CN101694127A - Formwork support system for steel frame structure cast-in-place concrete floorslabs - Google Patents

Formwork support system for steel frame structure cast-in-place concrete floorslabs Download PDF

Info

Publication number
CN101694127A
CN101694127A CN200910154043A CN200910154043A CN101694127A CN 101694127 A CN101694127 A CN 101694127A CN 200910154043 A CN200910154043 A CN 200910154043A CN 200910154043 A CN200910154043 A CN 200910154043A CN 101694127 A CN101694127 A CN 101694127A
Authority
CN
China
Prior art keywords
steel pipe
steel
meters
shaped cross
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910154043A
Other languages
Chinese (zh)
Other versions
CN101694127B (en
Inventor
张�成
吴慧
岑迪钦
陈强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN2009101540434A priority Critical patent/CN101694127B/en
Publication of CN101694127A publication Critical patent/CN101694127A/en
Application granted granted Critical
Publication of CN101694127B publication Critical patent/CN101694127B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a formwork support system for steel frame structure cast-in-place concrete floorslabs. The formwork support system comprises I-shaped section beams, horizontal scaffold steel pipes, vertical scaffold steel pipes, steel pipe fasteners, timber formworks, tie bar steel pipes and battens; two horizontal scaffold steel pipes and a plurality of vertical scaffold steel pipes are connected by the steel pipe fasteners to form scaffold steel pipe trusses; more than two scaffold steel pipe trusses are connected with more than two tie bar steel pipes by the steel pipe fasteners; the lower ends of the scaffold steel pipe trusses are arranged on the lower flanges of the I-shaped section beams, the battens are arranged on the upper ends of the scaffold steel pipe trusses, and the timber formworks are arranged on the battens. Compared with the background art, the invention has the advantages: 1) the timber formworks are used for freely fabrication and assembly; 2) steel pipe top bracings are avoided, thereby reducing the site work load; and 3) the formworks are supported on the lower flanges of the beams, thereby providing wide working platforms for the operations of all types of work, and realizing multilayer stereo operation to further accelerate the construction progress.

Description

The formwork bracing system of steel framed structure cast-in-place concrete floor
Technical field
The present invention relates to building field, relate in particular to a kind of formwork bracing system of steel framed structure cast-in-place concrete floor.
Background technology
Multi-rise building adopts steel work, has from heavy and light, advantage such as anti-seismic performance is good, speed of application is fast, environment pollution is little, and China's multi-rise building adopts steel work more and more general.What steel framed structure application at present was more is common cast-in-place concrete floor and profiled sheet-cast-in-situ concrete composite floor.
But also there is following problem in it:
1) common cast-in-place concrete floor need be installed a large amount of the templates supports in flooring, and construction speed is slow.
2) profiled sheet need be provided with the end anchor firmware, has increased the complexity of construction.
3) if will consider the compound action of profiled sheet and concrete floor, removing needs to adopt special shape or special tectonic, to the durability of steel plate with prevent fires requirement is also arranged; Otherwise the template of steel plate during just as floor slab construction is promptly ineffective after construction is finished, and needs to consume great deal of steel.
4) profiled sheet can not bear separately and not tie hard concrete load and working load, need establish and vertically support between striding temporarily, comprises sub-truss and shores in the steel pipe of flooring, has slowed down construction speed, increases Master Cost.
Summary of the invention
The objective of the invention is to overcome the prior art deficiency, a kind of formwork bracing system of steel framed structure cast-in-place concrete floor is provided.
The formwork bracing system that is used for the steel framed structure cast-in-place concrete floor comprises i shaped cross section beam, horizontal scaffold member steel pipe, vertical scaffolding steel pipe, steel tube fastener, wooden form, tie-rod steel pipe, stupefied wood; 2 horizontal scaffold member steel pipes and the vertical scaffolding steel pipe of Duo Gen are connected to form the scaffolding steel pipe truss by steel tube fastener, the above scaffolding steel pipe truss of 2 Pin is connected by steel tube fastener with 2 above tie-rod steel pipes, scaffolding steel pipe truss lower end places the bottom flange of i shaped cross section beam, the stupefied wood of scaffolding steel pipe truss upper ends is placed wooden form on the stupefied wood.
Described two adjacent i shaped cross section case bays are during less than 3 meters, and adjacent two Pin scaffolding steel pipe truss spaces are not more than 2.5 meters; When two adjacent i shaped cross section case bays were 3 meters to 4 meters, adjacent two Pin scaffolding steel pipe truss spaces were not more than 1.5 meters; When two adjacent i shaped cross section case bays were 4 meters to 5 meters, adjacent two Pin scaffolding steel pipe truss spaces were not more than 0.9 meter.The aspect ratio i shaped cross section depth of beam of described scaffolding steel pipe truss is little 10 centimetres to 12 centimetres.Place the spacing of stupefied wood on the described horizontal scaffold member steel pipe at 20 centimetres to 30 centimetres.The upper surface of described wooden form flushes with the soffit of i shaped cross section beam top flange.
The present invention compares the beneficial effect that has with background technology:
1) adopt wooden form, it is random to make assembly unit.
2) save steel pipe and shored, reduced the site work amount.
3) template is supported on the bottom flange of beam among the present invention, for various work post operations provide spacious working platform, can the layer stereo operation, and accelerating construction progress.
Description of drawings
Fig. 1 is the sectional drawing of support arrangement;
Fig. 2 is the plan view of support arrangement;
Among the figure: i shaped cross section beam 1, horizontal scaffold member steel pipe 2, vertical scaffolding steel pipe 3, steel tube fastener 4, wooden form 5, tie-rod steel pipe 6, scaffolding steel pipe truss 7, stupefied wooden 8.
The specific embodiment
The formwork bracing system that is used for the steel framed structure cast-in-place concrete floor comprises i shaped cross section beam 1, horizontal scaffold member steel pipe 2, vertical scaffolding steel pipe 3, steel tube fastener 4, wooden form 5, tie-rod steel pipe 6, stupefied wooden 8; 2 horizontal scaffold member steel pipes 2 and the vertical scaffolding steel pipe 3 of Duo Gen are connected to form scaffolding steel pipe truss 7 by steel tube fastener 4, the above scaffolding steel pipe truss 7 of 2 Pin is connected by steel tube fastener 4 with 2 above tie-rod steel pipes 6, scaffolding steel pipe truss 7 lower ends place the bottom flange of i shaped cross section beam 1, place wooden form 5 on scaffolding steel pipe truss 7 upper ends stupefied wooden 8, stupefied wooden 8.
Described two adjacent i shaped cross section beam 1 spacings are during less than 3 meters, and adjacent two Pin scaffolding steel pipe truss, 7 spacings are not more than 2.5 meters; When two adjacent i shaped cross section beam 1 spacings were 3 meters to 4 meters, adjacent two Pin scaffolding steel pipe truss, 7 spacings were not more than 1.5 meters; When two adjacent i shaped cross section beam 1 spacings were 4 meters to 5 meters, adjacent two Pin scaffolding steel pipe truss, 7 spacings were not more than 0.9 meter.The aspect ratio i shaped cross section beam 1 of described scaffolding steel pipe truss 7 is highly little 10 centimetres to 12 centimetres.Place stupefied wooden 8 spacing on the described horizontal scaffold member steel pipe 2 at 20 centimetres to 30 centimetres.The upper surface of described wooden form 5 flushes with the soffit of i shaped cross section beam 1 top flange.
Embodiment.Be provided with a steel framed structure, i shaped cross section case bay 3m, scaffolding steel pipe rise of a truss 0.4m, spacing 2.5m.Wooden form thickness 18mm, stupefied wood adopts 50mm * 100mm, stupefied wooden spacing 300mm, modulus of elasticity of wood 10000N/mm 2, flexural strength 13N/mm 2The scaffolding steel pipe truss adopts The Q235 steel of 48 * 2mm, modulus of elasticity 2.06 * 10 5N/mm 2, intensity 215N/mm 2The dead load standard value is: template deadweight 0.3kN/m 2, the thick ordinary concrete plate of 150mm 3.6kN/m 2The mobile load standard value is: constructor and equipment 2.5kN/m 2During the supporting capacity checking computations, the design load on the template is 1.2 * 3.9+1.4 * 2.5=8.18kN/m 2, template is the one-way slabs of span 2.5m, gets the wide strip of 0.3m, its maximum stress in bend is
Figure G2009101540434D0000031
Being subjected to line load on the scaffolding steel pipe truss is 8.18 * 2.5=20.45kN/m, and span 3m bears moment of flexure by the horizontal scaffold member steel pipe, maximum stress
Figure G2009101540434D0000032
Vertical scaffolding steel pipe bears shearing, maximum stress
Figure G2009101540434D0000033
During deformation analysis, disregard shear strain, the load of template is 0.3+3.6=3.9kN/m 2, the template maximum defluxion is
Figure G2009101540434D0000034
Being subjected to line load on the scaffolding steel pipe truss is 3.9 * 2.5=9.75kN/m, scaffolding steel pipe truss maximum defluxion
Figure G2009101540434D0000035
All meet the demands.

Claims (5)

1. formwork bracing system that is used for the steel framed structure cast-in-place concrete floor is characterized in that: it comprises i shaped cross section beam (1), horizontal scaffold member steel pipe (2), vertical scaffolding steel pipe (3), steel tube fastener (4), wooden form (5), tie-rod steel pipe (6), stupefied wood (8); 2 horizontal scaffold member steel pipes (2) and many vertical scaffolding steel pipes (3) are connected to form scaffolding steel pipe truss (7) by steel tube fastener (4), the above scaffolding steel pipe truss of 2 Pin (7) are connected by steel tube fastener (4) with 2 above tie-rod steel pipes (6), scaffolding steel pipe truss (7) lower end places the bottom flange of i shaped cross section beam (1), the stupefied wood of scaffolding steel pipe truss (7) upper ends (8), stupefied wood (8) are gone up and are placed wooden form (5).
2. a kind of formwork bracing system that is used for the steel framed structure cast-in-place concrete floor according to claim 1, when it is characterized in that described two adjacent i shaped cross section beam (1) spacings less than 3 meters, adjacent two Pin scaffolding steel pipe truss (7) spacings are not more than 2.5 meters; When two adjacent i shaped cross section beam (1) spacings were 3 meters to 4 meters, adjacent two Pin scaffolding steel pipe truss (7) spacings were not more than 1.5 meters; When two adjacent i shaped cross section beam (1) spacings were 4 meters to 5 meters, adjacent two Pin scaffolding steel pipe truss (7) spacings were not more than 0.9 meter.
3. a kind of formwork bracing system that is used for the steel framed structure cast-in-place concrete floor according to claim 1 is characterized in that the aspect ratio i shaped cross section beam (1) of described scaffolding steel pipe truss (7) is highly little 10 centimetres to 12 centimetres.
4. a kind of formwork bracing system that is used for the steel framed structure cast-in-place concrete floor according to claim 1 is characterized in that the last spacing of stupefied wood (8) of placing of described horizontal scaffold member steel pipe (2) is at 20 centimetres to 30 centimetres.
5. a kind of formwork bracing system that is used for the steel framed structure cast-in-place concrete floor according to claim 1 is characterized in that the upper surface of described wooden form (5) flushes with the soffit of i shaped cross section beam (1) top flange.
CN2009101540434A 2009-10-22 2009-10-22 Formwork support system for steel frame structure cast-in-place concrete floorslabs Expired - Fee Related CN101694127B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101540434A CN101694127B (en) 2009-10-22 2009-10-22 Formwork support system for steel frame structure cast-in-place concrete floorslabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101540434A CN101694127B (en) 2009-10-22 2009-10-22 Formwork support system for steel frame structure cast-in-place concrete floorslabs

Publications (2)

Publication Number Publication Date
CN101694127A true CN101694127A (en) 2010-04-14
CN101694127B CN101694127B (en) 2011-04-06

Family

ID=42093120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101540434A Expired - Fee Related CN101694127B (en) 2009-10-22 2009-10-22 Formwork support system for steel frame structure cast-in-place concrete floorslabs

Country Status (1)

Country Link
CN (1) CN101694127B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418414A (en) * 2010-09-28 2012-04-18 杨峰 Long-slab-span prefabricated beam floor formwork system
CN102418416A (en) * 2010-09-28 2012-04-18 杨峰 Long-slab-span steel beam cast-in-situ floor formwork system
CN102720355A (en) * 2012-06-01 2012-10-10 中建三局建设工程股份有限公司 Novel steel truss concrete slab form support system
CN108442691A (en) * 2018-02-07 2018-08-24 中国核电工程有限公司 A kind of quick method for supporting of reusable floor slab construction
CN110984566A (en) * 2019-12-05 2020-04-10 中国三冶集团有限公司 Reinforced concrete rammed floor support and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1037007A (en) * 1988-04-18 1989-11-08 铁道部武汉工程机械厂 Built-up type plane frame compound template
CN2475776Y (en) * 2001-03-28 2002-02-06 张家昌 Systematic mould for high-rise concrete structure
CN2786230Y (en) * 2005-05-23 2006-06-07 方敏 Support rack and plane grid board assembled thereby
ES2303434B1 (en) * 2006-03-28 2009-06-03 Inveral, S.A. PROCEDURE FOR THE MANUFACTURE OF A UNION DEVICE FOR COOLED PANELS AND DEVICE OBTAINED ACCORDING TO SUCH PROCEDURE.
CN201071598Y (en) * 2007-08-21 2008-06-11 成都市莱达建材有限责任公司 Compound wood brace used for reinforced concrete member shaping support

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418414A (en) * 2010-09-28 2012-04-18 杨峰 Long-slab-span prefabricated beam floor formwork system
CN102418416A (en) * 2010-09-28 2012-04-18 杨峰 Long-slab-span steel beam cast-in-situ floor formwork system
CN102418416B (en) * 2010-09-28 2014-10-01 杨峰 Long-slab-span steel beam cast-in-situ floor formwork system
CN102720355A (en) * 2012-06-01 2012-10-10 中建三局建设工程股份有限公司 Novel steel truss concrete slab form support system
CN108442691A (en) * 2018-02-07 2018-08-24 中国核电工程有限公司 A kind of quick method for supporting of reusable floor slab construction
CN110984566A (en) * 2019-12-05 2020-04-10 中国三冶集团有限公司 Reinforced concrete rammed floor support and construction method

Also Published As

Publication number Publication date
CN101694127B (en) 2011-04-06

Similar Documents

Publication Publication Date Title
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN206428968U (en) A kind of steel bar girder formula is without supporting template system
CN201347598Y (en) Casting formwork component for construction
CN204040464U (en) A kind of slab form supporting construction
CN102146731B (en) Supporting structure for floor formwork of steel structure building and construction method
CN101694127B (en) Formwork support system for steel frame structure cast-in-place concrete floorslabs
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN201747060U (en) Assembly type formwork truss support
CN105649249A (en) Bidirectional profiled steel sheet and concrete composite floor slab internally provided with hollow circular steel pipes
CN111206680B (en) Combined floor system frame structure building system
CN201826526U (en) Device for supporting template of steel frame structure cast-in-situ concrete floor slab
CN102322140B (en) Supporting construction method for large-span creasing formwork
CN101435237A (en) Novel hollow combined board
CN201011127Y (en) Suspended steel wood combined template
CN101575890A (en) Girder and profiled steel sheet concrete combined floor construction method without support of hack lever
CN111677281A (en) Construction method of floor system with triangular truss easy to install
CN101701493B (en) Template support system of box type girder cast-in-place concrete floor plate of steel frame construction
CN201679227U (en) Template-supporting device of cast-in-place concrete floor slab of box-shaped beam with steel frame structure
CN208039577U (en) Half prefabricated prestressed concrete floor slab of figure of eight steel bar girder
CN112609966B (en) Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system
CN210195229U (en) Assembly type building truss girder and detachable wood formwork combination
CN203603461U (en) Floor aluminum shuttering splicing formwork structure system
CN203403668U (en) Self-supporting plate type steel bar mesh frame combination formwork
CN214329859U (en) Connecting structure of vertical wood formwork and vertical aluminum formwork
CN214302860U (en) Template system replacing steel bar truss floor support plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20131022