CN101672017A - Electric hanging bracket with traveling right-handed wheel - Google Patents
Electric hanging bracket with traveling right-handed wheel Download PDFInfo
- Publication number
- CN101672017A CN101672017A CN200910184618A CN200910184618A CN101672017A CN 101672017 A CN101672017 A CN 101672017A CN 200910184618 A CN200910184618 A CN 200910184618A CN 200910184618 A CN200910184618 A CN 200910184618A CN 101672017 A CN101672017 A CN 101672017A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- hanging bracket
- handed
- traveling
- pressing wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The invention relates to a hanging bracket for pouring bridges and cantilevers, in particular to an electric hanging bracket with a traveling right-handed wheel. The hanging bracket adopts the right-handed pressing wheel machine traveling mode and is driven by an electric winch. A traveling device comprises one or more right-handed pressing wheel machines. The right-handed pressing wheel machinesare connected with anchor rods embedded on the bridge deck by connectors. Rollers of the right-handed pressing wheel machines are welded in a chute on the hanging bracket and roll but not move along with the hanging bracket. A set of electric winches and a set of angle pulley blocks are respectively arranged on each of two longitudinal girders of the hanging bracket to serve as drive systems for moving the hanging bracket. The hanging bracket does not need to balance weights, does not need traveling tracks and features lighter dead weight, lower cost, easy and simple operation, low labor intensity and high efficiency.
Description
Technical field
The present invention relates to a kind of bridge cantilever pouring Hanging Basket, especially do not have balance ballast Hanging Basket.
Background technology
Firm structure of prestressed concrete or continuous girder bridge adopt the cast-in-place method of sections sections ground cantilever to construct, and each sections links up by reinforcing bar and prestressing force steel hinge line.Cantilever pouring concrete and prestress engineering all carry out on Hanging Basket.After a sections was finished, Hanging Basket needed cantilever running to arrive the continuation construction of next position, and so circulation is carried out, until last sections.
The cantilever pouring Hanging Basket adopts the Hanging Basket of no balance ballast at present mostly, under the situation particularly big in bridge span, that wind load is big, in order to alleviate the weight of Hanging Basket, can only adopt the Hanging Basket of no balance ballast to carry out cantilever construction.Hanging Basket needs cantilever and the load of playing is walked to walk to next position and continued operation after finishing the building of a beam section, therefore, during the Hanging Basket walking, the problem of must solution toppling forward.At present, the left-hand thread wheel mode is all adopted in the walking of known no balance ballast Hanging Basket, and the left-hand thread wheel is connected the Hanging Basket rear end and fastens the edge of a wing that is anchored at the track on the bridge floor.During the Hanging Basket walking, the left-hand thread wheel moves and fastens the edge of a wing of track and topples to prevent Hanging Basket with Hanging Basket, and behind stroke of traveling, the track of the back of dismantling is installed on it the place ahead again and walks on for Hanging Basket.This left-hand thread wheel mode, track must be arranged, this track is very heavy, not only need the transportation that manufactures and designs of the time-consuming expense material of taking a lot of work to install, and dismounting and transporting repeatedly also in the course of the work, every installation once all will be jack-uped Hanging Basket heavy walking road can be filled in Hanging Basket longeron below, and labour intensity is big, speed is low, but also has unsafe factor.The type of drive of existing Hanging Basket has hydraulic pressure, electronic and manual mode, but all takes turns away line mode at left-hand thread.
Summary of the invention
In order to overcome the deficiency of above-mentioned Hanging Basket, the invention provides a kind of electric hanging bracket with traveling right-handed wheel.This Hanging Basket adopts electric winch to drive, and right hand thread pinch rollers is adopted in walking, need not the balance ballast, also need not the track of walking.
The present invention is achieved by the following technical programs: cover electric winch and an angle pulley group respectively is set, the drive system that moves as Hanging Basket on two longerons of Hanging Basket.
