CN105458633B - A kind of manufacture method of mild steel coiled tubing - Google Patents

A kind of manufacture method of mild steel coiled tubing Download PDF

Info

Publication number
CN105458633B
CN105458633B CN201610003513.7A CN201610003513A CN105458633B CN 105458633 B CN105458633 B CN 105458633B CN 201610003513 A CN201610003513 A CN 201610003513A CN 105458633 B CN105458633 B CN 105458633B
Authority
CN
China
Prior art keywords
steel band
coiled tubing
steel
rollers
manufacture method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610003513.7A
Other languages
Chinese (zh)
Other versions
CN105458633A (en
Inventor
张书军
郑镔
张书林
孙福堂
崔少雷
翟云鹏
胡子龙
段建良
郝浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinda (tangshan Branch) Petroleum Equipment Co Ltd
HEBEI HUATONG WIRES AND CABLES GROUP CO Ltd
Original Assignee
Xinda (tangshan Branch) Petroleum Equipment Co Ltd
HEBEI HUATONG WIRES AND CABLES GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinda (tangshan Branch) Petroleum Equipment Co Ltd, HEBEI HUATONG WIRES AND CABLES GROUP CO Ltd filed Critical Xinda (tangshan Branch) Petroleum Equipment Co Ltd
Priority to CN201610003513.7A priority Critical patent/CN105458633B/en
Publication of CN105458633A publication Critical patent/CN105458633A/en
Application granted granted Critical
Publication of CN105458633B publication Critical patent/CN105458633B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/02Rigid pipes of metal

Abstract

The present invention relates to a kind of manufacture method of mild steel coiled tubing, comprise the following steps:Steel band is supplied to cleaning device from feed reel, utilizes the impurity of alkaline degreaser removal steel strip surface;Steel band is set to pass through rolling device and pipe forming apparatus, to form the shape of coiled tubing;It is using method for laser welding that the butt welding of steel band is integral;Normalized treatment is carried out to weld seam, sizing processing is carried out to coiled tubing and homogeneous tube is heat-treated;Finishing and reel encapsulation are carried out to coiled tubing.According to the manufacture method of the mild steel coiled tubing of the present invention, improved from many aspects such as component, former, welding procedure and Technologies for Heating Processing, enable to produce coiled tubing incessantly, while solve the corrosion-resistant problem in working condition, have broad application prospects.The present invention is applied to the technical field of petroleum works.

