CN201596691U - Equipment for producing aluminum covered copper tubes - Google Patents

Equipment for producing aluminum covered copper tubes Download PDF

Info

Publication number
CN201596691U
CN201596691U CN2009202921890U CN200920292189U CN201596691U CN 201596691 U CN201596691 U CN 201596691U CN 2009202921890 U CN2009202921890 U CN 2009202921890U CN 200920292189 U CN200920292189 U CN 200920292189U CN 201596691 U CN201596691 U CN 201596691U
Authority
CN
China
Prior art keywords
copper pipe
die
aluminium strip
aluminum
front side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202921890U
Other languages
Chinese (zh)
Inventor
戴雅康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN TONGFA COMPOSITE CABLE SCIENCE & TECHNOLOGY DEVELOPMENT CO., LTD.
Original Assignee
Dalian TTOFF New Material Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian TTOFF New Material Development Co Ltd filed Critical Dalian TTOFF New Material Development Co Ltd
Priority to CN2009202921890U priority Critical patent/CN201596691U/en
Application granted granted Critical
Publication of CN201596691U publication Critical patent/CN201596691U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

Equipment for producing aluminum covered copper tubes is provided with a coating device and a welding device matching with the coating device. An outlet of the welding device is continuously provided with at least two groups of wire drawing machines and a winding frame, the front side of an inlet of the coating device is provided with an aluminum tape skinning machine and a copper tube straightening brushing device, the front side of an inlet of the aluminum tape skinning machine is provided with an aluminum tape frame for placing an aluminum tape tray, the front side of an inlet of the copper tube straightening brushing device is provided with a copper tube tray frame for placing a copper tube tray, the front side of each wire drawing machine is provided with a tube drawing die device with a moving mandrel, the aluminum tape skinning device consists of a die base supported onto a die base frame and a skinning die mounted onto the die base, the die base and the die base frame below the die base are fixedly connected via bolts, the skinning die is placed inside a side groove of the die base and provided with a skinning die opening, and three edges on the periphery of an inlet side of the skinning die opening form sharp cutting edges while the other edge is provided with a smooth chamfer. The equipment is simple in structure, low in manufacturing cost and easy in operation and control.

