CN101701526B - 一种采空区袋式充填方法 - Google Patents

一种采空区袋式充填方法 Download PDF

Info

Publication number
CN101701526B
CN101701526B CN2009101853195A CN200910185319A CN101701526B CN 101701526 B CN101701526 B CN 101701526B CN 2009101853195 A CN2009101853195 A CN 2009101853195A CN 200910185319 A CN200910185319 A CN 200910185319A CN 101701526 B CN101701526 B CN 101701526B
Authority
CN
China
Prior art keywords
goaf
bag
filling
bags
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101853195A
Other languages
English (en)
Other versions
CN101701526A (zh
Inventor
孙春东
李风凯
冯光明
胡海江
韩晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jizhong Energy Handan Mining Group Co ltd
China University of Mining and Technology CUMT
Original Assignee
Jizhong Energy Handan Mining Group Co ltd
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jizhong Energy Handan Mining Group Co ltd, China University of Mining and Technology CUMT filed Critical Jizhong Energy Handan Mining Group Co ltd
Priority to CN2009101853195A priority Critical patent/CN101701526B/zh
Publication of CN101701526A publication Critical patent/CN101701526A/zh
Application granted granted Critical
Publication of CN101701526B publication Critical patent/CN101701526B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

一种采空区袋式充填方法,从开切眼起,在采空区内间隔吊挂多个柔性充填袋,并在多个柔性充填袋的外侧布置多个单体支柱,然后在柔性充填袋外侧架设依托于单体支柱的模板;向袋内充填含水量达85%以上的高水材料浆液至饱满,待袋内高水材料凝固后,拆除模板和单体支柱,完成一排充填循环。随采煤工作面的推进,继续下一排充填作业,紧靠前排吊挂柔性充填袋,进行下一循环的挂袋充填,周而复始,直至完成整个采空区的充填作业。本发明能对采空区顶板进行直接支撑,有效减少顶板下沉与控制地表的移动。尤其适用于走向推进或煤层倾角较小的仰斜开采工作面采空区充填。其工艺简单,易施工,成本低,操作简便,充填率高。