Description

A kind of manufacture method of mild steel coiled tubing
Technical field
The present invention relates to a kind of manufacture method of mild steel coiled tubing, suitable for the technical field of petroleum works.
Background technology
Coiled tubing (coiled tubing), also known as coiled tubing, a roll are myriametre, can replace conventional oil pipe Carry out many operations.Continuous oil pipe operation equipment has the characteristics of Operating Pressure, continuously remove, and equipment volume is small, duty cycle It hurry up, cost is low.Twentieth century nineties, the development that coiled tubing technology is advanced by leaps and bounds.Continuous oil pipe operation fills Put and be described as " omnipotent working rig ", be widely used in the operations such as oil gas field well workover, drilling well, completion, well logging, run through oil gas and opened The overall process adopted.The operating environment of coiled tubing determines that it will face serious etching problem.
The manufacture of coiled tubing is that steel band is bent into the shape of pipe in the prior art, with resistance welding (ERW) mode Form coiled tubing.ERW, which is heated pipe abutting edge using the resistance heat of high frequency electric or high frequency electric of inducting, to be melted, and is applied The production technology of soldering with extruding.Compared with general welding method, ERW weld seams do not use external filling metal, and heat Speed is fast, production efficiency is high.But due to no filling metal, so weldering can not be improved by adding the method for alloying element The combination property of seam.In addition, heating-up temperature is high in welding process, the time is short, causes welding temperature gradient big so that some steel grades It is easy to produce hardening phase and structural stress, increases weld seam fragility, cause comprehensive mechanical property to decline.
It is inevitable trench etching problem using the maximum hidden danger of ERW manufacture coiled tubings, its essence is Local Phase Microcell corrosion caused by electrochemistry is uneven.The origin cause of formation of trench etching is divided into internal cause and the major class of external cause two.Internal cause is primarily referred to as welding Pipe product oneself factor, including composition, microstructure and residual stress the influence to trench etching performance.Specifically, weld During high heat cause the alloying component of weld metal zone to be different from mother metal, so as to form corrosion cell;In ERW welding processes, Due to the input of heat, weld metal zone and melt run can produce residual stress, the weld seam of fusing in the presence of temperature gradient field Contraction is produced in cooling and solidification process, is plastically deformed the base metals of weld seam both sides, when whole component is cooled to room Wen Hou, larger residual stress be present in steel, the corrosion of steel can be accelerated.External cause is primarily referred to as the use environment of coiled tubing, bag Include medium species, composition, temperature, pressure and rate of flow of fluid etc..For example, coiled tubing is in use, have to consider in medium The influence of the factor to trench etching performance such as carbon dioxide, hydrogen sulfide and temperature and pressure.
The another question that ERW welding methods are brought be coiled tubing inwall formed inner burr, such as certain factory life The specification of production is Φ 38.1mm*3.2mm (diameter * wall thickness) coiled tubing, and its inner burr is highly even up to 1.8mm.Even In continuous oil pipe, due to the appearance of inner burr, reduce its latus rectum, producing level is significantly limited, it is often necessary to unreasonably Expand its internal diameter, cause the waste of material and cost.
Laser welding be by the use of high-energy-density laser beam as thermal source a kind of high-efficiency and precision welding method.Laser Welding It is one of importance of Materialbearbeitung mit Laserlicht technology application to connect.It is mainly used in the 1970s welding thin-walled material and low speed Welding, welding process category heat-conduction-type, i.e. laser emission heated partses surface, surface heat are internally spread by heat transfer, By controlling the parameters such as laser energy, defocusing amount and speed of welding, workpiece is melted, form specific molten bath.Because it is unique The advantages of, it has been successfully applied in micro-, miniature parts precision weldings.But because its is costly and operating condition limit System, it is not used at present in the manufacture of coiled tubing.
A kind of manufacturer that can effectively overcome trench etching and the coiled tubing of inner burr problem is needed in the prior art The welding procedure of method, especially coiled tubing, enable to produce coiled tubing incessantly.
The content of the invention
The present invention is intended to provide a kind of manufacture method of mild steel coiled tubing, it instead of tradition with laser welding technology ERW welding, efficiently solve the inner burr problem and trench etching problem of coiled tubing in the prior art.Meanwhile according to The manufacture method of the mild steel coiled tubing of the present invention, the also component from the steel band for forming coiled tubing and production technology, shaping The many aspects such as equipment, welding procedure, heat treatment and Anticorrosion measure are improved, and enable the company of producing incessantly Continuous oil pipe, while the coiled tubing for produce not only meets intensity requirement but also met resistance in working condition Etching problem, have broad application prospects.
According to the manufacture method of the mild steel coiled tubing of the present invention, comprise the following steps:
(1) from the steel band of feed reel supply mild steel to cleaning device, the miscellaneous of steel strip surface is removed using alkaline degreaser Matter;
