CN101695790A - 一种激光焊接方法 - Google Patents
一种激光焊接方法 Download PDFInfo
- Publication number
- CN101695790A CN101695790A CN200910110241A CN200910110241A CN101695790A CN 101695790 A CN101695790 A CN 101695790A CN 200910110241 A CN200910110241 A CN 200910110241A CN 200910110241 A CN200910110241 A CN 200910110241A CN 101695790 A CN101695790 A CN 101695790A
- Authority
- CN
- China
- Prior art keywords
- welding
- galvanized
- galvanized sheet
- laser welding
- laser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003466 welding Methods 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 26
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 claims abstract description 17
- 229910052725 zinc Inorganic materials 0.000 claims abstract description 17
- 239000011701 zinc Substances 0.000 claims abstract description 17
- 239000003517 fume Substances 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 3
- 239000010935 stainless steel Substances 0.000 abstract description 3
- 229910001220 stainless steel Inorganic materials 0.000 abstract description 3
- 239000010959 steel Substances 0.000 abstract description 3
- 229910001297 Zn alloy Inorganic materials 0.000 abstract 1
- 229910000679 solder Inorganic materials 0.000 description 8
- 238000010586 diagram Methods 0.000 description 3
- 238000009835 boiling Methods 0.000 description 2
- 238000001704 evaporation Methods 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 229910001338 liquidmetal Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Landscapes
- Laser Beam Processing (AREA)
Abstract
本发明所采用的技术方案是提供一种激光焊接方法,包括以下步骤:相对的两块钢板的相对面分别镀有锌;设置该两块镀锌板之间预留一定间隙;激光束对该两块镀锌板进行激光焊接。本发明通过将待焊接的镀锌板之间预留一定间隙,从而可使焊接过程中的锌蒸汽从该预留的间隙中排除,从而可克服因焊接工艺参数不锈钢与锌合金时易发生飞溅,造成焊点有效结合面积减小,强度下降,及整个焊接过程及强度均不稳定的问题。
Description
【技术领域】
本发明涉及一种激光焊接方法,尤其涉及焊接镀锌板的焊接。
【背景技术】
镀锌板的材料焊接,其传统加工方式一般为电阻焊,且激光束焊接相对电阻焊而言具有单面加工、结构强度增加、无电极磨损现象、焊接质量稳定、非接触式加工、柔性、焊接速度快、焊接变形小等特点受到越来越广泛的关注。但由于镀锌层的影响,在镀锌板激光搭接点焊时易产生飞溅、未焊上等焊接缺陷,严重影响焊接质量及其稳定性。
从焊接过程来分析,镀锌板激光搭接点焊的不稳定现象是由以下三个原因造成:①锌元素与铁元素熔沸点的差异过大;②激光焊接过程的迅速性;③两层镀锌板之间的锌层在焊接时处于近似封闭的空间。
【发明内容】
本发明提供一种对于镀锌板的焊接、实现焊接稳定、焊接强度的激光焊接方法。
本发明所采用的技术方案是提供一种激光焊接方法,包括以下步骤:
相对的两块钢板的相对面分别镀有锌;
设置该两块镀锌板之间预留一定间隙;
激光束对该两块镀锌板进行激光焊接。
其中,所述两块镀锌板的相对间隔一定距离。
其中,所述至少一镀锌板与相对镀锌板的相对面设置有凸点。
其中,所述至少一镀锌板与相对镀锌板的向对面设置有凸台。
其中,所述至少一镀锌板的中间设置有通气孔。
本发明通过将待焊接的镀锌板之间预留一定间隙,从而可使焊接过程中的锌蒸汽从该预留的间隙中排除,从而可克服因焊接工艺参数不锈钢与锌合金时易发生飞溅,造成焊点有效结合面积减小,强度下降,及整个焊接过程及强度均不稳定的问题。
【附图说明】
下面结合附图和实施例对本发明进一步说明。
图1为本发明激光焊接方法的示意图;
图2为图1所示的焊接方法的第一实施例的示意图;
图3为图1所示的焊接方法的第二实施例的示意图。
【具体实施方式】
发明提供一种两块镀锌板之间的激光焊接,但由于锌元素沸点(907℃)相对于铁元素的熔点(1538℃)过低,而激光焊接过程极其迅速(毫秒级),致使锌元素的蒸发与铁元素的熔化几乎同步发生,在极短的时间之内,两层镀锌板之间的镀锌层迅速蒸发形成锌蒸汽并急剧膨胀,将上板焊接熔池中的液态金属喷射出熔池形成飞溅,而焊点由于失去金属填充造成焊接有效结合面积减少,导致不能形成牢固稳定的焊点。
