CN101654144B - Method for removing enteromorpha from round haul seines on surface layers of two ships - Google Patents
Method for removing enteromorpha from round haul seines on surface layers of two ships Download PDFInfo
- Publication number
- CN101654144B CN101654144B CN2008100418182A CN200810041818A CN101654144B CN 101654144 B CN101654144 B CN 101654144B CN 2008100418182 A CN2008100418182 A CN 2008100418182A CN 200810041818 A CN200810041818 A CN 200810041818A CN 101654144 B CN101654144 B CN 101654144B
- Authority
- CN
- China
- Prior art keywords
- trawlnet
- keed
- enteromorpha
- length
- workboat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The invention discloses a method for removing enteromorpha from round haul seines on surface layers of two ships, and relates to a technique for removing the enteromorpha, wherein in the technique, a method for removing the enteromorpha is required to be provided. The method is provided with a round haul seine work ship and a netting gear, and is characterized in that the length (meter) of a round haul seine is approximately equal to the power (KW) of the work ship multiplied by 0.36; the middle part of the round haul seine is provided with a cod end; a float line of the round haul seine adopts a light cable with the material specific gravity of about 1, a ground rope uses an iron chain, and the length ratio of the float line to the ground rope is 1:0.98; and the work ship provided with the round haul seine adopts against current operation, and the towing speed is 1.5 to 2.0 sections. The method is suitable for removing the enteromorpha on the offshore surface layer water surfaces.
Description
Technical field:
The present invention relates to enclose trawlnet and remove water surface Enteromorpha technology with the double boat surface layer.
Background technology
The Enteromorpha of removing at present top layer, the coastal waters water surface generally adopts containment boom, block and ship to choose net etc. and tackles and salvage.Containment boom, block and ship are chosen net in removing the Enteromorpha process, though can play the effect of blocking collection and salvaging, but the influence that wind-engaging, stream and Enteromorpha constantly gather, Enteromorpha overflows from the upper and lower of containment boom, hurdle net in a large number, make some Enteromorphas flow to the bank, adding goes on board chooses net and is subjected to the netting gear capacity limitation, and the unit net that Enteromorpha is salvaged time output is limited, and it is lower to remove big water surface Enteromorpha effect and work efficiency.
Summary of the invention
The technical issues that need to address of the present invention provide a kind of method that can enclose trawlnet (following narration abbreviation encloses trawlnet) removing Enteromorpha at the coastal waters double boat surface layer that the different capacity workboat uses.
Technical scheme of the present invention is equipped with workboat and netting gear, the power of workboat is 220KW (300 horsepowers) or 294KW (400 horsepowers), 441KW (600 horsepowers), 588KW (800 horsepowers), 735KW (1000 horsepowers), it is characterized in that workboat adopts the trawlnet that encloses of 6 meters of body height, enclose length (rice) the ≈ workboat power (KW) * 0.36 of trawlnet, 100 millimeters of mesh size; In the middle part of enclosing trawlnet 1~3 length being set is 30 meters, the keed of back of the body abdomen symmetry, symmetrical four-piece type structure, the keed back of the body or abdomen forward position are 200 orders, close by foldable ratio of joining and body net sheet 120 sighting slits, along being 75 orders, the side net forward position of keed is 100 orders, closes by foldable ratio of joining and body height 75 sighting slits behind the keed back of the body or the abdomen, the edge is 30 orders behind the keed side net, 60 millimeters of the mesh size of keed; Headline and ground rope length ratio are 1: 0.98, and enclosing the Float trawlnet guiding principle is that material proportion is about 1 lightweight hawser, and ground rope is joined iron chains; Workboat is equipped with this trawlnet top stream operation of enclosing, towed speed 1.5~2.0 joints.
The present invention encloses trawlnet and drifts along than being 3: 1 owing to the netting gear that trawlnet combines that encloses of workboat adapted particular design, and 60% of gross buoyancy is distributed in the network interface part, and netting gear is fully bubbled through the water column, and it is bigger to overcome stormy waves, the many slightly shortcomings of just overflowing and raising to the higher plane of principle of Enteromorpha; Sinker and float produce each component in the towing of removing the Enteromorpha operation, and the vertical dimension of netting gear is given full play to, and prevent that Enteromorpha from spilling from net bottom, can tackle and collect Enteromorpha effectively, are specially adapted to remove the operation of water surface Enteromorpha; With existing containment boom, block fixation facility interception Enteromorpha and choose net with ship and salvage the sweep-out method of Enteromorpha and compare, this method not only all can be implemented initiatively operation to the Enteromorpha that floats on intensive Enteromorpha in sea and dispersion in a large number, and can become hundred times to improve removing Enteromorpha work efficiency, have the operation effectiveness of " catching all in one draft ".
Description of drawings
Fig. 1 represents is that the netting gear that Enteromorpha encloses trawlnet is always schemed;
What Fig. 1-1 represented is the side net of keed.