(2) steel band is passed through rolling device, to produce preliminary deformation, be easy to be formed the shape of coiled tubing;
(3) steel band is made to pass through pipe forming apparatus, to form the shape of coiled tubing;
(4) it is using method for laser welding that the butt welding of steel band is integral;
(5) normalized treatment is carried out to weld seam, sizing processing is carried out to coiled tubing;
(6) homogeneous tube heat treatment is carried out to coiled tubing;
(7) finishing is carried out to coiled tubing and reel encapsulates.
Preferably, step is increased between step (1) and (2):After being terminated using the cleaning of alkaline degreaser, with clear water pair Steel strip surface carries out ultrasonic wave cleaning, to remove the degreaser on surface;Then the surface of steel band is dried up by drying blowing device. Except increase is gone between step (4) and (5) the step of burr, outer burr is by burr removal device physical removal or outside Smear burr and remove liquid removal in the region that burr is concentrated.In step (7), after coiled tubing finishing, in the outer of coiled tubing Surface smear preservative, for preventing the corrosion on coiled tubing surface.
Preferably, the chemical composition in steel band is according to mass percent:C:0.05-0.09%, Mn:0.35-0.45%, Si:0.35-0.40%, Cr:0.61-0.72%, Nb:0.021-0.024%, Mo:0.01-0.03%, P:0.012- 0.018%, S:0.002-0.005%, remaining is Fe and inevitable impurity;
The preparation process of steel band is:First, said components are smelted according to corresponding mass percent and are cast into slab; Second, by heating of plate blank to 1300-1340 DEG C, soaking time is that 2.0-2.3 divides/millimeter, the thickness depending on slab;3rd, Finishing temperature control scope is 820-850 DEG C;4th, it is 20-25 DEG C/s to control the cooling velocity in cooling, according to coiling temperature To determine finally to need the temperature cooled down;5th, coiling temperature is 250-270 DEG C, batches rear natural cooling;
The spot diameter of laser welding is 2mm, bonding power 7500W, focal length 230mm, speed of welding is 1.5 meters/ Point, argon gas use during welding as protecting gas.
Preferably, alkaline degreaser is made up of sodium hydroxide, sodium carbonate, sodium metasilicate and water, the mass fraction point of each component Not Wei sodium hydroxide 0.7%, sodium carbonate 8%, sodium metasilicate 3.5%, remaining is water;The temperature of degreaser is maintained in skimming processes 85±5℃。
Preferably, rolling device is set including the first rolling equipment, the second rolling equipment, the 3rd rolling equipment and the 4th roll-in It is standby;First rolling equipment is the H type pressure rollers being centrally located relative to steel band, is rotated around horizontal axis, its lower edge roll-in On steel band, the ratio of the distance between lower edge of the sidepiece of steel band and end H type pressure rollers and steel band overall width is 0.1- 0.2;Second rolling equipment is the plate-like pressure roller being centrally located relative to steel band, and the ratio of its thickness and steel band overall width is 0.6-0.8, the scope of the angle between the rolling surface of the second rolling equipment and side is 100-110 °;3rd rolling equipment For the plate-like pressure roller being centrally located relative to steel band, the ratio of its thickness and steel band overall width is 0.4-0.5, the 3rd rolling equipment Rolling surface and side between angle scope be 110-120 °;4th rolling equipment is to be centrally located relative to steel band Plate-like pressure roller, the ratio of its thickness and steel band overall width is 0.2-0.3, between the rolling surface of the 4th rolling equipment and side The scope of angle is 110-120 °.
Preferably, pipe forming apparatus includes three groups of extruding two pairs of rollers, and every group of extruding two pairs of rollers include two I-shapeds of parallel arrangement Type edger roll, each edger roll are rotated around vertical axis, and the spacing between three groups of extruding two pairs of rollers is sequentially reduced, and steel band is successively by squeezing Press the space between two pairs of rollers web.The width of steel band and the first ratio for extruding the distance between the web of two pairs of rollers are 1.8-2.3; The width of steel band and the second ratio for extruding the distance between the web of two pairs of rollers are 2.5-2.8;The width of steel band and the 3rd extruding The ratio of the distance between the web of two pairs of rollers is 3.0-3.1.
Preferably, it is to the mode of coiled tubing progress homogeneous tube heat treatment:Coiled tubing is warming up to 920 DEG C;Then enter Row air cooling, temperature control is at 450 DEG C~470 DEG C after air cooling;Then water cooling is carried out, cooling velocity is 120 DEG C -150 DEG C/sec, water It is cooled to room temperature.
According to the manufacture method of the mild steel coiled tubing of the present invention, inner burr problem and trench etching are efficiently solved Problem so that what the coiled tubing produced not only met intensity requirement but also met in working condition corrosion-resistant asks Topic, has broad application prospects.
Brief description of the drawings
Fig. 1 shows the schematic diagram of the manufacture system of the mild steel coiled tubing of the present invention.
Fig. 2 shows the first rolling equipment of the present invention.
Fig. 3 shows the second rolling equipment of the present invention.
Fig. 4 shows the 3rd rolling equipment of the present invention.
Fig. 5 shows the 4th rolling equipment of the present invention.
Fig. 6 shows the first extruding two pairs of rollers of the present invention.
Fig. 7 shows the second extruding two pairs of rollers of the present invention.
Fig. 8 shows the 3rd extruding two pairs of rollers of the present invention.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with accompanying drawing to the present invention Embodiment be described in detail.It should be noted that in the case where not conflicting, in the embodiment and embodiment in the application Feature can mutually be combined.