The present invention also is achieved by the following technical programs: running gear comprises one or more right hand thread pinch rollers.Right hand thread pinch rollers is connected with embedded anchor bar on being embedded in bridge floor with connector, rolls in the chute of the roller of right hand thread pinch rollers on being welded in Hanging Basket but does not move with Hanging Basket.
The invention has the beneficial effects as follows:
● Hanging Basket need not the balance ballast, also need not walking rails, conduct oneself with dignity lighter, cost is lower, and is easy and simple to handle, labour intensity is low, efficient is high.
● electric winch and assembly pulley are the standing instrument equipment of unit in charge of construction, and Hanging Basket drives and adopts hoist system, can improve utilization rate of equipment and installations; Hoist engine and assembly pulley also are the standard devices of using always, purchase convenient and swift, even the therefore also very easy acquisition of cash purchase.
Description of drawings
Fig. 1-Hanging Basket front view (schematic diagram)
Fig. 2-Hanging Basket vertical view (schematic diagram)
Fig. 3-Hanging Basket left view (schematic diagram)
I enlarged drawing among Fig. 4-Fig. 1 (right hand thread pinch rollers front view)
II enlarged drawing among Fig. 5-Fig. 3 (right hand thread pinch rollers left view)
Before Fig. 6-Hanging Basket moves, the relative position schematic diagram of right hand thread pinch rollers and Hanging Basket
After Fig. 7-Hanging Basket moves into place, the relative position schematic diagram of right hand thread pinch rollers and Hanging Basket
Component part numbers among the figure is as follows:
1-Hanging Basket spandrel girder;
2-Running System (Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5): 21-right hand thread pinch rollers, 22-chute, 23-bridge floor embedded anchor bar, 24-cushion block, 211-anchor pole, 212-nut, 213-backing plate, 214-bearing pin; The 215-balancing stand, 216-turning rolls, 217-roller, 218-connector;
3-drives system (Fig. 1, Fig. 2): 31-electric winch, 32-angle pulley group; The pre-buried anchor ring of 33-;
4-hangs system.
The specific embodiment
Hanging Basket mainly is made up of spandrel girder (1), Running System (2), driving system (3), suspension system (4) and anchor device.Drive system (3) and Running System (2) and be used for driving the Hanging Basket walking, and the overturning moment of balance Hanging Basket when walking.The overturning moment of Hanging Basket when cantilever pouring come balance with anchor device.
Drive (3) (Fig. 1, the Fig. 2) of system and form, angle pulley group (32) is used for Hanging Basket position counteragent when accurately adjusting by hoist engine (31), angle pulley group (32) and pre-buried anchor ring (33).Driving system (3) has two cover drive units, is installed on respectively on two longerons.
Running System (2) (Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5) is made up of some right hand thread pinch rollers (21), chute (22), bridge floor embedded anchor bar (23) and cushion block (24), pressing wheel device (21) is connected on the bridge floor embedded anchor bar (23) with connector, the roller of pressing wheel device (21) rolls in chute (22), chute is welded on the longeron of Hanging Basket, when Hanging Basket moves, the Hanging Basket longeron is gone up at cushion block (24) and is slided, chute (22) moves with Hanging Basket, and the roller of pressing wheel device (21) rolls in chute (22).When drive unit drove the Hanging Basket walking, right hand thread pinch rollers (21) was rolled on the Hanging Basket longeron but is not moved.After Hanging Basket walking puts in place and finishes a beam section construction of bridge, take being connected of embedded anchor bar (23) on right hand thread pinch rollers (21) and the bridge apart, carry out next working cycles.Embedded anchor bar (23) can replace with bridge vertical prestressing reinforcing bar, also can adopt the fining twisted steel reinforcing bar to be embedded in bridge floor in advance.