激光点焊之所以产生不稳定现象正是因为在焊接过程中两层镀锌板之间的镀锌层蒸发后无法及时排出而造成的。
因此,从焊接结构入手,设计焊接结构及接头使锌蒸汽在焊接的过程中能够及时地排出去,从而实现焊接的稳定,提高焊接强度。
本发明采用预置间隙的方式,即在两层镀锌板之间预留一定间隙,在焊接的过程中,锌蒸汽可从预置的间隙中排除,以达到增加焊接稳定性的目的。
如图1,第一钢板10与第二钢板20的相对面分别镀有锌11、21,通过将该两块钢板10、20之间相对间隔距离L,然后通过激光束30对该两块钢板10、20进行激光焊接,从而焊点40将该两块镀锌板10、20焊接在一起。
通过对比试验发现,预置间隙的焊接方式比直接焊接方式效果有明显的提升,由于,直接焊接时有较大颗粒飞溅的焊点达50%,而预置间隙焊接时几乎没有较大颗粒的飞溅,且焊点成型良好,焊接强度稳定。
通过在待焊接的镀锌板之间预置间隙的方式上,本发明还有其他实施例可以达成这种效果。
图2为本发明的第一实施例,通过在上镀锌板10或下镀锌板20与相对镀锌板的相对面上设置凸点50,本实施例中,在上镀锌板10的两面都设置有凸点50,这样可达到上镀锌板10与下镀锌板20不会直接贴合在一起,这样即可保证装配精度,又可达到预置间隙的目的,从而有利于激光焊接。
图3为本发明的第二实施例,通过在上镀锌板10或下镀锌板20与相对镀锌板的相对面上设置凸台60,在本实施例中,上镀锌板10的两面都设置有凸台60,且上镀锌板10的中间设置通气孔70,从而也可保证上镀锌板10与下镀锌板不会直接贴合在一起,焊接时,锌蒸汽可从中凸台60形成间隙或通气孔70中排除,这样即可保证装配精度,又可实现预置间隙的目的,并且易于实现大规模生产。
不过当在上镀锌板10的中间设置通气孔70时,当在上镀锌板10的中间设置通气孔70时,可在通气孔70的两侧设置焊点。
本发明通过将待焊接的镀锌板之间预留一定间隙,从而可使焊接过程中的锌蒸汽从该预留的间隙中排除,从而可克服因焊接工艺参数不锈钢与锌合金时易发生飞溅,造成焊点有效结合面积减小,强度下降,及整个焊接过程及强度均不稳定的问题。
Claims (5)
1.一种激光焊接方法,其特征在于,包括以下步骤:
相对的两块钢板的相对面分别镀有锌;
设置该两块镀锌板之间预留一定间隙;
激光束对该两块镀锌板进行激光焊接。
2.如权利要求1所述的激光焊接方法,其特征在于:所述两块镀锌板的相对间隔一定距离。
3.如权利要求1所述的激光焊接方法,其特征在于:所述至少一镀锌板与相对镀锌板的相对面设置有凸点。
4.如权利要求1所述的激光焊接方法,其特征在于:所述至少一镀锌板与相对镀锌板的向对面设置有凸台。
5.如权利要求1所述的激光焊接方法,其特征在于:所述至少一镀锌板的中间设置有通气孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910110241 CN101695790B (zh) | 2009-10-26 | 2009-10-26 | 一种激光焊接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910110241 CN101695790B (zh) | 2009-10-26 | 2009-10-26 | 一种激光焊接方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101695790A true CN101695790A (zh) | 2010-04-21 |
CN101695790B CN101695790B (zh) | 2013-09-04 |
Family
ID=42140935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910110241 Active CN101695790B (zh) | 2009-10-26 | 2009-10-26 | 一种激光焊接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101695790B (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102233481A (zh) * | 2010-04-28 | 2011-11-09 | 铃木株式会社 | 镀锌钢板用激光搭接焊接方法 |
CN102248297A (zh) * | 2011-06-24 | 2011-11-23 | 浙江工业大学 | 一种电梯不锈钢复合面板的单面无痕焊接方法 |
CN102922817A (zh) * | 2012-11-20 | 2013-02-13 | 无锡汉神电气有限公司 | 用于激光叠焊的镀锌板及其焊接工艺 |
CN104416287A (zh) * | 2013-08-27 | 2015-03-18 | 首都航天机械公司 | 一种W-Co硬质合金与碳钢激光焊接方法 |
CN104994988A (zh) * | 2013-02-15 | 2015-10-21 | 日产自动车株式会社 | 激光焊接方法、激光焊接装置以及焊接构件 |
CN106256471A (zh) * | 2015-06-22 | 2016-12-28 | 马自达汽车株式会社 | 金属部件的焊接方法及焊接构造 |
WO2017177411A1 (en) * | 2016-04-14 | 2017-10-19 | GM Global Technology Operations LLC | Integrated predrilling and laser spot welding of coated steels |
WO2018010132A1 (en) * | 2016-07-14 | 2018-01-18 | GM Global Technology Operations LLC | Multi-beam laser spot welding of coated steels |
CN108349045A (zh) * | 2015-11-17 | 2018-07-31 | 日产自动车株式会社 | 激光焊接方法以及激光焊接装置 |
