CN101702190A - 矿井通风网络解算的阻力测定数据管理方法和装置 - Google Patents
矿井通风网络解算的阻力测定数据管理方法和装置 Download PDFInfo
- Publication number
- CN101702190A CN101702190A CN200910226075A CN200910226075A CN101702190A CN 101702190 A CN101702190 A CN 101702190A CN 200910226075 A CN200910226075 A CN 200910226075A CN 200910226075 A CN200910226075 A CN 200910226075A CN 101702190 A CN101702190 A CN 101702190A
- Authority
- CN
- China
- Prior art keywords
- ventilation network
- wind
- data
- resistance
- force resistance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Ventilation (AREA)
Abstract
本发明是一种矿井通风网络解算的阻力测定数据管理方法和装置,其方法步骤为:对通风网络的测定点的风力阻力的数据输入(100);对通风网络的风力阻力的数据的计算(110);对通风网络的风力阻力的数据的分析(120);通风网络的风力阻力的图形和计算结果的形成(200);其装置由以下模块组成:对通风网络的测定点的风力阻力的数据输入模块(100);对通风网络的风力阻力的数据的计算模块(110);对通风网络的风力阻力的数据的分析模块(120);通风网络的风力阻力的图形和计算结果的显示模块(200)。因此对通风网络中的各点阻力进行测定、计算、分析和优化。
Description
一、技术领域
本发明涉及一种矿井通风网络解算的阻力测定数据管理方法和装置,尤其是一种适用于大型矿井的矿井通风网络解算的阻力测定数据管理方法和装置。
二、背景技术
在对矿井生产系统进行技术改造的同时,必然进行矿井通风技术改造;另外,由于生产布局和生产条件的变化,也需要及时对通风系统进行调整,以满足安全生产的需要。为了从通风技术改造所提方案中选出最优调整方案。进行通风网络解算是必由之路,进行阻力测定取得网络中各分支的风阻是网络解算成败的关键。
三、发明内容
本发明的目的是在于提供在矿井通风中对通风网络中的各点阻力进行测定、计算、分析和优化的系统。
四、附图说明
图1为本发明的矿井通风阻力测定数据系统操作流程图:
图2为风压平衡定律计算示意图。
五、具体实施方式
本发明的目的通过下述说明的本发明可以完全实现。
本发明的矿井通风网络解算的阻力测定数据管理方法的特征在于由以下步骤组成:对通风网络的测定点的风力阻力的数据输入100;对通风网络的风力阻力的数据的计算110;对通风网络的风力阻力的数据的分析120;通风网络的风力阻力的图形和计算结果的形成200。
在对通风网络的测定点的风力阻力的数据输入100中,在通风网络的测定点的风力阻力测定时,测定点参数与测定系统测段参数共享测定点原始数据中输入的原始数据,对于测定系统中的公共测段与测点可重复调用;用户所做的工作只是在测点设置中从下拉列表框中选择测点序号;为了得到风流流动线路任两点的测段参数。用户可在测定系统名称设置中加一虚拟测定子系统名称(如通风设计、采区设计等名称);对于通风阻力测定中没有测点的分支或准备开拓的巷道(分支)其风阻值可根据断面尺寸、支护形式、长度、α系数等参数;通过在风阻计算子系统中的风阻计算模块中输入必要的参数获得。
对于未进行阻力测定的分支,其风流流动线路上任两点测点风阻值计算可由风压平衡定律或使用本系统的原理求算。其步骤:
步骤一:按风压平衡定律计算:
在通风网络中,与进行通风阻力测定并联的分支,其风阻值可根据风压平衡定律求算。如图2所示,假若1-2-5-4-3线路为阻力测定路线,其分支的阻力(h1-2→h2-5→h5-4→h4-3)均为已知。为求算5-3分支风阻R5-3,则由风压平衡定律 可知:h5-3=h5-4+h4-3
由阻力定律可知:
故
式中,h5-4和h4-3均在阻力测定中获得,只要有5-3分支的风量Q5-3值即可求出R5-3值。
同理:
步骤二:本系统计算原理:
用精密气压计逐点测定时,两测点间的静压差、位压差和速压差按下列公式计算:
静压差:hs(i,i+1)=(Bi-Bi+1)-(B′i-B′i+1)
位压差:hz(i,i+1)=4.905(Zi-Zi+1)(ρi+ρi+1)
速压差:hv(i,i+1)=(hv,i-hv,i+1)
按照矿井通风伯努利方程计算原理,则两点间的通风阻力为:
hr(i,i+1)=hs(i,i+1)+hz(i,i+1)+hv(i,i+1)
式中Bi、Bi+1——前后测点的气压相对压力;
