CN101649732A - 不动防砂管柱再次防砂工艺 - Google Patents

不动防砂管柱再次防砂工艺 Download PDF

Info

Publication number
CN101649732A
CN101649732A CN200910018230A CN200910018230A CN101649732A CN 101649732 A CN101649732 A CN 101649732A CN 200910018230 A CN200910018230 A CN 200910018230A CN 200910018230 A CN200910018230 A CN 200910018230A CN 101649732 A CN101649732 A CN 101649732A
Authority
CN
China
Prior art keywords
sand
pipe
sand control
packer
blanking plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910018230A
Other languages
English (en)
Inventor
高国强
谢文献
吕建海
周广军
马清明
李力
袁杰
王福兵
滕腾
程军
许建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Shengli Oil Extraction Plant
Original Assignee
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Shengli Oil Extraction Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Shengli Oilfield Co Shengli Oil Extraction Plant filed Critical China Petroleum and Chemical Corp
Priority to CN200910018230A priority Critical patent/CN101649732A/zh
Publication of CN101649732A publication Critical patent/CN101649732A/zh
Pending legal-status Critical Current

Links

Images

Abstract

一种不动防砂管柱再次防砂工艺,先向油井套管内下入防砂管柱,经充填工具向地层和井筒内充填砾石,然后使铅封密封套管,充填工具与铅封脱开,起出充填工具,需要再次防砂时,下打捞器取出铅封,下入油管,油管下部带封隔器、堵塞器,堵塞器堵住联通管出口,堵塞器、封隔器之间有联通孔,使封隔器座封,经油管、联通孔向地层和井筒内挤入砾石,挤满砾石后,取出油管、封隔器、堵塞器,再将铅封安装在联通管内部出口之上,不需要将防砂管柱全部取出再重新下入防砂管柱进行重新防砂,实现了不动防砂管柱再次防砂,减少了捞取原防砂管柱的工作,作业工序少,大大减少防砂费用和防砂时间,缩短了油井停产,具有显著的经济效益。

Description

不动防砂管柱再次防砂工艺
技术领域
本发明是油田油井防砂工艺,是一种不动防砂管柱再次防砂工艺。
背景技术
绕丝筛管砾石充填防砂后的油井在生产一段时间后,环空充填砾石由于受到井下流体波及或稠油井注汽的影响,充填砾石经过了防砂初期的四点接触演变为六点接触,炮眼周围的砾石架桥力减弱,导致部分或全部井筒环空充填砾石进入地层,从而使得第一级挡砂屏障失去阻挡地层砂的作用。目前出现这种挡砂层遭破坏后就将防砂管柱全部取出再重新下入防砂管柱进行重新防砂。由于取出防砂管柱较困难,所以,这种防砂工艺需要几十万的防砂费用,防砂作业工序多,作业时间长,油井停产时间长,经济损失大。
发明内容
本发明的目的是提供一种不动防砂管柱再次防砂工艺,减少作业工序,减少防砂费用,缩短油井停产时间。
本发明的目的是这样实现的:先向油井套管内下入防砂管柱,管柱上包括充填工具、铅封、联通管、挡砂筛管,经充填工具向地层和井筒内充填砾石,然后使铅封密封套管,充填工具与铅封脱开,起出充填工具,需要再次防砂时,下打捞器取出铅封,下入油管,油管下部带封隔器、堵塞器,堵塞器堵住联通管上内部出口,堵塞器、封隔器之间有联通孔,使封隔器座封,经油管、联通孔向地层和井筒内挤入砾石,挤满砾石后,取出油管、封隔器、堵塞器,再下入安装铅封的管柱,将铅封安装在联通管内部出口之上。
本发明的有益效果是:不需要将防砂管柱全部取出再重新下入防砂管柱进行重新防砂,实现了不动防砂管柱再次防砂,减少了捞取原防砂管柱的工作,作业工序少,大大减少防砂费用和防砂时间,缩短了油井停产,具有显著的经济效益。
附图说明
附图1是现有防砂后的生产防砂管柱图。
附图2是本发明进行再次防砂时的管柱图。
具体实施方式
下面结合附图对本发明实施例进行说明。
先向油井套管1内下入防砂管柱,管柱上包括充填工具、铅封2、联通管3、挡砂筛管4,充填工具、铅封2为一体。经充填工具向地层5和井筒内充填砾石6,然后使铅封2受压使其外径扩大密封套管1,充填工具与铅封2脱开,起出充填工具,井内为如图1所示的管柱,油井就可开井生产,在铅封2作用下,井液从地层5,经砾石6、挡砂筛管4进入油管3内流至井内被抽油泵采出(图1中没有画出抽油泵)。油井生产一定时间后,充填的砾石6架桥力减弱,导致部分或全部井筒环空充填砾石进入地层,从而使得挡砂屏障失去阻挡地层砂的作用需要再次防砂,需要再次防砂时,下打捞器取出铅封2,再下入油管7,油管7下部带封隔器8、堵塞器9,堵塞器9堵住联通管3上内部出口,堵塞器9、封隔器8之间有联通孔10,使封隔器8座封,经油管7、联通孔10向地层5和井筒内挤入砾石6,挤满砾石6后,取出油管7、封隔器8、堵塞器9,再下入安装铅封2的管柱,将铅封2安装在联通管3内部出口之上,就可再次开井生产。
挡砂筛管4为绕丝筛管。