Right hand thread pinch rollers (21) (Fig. 4, Fig. 5) by anchor pole (211), nut (212), backing plate (213), pivot pin (214), balancing stand (215), turning rolls (216), roller (217), connector (218) is formed, roller (217) is installed on the turning rolls (216), turning rolls (216) is connected with pivot pin (214) with balancing stand (215), the through hole that anchor pole (211) passes on the balancing stand (215) is connected with bridge embedded anchor bar (23) with connector (218), anchor pole (211) upper end is fixed on the balancing stand (215) with nut (612) and backing plate (213), during the Hanging Basket walking, roller (217) rolls in chute (22) but does not move.
Hanging Basket work mainly contains two states, and one is the concreting state, and one is walking states.At the concreting state, earlier end basket, external mold and the internal mold of Hanging Basket are adjusted to the right place by hanging system (4), with anchor device with the rear end anchoring temporarily of Hanging Basket on bridge floor, can carry out the Bridge Beam section then and construct.When Hanging Basket moves, remove anchor device earlier, with the wire rope rope of hoist engine on the pre-buried anchor ring in bridge floor the place ahead (33), starting hoist engine can spur Hanging Basket and move ahead, when need fall back in accurate adjustment Hanging Basket position, the wire rope of hoist engine is tied up to the rear by angle pulley group (32) can be realized.Concrete walking step is as follows:
1. at the middle part of Hanging Basket longeron right hand thread pinch rollers (21) is installed, its anchor pole is connected (Fig. 6) with bridge floor embedded anchor bar (23);
2. start hoist engine, drive the Hanging Basket walking and arrive new position, right hand thread pinch rollers (21) motionless in position (Fig. 7);
3. after the construction of concrete beam section finishes, take being connected of right hand thread pinch rollers (21) and bridge floor embedded anchor bar (23) apart, and promote right hand thread pinch rollers (21) and arrive anterior position along chute (22) rolling;
4. once more right hand thread pinch rollers (21) is connected with the embedded anchor bar (23) of bridge floor reposition;
5. start hoist engine once more, drive Hanging Basket walking row and arrive another new position, carry out another new working cycles.
Claims (3)
1. electric hanging bracket with traveling right-handed wheel, mainly form by spandrel girder (1), Running System (2), driving system (3), suspension system (4) and anchor device, it is characterized in that, Running System (2) is made up of right hand thread pinch rollers (21), chute (22), bridge floor embedded anchor bar (23) and cushion block (24), pressing wheel device (21) is connected on the bridge floor embedded anchor bar (23) with connector, roll in the chute (22) of the roller of pressing wheel device (21) on being welded in the Hanging Basket longeron, when Hanging Basket moved, the Hanging Basket longeron was gone up at cushion block (24) and is slided.
2. the described electric hanging bracket with traveling right-handed wheel of claim 1, it is characterized in that driving system (3) is made up of hoist engine (31), angle pulley group (32) and pre-buried anchor ring (33), drive system (3) two cover drive units are arranged, be installed on respectively on two longerons, the wire rope of hoist engine (31) is tethered on the pre-buried anchor ring (33) on the bridge of the place ahead.