According to the manufacture method of the mild steel coiled tubing of the present invention, steel band is welded into by continuous oil by laser-beam welding machine Pipe, the height of inner burr on coiled tubing inwall can be controlled and (can be described as " no inner burr ") within 0.3mm, while effectively Ground solves the problems, such as trench etching, and its heat affected area is small, and reliability is high, and the scope of application is wider.For example, in above-mentioned no internal hair Pierce in coiled tubing, combination process water pumping gas production can be carried out with plunger, solve yield 3000-15000m3/ more than d oil wells Continuous drainage gas production problem.
Specifically, as shown in figure 1, the confession for including being sequentially arranged according to the manufacture system of the mild steel coiled tubing of the present invention Tep reel, cleaning device, rolling device, pipe forming apparatus, laser-beam welding machine, annealing device and the reel that gathers materials.Wherein, feed reel For supplying steel band, contain alkaline degreaser in cleaning device, for removing the impurity of steel strip surface, such as antirust coat or its His impurity etc..Alkaline degreaser is the aqueous solution based on alkaline cleaner, and animal and plant fat is allowed into by saponification For water-soluble soaps.This soap is surfactant, has emulsification to nonpolar mineral oil, therefore can be washed away.Roller Pressure device is used to make steel band produce preliminary deformation in order to form the shape of coiled tubing, and pipe forming apparatus is used to make steel band shape Into the shape of coiled tubing.Laser-beam welding machine is integral for the butt welding that will form the steel band of coiled tubing shape, finally Form coiled tubing.Annealing device is used to be heat-treated the coiled tubing formed after welding, to optimize its mechanical property. The reel that gathers materials is used to collect final coiled tubing finished product, and encapsulation is stand-by.
According to the manufacture method of the mild steel coiled tubing of the present invention, comprise the following steps:
(1) steel band is supplied to cleaning device from feed reel, utilize the impurity of alkaline degreaser removal steel strip surface, such as antirust Coating or other impurities;
(2) steel band is passed through rolling device, to produce preliminary deformation, be easy to be formed the shape of coiled tubing;
(3) steel band is made to pass through pipe forming apparatus, to form the shape of coiled tubing;
(4) it is using method for laser welding that the butt welding of steel band is integral;
(5) normalized treatment is carried out to weld seam, sizing processing is carried out to coiled tubing;
(6) homogeneous tube heat treatment is carried out to coiled tubing;
(7) finishing is carried out to coiled tubing and reel encapsulates.
Preferably, step can also be increased between above-mentioned steps (1) and (2):Terminate using the cleaning of alkaline degreaser Afterwards, carry out ultrasonic wave to steel strip surface with clear water to clean, to remove the degreaser on surface;Then dried up by drying blowing device The surface of steel band.
Preferably, step can also be increased between above-mentioned steps (4) and (5):After laser welding forms coiled tubing, Except can also increasing the step of burr, outer burr can be by burr removal device physical removal, or in outer burr collection In region smear burr remove the chemical removal of liquid.
Preferably, in above-mentioned steps (7), after coiled tubing finishing, can also be applied in the outer surface of coiled tubing Preservative is smeared, for preventing the corrosion on coiled tubing surface.
Steel band in the present invention uses low-carbon alloy steel, it is preferable that its chemical composition is according to mass percent:C: 0.05-0.09%, Mn:0.35-0.45%, Si:0.35-0.40%, Cr:0.61-0.72%, Nb:0.021-0.024%, Mo: 0.01-0.03%, P:0.012-0.018%, S:0.002-0.005%, remaining is Fe and inevitable impurity.Preparation process For:First, said components are smelted according to corresponding mass percent and are cast into slab;Second, by heating of plate blank to 1300- 1340 DEG C, soaking time is that 2.0-2.3 divides/millimeter, the thickness depending on slab;3rd, finishing temperature control scope is 820- 850℃;4th, it is 20-25 DEG C/s to control the cooling velocity in cooling, determines finally to need the temperature cooled down according to coiling temperature Degree;5th, coiling temperature is 250-270 DEG C, batches rear natural cooling.
Manufacture the embodiment 1 of the steel band of coiled tubing:
Each chemical composition in steel band is according to mass percent:C:0.05%, Mn:0.42%, Si:0.38%, Cr: 0.64%, Nb:0.022%, Mo:0.03%, P:0.012%, S:0.002%, remaining is Fe and inevitable impurity.Prepare Process is:First, said components are smelted according to corresponding mass percent and are cast into slab;Second, heating of plate blank is arrived 1320 DEG C, the soaking time of slab is 2.0 points/millimeter;3rd, finishing temperature control scope is 846 DEG C;4th, control cooling In cooling velocity be 20 DEG C/s, determine finally to need the temperature cooled down according to coiling temperature;5th, coiling temperature 250 DEG C, batch rear natural cooling.
Manufacture the embodiment 2 of the steel band of coiled tubing:
Each chemical composition in steel band is according to mass percent:C:0.06%, Mn:0.37%, Si:0.37%, Cr: 0.69%, Nb:0.024%, Mo:0.02%, P:0.015%, S:0.004%, remaining is Fe and inevitable impurity.Prepare Process is:First, said components are smelted according to corresponding mass percent and are cast into slab;Second, heating of plate blank is arrived 1335 DEG C, the soaking time of slab is 2.3 points/millimeter;3rd, finishing temperature control scope is 850 DEG C;4th, control cooling In cooling velocity be 24 DEG C/s, determine finally to need the temperature cooled down according to coiling temperature;5th, coiling temperature 265 DEG C, batch rear natural cooling.