B’i、B’i+1——读取Bi、Bi+1时,基点气压计对应的读数。
由上式可知,对于某一测段的通风阻力,与此测段所包含的子测段个数无关,只与所关联的前后始终两测点的参数相关。
对于hr(5,3)计算,只在测定系统设置在下拉列表框中选择测点5、3,在风量测点下拉列表框中选择风量测点,便可得到两测点及所选择测段hr(5,3)的各种参数(如空气密度、风速、断面、位压、静压、位压、阻力、风阻等)。
在对通风网络的测定点的风力阻力的数据输入100中,可直接输入各测定点的风量值。
在对通风网络的测定点的风力阻力的数据输入100中,使用MicrosoftAccess结构。
在通风网络的风力阻力的图形和计算结果的形成200中,使用SQL语言和DAO(Data Access Object)技术。
矿井通风网络解算的阻力测定数据管理装置的特征在于由以下模块组成:包含有对通风网络的测定点的风力阻力的数据输入模块100、对通风网络的风力阻力的数据的计算模块110、对通风网络的风力阻力的数据的分析模块120和通风网络的风力阻力的图形和计算结果的显示模块200;对通风网络的测定点的风力阻力的数据输入模块100设置为对通风网络的风力阻力的数据的计算模块110联接;对通风网络的风力阻力的数据的计算模块110设置为对通风网络的风力阻力的数据的分析模块120联接,对通风网络的风力阻力的数据的分析模块120设置为与通风网络的风力阻力的图形和计算结果的显示模块200联接。
本发明的单纯变形可以由本领域的技术人员容易地实施,所有这样的变形或变更都在包括在本发明的范围内。
Claims (5)
1.一种矿井通风网络解算的阻力测定数据管理方法,特征在于由以下步骤组成:
对通风网络的测定点的风力阻力的数据输入(100);
对通风网络的风力阻力的数据的计算(110);
对通风网络的风力阻力的数据的分析(120);
通风网络的风力阻力的图形和计算结果的形成(200)。
2.根据权利要求1所述的矿井通风网络解算的阻力测定数据管理方法,其特征是:在对通风网络的测定点的风力阻力的数据输入(100)中,可直接输入各测定点的风量值。
3.根据权利要求1所述的矿井通风网络解算的阻力测定数据管理方法,其特征是:在对通风网络的测定点的风力阻力的数据输入(100)中,使用MicrosoftAccess结构。
4.根据权利要求1所述的矿井通风网络解算的阻力测定数据管理方法,其特征是:在通风网络的风力阻力的图形和计算结果的形成(200)中,使用SQL语言和DAO(Data Access Object)技术。
5.一种矿井通风网络解算的阻力测定数据管理装置,特征在于由以下模块组成:对通风网络的测定点的风力阻力的数据输入模块(100);对通风网络的风力阻力的数据的计算模块(110);对通风网络的风力阻力的数据的分析模块(120);通风网络的风力阻力的图形和计算结果的显示模块(200);对通风网络的测定点的风力阻力的数据输入模块(100)设置为对通风网络的风力阻力的数据的计算模块(110)联接;对通风网络的风力阻力的数据的计算模块(110)设置为对通风网络的风力阻力的数据的分析模块(120)联接,对通风网络的风力阻力的数据的分析模块(120)设置为与通风网络的风力阻力的图形和计算结果的显示模块(200)联接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910226075A CN101702190A (zh) | 2009-11-23 | 2009-11-23 | 矿井通风网络解算的阻力测定数据管理方法和装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910226075A CN101702190A (zh) | 2009-11-23 | 2009-11-23 | 矿井通风网络解算的阻力测定数据管理方法和装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101702190A true CN101702190A (zh) | 2010-05-05 |
Family
ID=42157105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910226075A Pending CN101702190A (zh) | 2009-11-23 | 2009-11-23 | 矿井通风网络解算的阻力测定数据管理方法和装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101702190A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102323998A (zh) * | 2011-09-29 | 2012-01-18 | 辽宁工程技术大学 | 一种校核矿井巷道摩擦风阻值的方法 |