What Fig. 2 represented is the netting gear assembly drowing that Enteromorpha encloses trawlnet.
What Fig. 3 represented is to enclose the scheme drawing that drags the operation incipient stage.
Fig. 4 represents is to enclose the scheme drawing that Enteromorpha in the trawlnet gathers operation.
What Fig. 5 represented is the Enteromorpha scheme drawing that lifts by crane, unloads in the fortune keed.
The specific embodiment
Be example with the used trawlnet that encloses of 441KW workboat below, accompanying drawings the specific embodiment of the present invention: the order that encloses trawlnet that this method is equipped with is big 100 millimeters, height order number is 75 orders, 25, the 50 expression body height order numbers that marked in the scale line of the left side among Fig. 1, Fig. 2; Several 25, the 50 cooresponding netting lengths of body height order are respectively 2.5 meters, 5.0 meters, and its vertical hanging ratio is 0.80; (expression is made up of 5 stitchings among Fig. 2 for (net sheet upper lateral marks among Fig. 1) 2500 orders to determine to enclose trawlnet length order number by the Power x 0.36 of workboat, every length of a film 500 orders), enclosing the horizontal hanging ratio of trawlnet is 0.64, the 1-3 (Fig. 1, Fig. 2) of body two ends (position that promptly is equivalent to wing under the trawlnet) mark is the cutting slope, and its hypotenuse hanging ratio is 1.85.
Fig. 1 represents to adorn 3 keeds in the middle of the body, and the order of keed net sheet is big 60 millimeters, and keed length order number is 500,30 meters of netting lengths; Keed is sewed up by four net sheets of back of the body abdomen [(1) among Fig. 1] symmetry, left and right sides net [(2) among Fig. 1-1] symmetry and is constituted, and the 8-1 among Fig. 1 is the back of the body or abdomen (1) the cutting slope of keed; 14-1 among Fig. 1-1 is keed side net (a 2) cutting slope; The net sheet material is a polyethylene; The keed back of the body or abdomen (1) forward position are that 200 orders and body net sheet 120 order meshes are sewed up by the foldable ratio of joining, the order number on the keed back of the body or edge, abdomen (1) back is 75 orders, the order number in keed side net (2) forward position is that 75 orders of 100 orders and body net sheet short transverse are sewed up by foldable ratio of joining and body net sheet, and the order number on edge, keed side net (2) back is 30 orders.
Headline polyethylene and polypropylene blending rope, φ 24mm, length is 160 meters; Ground rope φ 18mm steel rope, length is 156.8 meters, the sinker iron chains of φ 12mm, length is 156.8 meters; The side guiding principle adopts φ 18mm polyethylene rope, 6 meters of length.
The workboat that trawlnet is enclosed in outfit arrives at the floating sea area Hou Ding of Enteromorpha and banishes net, and two ship spacings are about 250 meters, and towing speed is about about 1.8 joints; When Enteromorpha drags when collecting a certain amount of, two ships progressively reduce the distance, and towing speed is about about 1.5 joints; When Enteromorpha gathers in the keed when a certain amount of, two ships are shut down top stream hauling, are sling behind the keed by drag operation ship or barge, and the Enteromorpha that the pull drawline will gather in the keed is discharged into cabin.Through evidence, every group job per hour can be removed 20~100 tons of Enteromorphas to ship, reaches rapidly and efficiently to remove the effect that floats on the sea Enteromorpha.
Claims (2)
1. the double boat surface layer encloses trawlnet removing sea sedge method, be equipped with workboat and netting gear, the power of workboat is 300 horsepowers or 400 horsepowers, 600 horsepowers, 800 horsepowers, 1000 horsepowers, it is characterized in that workboat adopts the trawlnet that encloses of 6 meters of body height, enclose numerical value * 0.36 of numerical value ≈ workboat power of the length of trawlnet, the unit of length of enclosing trawlnet in above-mentioned expression formula is: rice, and the unit of workboat power is: KW, 100 millimeters of mesh size; In the middle part of enclosing trawlnet 1~3 length being set is 30 meters, the keed of back of the body abdomen symmetry, symmetrical four-piece type structure, the keed back of the body or abdomen forward position are 200 orders, close by foldable ratio of joining and body net sheet 120 sighting slits, along being 75 orders, the side net forward position of keed is 100 orders, closes by foldable ratio of joining and body height 75 sighting slits behind the keed back of the body or the abdomen, the edge is 30 orders behind the keed side net, 60 millimeters of the mesh size of keed; Headline and ground rope length ratio are 1: 0.98, and enclosing the Float trawlnet guiding principle is that material proportion is about 1 lightweight hawser, and ground rope is joined iron chains; Workboat is equipped with this trawlnet top stream operation of enclosing, towed speed 1.5~2.0 joints.