Manufacture the embodiment 3 of the steel band of coiled tubing:
Each chemical composition in steel band is according to mass percent:
C:0.08%, Mn:0.45%, Si:0.35%, Cr:0.72%, Nb:0.023%, Mo:0.01%, P: 0.016%, S:0.003%, remaining is Fe and inevitable impurity.Preparation process is:First, by said components according to corresponding Mass percent smelt and be cast into slab;Second, by heating of plate blank to 1340 DEG C, the soaking time of slab is 2.3 points/milli Rice, the thickness depending on slab;3rd, finishing temperature control scope is 835 DEG C;4th, control cooling in cooling velocity be 25 DEG C/s, determine finally to need the temperature cooled down according to coiling temperature;5th, coiling temperature is 270 DEG C, naturally cold after batching But.
By feed reel supply steel band then pass through cleaning device, to remove the impurity of steel strip surface, such as antirust coat or Other impurities.Preferably, the alkaline degreaser in cleaning device is made up of sodium hydroxide, sodium carbonate, sodium metasilicate and water, each component Mass fraction be respectively sodium hydroxide 0.7%, sodium carbonate 8%, sodium metasilicate 3.5%, remaining is water, degreaser in skimming processes Temperature be maintained at 85 ± 5 DEG C.After degreasing terminates, steel band passes through the ultrasonic cleaning equipment equipped with clear water to be carried out clearly to steel strip surface Wash, to remove the degreaser for being attached to steel strip surface.Then steel strip surface is dried up by drying blowing device.
Then steel band after over cleaning passes through rolling device, as shown in Figure 2-5, which show the roller according to the present invention Pressure device includes the first rolling equipment as shown in Figure 2, the second rolling equipment as shown in Figure 3, the 3rd roll-in as shown in Figure 4 Equipment and the 4th rolling equipment as shown in Figure 5.Steel band is successively by the first above-mentioned rolling equipment, the second rolling equipment, the After three rolling equipments and the 4th rolling equipment, substantially possess and form the deformation condition that coiled tubing needs.
It should be noted that pressure roller all in accompanying drawing is schematical, drawn only for the needs of clear explanation, The true shape of pressure roller is not represented.The pressure roller of actual use can need to have different shapes and chi according to steel belt molding It is very little, to ensure to form the coiled tubing of standard specification by steel band.The pressure that pressure roller applies to steel band meets to bring it about It is plastically deformed and produces bending section, but not to condition that its section thickness has an impact.
As shown in Fig. 2 the first rolling equipment is the H type pressure rollers being centrally located relative to steel band 1, rotated around horizontal axis L, Its lower edge roll-in makes the both sides of steel band produce upward bending section on steel band.Preferably, the sidepiece of steel band and end H types The ratio of the distance between lower edge of pressure roller and steel band overall width is 0.1-0.2, preferably 0.15.
As shown in figure 3, the second rolling equipment is the plate-like pressure roller being centrally located relative to steel band 1, its thickness and steel band are total The ratio of width is 0.6-0.8, preferably 0.8.The scope of angle α between the rolling surface of second rolling equipment and side is 100-110 °, preferably 100 °.The rolling surface of second rolling equipment is the curved surface seamlessly transitted.
As shown in figure 4, the 3rd rolling equipment is the plate-like pressure roller being centrally located relative to steel band 1, its thickness and steel band are total The ratio of width is 0.4-0.5, preferably 0.5.The scope of angle α between the rolling surface of 3rd rolling equipment and side is 110-120 °, preferably 110 °.The rolling surface of 3rd rolling equipment is the curved surface seamlessly transitted.
As shown in figure 5, the 4th rolling equipment is the plate-like pressure roller being centrally located relative to steel band 1, its thickness and steel band are total The ratio of width is 0.2-0.3, preferably 0.3.The scope of angle α between the rolling surface of 4th rolling equipment and side is 110-120 °, preferably 120 °.The rolling surface of 4th rolling equipment is the curved surface seamlessly transitted.
As shown in Figure 2-5, steel band successively by above-mentioned first rolling equipment, the second rolling equipment, the 3rd rolling equipment and After 4th rolling equipment, substantially possesses the deformation condition formed required for coiled tubing.Then, the steel band after deformation is passed through Cross pipe forming apparatus, you can form the shape of coiled tubing.Three groups of extruding two pairs of rollers are included according to the pipe forming apparatus of the present invention, point Not as shown in figures 6.It should be noted that the rolling device and pipe forming apparatus shown in accompanying drawing of the present invention are schematic And it is non-limiting, those skilled in the art can carry out various possible deformations and selection according to being actually needed.
As shown in figures 6, every group of extruding two pairs of rollers include two I-shaped edger rolls of parallel arrangement, and each edger roll can be around perpendicular Straight axis V is rotated, and the spacing between three groups of extruding two pairs of rollers is sequentially reduced, the sky that steel band passes through between the web of extruding two pairs of rollers successively Between.It should be noted that the extruding two pairs of rollers in accompanying drawing 6-8 are schematical, drawn only for the needs of clear explanation, and Do not represent the true shape of extruding two pairs of rollers.The extruding two pairs of rollers of actual use can need to have different shapes according to steel belt molding Shape and size, to ensure to form the coiled tubing of standard specification.Especially, the region that the web of edger roll contacts with steel band have with The shape that the surface of bent steel band is adapted.