CN108463308A (zh) * | 2016-01-18 | 2018-08-28 | 通用汽车环球科技运作有限责任公司 | 激光点焊镀层钢的方法 |
CN108890132A (zh) * | 2018-07-25 | 2018-11-27 | 亚琛联合科技(天津)有限公司 | 一种激光圆弧摆动的点焊方法 |
CN110560876A (zh) * | 2019-09-23 | 2019-12-13 | 南昌航空大学 | 一种带冷却用扰流柱结构的双层板及真空电子束加工方法 |
CN116441727A (zh) * | 2023-05-12 | 2023-07-18 | 武汉锐科光纤激光技术股份有限公司 | 激光焊接方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0178394A2 (en) * | 1984-09-20 | 1986-04-23 | PRIMA INDUSTRIE S.p.A. | Method of laser-welding sheet metal protected by low-temperature vaporizing materials |
WO2002081138A1 (en) * | 2001-04-03 | 2002-10-17 | The Regents Of The University Of Michigan | Alloy based laser welding |
JP2002331375A (ja) * | 2001-05-07 | 2002-11-19 | Nippon Steel Corp | 亜鉛めっき鋼板の重ね合わせレーザ溶接方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3515598C2 (de) * | 1985-04-30 | 1997-03-20 | Bayerische Motoren Werke Ag | Schweißverbindung zweier ein Innen- und ein Außenblech bildender Dünnbleche |
DE3812448C1 (zh) * | 1988-04-14 | 1989-06-15 | Bayerische Motoren Werke Ag, 8000 Muenchen, De | |
JP3354321B2 (ja) * | 1994-11-08 | 2002-12-09 | 統市 渡辺 | 亜鉛めっき鋼板のスポット溶接自動組付け方法 |
EP1440761B1 (de) * | 1995-11-04 | 2010-08-18 | Volkswagen AG | Verfahren zum Besäumen eines tiefgezogenen Blechteils |
-
2009
- 2009-10-26 CN CN 200910110241 patent/CN101695790B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0178394A2 (en) * | 1984-09-20 | 1986-04-23 | PRIMA INDUSTRIE S.p.A. | Method of laser-welding sheet metal protected by low-temperature vaporizing materials |
WO2002081138A1 (en) * | 2001-04-03 | 2002-10-17 | The Regents Of The University Of Michigan | Alloy based laser welding |
JP2002331375A (ja) * | 2001-05-07 | 2002-11-19 | Nippon Steel Corp | 亜鉛めっき鋼板の重ね合わせレーザ溶接方法 |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102233481A (zh) * | 2010-04-28 | 2011-11-09 | 铃木株式会社 | 镀锌钢板用激光搭接焊接方法 |
CN102233481B (zh) * | 2010-04-28 | 2014-11-05 | 铃木株式会社 | 镀锌钢板用激光搭接焊接方法 |
CN102248297A (zh) * | 2011-06-24 | 2011-11-23 | 浙江工业大学 | 一种电梯不锈钢复合面板的单面无痕焊接方法 |
CN102248297B (zh) * | 2011-06-24 | 2014-03-26 | 浙江工业大学 | 一种电梯不锈钢复合面板的单面无痕焊接方法 |
CN102922817A (zh) * | 2012-11-20 | 2013-02-13 | 无锡汉神电气有限公司 | 用于激光叠焊的镀锌板及其焊接工艺 |
CN104994988A (zh) * | 2013-02-15 | 2015-10-21 | 日产自动车株式会社 | 激光焊接方法、激光焊接装置以及焊接构件 |
US11203086B2 (en) | 2013-02-15 | 2021-12-21 | Nissan Motor Co., Ltd. | Laser welding method and laser welding device |
CN104416287A (zh) * | 2013-08-27 | 2015-03-18 | 首都航天机械公司 | 一种W-Co硬质合金与碳钢激光焊接方法 |
CN104416287B (zh) * | 2013-08-27 | 2016-08-10 | 首都航天机械公司 | 一种W-Co硬质合金与碳钢激光焊接方法 |
CN106256471A (zh) * | 2015-06-22 | 2016-12-28 | 马自达汽车株式会社 | 金属部件的焊接方法及焊接构造 |
US10421153B2 (en) | 2015-11-17 | 2019-09-24 | Nissan Motor Co., Ltd. | Laser welding method and laser welding device |