Description

Produce the equipment of aluminum-cladding copper pipe
Technical field
The utility model relates to a kind of production equipment, particularly a kind of equipment of producing aluminum-cladding copper pipe.
Background technology
Evaporimeter, condenser in air conditioner, the refrigerator uses aluminum-cladding copper pipe to replace pure copper tube mostly at present, to reduce production costs, to improve the heat exchange effect; In some equipment, also use aluminum-cladding copper pipe to replace pure aluminum tube in a large number, to improve its processing and serviceability.
Application number is the manufacture method that discloses a kind of copper aluminium composite tubing in 2006100760378 the application for a patent for invention Publication Specification; wherein mentioned mainly is that to adopt the planetary rolling machine that copper aluminum composite pipes base suit or continuous casting is carried out aximal deformation value rolling; pipe is heated up; and by dynamically recovering crystallization again; make copper and aluminium realize metallurgical binding; by drawing equipment, obtain required caliber then.This device structure is very complicated, costs an arm and a leg, and operation easier is big, causes the production cost height.
Summary of the invention
The purpose of this utility model provides the production equipment of simple, the good operation of a kind of overall structure, easy to control, production aluminum-cladding copper pipe that production cost is low, overcomes the deficiencies in the prior art.
The equipment of production aluminum-cladding copper pipe of the present utility model, the welder that coating unit is arranged and match with coating unit, the exit of welder is provided with at least two group wire drawing machinees continuously and twines bin, be provided with aluminium strip stripper and copper pipe aligning polishing device in the inlet front side of coating unit, be provided with the aluminium strip bin of placing the aluminium strip dish in the inlet front side of aluminium strip stripper, be provided with the copper pipe biscuit frame of placing the copper pipe dish in the inlet front side of copper pipe aligning polishing device; The front side of described each wire drawing machine is provided with the tube-drawing die device that has floating core head;
Described aluminium strip stripper is formed by being supported on die holder on the die holder frame and the slicing mould that is contained on the die holder, and bolting is connected between the die holder frame of die holder and below, and slicing mould places in the die holder lateral groove;
Have triangle to become sharp cutting edge around the die orifice that strips off the skin on the described slicing mould, the entrance side of the die orifice that strips off the skin, another side has slick and sly chamfering.
The equipment of production aluminum-cladding copper pipe of the present utility model is provided with the gap between the medial surface of wherein said lateral groove and the side of slicing mould.
The equipment of production aluminum-cladding copper pipe of the present utility model is equipped with before the inlet of wherein said aluminium strip stripper and after the outlet and is used for guide roller that aluminium strip is led.
The equipment of production aluminum-cladding copper pipe of the present utility model, the equipment that has wherein comprised existing production of copper alclad wire rod and producing steel-in-copper wires, make integral device simple in structure, low cost of manufacture, good operation, easy to control, when utilizing device fabrication aluminum-cladding copper pipe of the present utility model, with aluminium strip with the copper pipe that copper strips is made through welded tube mill is raw material, form the aluminum-cladding copper pipe material through clad welded and multi-pass drawing, make whole technology compared with prior art have device structure and operating procedure is simple, control easily, production efficiency height, advantage that production cost is low.
Description of drawings
Fig. 1 is the structural representation of the utility model specific embodiment;
Fig. 2 is that the master of the slicing mould in the aluminium strip stripper shown in Figure 1 looks schematic diagram;
Fig. 3 is that schematic diagram is looked on a left side shown in Figure 2;
Fig. 4 is the scheme of installation of the slicing mould in the aluminium strip stripper shown in Figure 1.
The specific embodiment
As shown in Figure 1: 17 is copper pipe biscuit frame, utilize copper strips on general welded tube mill, be rolled into the copper pipe that longitudinal seam that tubulose and welding form makes and be wound in copper pipe dish 1, copper pipe dish 1 places on the rolling disc of copper pipe biscuit frame 17 tops, when the external end head of copper pipe 19 is subjected to pulling force, whole copper pipe dish 1 is used to send copper pipe 19 with the turn disc of its below.
18 is the aluminium strip bin, and aluminium strip dish 2 places on the aluminium strip bin 18.
4 for the aligning polishing device, is made up of the combination smoothing roll and the electronic abrasive brush that are supported on the frame, is in operation and earlier copper pipe carried out straightening processing, then to its appearance outwash of polishing, removing surface contaminants.
Shown in Fig. 1,2,3,4,5: 5 is the aluminium strip stripper, form by being supported on die holder 26 on the die holder frame 25 and the slicing mould 24 that is contained on the die holder 26, stripping off the skin, bolting is connected between the die holder frame 25 of die holder 26 and below, and slicing mould 24 places in die holder 26 lateral grooves 27 that strip off the skin.Be provided with the gap between the side of the medial surface of lateral groove 27 and slicing mould 24.The die orifice 23 that strips off the skin that adapts with aluminium strip 20 sections is arranged on the slicing mould 24, and around the entrance side of the die orifice 23 that strips off the skin three limits being arranged is that top and dual-side form sharp cutting edge 21, the promptly following chamfering 22 that slyness is arranged of another side.During use, aluminium strip 20 enters from the entrance side of the die orifice 23 that strips off the skin, and under the pulling force effect, top (promptly the coating face) of 21 pairs of aluminium strips 20 of cutting edge and two sides (solder side) processing that strips off the skin with the removal foreign material, better contacts and longitudinal seam welding with copper pipe 19.
7 is coating unit, is equipped with manyly to level and vertical roller in it, is used for that aluminium strip 20 is rolled into tubulose and is coated on the outside of copper pipe 19.8 roll argon arc welding for friendship meets sb. at the airport, and 9 are the longitudinal seam welding device, and the longitudinal seam on the aluminum pipe that is coated on copper pipe 19 outsides is welded, and form the aluminum-cladding copper pipe base.