As shown in fig. 6, which show first extruding two pairs of rollers, the width of steel band and first extruding two pairs of rollers web between away from Ratio from (clear distance, similarly hereinafter) is 1.8-2.3, can preferably be 2.0.
As shown in fig. 7, which show second extruding two pairs of rollers, the width of steel band and second extruding two pairs of rollers web between away from From ratio be 2.5-2.8, can preferably be 2.7.
As shown in figure 8, which show the 3rd extruding two pairs of rollers, the width of steel band and the 3rd extruding two pairs of rollers web between away from From ratio be 3.0-3.1, can preferably be 3.0.After three groups of extruding two pairs of rollers, steel band is substantially formed continuously The shape of oil pipe.
Next, coiled tubing will pass through laser-beam welding machine, with using laser by the butt welding of coiled tubing together. Because laser welding is higher to required precision, so needing to be accurately positioned coiled tubing with chucking device during welding, then Welding assembly is placed in the focusing range of laser beam.As described above, compared to ERW welding manners, can using laser welding Greatly to reduce the height of inner burr and can effectively prevent trench etching problem.In the present invention, to prepare size Illustrated exemplified by coiled tubing for Φ 38.1mm*3.2mm (diameter * wall thickness).Preferably, the spot diameter of laser welding is 2mm, bonding power 7500W, focal length 230mm, speed of welding are 1.5 ms/min.It is highly preferred that made during welding using argon gas To protect gas.
After laser welding forms coiled tubing, except can also increasing the step of burr.Specifically, outer burr can be with By burr removal device physical removal, or smear burr in the region that outer burr is concentrated and remove the chemical removal of liquid.It is preferred that Ground, burr remove liquid and can pressed by water, benzoic acid, tartaric acid, salicylic acid, hydrogen peroxide, urea, K-IAO, sodium butyrate It is 1 according to mass ratio:0.1-0.12:0.08-0.1:0.05-0.07:0.06-0.1:0.01-0.05:0.02-0.04:0-0.02 is mixed Conjunction is uniformly made.In use, above-mentioned burr removal liquid is uniformly applied to outer burr concentrated area.
Burr removes liquid embodiment 1
Burr removes liquid and pressed by water, benzoic acid, tartaric acid, salicylic acid, hydrogen peroxide, urea, K-IAO, sodium butyrate It is 1 according to mass ratio:0.12:0.1:0.07:0.1:0.03:0.03:0.02 well mixed is made.
Burr removes liquid embodiment 2
Burr removes liquid and pressed by water, benzoic acid, tartaric acid, salicylic acid, hydrogen peroxide, urea, K-IAO, sodium butyrate It is 1 according to mass ratio:0.1:0.09:0.06:0.08:0.04:0.04:0.01 well mixed is made.
Burr removes liquid embodiment 3
Burr removes liquid by water, benzoic acid, tartaric acid, salicylic acid, hydrogen peroxide, urea, K-IAO according to quality Than for 1:0.11:0.08:0.05:0.07:0.05:0.02 well mixed is made.
Next, after carrying out normalized treatment to weld seam, sizing processing is carried out to coiled tubing.
Specifically, illustrated for coiled tubing made of the low-carbon alloy steel in the present invention.Normalizing temperature is 960 DEG C, air cooling after high tempering, temperature is 580 DEG C, and the time of air cooling is 10-15 minutes.Then, using sizing mill to continuous Oil pipe carries out sizing processing.So-called sizing is the term in steel pipe's production field, and mother tube usually is sent into extruding machine roller-way, Mother tube is promoted to the roll pass adjusted using the thrust of hydraulic cylinder, corrects the ovality of mother tube.
Next, homogeneous tube heat treatment is carried out to coiled tubing, to eliminate the significance difference between weld seam, heat affected area and mother metal It is different, make tissue evenly, and eliminate the internal stress of body.
Specifically, coiled tubing can be warming up to 920 DEG C;Then carry out air cooling, after air cooling temperature control 450 DEG C~ 470℃;Then water cooling is carried out, cooling velocity is 120 DEG C -150 DEG C/sec, water cooling to room temperature.The technique can significantly improve low-carbon The toughness of steel alloy, crystal grain thinning degree, the yield strength of continuous steel pipe is set to improve 25~30%.
Next, finishing and reel encapsulation are carried out to coiled tubing.Finishing includes being controlled the size of coiled tubing, Especially to the adjustment of its caliber and ovality.
Preferably, after coiled tubing finishing, preservative can also be smeared in the outer surface of coiled tubing, for preventing The corrosion on coiled tubing surface.
As described above, the invention provides a kind of manufacture method of mild steel coiled tubing, from the steel for forming coiled tubing The many aspects such as the component and production technology of band, former, welding method, heat treatment and Anticorrosion measure are improved, So that the coiled tubing produced not only meets intensity requirement but also also solves the corrosion-resistant problem in working condition, tool Have broad application prospects.
Although disclosed herein embodiment as above, described content only to facilitate understand the present invention and adopt Embodiment, it is not limited to the present invention.Any those skilled in the art to which this invention pertains, this is not being departed from On the premise of the disclosed spirit and scope of invention, any modification and change can be made in the implementing form and in details, But the scope of patent protection of the present invention, still should be subject to the scope of the claims as defined in the appended claims.

