CN101705463A - Device for continuously hot dip galvanizing pipe - Google Patents

Device for continuously hot dip galvanizing pipe Download PDF

Info

Publication number
CN101705463A
CN101705463A CN200910249685A CN200910249685A CN101705463A CN 101705463 A CN101705463 A CN 101705463A CN 200910249685 A CN200910249685 A CN 200910249685A CN 200910249685 A CN200910249685 A CN 200910249685A CN 101705463 A CN101705463 A CN 101705463A
Authority
CN
China
Prior art keywords
pipe
continuously
zinc
equipment
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910249685A
Other languages
Chinese (zh)
Inventor
汪为健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stargroup Research & Integration Co Ltd
Original Assignee
Stargroup Research & Integration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stargroup Research & Integration Co Ltd filed Critical Stargroup Research & Integration Co Ltd
Priority to CN200910249685A priority Critical patent/CN101705463A/en
Publication of CN101705463A publication Critical patent/CN101705463A/en
Pending legal-status Critical Current

Links

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The invention provides a device for continuously hot dip galvanizing a pipe. A continuous production line device is adopted to solve the problem that a steel pipe cannot be continuously galvanized in the prior art. The device for continuously hot dip galvanizing the pipe comprises an uncoiling machine 1, cropping tail scissors 2, a first withdrawal roll 3, a steel plate welder 4, a withdrawal roll 5, a disc-type loop 6, a second withdrawal roll 7, a straightening device 8, a rolling molding machine 9, a straight welding machine 10, a pre-heating cleaner 11, a zinc groove 12, an annular air knife 13, a cold air blower 14, a steel pipe clamping and delivering device 15, fixed-length rear scissors 16 and a stacking apparatus. The stacking apparatus is provided with two stackers, one of which is put into operation while the other is for later use. The device for continuously hot dip galvanizing the pipe improves the production efficiency and saves cost.