11 is first wire drawing machine, and the motor that joins with electric control gear is arranged in it, and motor connects the turning cylinder that protrudes upward, and first rotating disk 12 is arranged on the turning cylinder, is processed with the groove that matches with the aluminum-cladding copper pipe base on the outer circumference of first rotating disk 12.
10 is first to have the tube-drawing die device of floating core head, and during operation, the rotation of first rotating disk 12 produces pulling force, makes the aluminum-cladding copper pipe base of moulding obtain drawing for the first time at first tube-drawing die device 10 places that have floating core head.
14 is second wire drawing machine, and the motor that joins with electric control gear is arranged in it, and motor connects the turning cylinder that protrudes upward, and second rotating disk 15 is arranged on the turning cylinder, is processed with the groove that matches with the aluminum-cladding copper pipe base on the outer circumference of second rotating disk 15.
13 is second to have the tube-drawing die device of floating core head, and during operation, the rotation of second rotating disk 15 produces pulling force, and the aluminum-cladding copper pipe base after the drawing first time obtains drawing for the second time at second tube-drawing die device 13 places that have floating core head.After two passage drawings, form the aluminum-cladding copper pipe base that aluminium and copper fit tightly.16 for twining bin, can be wrapped in order on this bin through the aluminum-cladding copper pipe base after the drawing second time.
3 is rack-mounted first guide roller, is used for the guiding to the aluminium strip 20 before stripping off the skin, and 6 is rack-mounted second guide roller, is used for 20 guiding of the aluminium strip after stripping off the skin.
Above-described copper pipe biscuit frame 17, aluminium strip bin 18, aligning polishing device 4, coating unit 7, hand over and roll argon arc welding machine 8, longitudinal seam welding device 9, twine bin 16 and be the production of copper alclad wire rod selected for use and the existing apparatus in the producing steel-in-copper wires equipment.This device and first wire drawing machine 11 that first rotating disk 12 is housed are chained together with second wire drawing machine 14 that second rotating disk 15 is housed, form the production line of an aluminum-cladding copper pipe base.Above-mentioned wire drawing machine is existing equipment.The tube-drawing die device 13 that the first tube-drawing die device 10, second that has floating core head has floating core head is the existing drawing mould that is used for drawing pipes.The drawing mould compact dimensions that is positioned at back a time should make progressively drawing moulding of tubing less than the drawing mould compact dimensions of preceding a time.According to the specification of tubing, this production line also can be provided with the more drawing procedure of multi-pass.Aluminium and copper in the aluminum-cladding copper pipe base after the drawing have been realized fitting tightly.
In order to realize the metallurgical binding of aluminium and copper, can carry out internal pressurization formula annealing in process to the aluminum-cladding copper pipe material after the drawing.
Be example now, its production process is described with production φ 9.52mm * 0.5mm, the long-pending aluminum-cladding copper pipe that accounts for the section gross area 15% of tubing section copper aspect.
The external diameter φ 9.52mm of this production tube, internal diameter φ 8.52mm, wall thickness are 0.5mm, and wherein aluminum layer thickness is 0.425mm, and copper layer thickness is 0.075mm.
The external diameter that now designs the aluminum-cladding copper pipe base is φ 11.50mm, and internal diameter is φ 9.50nn, and an ancient piece of jade, round, flat and with a hole in its centre is thick to be 1mm.Selecting thickness for use is that 0.3mm, width are that the T2 copper strips of 31.7mm and thickness are that 0.7mm, width are that the L2 aluminium strip of 37.4mm is raw material.
At first copper strips being welded into external diameter with welded tube mill by above-mentioned steps is that φ 10.10mm, internal diameter are the pipe of φ 9.50mm.
As shown in Figure 1 aluminium strip 20 and copper pipe 19 are sent in the production line of aluminum-cladding copper pipe simultaneously.At first copper pipe is aligned and the polish-brush outer surface; Aluminium strip is by slicing mould, will coat face and the both sides solder side is taken 0.05mm. off.Enter then in the cladding welder, make aluminium strip progressively be rolled into tubulose and form a longitudinal joint around copper pipe, behind alternating-current argon arc welder welding longitudinal joint, forming external diameter is that φ 11.90mm, internal diameter are the aluminum pipe of φ 10.50mm, and wherein being with external diameter is that φ 10.10mm, internal diameter are that φ 9.50mm copper pipe forms the aluminum-cladding copper pipe base.The difference of aluminum pipe internal diameter and copper pipe external diameter is about 0.4mm.
Then the aluminum-cladding copper pipe base enters in the drawing equipment, carries out the drawing of 2 passages with the tube-drawing die device that has floating core head.During first passes of drawing, the internal diameter of drawing die is φ 10.75mm, and the external diameter of floating core head is φ 9.15mm; During second passes of drawing, the internal diameter of drawing die is 10.00mm, and the external diameter of floating core head is 8.80mm.Obtain the aluminum-cladding copper pipe base that aluminium lamination and copper layer fit tightly.
After putting into a certain amount of material of getting angry (as urea) in the above-mentioned aluminum-cladding copper pipe base or charging into a certain amount of clear water, two ends is sealed.Sealing means can select to push the mode of flattening, makes the termination be in sealing state.Put into heating furnace then, be heated to about 350 ℃, be incubated 1 hour and carry out diffusion annealing.Come out of the stove after being cooled to normal temperature.Make aluminium lamination and copper layer realize metallurgical binding, and eliminated the work hardening phenomenon.In annealing process, the pressure of aluminum-cladding copper pipe inner chamber is controlled at 4MPa or 5MPa or 6MPa, promptly between 4-6MPa all can, to guarantee the metallurgical binding of aluminium and copper.
Aluminum-cladding copper pipe after the heat treatment has accurate dimensions and regular shape in order to make it, carries out a drawing again according to the suitable mould of preferred dimension that requires of finished size, and making its external diameter is φ 9.52mm, and internal diameter is φ 8.52mm, and an ancient piece of jade, round, flat and with a hole in its centre is thick to be 0.5mm.

Claims (3)

1. equipment of producing aluminum-cladding copper pipe, it is characterized in that: the welder (9) that coating unit (7) is arranged and match with coating unit (7), the exit of welder (9) is provided with at least two group wire drawing machinees continuously and twines bin (16), be provided with aluminium strip stripper (5) and copper pipe aligning polishing device (4) in the inlet front side of coating unit (7), be provided with the aluminium strip bin (18) of placing aluminium strip dish (2) in the inlet front side of aluminium strip stripper (5), be provided with the copper pipe biscuit frame (17) of placing copper pipe dish (1) in the inlet front side of copper pipe aligning polishing device (4); The front side of described each wire drawing machine is provided with the tube-drawing die device that has floating core head;
Described aluminium strip stripper (5) is made up of the slicing mould (24) that is supported on the die holder (26) on the die holder frame (25) and be contained on the die holder (26), bolting is connected between the die holder frame (25) of die holder (26) and below, and slicing mould (24) places in die holder (26) lateral groove (27);
Have triangle to become sharp cutting edge (21) around the die orifice (23) that strips off the skin on the described slicing mould (24), the entrance side of the die orifice that strips off the skin (23), another side has slick and sly chamfering (22).
2. the equipment of production aluminum-cladding copper pipe according to claim 1 is characterized in that: be provided with the gap between the side of the medial surface of described lateral groove (27) and slicing mould (24).
3. the equipment of production aluminum-cladding copper pipe according to claim 2 is characterized in that: be equipped with before the inlet of described aluminium strip stripper (5) and after the outlet and be used for guide roller that aluminium strip is led.
CN2009202921890U 2009-12-29 2009-12-29 Equipment for producing aluminum covered copper tubes Expired - Fee Related CN201596691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202921890U CN201596691U (en) 2009-12-29 2009-12-29 Equipment for producing aluminum covered copper tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202921890U CN201596691U (en) 2009-12-29 2009-12-29 Equipment for producing aluminum covered copper tubes

Publications (1)

Publication Number Publication Date
CN201596691U true CN201596691U (en) 2010-10-06

Family

ID=42807738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202921890U Expired - Fee Related CN201596691U (en) 2009-12-29 2009-12-29 Equipment for producing aluminum covered copper tubes

Country Status (1)