Claims (8)

1. a kind of manufacture method of mild steel coiled tubing, it is characterised in that comprise the following steps:
(1) from the steel band of feed reel supply mild steel to cleaning device, the impurity of steel strip surface is removed using alkaline degreaser;
(2) steel band is passed through rolling device, to produce preliminary deformation, be easy to be formed the shape of coiled tubing;
(3) steel band is made to pass through pipe forming apparatus, to form the shape of coiled tubing;
(4) using method for laser welding that the butt welding of steel band is integral, the spot diameter of laser welding is 2mm, welds work( Rate is 7500W, and focal length 230mm, speed of welding is 1.5 ms/min;
(5) smear burr in the region that outer burr is concentrated and remove liquid and make a return journey flash removed, the burr remove liquid by water, benzoic acid, Tartaric acid, salicylic acid, hydrogen peroxide, urea, K-IAO, sodium butyrate are 1 according to mass ratio:0.12:0.1:0.07:0.1: 0.03:0.03:0.02 well mixed is made;
(6) normalized treatment is carried out to weld seam, sizing processing is carried out to coiled tubing;
(7) homogeneous tube heat treatment is carried out to coiled tubing, the mode of homogeneous tube heat treatment is:Coiled tubing is warming up to 920 DEG C;Then Air cooling is carried out, temperature control is at 450 DEG C~470 DEG C after air cooling;Then water cooling is carried out, cooling velocity is 120 DEG C -150 DEG C/sec, Water cooling is to room temperature;
(8) finishing is carried out to coiled tubing and reel encapsulates;
Chemical composition in the steel band of the mild steel is according to mass percent:C:0.05-0.09%, Mn:0.35- 0.45%, Si:0.35-0.40%, Cr:0.61-0.72%, Nb:0.021-0.024%, Mo:0.01-0.03%, P:0.012- 0.018%, S:0.002-0.005%, remaining is Fe and inevitable impurity;The preparation process of the steel band is:First, will Said components are smelted according to corresponding mass percent and are cast into slab;Second, by heating of plate blank to 1300-1340 DEG C, protect The warm time is that 2.0-2.3 divides/millimeter, the thickness depending on slab;3rd, finishing temperature control scope is 820-850 DEG C;The Four, it is 20-25 DEG C/s to control the cooling velocity in cooling, determines finally to need the temperature cooled down according to coiling temperature;5th, Coiling temperature is 250-270 DEG C, batches rear natural cooling.
2. manufacture method according to claim 1, it is characterised in that increase step between step (1) and (2):In profit Cleaned with alkaline degreaser after terminating, carrying out ultrasonic wave to steel strip surface with clear water cleans, to remove the degreaser on surface;Then The surface of steel band is dried up by drying blowing device.
3. manufacture method according to claim 1, it is characterised in that in step (8), after coiled tubing finishing, Preservative is smeared in the outer surface of coiled tubing, for preventing the corrosion on coiled tubing surface.
4. according to the manufacture method any one of claim 1-3, it is characterised in that use argon gas conduct during laser welding Protect gas.
5. according to the manufacture method any one of claim 1-3, it is characterised in that alkaline degreaser by sodium hydroxide, Sodium carbonate, sodium metasilicate and water are made, and the mass fraction of each component is respectively sodium hydroxide 0.7%, sodium carbonate 8%, sodium metasilicate 3.5%, remaining is water;The temperature of degreaser is maintained at 85 ± 5 DEG C in skimming processes.
6. according to the manufacture method any one of claim 1-3, it is characterised in that the rolling device includes the first roller Press equipment, the second rolling equipment, the 3rd rolling equipment and the 4th rolling equipment;
First rolling equipment is the H type pressure rollers being centrally located relative to steel band, is rotated around horizontal axis, its lower edge roll-in On steel band, the ratio of the distance between lower edge of the sidepiece of steel band and end H type pressure rollers and steel band overall width is 0.1- 0.2;
Second rolling equipment is the plate-like pressure roller being centrally located relative to steel band, and the ratio of its thickness and steel band overall width is 0.6-0.8, the scope of the angle between the rolling surface of the second rolling equipment and side is 100-110 °;
3rd rolling equipment is the plate-like pressure roller being centrally located relative to steel band, and the ratio of its thickness and steel band overall width is 0.4-0.5, the scope of the angle between the rolling surface of the 3rd rolling equipment and side is 110-120 °;
4th rolling equipment is the plate-like pressure roller being centrally located relative to steel band, and the ratio of its thickness and steel band overall width is 0.2-0.3, the scope of the angle between the rolling surface of the 4th rolling equipment and side is 110-120 °.
7. according to the manufacture method any one of claim 1-3, it is characterised in that the pipe forming apparatus includes three groups Two pairs of rollers are extruded, every group of extruding two pairs of rollers include two I-shaped edger rolls of parallel arrangement, and each edger roll rotates around vertical axis, and three Spacing between group extruding two pairs of rollers is sequentially reduced, the space that steel band passes through between the web of extruding two pairs of rollers successively.
8. manufacture method according to claim 7, it is characterised in that the width of steel band and first extruding two pairs of rollers web it Between the ratio of distance be 1.8-2.3;The width of steel band and the second ratio for extruding the distance between the web of two pairs of rollers are 2.5- 2.8;The width of steel band and the 3rd ratio for extruding the distance between the web of two pairs of rollers are 3.0-3.1.
CN201610003513.7A 2016-01-06 2016-01-06 A kind of manufacture method of mild steel coiled tubing Active CN105458633B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610003513.7A CN105458633B (en) 2016-01-06 2016-01-06 A kind of manufacture method of mild steel coiled tubing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610003513.7A CN105458633B (en) 2016-01-06 2016-01-06 A kind of manufacture method of mild steel coiled tubing

