403B (zh) | 2012-02-24 | 2012-02-24 | 一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733403A CN102733403A (zh) | 2012-10-17 |
CN102733403B true CN102733403B (zh) | 2015-05-13 |
Family
ID=46989660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210042646.7A Expired - Fee Related CN102733403B (zh) | 2012-02-24 | 2012-02-24 | 一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733403B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147453B (zh) * | 2013-03-22 | 2015-08-19 | 中交第一公路勘察设计研究院有限公司 | 多年冻土隧道边仰坡及路堑边坡截排水系统及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5685018A (en) * | 1979-12-12 | 1981-07-10 | Shimizu Constr Co Ltd | Construction of water shielding wall |
JP2001214453A (ja) * | 2000-01-31 | 2001-08-07 | Public Works Research Institute Ministry Of Land Infrastructure & Transport | 遮水壁による地中汚染物質の封じ込め方法 |
CN101298782A (zh) * | 2008-06-13 | 2008-11-05 | 朱邃科 | 地下室工程防水、排水方法及系统 |
CN101705691A (zh) * | 2009-10-30 | 2010-05-12 | 南通建工集团股份有限公司 | 基坑内基础底板下降水井的施工方法 |
CN102330435A (zh) * | 2011-07-05 | 2012-01-25 | 东南大学 | 一种用于污染场地原位隔离修复的隔离墙及其施工方法 |
-
2012
- 2012-02-24 CN CN201210042646.7A patent/CN102733403B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5685018A (en) * | 1979-12-12 | 1981-07-10 | Shimizu Constr Co Ltd | Construction of water shielding wall |
JP2001214453A (ja) * | 2000-01-31 | 2001-08-07 | Public Works Research Institute Ministry Of Land Infrastructure & Transport | 遮水壁による地中汚染物質の封じ込め方法 |
CN101298782A (zh) * | 2008-06-13 | 2008-11-05 | 朱邃科 | 地下室工程防水、排水方法及系统 |
CN101705691A (zh) * | 2009-10-30 | 2010-05-12 | 南通建工集团股份有限公司 | 基坑内基础底板下降水井的施工方法 |
CN102330435A (zh) * | 2011-07-05 | 2012-01-25 | 东南大学 | 一种用于污染场地原位隔离修复的隔离墙及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102733403A (zh) | 2012-10-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203403426U (zh) | 膨胀土路堑边坡支护结构 | |
CN111577383B (zh) | 一种高寒地区隧道渗漏水治理方法 | |
CN104131575A (zh) | 一种岩溶高度发育地层坝基的堵漏排水方法 | |
CN105179011B (zh) | 一种隧洞封堵设施及其封堵方法 | |
CN102733405B (zh) | 一种多年冻土区用于降低冻土温度和阻止向基坑内汇水的方法 | |
CN105544576A (zh) | 一种基坑降排水开挖结构及应用方法 | |
CN102926376A (zh) | 一种围海造地区域软土地基处理方法 | |
CN203145030U (zh) | 一种多年冻土隧道边仰坡及路堑边坡截排水系统 | |
CN102383408B (zh) | 高水位不透水盐碱地的绿化方法和绿化体系 | |
CN105887606A (zh) | 高寒冻土区深路堑保温渗水复合式暗沟及其施工方法 | |
CN109236367A (zh) | 一种具有防渗排水功能的隧道结构及其冻结施工方法 | |
CN208934002U (zh) | 一种挡墙结构 | |
CN102425175B (zh) | 山区大型弃碴场加固防护构造 | |
CN205775687U (zh) | 高寒冻土区深路堑保温渗水复合式暗沟 | |
CN209412838U (zh) | 一种膨胀土路堑边坡结构 | |
CN102733403B (zh) | 一种利用隔水膜阻止多年冻土层上水向开挖基坑涌水的方法 | |
CN102704437A (zh) | 一种适用复杂山区的采煤塌陷区耕作水源再造方法 | |
CN103276717A (zh) | 复合土工合成材料加筋垫层处理软土地基的方法 | |
CN207727514U (zh) | 一种库盆防渗抗抬动结构 | |
CN102425179A (zh) | 一种微型钢管灌注桩支撑加筋土渗沟结构 | |
CN102493810B (zh) | 管道斜井工程灌浆施工工艺 | |
CN114855846A (zh) | 一种地下防渗减压抗浮盲管结构及其施工方法 | |
CN214363925U (zh) | 一种截水渗沟系统 | |
CN203213130U (zh) | 利用薄膜阻止冻土层上水向基坑涌水的结构 | |
CN204825916U (zh) | 一种强透水地层深基坑封底止水结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150513 Termination date: 20180224 |