Description

一种采空区袋式充填方法
技术领域
本发明涉及一种采空区袋式充填方法,尤其适用于“三下”(建筑物下、水体下、铁路下)煤炭开采后采空区的充填。
背景技术
长期以来,“三下”压煤开采造成了岩层和地表严重的变形破坏。地下水系遭到破坏,大量的地面建筑物因变形严重导致无法继续使用。因此,需要对煤炭开采后采空区进行充填来减缓采空区上方的岩层向下运动,从而达到保护地表的目的。
目前采空区充填的主要方式有矸石充填、水砂充填、膏体和似膏体充填等。这些充填方式都对地表的下沉控制均起到了一定作用。但是矸石充填、水砂充填的充填率较低、充填成本很高、对地表的下沉控制作用有限;膏体充填和似膏体充填充填率虽然有提高,但其充填工艺较为复杂,需配备的设备复杂,初期投资较大,少则几千万元,多则上亿元,费用极高,因此限制了这两种充填方法的应用与推广。
发明内容
本发明的目的是克服已有技术中的不足,提供一种方法简单,充填率高,操作简便,易施工,成本低,效果好的采空区袋式充填方法。
本发明的采空区袋式充填方法:
a、从开切眼开始的采空区自上而下间隔施工通道的距离吊挂成排的多个柔性充填袋;
b、在成排吊挂的多个柔性充填袋外侧间隔布置多个单体支柱;
c、在柔性充填袋外侧架设依托于单体支柱的模板;
d、通过与混合浆液输送管路相连的注浆管向模板内的柔性充填袋充填高水材料浆液,直至饱满;
e、待高水材料凝固形成充填体后,拆除模板和单体支柱,完成一排充填作业;
f、随采煤工作面的推进,继续下一排充填作业,紧靠上一排充填体吊挂柔性充填袋,重复步骤b、c、d、e,周而复始,直至完成整个采空区的挂袋充填作业。
所述柔性充填袋的长度为10m~20m,宽度为2m~3m,高度与工作面采高相同;所述的间隔施工通道的距离为2m~3m;必要时,在工作面运输巷、副巷内构筑密闭墙,对柔性充填袋之间的施工通道进行漫灌,直至充满为止。
有益效果:采用柔性充填袋建模,利用注浆管将高水材料注入其中直至饱满、凝固后,可直接支撑采空区顶板以控制直接顶及上覆岩层,减少顶板弯曲下沉和离层量,达到控制地表沉陷的目的。由于高水材料充填浆液含水量高,简化了制浆生产系统和泵送系统,充填工艺简单,充填率高,设备投资省。另外,可直接利用井下废水作为充填浆液用水,从而降低了井下排水费用。能够解决“三下”压煤开采工作面其它采空区充填方式充填率较低、工艺复杂和投资较大的问题,适用于走向推进或煤层倾角较小的仰斜推进工作面的采空区充填。本发明工艺简单,设备投资省,充填率高,操作简便,易施工,成本低,效果好,具有广泛的实用性。
附图说明
图1是本发明的一排柔性充填袋布置示意图。
图2是本发明的二排柔性充填袋布置示意图。
图中:1-柔性充填袋;2-施工通道;3-模板;4-单体液压支柱;5-采空区;6-运输巷;7-副巷;8-充填泵;9-A料输送管路;10-B料输送管路;11-混合器;12-混合浆液输送管路;13-充填体;a-柔性充填袋长度;b-柔性充填袋宽度;L-保留通道长度。
具体实施方式
下面结合附图对本发明的实施例作进一步的描述:
图1所示,首先在副巷7内设置混合器11,在混合器11的出口端连接通向采空区的混合浆液输送管路12,高水材料混合器11入口端分别连接与充填泵8相连的A料输送管路9和B料输送管路10。然后从开切眼开始的采空区5内自上而下吊挂多个柔性充填袋1,柔性充填袋1的个数根据采空区的宽度确定,多个柔性充填袋1间隔排列成一排,每个柔性充填袋1的长度a为10m~20m,宽度b为2m~3m,高度与工作面采高相同;柔性充填袋与柔性充填袋之间留有施工通道2,施工通道2的距离L为2m~3m。在第一排吊挂的多个柔性充填袋1外侧间隔布置多个单体支柱4,在柔性充填袋1外侧架设依托于单体支柱4的模板3,模板3由多块木板、塑料板,或金属板构成。启动充填泵8,将所选用的加水搅拌配制好的高水材料A料、B料两种浆液分别经由A料输送管路9、B料输送管路10泵送到工作面副巷7巷,通过混合器11混合,形成含水量占85%以上的高水材料混合充填浆体,经混合器11出来的混合浆体再通过输送管路12向模板3内的柔性充填袋1充填高水材料浆液,直至饱满;待高水材料凝固形成充填体13后,拆除模板3和单体支柱4,完成第一排的充填作业。
图2所示,随采煤工作面的推进,继续第二排的充填作业,紧靠第一排充填体13吊挂第二排柔性充填袋1,在第二排吊挂的多个柔性充填袋1外侧间隔布置多个单体支柱4,在柔性充填袋1外侧架设依托于单体支柱4的模板3,通过注浆管向模板3内的柔性充填袋1充填高水材料浆液,直至饱满;待高水材料凝固后,拆除模板3和单体支柱4,完成第二排的充填作业。
依次循环,重复挂袋及充填作业,一排接一排周而复始,直至完成整个采空区5的挂袋充填作业。根据充填采空区上复岩情况,必要进,在工作面运输巷6、副巷7内构筑密闭墙,对间隔施工通道2进行漫灌,直至充满为止,使所有充填体固结在一起,完成采空区所有充填作业。

Claims (4)