Publications (2)

Publication Number Publication Date
CN105458633A CN105458633A (en) 2016-04-06
CN105458633B true CN105458633B (en) 2017-12-12

Family

ID=55597025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610003513.7A Active CN105458633B (en) 2016-01-06 2016-01-06 A kind of manufacture method of mild steel coiled tubing

Country Status (1)

Country Link
CN (1) CN105458633B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105945517B (en) * 2016-05-12 2018-04-27 宝鸡石油钢管有限责任公司 A kind of continuous velocity tubing string and its manufacture method
CN106869814B (en) * 2017-03-03 2018-11-23 河北华通线缆集团股份有限公司 With the continuous umbilical and its manufacturing method blocked in limit
CN108942102B (en) * 2018-08-01 2020-05-12 河北华通线缆集团股份有限公司 Manufacturing method of super duplex stainless steel coiled tubing
CN109609747B (en) 2018-12-11 2022-01-25 信达科创(唐山)石油设备有限公司 Homogenizing treatment process for coiled tubing
CN113937396A (en) * 2021-08-24 2022-01-14 无锡市源隆金属制品有限公司 New energy automobile blade battery tray frame beam and production process thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3405228A (en) * 1965-08-11 1968-10-08 Gen Cable Corp Folded, laminated electrical cable sheath having abutting edges of one lamination unwelded
KR20070003385A (en) * 2005-07-01 2007-01-05 박세헌 Method of manufacturing wiper for car
CN102407426A (en) * 2010-09-26 2012-04-11 上海月月潮钢管制造有限公司 Method for manufacturing low alloy steel tube of low-temperature pressure vessel
CN104801925A (en) * 2014-01-27 2015-07-29 上海却尘科技有限公司 Manufacturing method for blank for producing carbon steel-high carbon steel composite board
CN104073719A (en) * 2014-06-25 2014-10-01 宝山钢铁股份有限公司 High-strength welded steel pipe and manufacturing method thereof
CN104353973A (en) * 2014-11-13 2015-02-18 江苏省常熟环通实业有限公司 Preparation method of austenitic stainless steel pipe
CN105057989B (en) * 2015-08-21 2017-06-30 西安向阳航天材料股份有限公司 A kind of manufacture method of liner two-phase stainless steel pipe
CN105171349A (en) * 2015-09-14 2015-12-23 上海海隆复合钢管制造有限公司 Preparation method for hydraulic pressure composite thermometal oil pipe

Also Published As

Publication number Publication date
CN105458633A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105478524B (en) A kind of manufacture method of two phase stainless steel coiled tubing
CN105458633B (en) A kind of manufacture method of mild steel coiled tubing
CN105478525B (en) A kind of manufacture method for the coiled tubing for including logging cable
CN102699107B (en) Cold roll forming method of thin-walled and high-strength square steel tube
CN101710503B (en) Copper-clad aluminium wire production method
CN101481995A (en) High steel level petroleum casing pipe and oil pipe manufacturing process
CN103341522A (en) Production method of thick-walled titanium welded pipe and forming machine
WO2008037145A1 (en) A manufacture method of high precision seamless steel pipes
CN102527767A (en) Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN107649512A (en) A kind of manufacturing process of 65Mn cold rollings wide strip
CN106448932A (en) Method for preparing copper-clad steel composite material
CN110184542B (en) High-performance seamless continuous pipe and manufacturing method thereof
CN104971959A (en) High-strength closed sectional material hot roll forming process
CN102581062A (en) Method for producing seamless titanium and titanium alloy welded pipe
CN109128714B (en) Hot continuous rolling large-scale preparation method of stainless steel-carbon steel composite plate
CN109513766A (en) A kind of manufacturing method of high concentricity martensitic stainless steel seamless pipe material
CN105598200B (en) A kind of manufacture method of titanium alloy coiled tubing
CN106181261B (en) The manufacture method of thin-wall high intensity frame tube
CN102152070A (en) Method for manufacturing ring-shaped piece
CN106180460B (en) Controlled rolling, controlled cooling and cold bending comprehensive forming method for variable-section U-shaped steel
CN105364426A (en) Method for preparing thick-wall high-frequency welded steel tube
CN112171059B (en) Joint plasticizing method and device for automobile pipe fitting
CN106869814B (en) With the continuous umbilical and its manufacturing method blocked in limit
CN113829005A (en) Processing technology of high-strength nickel-based alloy welded pipe
CN101380649A (en) High precision steel tube manufacture technique and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A manufacturing method of low carbon steel coiled tubing

Effective date of registration: 20211025

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2021990001019

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221226

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2021990001019

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A manufacturing method of low carbon steel coiled tubing

Effective date of registration: 20230103

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2022110000369

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2022110000369

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Manufacturing Method for Low Carbon Steel Continuous Tubing

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2024110000021

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2024110000021

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Manufacturing Method for Low Carbon Steel Continuous Tubing

Granted publication date: 20171212

Pledgee: China Construction Bank Co.,Ltd. Tangshan Jidong Oilfield sub branch

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2024110000037

PE01 Entry into force of the registration of the contract for pledge of patent right