Description

A kind of equipment of continuously and thermally galvanizing pipe
Technical field
The invention belongs to and be coated with zinc-plated field in the metallurgy industry, relate in particular to the production field of pot galvanize.
Background technology
The employing that the production of domestic original galvanized pipe now has is electroplated, and the employing galvanized sheet that has is welded, and adopts the method galvanized pipe of electro-galvanizing, thickness of coating is difficult to control, and coating is thinner, and production rate is slow, the cost height, and pot galvanize adopts cage to soak zinc-plate process mostly, and steel pipe is cut into the length that needs, and is placed on to immerse the zinc pot in the cage, galvanizing in this way, the zinc layer that is plated is the two sides, and practical application just outer surface of steel tube need zinc-platedly, the double side zinc coating waste is serious; Technology with the galvanized sheet welding is roll-forming on heat zinc coating plate in addition, is welded, and postwelding is mended zinc coating then in the reconditioning of steel pipe seam place in the commissure.Zinc-plated on steel pipe, low with these several mode production efficiencys, can not continuous production, complex procedures, production cost is big, and labour intensity is big.
Summary of the invention
Low in order to overcome domestic original galvanized pipe production efficiency of equipment, the production cost height, can not continuous production, labour intensity is big, the mode that the present invention adopts the production unit of working continuously is zinc-plated and shear that all processes is all online to be finished to being welded into steel pipe from uncoiling, collection uncoiling, leveling, roll-forming, welding, cleaning, cold wind purging, cutting to length, buttress material equipment are one, be used for the full continuous automatic production of hot dip galvanizing pipe, can continuous production, thereby improved production efficiency, filled up domestic blank.
The technical scheme that the present invention solves its technical problem is: adopt a kind of equipment of continuously and thermally galvanizing pipe, comprise that Abrollhaspel 1, crop end cut that 2, first pinch roll 3, steel plate welding machine 4, pinch roll 5, disc type kink 6, second pinch roll 7, equipment for straightening 8, roller pressing forming machine 9, Straight seam welding machine 10, pre-warm wash 11, zinc groove 12, the air knife 13 that goes in ring, cold wind purge 14, steel pipe pinches 15, fixed length cuts 16 subsequently, stacking apparatus.
In the described zinc groove 12 zinc pump and nozzle are arranged.
Described fixed length is cut the parts that have the cut-to-length parts in 16 and move with steel pipe subsequently.
Described stacking apparatus has two stackers, the using and the reserved.
The invention has the beneficial effects as follows: the configuration of this continuously and thermally galvanizing pipe apparatus for production line can be finished from uncoiling zinc-plated and shear that all processes is all online to be finished to being welded into steel pipe, collection uncoiling, leveling, roll-forming, welding, cleaning, cold wind purging, cutting to length, buttress material are one, realize the online full continuous production of whole process of production; Reduced middle-chain, saved manpower, the method with the continuous zinc coating pipe has reduced zinc consumption, has reduced production cost, has improved production efficiency, has improved the level of automation of producing, and has saved manpower and materials, has improved quality of coating.
Description of drawings
Fig. 1: pipe figure is plated in pot galvanize continuously
Among Fig. 1: 1. Abrollhaspel, 2. crop end cut, 3. first pinch roll, 4. the steel plate welding machine, 5. pinch roll, 6. the disc type kink, 7. second pinch roll, 8. equipment for straightening, 9. roller pressing forming machine, 10. Straight seam welding machine, 11. pre-warm wash, 12. zinc grooves, 13. go in ring air knives, 14, cold wind purge, 15, steel pipe pinches, 16. fixed length are cut subsequently, 17. pairs of stackings
Embodiment
Entrance: earlier coil of strip is placed on the Abrollhaspel 1 with the coil of strip car, wrench is cut 2 with crop end and is cut wrench, flatten by steel plate welding machine 4 through first pinch roll 3, cutting 2 with last coil of strip through crop end, to cut the steel plate afterbody of irregular magnetic tape trailer welded together, change the locality of steel band by pinch roll 5, make steel band become vertical direction and enter disc type kink 6 by horizontal direction, steel band enters disc type kink 6, during normal uncoiling, disc type kink 6 storings, when change of lap welds, disc type kink 6 blowings satisfy the requirement of unit quantity-produced;
Process section: steel band comes out to turn to through second pinch roll 7 from disc type kink 6, make steel band become horizontal direction by vertical direction, through equipment for straightening 8, steel band is carried out straightening processing, eliminate the defective of steel strip surface, help next step soldering of steel band, enter roll-forming machine equipment 9, behind roll-forming, be rolled into steel pipe, be welded into steel pipe through Straight seam welding machine 10, the steel pipe seam place of postwelding is polished flat with sander, enter pre-warm wash 11, with cleaning through the tank liquor after the preheating, wash the iron scale of steel tube surface, steel band enters rinse stage then, washes the remaining tank liquor of steel tube surface off, then steel pipe enters the oven dry section, and hot-air seasoning is removed the moisture of steel tube surface.Steel pipe behind hot-air seasoning is through pinching, enter zinc groove 12, the zinc pump is arranged in the zinc groove 12, zinc liquid sprays to steel tube surface to zinc liquid through the zinc pump by the nozzle that goes in ring, unnecessary zinc liquid flows back in the zinc groove 12, zinc pipe after the spraying is through the air knife 13 that goes in ring, blow unnecessary zinc liquid off, thus the thickness and the uniformity coefficient of the air knife air output of gate ring promoting the circulation of qi cutter 13 control zinc coating, the quality of control zinc coating.The key of decision steel pipe finished product.
Outlet section: the steel pipe after zinc-plated purges 14 postcooling through behind the annular air knife through cold wind, pinching 15 through cooled steel pipe through steel pipe enters fixed length and cuts 16 subsequently, fixed length is cut 16 subsequently and is followed the steel plate walking, the length that requires according to required steel pipe customizes, shear steel pipe, the steel pipe scale is become fixed length, to reach the production needs, steel pipe after the fixed length enters two stackings 17, this equipment is used for carrying the finished product to length steel pipe, and shared two, the using and the reserved, when a stacking apparatus reaches the stacking height discharging of regulation, by handling equipment fished pipe is delivered to another stacking apparatus, continue stacking, satisfy unit quantity-produced needs, save the production time, improved production cost.

Claims (4)

1. the equipment of a continuously and thermally galvanizing pipe is characterized in that: comprise that Abrollhaspel (1), crop end are cut (2), first pinch roll (3), steel plate welding machine (4), pinch roll (5), disc type kink (6), second pinch roll (7), equipment for straightening (8), roller pressing forming machine (9), Straight seam welding machine (10), warm wash (11), zinc groove (12), the air knife (13) that goes in ring, cold wind purging (14), steel pipe pinch (15) in advance, fixed length is cut (16), stacking apparatus subsequently.
2. the equipment of a kind of continuously and thermally galvanizing pipe as claimed in claim 1 is characterized in that: it is characterized in that in the described zinc groove (12) zinc pump and nozzle being arranged.
3. the equipment of a kind of continuously and thermally galvanizing pipe as claimed in claim 1 is characterized in that: it is characterized in that described fixed length cuts the parts that (16) have the cut-to-length parts and move with steel pipe subsequently.
4. the equipment of a kind of continuously and thermally galvanizing pipe as claimed in claim 1 is characterized in that: it is characterized in that described stacking apparatus has two stackers, the using and the reserved.
CN200910249685A 2009-12-11 2009-12-11 Device for continuously hot dip galvanizing pipe Pending CN101705463A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910249685A CN101705463A (en) 2009-12-11 2009-12-11 Device for continuously hot dip galvanizing pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910249685A CN101705463A (en) 2009-12-11 2009-12-11 Device for continuously hot dip galvanizing pipe