1.一种采空区袋式充填方法,其特征在于:
a、从开切眼开始的采空区(5)自上而下间隔施工通道(2)的距离吊挂成排的多个柔性充填袋(1);
b、在成排吊挂的多个柔性充填袋(1)外侧间隔布置多个单体支柱(4);
c、在柔性充填袋(1)外侧架设依托于单体支柱(4)的模板(3);
d、通过与混合浆液输送管路(12)相连的注浆管向模板(3)内的柔性充填袋(1)充填高水材料浆液,直至饱满;
e、待高水材料凝固形成充填体(13)后,拆除模板(3)和单体支柱(4),完成一排充填作业;
f、随采煤工作面的推进,继续下一排充填作业,紧靠上一排充填体(13)吊挂柔性充填袋(1),重复步骤b、c、d、e,周而复始,直至完成整个采空区(5)的挂袋充填作业。
2.根据权利要求1所述的采空区袋式充填方法,其特征在于:所述柔性充填袋(1)的长度为10m~20m,宽度为2m~3m,高度与工作面采高相同。
3.根据权利要求1所述的采空区袋式充填方法,其特征在于:所述的间隔施工通道(2)的距离为2m~3m。
4.根据权利要求1所述的采空区袋式充填方法,其特征在于:根据充填采空区上复岩情况,必要时,在工作面运输巷(6)、副巷(7)内构筑密闭墙,对柔性充填袋(1)之间的施工通道(2)进行漫灌,直至充满为止。
CN2009101853195A 2009-11-05 2009-11-05 一种采空区袋式充填方法 Expired - Fee Related CN101701526B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101853195A CN101701526B (zh) 2009-11-05 2009-11-05 一种采空区袋式充填方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101853195A CN101701526B (zh) 2009-11-05 2009-11-05 一种采空区袋式充填方法

Publications (2)

Publication Number Publication Date
CN101701526A CN101701526A (zh) 2010-05-05
CN101701526B true CN101701526B (zh) 2011-07-06

Family

ID=42156450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101853195A Expired - Fee Related CN101701526B (zh) 2009-11-05 2009-11-05 一种采空区袋式充填方法

Country Status (1)

Country Link
CN (1) CN101701526B (zh)

Families Citing this family (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881179A (zh) * 2010-06-04 2010-11-10 新汶矿业集团有限责任公司孙村煤矿 煤矿仰采工作面倾斜区域似膏体充填方法
CN101881180A (zh) * 2010-06-04 2010-11-10 新汶矿业集团有限责任公司孙村煤矿 煤矿工作面似膏体充填方法及挡浆装置
CN101936065A (zh) * 2010-08-12 2011-01-05 惠兴田 刚柔复合结构模板及其沿空留巷隔墙施工方法
CN102061937B (zh) * 2010-11-27 2013-03-13 淄博矿业集团有限责任公司 一种用于封闭区域可视控制充填模板
CN102156302A (zh) * 2010-12-31 2011-08-17 大同煤矿集团有限责任公司 采空区地面探测方法
CN102269004A (zh) * 2011-01-26 2011-12-07 天地科技股份有限公司 一种煤矿充填开采工作面支护系统
CN102155225B (zh) * 2011-03-11 2012-11-14 中国矿业大学 煤矿气体充填开采方法
CN102155262B (zh) * 2011-03-11 2012-11-14 中国矿业大学 煤矿沿空留巷巷旁气体充填方法
CN102155260B (zh) * 2011-05-23 2012-11-28 中国矿业大学 一种急倾斜煤层采空区充填方法
CN102606207A (zh) * 2012-04-06 2012-07-25 陕西开拓建筑科技有限公司 一种矿山采空区充填兼留巷的装置系统及充填方法
CN102619559A (zh) * 2012-04-06 2012-08-01 陕西开拓建筑科技有限公司 一种矿山采空区充填流体材料的装置系统及充填方法
CN102852552A (zh) * 2012-09-17 2013-01-02 扬州中矿建筑新材料科技有限公司 一种高水材料充填柱及其施工方法
CN102852551A (zh) * 2012-09-17 2013-01-02 扬州中矿建筑新材料科技有限公司 一种高水材料充填柱沿空留巷方法
CN103016053B (zh) * 2012-12-07 2015-03-04 中国矿业大学 一种采空区局部充填控制地表沉陷的方法
CN103233774B (zh) * 2013-04-10 2015-07-08 山西晋城煤业集团勘察设计院有限公司 煤矿井下联络横川填充系统
CN103603689B (zh) * 2013-11-04 2015-07-08 葛洲坝集团基础工程有限公司 一种采空区处理帷幕灌浆的施工方法
CN103790597A (zh) * 2014-01-26 2014-05-14 太原理工大学 一种主动有压架后充填支护方法
CN103742190B (zh) * 2014-01-27 2015-10-07 淄博王煤矿业有限公司 料浆真空袋式多点同步充填装置及充填工艺
CN103982237A (zh) * 2014-04-09 2014-08-13 中国矿业大学 大倾角煤层条件下防止充填体滑移的方法及其结构形式
CN104453997B (zh) * 2014-10-21 2016-04-06 河南理工大学 一种煤矿沿空留巷的充填气囊隔板装置
CN104727847B (zh) * 2015-01-14 2016-11-02 中国矿业大学 充填墙体自消除的无煤柱沿空留巷方法
CN105019924B (zh) * 2015-07-30 2017-05-03 中国矿业大学 一种强力顶板支护墩柱和用于保护区段煤柱的方法
CN105736045B (zh) * 2016-04-20 2018-09-11 山东科技大学 一种控制采空区底板突水的袋式充填系统及其充填方法
CN105971669B (zh) * 2016-07-06 2018-01-12 冀中能源邯郸矿业集团有限公司 一种防止煤层自燃的采空区密封方法
CN106870001B (zh) * 2017-02-21 2019-05-21 长沙矿山研究院有限责任公司 巷道分层袋式自立充填挡墙构筑方法
CN107676131A (zh) * 2017-11-10 2018-02-09 缪协兴 一种固体废弃物装袋充填采煤方法
CN109057859B (zh) * 2018-09-14 2023-06-16 西安科技大学 一种矿井端头用模袋式浓缩充填装置及方法
CN109915138B (zh) * 2019-03-26 2021-03-30 中国矿业大学(北京) 易自燃煤层切顶自成巷无煤柱开采方法
CN111520187B (zh) * 2020-04-08 2021-06-04 中国矿业大学 一种改性eps模块复合高水密闭墙及其构筑方法
CN114109491A (zh) * 2021-11-30 2022-03-01 山西工程技术学院 一种选择保留巷道的采空区混合式充填方法和充填装置
CN114562329B (zh) * 2022-04-02 2023-03-24 中国矿业大学 非封闭覆岩注浆充填隔离方法