3. the described electric hanging bracket with traveling right-handed wheel of claim 1, it is characterized in that right hand thread pinch rollers (21) is installed on the longeron of Hanging Basket, by anchor pole (211), nut (212), backing plate (213), pivot pin (214), balancing stand (215), turning rolls (216), roller (217), connector (218) is formed, roller (217) is installed on the turning rolls (216), turning rolls (216) is connected with pivot pin (214) with balancing stand (215), the through hole that anchor pole (211) passes on the balancing stand (215) is connected with bridge embedded anchor bar (23) with connector (218), anchor pole (211) upper end is fixed on the balancing stand (215) with nut (612) and backing plate (213), during the Hanging Basket walking, roller (217) rolls in chute (22) but does not move.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910184618A CN101672017A (en) | 2009-08-27 | 2009-08-27 | Electric hanging bracket with traveling right-handed wheel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910184618A CN101672017A (en) | 2009-08-27 | 2009-08-27 | Electric hanging bracket with traveling right-handed wheel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101672017A true CN101672017A (en) | 2010-03-17 |
Family
ID=42019408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910184618A Pending CN101672017A (en) | 2009-08-27 | 2009-08-27 | Electric hanging bracket with traveling right-handed wheel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101672017A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102174795A (en) * | 2011-03-28 | 2011-09-07 | 中铁一局集团有限公司 | Reversible suspended basket wheel type travelling system and method |
CN107130526A (en) * | 2017-05-17 | 2017-09-05 | 贵州路桥集团有限公司 | A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket |
CN111042005A (en) * | 2020-01-16 | 2020-04-21 | 中建七局安装工程有限公司 | Construction method for cantilever casting of corrugated steel web diagonal box girder bridge by hanging basket method |
CN113882281A (en) * | 2021-11-16 | 2022-01-04 | 中国建筑第四工程局有限公司 | Hanging basket walking system for bridge cantilever construction and operation method |
-
2009
- 2009-08-27 CN CN200910184618A patent/CN101672017A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102174795A (en) * | 2011-03-28 | 2011-09-07 | 中铁一局集团有限公司 | Reversible suspended basket wheel type travelling system and method |
CN107130526A (en) * | 2017-05-17 | 2017-09-05 | 贵州路桥集团有限公司 | A kind of Hanging Basket uses the traveling method of this device with towed running gear and Hanging Basket |
CN111042005A (en) * | 2020-01-16 | 2020-04-21 | 中建七局安装工程有限公司 | Construction method for cantilever casting of corrugated steel web diagonal box girder bridge by hanging basket method |
CN111042005B (en) * | 2020-01-16 | 2022-02-01 | 中建七局安装工程有限公司 | Construction method for cantilever casting of corrugated steel web diagonal box girder bridge by hanging basket method |
CN113882281A (en) * | 2021-11-16 | 2022-01-04 | 中国建筑第四工程局有限公司 | Hanging basket walking system for bridge cantilever construction and operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101672018B (en) | Trackless hanging bracket with traveling truss | |
CN101586330B (en) | Receding construction method of cradle of continuous girder bridge made of prestressing concrete | |
CN101260650B (en) | 50m/1430t double width integral box girder construction process | |
CN101935987B (en) | Construction method for integrally sliding large-span steel pipe arch of curved bridge | |
CN102261039B (en) | Integral thrusting construction method of network tied arch bridge | |
CN111926720B (en) | Construction method suitable for continuous steel-structure cantilever beam closure in loess area | |
CN201003145Y (en) | Upward and self-walking type mobile die carrier | |
CN101672013A (en) | Cable-stayed bailey hanging bracket without balance weight | |
CN101736703B (en) | 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN110820602A (en) | Single-segment box girder bridge girder erection machine and operation method thereof | |
CN101935984B (en) | Traveling device of frame beam crane of steel truss girder of cable-stayed bridge and use method thereof | |
CN105239510A (en) | Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method | |
CN2597531Y (en) | Single rope face tracting rope hanging cage | |
CN110656570A (en) | Telescopic pedestrian bridge, construction device and construction method | |
CN110453613A (en) | A kind of cantilever method construction of Large span girder bridge box beam tunneling boring | |
CN203393639U (en) | Diamond self-anchored hanging basket for road and bridge construction | |
CN101672017A (en) | Electric hanging bracket with traveling right-handed wheel | |
CN110409318B (en) | Assembling and erecting method for large-span simply-supported steel-concrete composite beam | |
CN209456892U (en) | Cable-stayed bridge steel overhangs structure of sidewalk | |
CN101672012B (en) | Trackless right-handed wheel cantilever running technology | |
CN201526013U (en) | Positive sprocket wheel walking type cradle | |
CN208533370U (en) | A kind of Bridge Erector of large span steel reinforced concrete combination beam erection construction | |
CN103806374B (en) | The overall track erection supplying system of assembly type steel bridge on highway and erection push technique | |
CN101698989B (en) | Hydralic right hand thread wheel cradle without balance weight |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100317 |