CN104732065A (zh) * | 2015-02-13 | 2015-06-24 | 中南大学 | 矿井通风网络解算算法及矿井通风网络预测系统 |
CN109753624A (zh) * | 2019-01-10 | 2019-05-14 | 天地(常州)自动化股份有限公司 | 基于特征巷道的矿井通风阻力测定方法 |
-
2009
- 2009-11-23 CN CN200910226075A patent/CN101702190A/zh active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102323998A (zh) * | 2011-09-29 | 2012-01-18 | 辽宁工程技术大学 | 一种校核矿井巷道摩擦风阻值的方法 |
CN102323998B (zh) * | 2011-09-29 | 2014-02-05 | 辽宁工程技术大学 | 一种校核矿井巷道摩擦风阻值的方法 |
CN104732065A (zh) * | 2015-02-13 | 2015-06-24 | 中南大学 | 矿井通风网络解算算法及矿井通风网络预测系统 |
CN104732065B (zh) * | 2015-02-13 | 2017-08-04 | 中南大学 | 矿井通风网络解算方法及矿井通风网络预测系统 |
CN109753624A (zh) * | 2019-01-10 | 2019-05-14 | 天地(常州)自动化股份有限公司 | 基于特征巷道的矿井通风阻力测定方法 |
CN109753624B (zh) * | 2019-01-10 | 2023-03-24 | 天地(常州)自动化股份有限公司 | 基于特征巷道的矿井通风阻力测定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105260474A (zh) | 一种基于信息交互网络的微博用户影响力计算方法 | |
Mote et al. | Coastal upwelling in a warmer future | |
US20110054868A1 (en) | Atmospheric flow simulation method considering influence of terrain elevation data resolution | |
CN108647401B (zh) | 一种基于空间遥感技术的流域氮磷污染评估方法 | |
CN111367911B (zh) | 一种场地环境数据分析方法及其系统 | |
Sogachev et al. | Flux footprints over complex terrain covered by heterogeneous forest | |
CN101702190A (zh) | 矿井通风网络解算的阻力测定数据管理方法和装置 | |
CN111143999A (zh) | 一种区域地表粗糙度的计算方法、装置和设备 | |
CN105184370A (zh) | 一种基于som分类技术的河口流域水环境质量评价方法 | |
CN103235890A (zh) | 卫星短时临近降水预报系统及降水预报方法 | |
CN211234451U (zh) | 一种mems陀螺仪校准测试平台 | |
CN113159526A (zh) | 一种风光资源集成管理系统 | |
CN117933095B (zh) | 一种基于机器学习的地表发射率实时反演及同化方法 | |
CN201667073U (zh) | 矿井通风网络解算的阻力测定数据管理装置 | |
CN105954813A (zh) | 非Kolmogorov湍流统计特征的微温探空仪测量方法 | |
CN106644495A (zh) | 一种电动汽车性能参数的灵敏度分析方法 | |
Barbano et al. | Performance evaluation of MeteoTracker mobile sensor for outdoor applications | |
CN104020366B (zh) | 一种确定接收机天线灵敏度的方法 | |
CN202809418U (zh) | 客运专线i型轨道板i-pms精调测量与远程监控系统 | |
CN202734971U (zh) | 一种大气相干长度的光学测量仪器 | |
CN112733906A (zh) | 一种全球高分辨率每日地表动量粗糙度长度估算方法 | |
CN101539421A (zh) | 一种测量二点间距离与高差的方法 | |
CN101995236A (zh) | 校正压力转高度的基准值的系统及方法 | |
CN101008673B (zh) | 二次测风雷达接收控制、数据处理方法 | |
CN115840740A (zh) | 一种用于光伏电站的太阳能资源缺测数据插补方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100505 |