Also Published As

Publication number Publication date
CN101701526A (zh) 2010-05-05

Similar Documents

Publication Publication Date Title
CN101701526B (zh) 一种采空区袋式充填方法
CN101705838A (zh) 一种采空区阻隔式充填方法
CN108222938B (zh) 一种大倾角煤层采空区组合注浆充填开采方法
CN101806226B (zh) 一种采空区堤坝式充填方法
CN101967992B (zh) 薄煤层无煤柱开采不等强承载巷旁充填体
CN104564137B (zh) 双介质垛式支撑坚硬顶板的煤矿采空区处理方法及装置
CN103147793B (zh) 薄煤层巷旁充填无煤柱护巷方法
CN102777182B (zh) 大采高工作面快速末采方法
CN106014412B (zh) 一种梯式构造充填复采残采区遗留煤柱群的方法
CN103498696A (zh) 一种从顶板巷道注浆充填压实采空区充填体的方法
CN103016053A (zh) 一种采空区局部充填控制地表沉陷的方法
CN103046955A (zh) 一种大范围采空区群充填处理方法
CN109707442A (zh) 一种与割煤同步的采空区快速注浆充填袋及其采煤方法
CN101906979A (zh) 沿空留巷支护方法及其注巷滑模
CN109209490B (zh) 一种矸石充填辅助末采阶段工作面回撤方法
CN110454163B (zh) 一种综采工作面快速末采回撤及淸煤工艺
CN102852551A (zh) 一种高水材料充填柱沿空留巷方法
CN104088662A (zh) 一种固体充填采煤沿空留巷支护墙体的施工方法
CN207620844U (zh) 一种矿井高水材料填充机组
CN205277446U (zh) 一种煤矿采空区巷道支护装置
CN202851078U (zh) 一种高水材料充填柱袋体
CN103061767B (zh) 下向水平分层干式充填采矿法
CN104295315A (zh) 一种薄煤层沿空留巷方法
CN106121645A (zh) 一种台阶式构造充填复采残采区遗留煤柱群的方法
CN106150502B (zh) 一种多级梯式构造充填复采残采区遗留煤柱群的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20171105

CF01 Termination of patent right due to non-payment of annual fee