2. double boat surface layer according to claim 1 encloses trawlnet and removes the sea sedge method, and it is characterized in that enclosing the Float trawlnet guiding principle is Φ 24mm, 160 meters polyethylenes of length and polypropylene blending rope, ground rope is Φ 18mm, 156.8 meters steel ropes of length, the length of iron chains is 156.8 meters, Φ 12mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100418182A CN101654144B (en) | 2008-08-18 | 2008-08-18 | Method for removing enteromorpha from round haul seines on surface layers of two ships |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100418182A CN101654144B (en) | 2008-08-18 | 2008-08-18 | Method for removing enteromorpha from round haul seines on surface layers of two ships |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101654144A CN101654144A (en) | 2010-02-24 |
CN101654144B true CN101654144B (en) | 2011-12-07 |
Family
ID=41708649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100418182A Expired - Fee Related CN101654144B (en) | 2008-08-18 | 2008-08-18 | Method for removing enteromorpha from round haul seines on surface layers of two ships |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101654144B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102172235A (en) * | 2011-03-15 | 2011-09-07 | 浙江省海洋水产养殖研究所 | Method for removing enteromorpha in pond |
CN102626573B (en) * | 2012-03-27 | 2015-04-22 | 绍兴文理学院 | Filter composite layer and filter blocking net, and application method thereof |
CN103993588B (en) * | 2013-02-17 | 2016-10-26 | 上海城投原水有限公司青草沙水库管理分公司 | A kind of water head site Hu Ku filters algae net |
CN110886279A (en) * | 2019-11-26 | 2020-03-17 | 无锡德林海环保科技股份有限公司 | Intelligent blue algae enrichment robot on water |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2671338Y (en) * | 2003-12-29 | 2005-01-19 | 中国水产科学研究院东海水产研究所 | Double boat surface and middle layer rope trawl |
CN1620865A (en) * | 2003-11-24 | 2005-06-01 | 中国水产科学研究院东海水产研究所 | Sail type net mouth scissoring and assembling method |
CN201258472Y (en) * | 2008-08-18 | 2009-06-17 | 中国水产科学研究院东海水产研究所 | Surface purse net for removing alga at offshore surface |
-
2008
- 2008-08-18 CN CN2008100418182A patent/CN101654144B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1620865A (en) * | 2003-11-24 | 2005-06-01 | 中国水产科学研究院东海水产研究所 | Sail type net mouth scissoring and assembling method |
CN2671338Y (en) * | 2003-12-29 | 2005-01-19 | 中国水产科学研究院东海水产研究所 | Double boat surface and middle layer rope trawl |
CN201258472Y (en) * | 2008-08-18 | 2009-06-17 | 中国水产科学研究院东海水产研究所 | Surface purse net for removing alga at offshore surface |
Non-Patent Citations (2)
Title |
---|
刘永利等.双船表层浒苔围拖网实船试验报告.《现代渔业信息》.2009,第24卷(第12期),第14-15页. * |
陈雪忠等.片式中层拖网主要部件尺寸变化对其性能的影响.《水产学报》.1997,第21卷(第1期),第49-56页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101654144A (en) | 2010-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8025460B2 (en) | Ocean oil spill and contaminated sea ice containment, separation and removal system | |
CN109736254B (en) | High dam comprehensive fish passing facility and fish passing method thereof | |
US3653510A (en) | Oil skimming method and apparatus | |
CN101654144B (en) | Method for removing enteromorpha from round haul seines on surface layers of two ships | |
CN108487180B (en) | Plant ecological floating breakwater | |
KR20090011975A (en) | Apparatus for collection of floating waste on water surface | |
CN2932992Y (en) | Sampling trawl for Antarctic krill | |
WO2011156550A1 (en) | Systems and methods for recovering oil from water | |
KR102137352B1 (en) | Floating Object Collection Ship | |
KR200393486Y1 (en) | floating trash salvage vessel | |
CN105691583A (en) | Centralized treatment platform for ship ballast water | |
CN109042284A (en) | A kind of mooring gear suitable for the plantation of deep water seaweed | |
CN105484220A (en) | Oil containment type oil absorption drag fence | |
CN106522180B (en) | Water surface floater intercepting device | |
CN205329662U (en) | Enclose oily formula oil absorption drag bar | |
JP5946083B2 (en) | Ship net | |
CN114108706B (en) | Marine foundation erodees multiple protection system | |
JP5270711B2 (en) | How to transplant coral communities | |
CN214420670U (en) | Floating fan and mussel farm integrated system | |
CN108496904A (en) | River mouth subtidal zone biological monitoring net and its building method | |
CN201258472Y (en) | Surface purse net for removing alga at offshore surface | |
CN208462757U (en) | River mouth subtidal zone biological monitoring net | |
CN209873693U (en) | High dam comprehensive fish passing facility | |
CN208917805U (en) | River sea offshore estuary source rubbish intercepts and collects serial control system | |
CN112829890A (en) | Floating fan and mussel farm integrated system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |