CN101672102B - 钢结构高空吊顶施工平台 - Google Patents

钢结构高空吊顶施工平台 Download PDF

Info

Publication number
CN101672102B
CN101672102B CN200910180517.2A CN200910180517A CN101672102B CN 101672102 B CN101672102 B CN 101672102B CN 200910180517 A CN200910180517 A CN 200910180517A CN 101672102 B CN101672102 B CN 101672102B
Authority
CN
China
Prior art keywords
platform body
platform
steel pipe
synchronous
rectangular steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910180517.2A
Other languages
English (en)
Other versions
CN101672102A (zh
Inventor
武利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN200910180517.2A priority Critical patent/CN101672102B/zh
Publication of CN101672102A publication Critical patent/CN101672102A/zh
Application granted granted Critical
Publication of CN101672102B publication Critical patent/CN101672102B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本发明涉及一种钢结构高空吊顶施工平台,包括平台体、同步提升装置、吊点悬挂装置,所述平台体为组合钢桁架结构,平台体四周设置有护栏和挡脚板,平台体上设有四个提升装置安装支架,平台体上铺设有底板,平台下设有尼龙万向轮;同步提升装置设置有总控制箱,总控制箱通过同步控制电路与提升机电机连接,四台提升机可单独动作,所述吊点悬挂装置与屋架固定,吊点悬挂装置包括U型卡环和悬挂在U型卡环内的钢丝绳,钢丝绳下设重锤。本发明的有益效果为:本发明钢结构高空吊顶施工平台,结构简单,用钢量少;采用组合式平台,尺寸可调,可适用于不同尺度的钢结构屋架,甚至可悬挂于钢筋混凝土结构顶板上。

Description

钢结构高空吊顶施工平台
技术领域
本发明涉及建筑设备领域,尤其涉及一种钢结构高空吊顶施工平台。
背景技术
现代大型公共建筑中,尤其是新建大型火车站候车大厅、机场候机大厅等,跨度和高度都很大,通常采用钢结构网架或桁架型式的屋架,并进行金属板吊顶装饰,顶棚上还有灯具等设备需要安装。要进行这些高、大空间的顶棚(含附属设备)装饰施工,通常需要搭设施工平台,通常有三种途径:方案1:落地式满堂红脚手架,采用扣件式钢管脚手架或模块式钢管脚手架,钢管和人工消耗量巨大,经济不合理,施工周期长;方案2:搭设吊挂脚手架,搭拆复杂、安全性低,施工适用性差;方案3:现场制作简易可升降施工平台,通常用卷扬机拉升就位后固定,安全性差,对结构附加荷载大。
发明内容
本发明的目的是提供一种钢结构高空吊顶施工平台,以克服现有的脚手架,钢管和人工消耗量巨大,施工周期长,搭拆复杂、安全性低,对结构附加荷载大的不足。
本发明的目的是通过以下技术方案来实现:
一种钢结构高空吊顶施工平台,包括平台体、同步提升装置和吊点悬挂装置,所述平台体为组合钢桁架结构,平台体四周设置有护栏和挡脚板,平台体上设有四个提升装置安装支架,平台体上铺设有底板,平台下设有尼龙万向轮;所述同步提升装置为四台吊篮提升机,同步提升装置设置有总控制箱,总控制箱通过同步控制电路与提升机电机连接,四台提升机可单独动作,同步提升装置设置有钢丝绳同步提升限位开关、限位块和吊篮用摆臂式安全锁;所述吊点悬挂装置与屋架固定,吊点悬挂装置包括U型卡环和悬挂在U型卡环内的钢丝绳,钢丝绳下设重锤。
所述平台体由四角基本单元和中间可调换单元通过高强螺栓组合而成,四角基本单元和中间可调换单元均由边框矩形钢管桁架和中间龙骨焊接而成,所述底板铺设在矩形钢管桁架边框龙骨和中间龙骨上。
所述边框矩形钢管桁架的上下弦杆和两侧立杆采用50*40*2矩形钢管,腹杆采用25*25*2(长*宽*壁厚)矩形钢管,中间龙骨为40*40*2矩形钢管,所述底板为1.5mm厚穿孔钢板,穿孔率30%。
本发明的有益效果为:本发明钢结构高空吊顶施工平台,结构简单,用钢量少;采用组合式平台,尺寸可调,可适用不同的尺度的钢结构屋架,甚至可悬挂于钢筋混凝土结构顶板上。使用时,只需将吊点钢丝绳悬挂在钢屋架节点处或可受荷处,便可电动升降,升到预定高度便可进行屋架下吊顶或设备安装等施工作业,不仅可节约大量脚手架费用,而且可节约施工工期。以某大型火车站工程为例,吊顶面积60000平方米,平均高度20米,采用本发明的方案要比搭设满堂架的方案节约经济效益600万元,节约工期30天,并且实现一个工程投入,多个工程受益。
附图说明
图1是本发明所述钢结构高空吊顶施工平台的结构示意图;
图2是本发明所述钢结构高空吊顶施工平台平台体的结构示意图;
图3是本发明所述钢结构高空吊顶施工平台平台体的结构俯视图。
图中:1、平台体;2、同步提升装置;3、吊篮用摆臂式安全锁;4、护栏;5、挡脚板;6、提升装置安装支架;7、钢丝绳同步提升限位开关;8、限位块;9、吊点悬挂装置;10、钢丝绳;11、底板;12、重锤;13、尼龙万向轮;14、四角基本单元;15、中间可调换单元;16、边框矩形钢管桁架;17、中间龙骨;18、屋架;19、U型卡环。
具体实施方式
如图1-3所示,本发明所述的一种钢结构高空吊顶施工平台,包括平台体1、同步提升装置2、吊点悬挂装置9,所述平台体1为组合钢桁架结构,平台体1四周设置有护栏4和挡脚板5,平台体上设有四个提升装置安装支架6,平台体1上铺设有底板11,平台下设有尼龙万向轮13;所述同步提升装置2为四台800型吊篮提升机,同步提升装置2设置有总控制箱,总控制箱通过同步控制电路与提升机电机连接,四台提升机可单独动作,同步提升装置2设置有钢丝绳同步提升限位开关7、限位块8和吊篮用摆臂式安全锁3;所述吊点悬挂装置9与屋架18固定,吊点悬挂装置9包括U型卡环19和悬挂在U型卡环内的钢丝绳10,钢丝绳10下设有重锤12。
所述平台体1由四角基本单元14和中间可调换单元15通过高强螺栓组合而成,四角基本单元14和中间可调换单元15均由边框矩形钢管桁架16和中间龙骨17焊接而成,所述底板11铺设在矩形钢管桁架边框龙骨和中间龙骨17上。
所述边框矩形钢管桁架16的上下弦杆和两侧立杆采用50*40*2矩形钢管,腹杆采用25*25*2矩形钢管,中间龙骨17为40*40*2矩形钢管,所述底板11为1.5mm厚穿孔钢板,穿孔率30%。
本发明钢结构高空吊顶施工平台,其中的钢结构平台体也可以用C型钢或矩形钢管等制成;面板也可为铝合金板或轻质复合板;平台的组合尺寸根据现场需要和承载的屋架特性进行确定,基本单元和中间可调换单元的制作考虑了可连接性和组合性。在使用时,先在作业面附近组装好平台并移动到作业面下方,高处特种作业人员将提升钢丝绳和安全钢丝绳悬挂在屋架18节点处(或其他受力点)并挂好人员安全绳,施工人员在平台上操控平台升到合适位置即可进行顶棚装饰施工或进行安装作业。变换工作面时,只需将平台降至地面、松开钢丝绳并移到下一工作面下方,高处特种作业人员解开钢丝绳并在下一工作面处重新悬挂钢丝绳即可。作业时,施工人员必须挂好安全带。一个工程结束后,平台可拆卸解体,方便转场运输。

Claims (3)

1.一种钢结构高空吊顶施工平台,包括平台体(1)、同步提升装置(2)、吊点悬挂装置(9),其特征在于:所述平台体(1)为组合钢桁架结构,平台体(1)四周设置有护栏(4)和挡脚板(5),平台体上设置有四个提升装置安装支架(6),平台体(1)上铺设有底板(11),平台体(1)下设有尼龙万向轮(13);所述同步提升装置(2)为四台吊篮提升机,同步提升装置(2)设置有总控制箱,总控制箱通过同步控制电路与提升机电机连接,四台提升机可单独动作,同步提升装置(2)设置有钢丝绳同步提升限位开关(7)、限位块(8)和吊篮用摆臂式安全锁(3);所述吊点悬挂装置(9)与屋架(18)固定,吊点悬挂装置(9)包括U型卡环(19)和悬挂在U型卡环(19)内的钢丝绳(10),钢丝绳(10)下设有重锤(12);所述平台体(1)由四角基本单元(14)和中间可调换单元(15)通过高强螺栓组合形成,四角基本单元(14)和中间可调换单元(15)均由边框矩形钢管桁架(16)和中间龙骨(17)焊接而成,所述底板(11)铺设在矩形钢管桁架(16)边框龙骨和中间龙骨(17)上。
2.根据权利要求1所述的钢结构高空吊顶施工平台,其特征在于:所述边框矩形钢管桁架(16)的上下弦杆和两侧立杆采用50*40*2矩形钢管,腹杆采用25*25*2矩形钢管,中间龙骨(17)为40*40*2矩形钢管,底板(11)为1.5mm厚穿孔钢板,穿孔率30%。
3.根据权利要求1所述的钢结构高空吊顶施工平台,其特征在于:所述同步提升装置(2)为四台800型吊篮提升机。
CN200910180517.2A 2009-10-19 2009-10-19 钢结构高空吊顶施工平台 Active CN101672102B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910180517.2A CN101672102B (zh) 2009-10-19 2009-10-19 钢结构高空吊顶施工平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910180517.2A CN101672102B (zh) 2009-10-19 2009-10-19 钢结构高空吊顶施工平台

Publications (2)

Publication Number Publication Date
CN101672102A CN101672102A (zh) 2010-03-17
CN101672102B true CN101672102B (zh) 2015-03-04

Family

ID=42019487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910180517.2A Active CN101672102B (zh) 2009-10-19 2009-10-19 钢结构高空吊顶施工平台

Country Status (1)

Country Link
CN (1) CN101672102B (zh)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852008A (zh) * 2010-06-04 2010-10-06 刘玉伟 一种升降脚手架装置
CN102409838B (zh) * 2011-08-22 2014-05-28 中国建筑第八工程局有限公司 移动操作平台
CN102392532B (zh) * 2011-10-28 2013-05-29 山东万鑫建设有限公司 高耸构筑物内置悬空脚手架施工方法
CN102817468A (zh) * 2012-08-15 2012-12-12 中建钢构有限公司 便携可拆卸式型钢操作平台
CN103603486B (zh) * 2013-10-30 2016-01-13 北京工业大学 一种自适应角度自爬升施工平台
CN104358393A (zh) * 2014-10-24 2015-02-18 中铁航空港建设集团北京有限公司 一种高空吊挂水平移动平台
CN104499729B (zh) * 2014-11-28 2016-12-07 芜湖银星汽车零部件有限公司 一种拆卸台
CN104989094B (zh) * 2015-07-06 2017-04-19 上海中建八局装饰有限责任公司 行走吊篮安装方法
CN105386593B (zh) * 2015-12-08 2018-06-29 上海市机械施工集团有限公司 吊挂式操作平台及施工方法
CN106049846B (zh) * 2016-07-15 2018-04-06 上海市安装工程集团有限公司 一种防倾斜施工平台及其使用方法
CN106049848B (zh) * 2016-07-15 2018-04-06 上海市安装工程集团有限公司 一种可调式防晃移动平台及其安装方法
CN106049843B (zh) * 2016-07-15 2018-04-06 上海市安装工程集团有限公司 一种悬挂式防晃施工平台及其安装方法
CN106522565A (zh) * 2016-11-16 2017-03-22 上海通用金属结构工程有限公司 一种钢结构屋面吊顶板施工用操作平台
CN106437179A (zh) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 一种钢结构屋面吊顶板施工用装置
CN107246139B (zh) * 2017-03-02 2019-06-07 中国建筑第七工程局有限公司 一种建筑工程高空作业的吊篮
CN106760468A (zh) * 2017-03-06 2017-05-31 辽宁科技大学 一种建筑工地使用的悬吊平台
CN108691420A (zh) * 2017-04-10 2018-10-23 五冶集团上海有限公司 一种檩条暗藏式双层屋面压型钢板底层板的安装方法
CN107827043A (zh) * 2017-11-09 2018-03-23 海阳龙凤热电有限公司 节能环保的吊篮
CN108222453A (zh) * 2018-02-07 2018-06-29 中建三局第三建设工程有限责任公司 高空大跨度异型吊顶施工装置及方法
CN112112413A (zh) * 2019-06-21 2020-12-22 无锡雄宇集团吊蓝机械制造有限公司 自锁式吊篮重锤
CN110593116A (zh) * 2019-09-27 2019-12-20 中交一公局集团有限公司 一种适用于钢桥施工的高空作业平台装置
CN112431399A (zh) * 2020-11-16 2021-03-02 中山志特铝模科技有限公司 一种建筑外墙用吊篮及其安装方法
CN115095128B (zh) * 2022-07-04 2023-12-22 上海建工集团股份有限公司 一种超高层核心筒泵管检修方法
CN115450413A (zh) * 2022-08-01 2022-12-09 上海二十冶建设有限公司 一种基于施工吊篮搭建的高空悬挑吊顶屋面施工装置
CN115450414A (zh) * 2022-09-29 2022-12-09 中国二十二冶集团有限公司 外墙施工用吊篮的重锤位置分散的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0332748A2 (en) * 1988-03-17 1989-09-20 Figgie International Inc. Platform module for suspending in space
CN2758369Y (zh) * 2004-12-20 2006-02-15 武汉市金泉绿色科技有限公司 机械传动高空作业吊篮
CN2849025Y (zh) * 2005-09-28 2006-12-20 沈阳瑞科节能工程有限公司 手摇式升降吊篮
CN101200975A (zh) * 2007-11-26 2008-06-18 通州建总集团有限公司 高空桥式悬移脚手架
CN201162337Y (zh) * 2008-03-12 2008-12-10 曾凡清 可调式悬崖安全作业舱

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0332748A2 (en) * 1988-03-17 1989-09-20 Figgie International Inc. Platform module for suspending in space
CN2758369Y (zh) * 2004-12-20 2006-02-15 武汉市金泉绿色科技有限公司 机械传动高空作业吊篮
CN2849025Y (zh) * 2005-09-28 2006-12-20 沈阳瑞科节能工程有限公司 手摇式升降吊篮
CN101200975A (zh) * 2007-11-26 2008-06-18 通州建总集团有限公司 高空桥式悬移脚手架
CN201162337Y (zh) * 2008-03-12 2008-12-10 曾凡清 可调式悬崖安全作业舱

Also Published As

Publication number Publication date
CN101672102A (zh) 2010-03-17

Similar Documents

Publication Publication Date Title
CN101672102B (zh) 钢结构高空吊顶施工平台
CN108979131B (zh) 一种高层建筑施工钢模板及操作架整体提升平台装置
CN201144515Y (zh) 钢结构高空施工平台
CN213268983U (zh) 一种自爬升卸料平台
CN110258352A (zh) 两跨连做的钢混组合桥梁施工方法
CN210635627U (zh) 一种用于外墙装饰的大型吊运机
CN108286332A (zh) 一种过混凝土凌空梁自爬升整体式筒架体系及施工方法
CN209456892U (zh) 斜拉桥钢悬挑人行道结构
CN104153586A (zh) 一种用悬索吊来安装檩条的施工方法
CN201908447U (zh) 一种升降式安全平网
CN202441045U (zh) 导轨式电动附着升降脚手架
CN209585654U (zh) 附着式升降卸料平台
CN107013013A (zh) 一种钢结构电梯井道标准节吊装工装与工艺
CN201460186U (zh) 附着升降脚手架
CN203021921U (zh) 拼装式挂架系统
CN111997345B (zh) 一种升降脚手架倒挂提升系统
CN2494860Y (zh) 挑梁支承式升降脚手架
CN204754150U (zh) 盘型节点式脚手架
CN113445723A (zh) 一种用于悬挑结构幕墙安装的施工平台及安装方法
CN103225390B (zh) 中空立面滑轮导座式附着升降脚手架
CN208934392U (zh) 建筑施工用模架
CN208122299U (zh) 一种过混凝土凌空梁自爬升整体式筒架体系
CN207244453U (zh) 一种悬索桥轻型锚碇门架装置
CN206328690U (zh) 一种大高差、大跨度劲性骨架外包混凝土模板施工设备
CN207484991U (zh) 一种玻璃幕墙单轨道吊装结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180626

Address after: 100040 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Co-patentee after: China Railway Construction Group Beijing Engineering Co., Ltd.

Patentee after: Zhongtie Construction Group Corporation Limited

Address before: No. 1 Wu Jia Village Road, Fengtai District, Beijing

Patentee before: Zhongtie Construction Group Corporation Limited