Country Link
CN (1) CN201596691U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101767123A (en) * 2009-12-29 2010-07-07 大连通发新材料开发有限公司 Process and equipment for producing aluminum-cladding copper pipe
CN106785771A (en) * 2016-12-28 2017-05-31 菏泽海诺知识产权服务有限公司 A kind of seamless V-type trolley producing device and its copper strips unwinding device
CN111299476A (en) * 2019-12-23 2020-06-19 太仓市惠得利弹簧有限公司 Metal fatigue resistant spring steel wire processing technology
CN111421293A (en) * 2019-01-09 2020-07-17 浙江伟星新型建材股份有限公司 Continuous cutting and welding cladding platform for thermal insulation pipe and cladding method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101767123A (en) * 2009-12-29 2010-07-07 大连通发新材料开发有限公司 Process and equipment for producing aluminum-cladding copper pipe
CN106785771A (en) * 2016-12-28 2017-05-31 菏泽海诺知识产权服务有限公司 A kind of seamless V-type trolley producing device and its copper strips unwinding device
CN106785771B (en) * 2016-12-28 2019-05-10 菏泽海诺知识产权服务有限公司 A kind of seamless V-type trolley producing device and its copper strips unwinding device
CN111421293A (en) * 2019-01-09 2020-07-17 浙江伟星新型建材股份有限公司 Continuous cutting and welding cladding platform for thermal insulation pipe and cladding method thereof
CN111299476A (en) * 2019-12-23 2020-06-19 太仓市惠得利弹簧有限公司 Metal fatigue resistant spring steel wire processing technology
CN111299476B (en) * 2019-12-23 2022-04-15 太仓市惠得利弹簧有限公司 Metal fatigue resistant spring steel wire processing technology

Similar Documents

Publication Publication Date Title
CN101767123A (en) Process and equipment for producing aluminum-cladding copper pipe
CN100485822C (en) Acopper clad aluminum alloy line, and its preparing method and production apparatus
CN102154599B (en) Short-flow high-efficiency production method for white brass alloy pipes
CN101722390B (en) Preparation method of high-quality aluminum alloy welding wire
CN103962409B (en) The manufacture method of a kind of copper cash
CN104733133B (en) Copper coated aluminium composite bus arranges preparation technology
CN104900300B (en) A kind of aluminum-clad steel wire and its manufacturing process
CN101071662A (en) Copper cladding aluminium wire, copper cladding aluminium pipe production process and its equipment
CN101737565A (en) Method for manufacturing copper-aluminum composite tube
CN201596691U (en) Equipment for producing aluminum covered copper tubes
CN102284549A (en) Manufacturing method of aluminum-clad copper pipe having metallurgical bonding
CN101236806A (en) A short process making method for copper-coated aluminum complex lead
CN107262550B (en) A kind of manufacturing method of aluminium aluminium composite pipe
CN102527768A (en) Manufacturing method of copper-clad aluminum pipe
CN104028577B (en) A kind of copper alloy flat wire combined type process equipment
CN101412047A (en) Technique for producing copper-clad aluminium composite tube or stick
CN103599935A (en) Compound cast-rolling device for metallurgical bonding of liquid aluminum base strip and single metal or alloy strip
CN102059272A (en) Method for horizontal continuous casting, Pilger rolling and continuous drawing of copper alloy condenser tube
CN109290388A (en) A kind of continuous sandwich rolling production technology of copper clad steel conducting wire
CN116441345A (en) Processing method of copper-clad aluminum composite material
CN105244119B (en) A kind of copper cover aluminum is combined the preparation technology of V-type line
CN102107233B (en) Method for manufacturing steel/copper composite welded pipe
CN111283012A (en) Coil drawing forming process of rectangular copper pipe
CN105537313A (en) Manufacturing method for copper wire
CN104690499A (en) Cold rolling technology for forming small flat steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: DALIAN TONGFA COMPOSITE WIRE CABLE TECHNOLOGY DEVE

Free format text: FORMER NAME: TONGFA NEW MATERIALS DEVELOPMENT CO., LTD., DALIAN

CP01 Change in the name or title of a patent holder

Address after: 116600 Lingang Industrial Zone, Dalian Development Zone, Dalian, Liaoning

Patentee after: DALIAN TONGFA COMPOSITE CABLE SCIENCE & TECHNOLOGY DEVELOPMENT CO., LTD.

Address before: 116600 Lingang Industrial Zone, Dalian Development Zone, Dalian, Liaoning

Patentee before: Dalian TTOFF New Material Development Co., Ltd.

DD01 Delivery of document by public notice

Addressee: DALIAN TONGFA COMPOSITE CABLE SCIENCE & TECHNOLOGY DEVELOPMENT CO., LTD.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: DALIAN TONGFA COMPOSITE CABLE SCIENCE & TECHNOLOGY DEVELOPMENT CO., LTD.

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20171229

CF01 Termination of patent right due to non-payment of annual fee