Claims (1)

1、一种不动防砂管柱再次防砂工艺,先向油井套管(1)内下入防砂管柱,管柱上包括充填工具、铅封(2)、联通管(3)、挡砂筛管(4),经充填工具向地层(5)和井筒内充填砾石(6),然后使铅封(2)密封套管(1),充填工具与铅封2脱开,起出充填工具,其特征是:需要再次防砂时,下打捞器取出铅封(2),下入油管(7),油管(7)下部带封隔器(8)、堵塞器(9),堵塞器(9)堵住联通管(3)上内部出口,堵塞器(9)、封隔器(8)之间有联通孔(10),使封隔器(8)座封,经油管(7)、联通孔(10)向地层(5)和井筒内挤入砾石(6),挤满砾石(6)后,取出油管(7)、封隔器(8)、堵塞器(9),再下入安装铅封(2)的管柱,将铅封(2)安装在联通管(3)内部出口之上。
CN200910018230A 2009-08-31 2009-08-31 不动防砂管柱再次防砂工艺 Pending CN101649732A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910018230A CN101649732A (zh) 2009-08-31 2009-08-31 不动防砂管柱再次防砂工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910018230A CN101649732A (zh) 2009-08-31 2009-08-31 不动防砂管柱再次防砂工艺

Publications (1)

Publication Number Publication Date
CN101649732A true CN101649732A (zh) 2010-02-17

Family

ID=41672042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910018230A Pending CN101649732A (zh) 2009-08-31 2009-08-31 不动防砂管柱再次防砂工艺

Country Status (1)

Country Link
CN (1) CN101649732A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906954A (zh) * 2010-08-05 2010-12-08 中国石油化工股份有限公司 分层防砂分层采油一体化管柱
CN104632130A (zh) * 2014-12-03 2015-05-20 中国庆华能源集团有限公司 大修井完井工艺
CN105986785A (zh) * 2015-02-11 2016-10-05 中国石油化工股份有限公司 一种混纤维分级充填防砂工艺方法
CN114109315A (zh) * 2021-12-02 2022-03-01 中国地质大学(武汉) 一种提高储层注采能力的石油开采方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906954A (zh) * 2010-08-05 2010-12-08 中国石油化工股份有限公司 分层防砂分层采油一体化管柱
CN104632130A (zh) * 2014-12-03 2015-05-20 中国庆华能源集团有限公司 大修井完井工艺
CN105986785A (zh) * 2015-02-11 2016-10-05 中国石油化工股份有限公司 一种混纤维分级充填防砂工艺方法
CN114109315A (zh) * 2021-12-02 2022-03-01 中国地质大学(武汉) 一种提高储层注采能力的石油开采方法

Similar Documents

Publication Publication Date Title
CN109296349B (zh) 活塞式延时开启趾端滑套
RU2374431C2 (ru) Способ сооружения гравийного фильтра
CN203655249U (zh) 一种地浸采铀工艺井
CN204703876U (zh) 一种桥式同心分注管柱
CN103452531B (zh) 欠平衡下油管、不压井气举、转抽、检泵和检修油管的方法
CN104100237B (zh) 一种煤层气井的排采方法
CN101649732A (zh) 不动防砂管柱再次防砂工艺
CN201810292U (zh) 分层注水工艺管柱
CN103775022B (zh) 一种首次高压坐封后可低压重复坐封的多功能封隔器
CN201013335Y (zh) 注水井带压作业工艺管柱
CN103388469A (zh) 充填工具
CN201292800Y (zh) 一种六级分支井窗口密封机构
CN109138932A (zh) 一种直井充填结合化学封隔体分段控水完井方法
CN204327048U (zh) 一种泄压阀及使用该泄压阀的洗井管柱
CN104695914B (zh) 水平井管内分段高压充填防砂管柱
CN203515494U (zh) 一种双套管单泵分层控压合层排采设备
CN203716920U (zh) 一种首次高压坐封后可低压重复坐封的多功能封隔器
CN105298443A (zh) 油管浮阀及欠平衡完井下油管防喷、气举和压裂联作方法
CN202851052U (zh) 瓦斯抽采钻孔延时自膨胀胶囊-膏体组合封孔装置
CN108533234A (zh) 水平井不动管柱分段充填及配套工具
CN210858651U (zh) 一种带压作业的可溶解专用油管桥塞
WO2021022909A1 (zh) 堆积封隔颗粒实现自堵水的方法、自堵水管柱和完井结构
CN201474622U (zh) 开放式防砂管柱
CN202544815U (zh) 一种用于深抽工艺井的可排气管柱
CN111963111A (zh) 疏松低渗裸眼水平井充填防砂和分段压裂一体化工艺方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100217