Publications (1)

Publication Number Publication Date
CN101705463A true CN101705463A (en) 2010-05-12

Family

ID=42375714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910249685A Pending CN101705463A (en) 2009-12-11 2009-12-11 Device for continuously hot dip galvanizing pipe

Country Status (1)

Country Link
CN (1) CN101705463A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552768A (en) * 2013-11-15 2014-02-05 攀枝花钢城集团有限公司 Manufacturing method of angle bead structure for steel coil packaging
CN104805388A (en) * 2013-12-05 2015-07-29 绵阳快典科技有限公司 Coating zinc-plating device for external wall of steel pipe
CN105177573A (en) * 2015-08-31 2015-12-23 中国钢研科技集团有限公司 Combined unit for steel strip continuous hot-dip galvanizing and zinc-magnesium alloy plating and production method for combined unit
CN111501037A (en) * 2020-04-23 2020-08-07 浙江航峰铁塔有限公司 Passivation device for galvanized component

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552768A (en) * 2013-11-15 2014-02-05 攀枝花钢城集团有限公司 Manufacturing method of angle bead structure for steel coil packaging
CN104805388A (en) * 2013-12-05 2015-07-29 绵阳快典科技有限公司 Coating zinc-plating device for external wall of steel pipe
CN104911521A (en) * 2013-12-05 2015-09-16 绵阳快典科技有限公司 Inner bore avoidance steel pipe coating galvanization device
CN104911521B (en) * 2013-12-05 2017-06-20 甘肃天和力德管道制造有限公司 A kind of endoporus keeps away the steel pipe coating galvanizing rig of position
CN105177573A (en) * 2015-08-31 2015-12-23 中国钢研科技集团有限公司 Combined unit for steel strip continuous hot-dip galvanizing and zinc-magnesium alloy plating and production method for combined unit
CN105177573B (en) * 2015-08-31 2017-09-29 中国钢研科技集团有限公司 The Unit erriger and its production method of continuous hot galvanizing of steel strip and plating zinc magnesium alloy
CN111501037A (en) * 2020-04-23 2020-08-07 浙江航峰铁塔有限公司 Passivation device for galvanized component

Similar Documents

Publication Publication Date Title
CN101249606B (en) Method and equipment for hot rolled plate colored forming continuous production
CN205011821U (en) High -quality ultra -thin hot -galvanize belted steel continuous production line
CN101249605B (en) Method for continuous producing rust-inhibiting primer coating steel plate
CN108480416B (en) Method for producing non-spangle galvanized sheet based on sheet billet continuous casting and continuous rolling hot base raw material and acid pickling galvanizing continuous production line
CN102764790B (en) Completely continuous magnesium alloy strip coil finishing device and finishing method
CN201381372Y (en) Strip steel electrogalvanizing unit
WO2007090326A1 (en) Automatic production line for producing high-strength color coated packing steel strip by utilizing non-quenching process
CN101709445A (en) Method for continuously and thermally galvanizing pipe
CN201817540U (en) Plant for continuously galvanizing tubes by heat
CN106244967B (en) Cold-rolling of steel plate coating integration produces unit and its production technology
CN101705463A (en) Device for continuously hot dip galvanizing pipe
CN101767123A (en) Process and equipment for producing aluminum-cladding copper pipe
US3845540A (en) Hot galvanizing process and apparatus
CN101285525B (en) Technological process for continuous production of sealing cushion raw material plate
CN105458633B (en) A kind of manufacture method of mild steel coiled tubing
CN105127236A (en) Manufacturing method for special-shaped steel pipes special for logistics shelves
CN108356083A (en) A kind of coil of strip pickling skin pass mill group and coil of strip production method
CN104525559A (en) Method and device for rolling wide nickel strip coil based on twenty-high roll mill
CN105965171A (en) Method and device for producing barreled seamless flux-cored wire used for high-strength steel
CN113043020B (en) Stainless steel pipe production device and production method
CN206689733U (en) A kind of continous way automatic production device of damping block
CN202779250U (en) Full-continuous magnesium alloy strip coil finishing device
CN201596691U (en) Equipment for producing aluminum covered copper tubes
CN219541348U (en) Belt cleaning device with foil aligns structure
CN210304321U (en) Oriented silicon steel staggered coating device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100512