CN108349045A (zh) * | 2015-11-17 | 2018-07-31 | 日产自动车株式会社 | 激光焊接方法以及激光焊接装置 |
CN108463308A (zh) * | 2016-01-18 | 2018-08-28 | 通用汽车环球科技运作有限责任公司 | 激光点焊镀层钢的方法 |
US11077522B2 (en) | 2016-01-18 | 2021-08-03 | GM Global Technology Operations LLC | Method of laser spot welding coated steels |
CN109153097A (zh) * | 2016-04-14 | 2019-01-04 | 通用汽车环球科技运作有限责任公司 | 经涂覆的钢的集成预钻和激光点焊 |
WO2017177411A1 (en) * | 2016-04-14 | 2017-10-19 | GM Global Technology Operations LLC | Integrated predrilling and laser spot welding of coated steels |
WO2018010132A1 (en) * | 2016-07-14 | 2018-01-18 | GM Global Technology Operations LLC | Multi-beam laser spot welding of coated steels |
US11148226B2 (en) | 2016-07-14 | 2021-10-19 | GM Global Technology Operations LLC | Multi-beam laser spot welding of coated steels |
CN108890132A (zh) * | 2018-07-25 | 2018-11-27 | 亚琛联合科技(天津)有限公司 | 一种激光圆弧摆动的点焊方法 |
CN110560876A (zh) * | 2019-09-23 | 2019-12-13 | 南昌航空大学 | 一种带冷却用扰流柱结构的双层板及真空电子束加工方法 |
CN116441727A (zh) * | 2023-05-12 | 2023-07-18 | 武汉锐科光纤激光技术股份有限公司 | 激光焊接方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101695790B (zh) | 2013-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101695790B (zh) | 一种激光焊接方法 | |
JP4961532B2 (ja) | 異種金属の接合方法及び装置 | |
CN104842058A (zh) | 用于不同金属的电阻点焊的电极 | |
US10220885B2 (en) | Different material joining structure and different material joining method | |
CN101508058A (zh) | 一种镀锌钢板搭接激光焊接方法 | |
CN107350613A (zh) | 带有涂镀层的钢工件的电阻点焊工艺方法 | |
CN107442921A (zh) | 一种异种铝合金材料的电子束焊接方法 | |
CN102059439A (zh) | 异种金属板的接合方法及异种金属接合体 | |
JP2010023047A (ja) | 薄板のレーザー溶接方法 | |
CN103111741A (zh) | 一种用于降低多层板电阻点焊焊接飞溅的可控电极力方法 | |
CN104668765B (zh) | 一种消除镁合金搅拌摩擦搭接接头钩状缺陷的焊接方法 | |
CN105643103A (zh) | 一种镀锌钢板激光搭接焊接方法 | |
CN103056523A (zh) | 一种多光束激光焊接方法 | |
KR20190126098A (ko) | 저항 스폿 용접 조인트의 제조 방법 | |
CN108406071A (zh) | 一种薄板及超薄板电阻点焊连接方法 | |
WO2023065797A1 (zh) | 一种异种金属接头及其电阻焊方法 | |
CN107570866A (zh) | 一种薄板的激光焊接方法 | |
CN103831533A (zh) | 钛合金激光-mig复合焊接方法 | |
CN110834139B (zh) | 一种电阻点焊异种金属的方法 | |
CN101934432A (zh) | 激光与电阻点焊的同轴复合焊接方法 | |
CN112676688A (zh) | 一种异质金属电阻点焊方法 | |
CN107639344B (zh) | 一种镀锌钢板双光束激光叠接焊接方法与系统 | |
CN103357999A (zh) | 一种针对不匹配材料的电阻焊、螺柱焊焊接技术 | |
JP2009226425A (ja) | 異種板材のスポット溶接方法 | |
CN112570868B (zh) | 一种提高1800MPa级热成形钢电阻点焊焊点耐蚀性的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 518000 No. 9988 Shennan Road, Nanshan District, Shenzhen, Guangdong Patentee after: HAN'S LASER TECHNOLOGY INDUSTRY GROUP Co.,Ltd. Address before: 518055, the Han Dynasty laser building, No. 9 West West Road, Nanshan District hi tech park, Guangdong, Shenzhen Patentee before: HAN'S LASER TECHNOLOGY Co.,Ltd. |
|
CP03 | Change of name, title or address |